This document provides details for a federal solicitation seeking construction services for the establishment of NAVAIDS facilities at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, materials, and equipment to perform the project in accordance with contract requirements, drawings, and specifications. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Interested firms must demonstrate successful completion of similar projects both in dollar amount and scope of work at operational airports. Offers are due by October 7, 2020. Responses must include documentation of past performance, financial capability, insurance coverage, bonding confirmation, and a small business subcontracting plan. The solicitation is being conducted by the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ld r-g .d g n
/2
/2
:3
:0
A
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A m in
8"8"2 c l.
PAVEMENT
BITUMINOUS
8"
2"
PAVEMENT
BITUMINOUS
8"
13"
6"
18"
10" 31" 10"
10"
7’-6"
5’-5"
DIRECTION (TYP.)
NO. 4 BARS ON 7 CTS. EACH
U BAR
APPROVED EQUAL
NEENAH R4990-FX FRAME OR
OR APPROVED EQUAL
NEENAH R4990-FX FRAME
33"
3’-6"
4’-6"
22"
SEE DETAIL A
u bars
CL
u bars
4% 8.3%
AGGREGATE PAD
u1 u2 u3 u4 u5 u6
CAST FRAME
A-A
B-B
A
NOT TO SCALE
DETAIL
NOT TO SCALE
B-B
SECTION
BAR u
BARS u1, u2 & u5
BARS u3, u4 & u6
NOT TO SCALE
A-A
SECTION
u3, u4 or u6 bars bars u1, u2 or u5 bars or u4 u3 bars u1, u2 or u5 cl.
1 1/2" cl.
1 1/2"
TYPICAL PLAN
DRAIN
CONNECT TO NEAREST
PER ORD-D-ALD-G020 OR
OUTLET TO SIDE SLOPE
STORM DRAIN, 12" DIA
FOR OVERALL LENGTH
REFER TO SITE PLAN
M
IN
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
07/24/2019 1898272
ORD-D-ALD09R-G024
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALD
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ld r-g .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
RUNWAY 9R-27L NAVAIDS
TRENCH DRAIN DETAILS
RC
| 2020-07-02T13:27:01-0500 | |
| RAFAEL CRAME |
| 2020-07-09T13:25:19-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .