ord-d-als27l-e011.pdf
PDF 280 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This document includes a federal solicitation for construction services and a related federal contract opportunity. The solicitation is for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, materials, equipment, and supervision to perform the project in accordance with contract clauses, drawings, and specifications. The performance period is 605 calendar days, with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Offerors must have experience with similar airport construction projects of comparable size and scope. Offers are due by October 7, 2020. Interested firms must submit documentation including past performance, schedule, insurance, bonding, and subcontracting plans meeting the requirements specified. The federal agency is the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ls l-e .d g n
/2
/2
:0
:4
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
SEE NOTE 5
HEATER
BLOCK
RELAY
RUN
B A
T T
E R
Y
S/N
E
G
3P, 400A*
*100% RATED
3P, 400A*
G
GLIDE SLOPE SHELTER. SEE DWG E027C
DISTRIBUTION TO RUNWAY 10R
DISCONNECT SWITCH FOR
TO STEP-UP TRANSFORMER
CONTROL BOX
POWER AND
VENTILATION
D-5
CHARGER
BATTERY
D-6
STOP SWITCH
REMOTE EMERGENCY
C-12
CONTROL PANEL
LOAD BANK
D-8
LOAD BANK
D-7
SWITCH, 400A
AND BYPASS ISOLATION
AUTOMATIC TRANSFER
D-2
CABINET
AND MONITOR
CONTROL
E/G REMOTE
D-11
SEE NOTE 3
WIRING DETAIL
SEE LOAD BANK CONTROL OTHERS)
(BY
HOST
FUTURE
3P
225A
3P
100A
3P
70A
SPARE
2P
100A
* 100% RATED
2P
70A
2P
30A
2P
40A
SPARE
D-20
400A *
SPD
S/N
100A MAIN
GROUND BUSNEUTRAL BUS
SWITCH D-23
DISCONNECT
100A
OUTPUT, 37.5 KVA
60 HZ, 120/240V SECONDARY
480V, PRIMARY INPUT, 1 PHASE
TRANSFORMER, D-3:
20A
20A
20A
20A
20A
20A
20A
30A
30A
20A
20A
30A
30A
20A
20A
20A
20A
20A
20A
20A
20A
20A
20A
20A
20A
35A
20A
20A
20A
20A
20A
BA
MAIN
100A
GROUND BUSNEUTRAL BUS
30A
30A
35A
20A
20A
20A
20A
SPD
S/N
SWITCH D-19
DISCONNECT
100A
GND
LOAD BANK DISCONNECT SWITCH, D-4
INSTALLATION PERSONNEL
CONTROL WIRES BY FAA
400A, 480/277V, 3-PHASE, 4-WIRE
NAVAIDS DISTRIBUTION PANEL, D-20
POWER AND CONTROL ONE-LINE DIAGRAM GENERATOR ROOM PANEL BOARD, D-16
LOCALIZER ROOM DIST. PANEL E-3
SERVICE DISCONNECT, SEE SHEET E010
FOR CONTINUATION TO INCOMING UTILITY
ROOM DISCONNECT SWITCH C-8
CABLES CONTINUE TO REGULATOR
1/0 AWG GROUND#
THREE 500 KCMIL AND
1/0 AWG GREEN GROUND#AND
FOUR 500 KCMIL TYPE THHN/THWN
1/0 AWG THHN/THHW GROUND#
THREE 500 KCMIL AND
4 AWG GND#1-1/C
+4/0 AWG#4-1/C
GROUND WIRE
6 AWG THWN GREEN
2 AWG THWN AND#THREE
1/0 GROUND#1
(4) 500 KCMIL AND
2 U.S.E.#MIN.
MANUFACTURER’S INSTRUCTIONS.
3W,RAYCAP, RAYVOSS. WIRE PER
SURGE ARRESTER, E-14, 1-PHASE,
6 THWN GREEN GROUND#
2 AWG THWN AND #3-
2 U.S.E.#MIN.
WIRE PER MANUFACTURER’S INSTRUCTIONS.
RAYCAP MODEL RAYVOSS 277-3Y-N1-7-06-C-H.
SURGE ARRESTER, D-10A, 3-POLE, 4 WIRE,
SEE NOTE 5
SEE NOTE 2.
GROUNDING CONDUCTOR.
4/0 AWG THWN GREEN
SEE NOTE 8
12 AWG THWN GROUND
TWO 12 AWG THWN AND
250KW
ENGINE/GENERATOR
D-1
SEE NOTE 9
SEE NOTE 10
SPARE
(SEE NOTE 12)
DAY TANK
D-9
TANK MONITORING SYSTEM
VEEDER ROOT FUEL
D-17
3000 CONTROLLER
DECISION MAKER
6 GND, THWN#
1-1/C +2 #2-1/C
THWN GROUND
12 AWG#12 AWG THWN AND #TWO
12 AWG THWN GROUND#
12 AWG THWN AND #TWO
2 U.S.E.#MIN.
MANUFACTURER’S INSTRUCTIONS.
3W, RAYCAP, RAYVOSS. WIRE PER
SURGE ARRESTER, D-10B, 1-PHASE,
THWN
12 AWG#FOUR
SEE NOTE 11)
THWN
12 AWG#TWO
BYPASSBYPASS
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-ALS27L-E011
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALS
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ls l-e .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
RUNWAY 27L ALSF-2 / 9R LOCALIZER
PARTIAL SCHEMATIC DIAGRAM
LOCALIZER AND ENG/GEN
KE
NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
OF DAY TANK.
SEE MANUFACTURER’S INSTALLATION INSTRUCTIONS FOR WIRING
TBF-1 AND TBF-2. SEE MANUFACTURER’S INSTRUCTIONS FOR DETAILS.
INSIDE THE AUTOMATIC TRANSFER SWITCH ON TERMINAL
3000 CONTROLLER. TERMINATE THE OTHERS END OF THE CONDUCTORS
3 AND 4 ON TERMINAL STRIP TB3 INSIDE THE DECISION MAKER
TERMINATE THE CONDUCTORS ON TERMINALS
CONDUCTORS ON 2-POLE 20A CIRCUIT BREAKER
THE BLOCK HEATHER IS 240 WATS AND 2500 WATS. TERMINATED
DISTRIBUTOR INSTALL THE RUN RELAY.
THE LOCAL KOHLER DISTRIBUTOR AND HAVE THE LOCAL KOHLER
THE CONTRACTOR SHALL PURCHASE THE RUN RELAY FROM
MANUFACTURER’S INSTRUCTION, FOR DETAILS.
STRIP TB3 INSIDE THE DECISION MAKER 3000 CONTROLLER. SEE
TERMINATE THE CONNECTORS ON TERMINALS 1 AND 1A ON TERMINAL
UNLESS SHOWN OTHERWISE.
SPARE CIRCUIT BREAKERS, MINIMUM 20 AMP, SINGLE POLE
ALL UNUSED PANELBOARD SPACES SHALL BE FILLED WITH
BE STRANDED.
ALL WIRE CONNECTED TO THE ENGINE GENERATOR SHALL
FOR PANELBOARD SCHEDULE SEE DWG E003.
REQUIREMENTS.
SHALL BE SIZED AND INSTALLED PER MANUFACTURER’S
SURGE ARRESTER WIRES AND CIRCUIT BREAKERS/FUSE
FAA DIRECTION.
DRAWING TO BE LOCATED WITHIN ALSF SHELTER PER
OF THIS DRAWING MOUNTED UNDER PROTECTIVE COVERING.
CONTRACTOR TO PROVIDE AN "AS-BUILT" 11"X17" COPY
SPECIFICATIONS, AND COMED REQUIREMENTS.
USING AN EXOTHERMIC WELD TO A GROUND ROD PER
AWG BARE COPPER PERIMETER GROUNDING CONDUCTOR
CONNECT GROUNDING CONDUCTOR TO SUBSTATION 4/0
CT AROUND THE HIGHEST LOADED PHASE.
SHALL INPUT TO THE LOAD BANK AS SHOWN. PLACE THE
CURRENT TRANSFORMER (CT), SUPPLIED WITH LOAD BANK,
RC
| 2020-07-02T14:04:58-0500 | |
| RAFAEL CRAME |
| 2020-07-09T15:48:12-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .