About this file

This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with contract clauses, drawings, and specifications, with a performance time of 605 calendar days and an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5,000,000 to $10,000,000. Interested firms must demonstrate successful completion of similar projects both in dollar amount and scope of work at operational airports. Offers must be submitted by October 7, 2020 and include documentation of past experience, ability to meet the specified construction schedule and insurance requirements, bonding capability, and a small business subcontracting plan. Technical questions must be submitted in writing by the proposal deadline.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls l-c .d g n

/2

/2

:3

:1

P

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

SCALE: 1/2" = 1’-0"

SOUTH WALL OF REGULATOR ROOM

ELEVATION

GROUNDING PLATE

TO MULTI-POINT

2" CONDUIT

C-17

HVAC-2

SCALE: 1/2" = 1’-0"

NORTH WALL OF REGULATOR ROOM

ELEVATION

8" SQ. DUCT FOR CTRL AND GROUNDING CABLES ONLY, 12’-0" LONG

A-23R

C-10

C-1

C-5

T-2

2’-6"8’-4 7/8" 2’-7" 3’-7" 3’-7" 3’-0" 2’-9" 3’-0" 3’-6" 2’-9" 2’-0"

1’-0"

9" 8" 1’-0" 9"2’-1" 9" 2’-3" 1’-8" 6" 2’-1" 9" 2’-8" 1’-0" 1’-9" 2’-0" 1’-0" 9" 9" 9" 9" 1’-2" 10" 6"6"6"

2" CONDUIT TO

CCR NO. 1 THRU CCR NO. 5

FLASHERS

TO

TO A-23E

2" CONDUITCCR NO. 1 THRU CCR NO. 5

2" CONDUIT TO

(5" SP.)

4" CONDUIT

MC-1

2" CONDUIT

TO DIST. PANEL, D-20

C-8

C-8A

C-12 C-2

C-6

C-7

POWER CABLES, 5’-0" LONG

8" SQUARE DUCT FOR

4"x4"

NOTE 2

SEE

HVAC-1

B-5

STATION, C-14

FLASHER TEST

FE

EXIT

B-5

"7

MAIN GROUNDING PLATE

ELECTRONIC

CAUTION

CAUTION

DANGER

C-9

C-11

EXIT

FE

C-18

IN THIS SQUARE DUCT

SHALL BE INSTALLED

GROUNDING CONDUCTORS

ONLY POWER AND

ON REAR WALL

SQUARE DUCT

2" CONDUIT TO

2-2" CONDUIT WITH FLASHER CONTROL CABLE

CABLE JUNCTION BOX, A-23E

2" CONDUIT TO CONTROL

CABLE JUNCTION BOX, E-11

2" CONDUIT TO CONTROL

CONDUCTOR. SEE NOTE 1.

PERIMETER GROUNDING

1" CONDUIT TO

TO COUNTERPOISE

2" CONDUIT

DUCT

6" SQUARE

UNISRUT (TYP)

P1000 GALVANIZED

BY CONTRACTOR)

INSTALLED

(PROVIDED AND

SHUT-OFF SWITCH

E/G EMERGENCY

REMOTE

IN 1" CONDUIT

GROUNDING CONDUCTOR

2/0 AWG THWN GREEN

PANEL

CONTROL

TO E/G

TYPICAL)

(SEE NOTE 10,

3" CONDUIT

MAINTENANCE CONCRETE PADS (TYP)

(TYP)

2" EMT

NOTE 1

SEE

C-13, 1" SCH80 PVC

OUTPUT CABINET, C-4

CABLES TO HIGH VOLTAGE

2" CONDUIT WITH CONTROL

(TYPICAL)

CABLE J-BOX

CONTROL

4" X 4" X 2"

WALL (TYPICAL)

THE EXTERIOR

UNIT C-18 ON

THRU WALL TO

1" GRS NIPPLE

CABLES

CONTROL

CONDUIT FOR

3/4" EMT

CIRCUIT IN PANEL C-6

WIRE TO HVAC-1 AND HVAC-2

2 #6 AND 1 #6 INSULATED GREEN

NOTE

SEE

POWER

FOR

CABLES

CONDUIT

3/4" EMT

NEMA 1 J-BOX (TYPICAL)

6" X 6" X 4"

HVAC UNITS

TYPICAL AT

UNIT C-18, NEMA 3R,

DISCONNECT SWITCH,

CABLES

CONTROL

CONDUIT FOR

3/4" EMT

UPS

FED FROM

(TYP. OF 2)

20A REC.

EM LT

EM LT

CONDUIT (SPARE WITH PULL CORD)

OUTPUT CABINET, C-4 1-2"

CABLES FROM HIGH VOLTAGE

8 5KV LOOP POWER #2-1/C

6-2" CONDUIT-EACH WITH

SEE NOTE 10

DISTRIBUTION PANEL, C-6,

2" CONDUIT FROM POWER

DUCT

6" SQUARE

(TYPICAL)

RECEPTACLE

120V

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS27L-C009

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

o rd -d -a ls l-c .d g n

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

1.

2.

NEMA 1 ENCLOSURE.

INSTALL POWER SURGE ARRESTER, RV-1 (GFM) FOR DISTRIBUTION PANEL, C-6 IN 15" X 12" X 4", 3.

FOR CONNECTION (BY FAA INSTALLATION REPRESENTATIVES)

AND 12 AWG GROUND IN CONDUITS. LEAVE 3’ COIL OF EACH CONDUCTOR IN JUNCTION BOX

INSTALL JUNCTION BOXES AT LOCATIONS SHOWN AND INSTALL 2-1/C 12 AWG THWN POWER

4.

EXPANSION ANCHORS.

SECURE FLOOR-MOUNTED EQUIPMENT TO CONCRETE FLOOR USING 3/8" X 5" STEEL

5.

TERMINATED BY FAA INSTALLATION PERSONNEL

INSIDE BUILDING. CONDUIT WILL BE CUT TO REQUIRED LENGTH AND CONDUCTOR WILL BE

GROUNDING CONDUCTOR USING EXOTHERMIC WELD AND LEAVE 2’ OF CONDUCTOR COILED

TRACER HIGH ENERGY GROUNDING CONDUCTOR. BOND END OF CONDUCTOR TO PERIMETER

INSTALL 1" SCHEDULE 80 PVC CONDUIT THRU FLOOR WITH 4 AWG THWN GREEN W/RED

6.

LEAVE 3’ COIL OF WIRE IN BOX C-10 FOR CONNECTION BY FAA INSTALLATION PERSONNEL.

TRACER HIGH ENERGY GROUNDING CONDUCTOR FOR TRANSIENT SUPPRESSION BOX, C-10.

INSTALL 1" SCHEDULE 80 PVC CONDUIT THRU FLOOR WITH 4 AWG THWN GREEN W/RED

9.

10.

11.

12.

13.

DRAWING ORD-D-ALS27C-E010 AND E011. 2 SHEETS MAY BE REQUIRED.

LOCATION OF CONTRACTOR PROVIDED 11"X17" ONE LINE DIAGRAM AS REQUIRED PER

7.

NOTES:

LEGEND:

DISCONNECT SWITCH FOR HVAC UNITS (TYPICAL OF 3)

STORAGE CABINET

WORK BENCH

FLASHER TEST STATION

GROUNDING PLATE

KOHLER E/G MONITORING UNIT

UNINTERRUPTABLE POWER SUPPLY

CONTROL CABLE TRANSIENT SUPPRESSION BOX

CODEX MODEM WITH SHELF

INPUT SURGE ASSEMBLY, UNIT 15A

SAFETY DISCONNECT SWITCH, UNIT 15

50 KVA TRANSFORMER, UNIT 14

DISTRIBUTION PANEL, UNIT 13

REMOTE MONITORING SUBSYSTEM, UNIT 12

HIGH VOLTAGE OUTPUT CABINET, UNIT 6

CONSTANT CURRENT REGULATOR, UNIT 5

480 VAC INPUT CABINET, UNIT 4

SUBSTATION CONTROL & MONITOR ASSEMBLY, UNIT 3

HVAC UNIT MASTER CONTROLLER

INSIDE TEMPERATURE SENSOR (2 REQUIRED)

REGULATOR ROOM CONTROL CABLE JUNCTION BOX

E/G CONTROL CABLE JUNCTION BOX

A-23R A-23E

C-18 C-17 C-16 C-14 C-13 C-12 C-11 C-10 C-9 C-8A C-8 C-7 C-6 C-5 C-4 C-3 C-2 C-1

MC-1

T-2

INSTALLED BY FAA INSTALLATION PERSONNEL

THIS ITEM WILL BE FURNISHED BY GOVERNMENT AND *

PROPER INSTALLATION.

BY OTHERS. COORDINATE TO ENSURE

CLOUDED ITEMS TO BE INSTALLED

GRAPHIC SCALE:

SCALE: 1/2" = 1’-0"

5’1’ 2’01’

D-23 D-20

D-19 D-18 D-17 D-16 D-15 D-14 D-13 D-12 D-11 D-10 D-9 D-8 D-7 D-6 D-5 D-4 D-3 D-2

D-1

RUNWAY 27L ALSF-2 / 9R LOCALIZER

EQUIPMENT ROOM INTERIOR ELEVATIONS

KE

RC

14.

15.

16.

17.PENETRATE FLOOR SLAB.

MAINTAIN A MINIMUM OF 2" SEPARATION BETWEEN ADJACENT CONDUITS AS THEY

FOR PROPER ENTRY TO ELECTRICAL EQUIPMENT AS SHOWN AND APPROVED BY THE FAA.

THE CONTRACTOR IS RESPONSIBLE FOR LOCATING CONDUIT PENETRATIONS OF CONCRETE SLAB 8.

DISCONNECT SWITCH FOR D-16

NAVAIDS DISTRIBUTION PANEL BOARD

SWITCH

LOCALIZER ROOM DISTRIBUTION PANEL DISCONECT

EYE WASH STATION

FUEL TANK MONITOR CONTROL PANEL

POWER DISTRIBUTION PANELBOARD

STORAGE CABINET (ROLLERS)

CURRENT TRANSFORMER CABINET

SERVICE ENTRANCE DISCONNECT SWITCH

METER ENCLOSURE

E/G REMOTE CONTROL & MONITOR BOX

TRANSIENT SURGE SUPPRESSORS

DAY TANK

LOAD BANK CONTROL PANEL

AUTOMATIC LOAD BANK

BATTERY CHARGER

VENTILATION POWER AND CONTROL BOX

LOAD BANK DISCONNECT SWITCH

37.5 KVA TRANSFORMER

TRANSFER AND BYPASS SWITCH

DIESEL ENGINE GENERATOR FRAME AUTOMATIC

TEMPORARY POWER C-6 (OR ITS SUBSTITUTE) CONNECTION TO RG FROM PANEL D-20.

PLATES WITH #2 GREEN WITH ORANGE TRACER ROUTED IN 1" SCH80 PVC.

INSTALL 2" SCH80 PVC CONDUIT CONTAINING 1-500 MCM OR 2-4/0 GREEN. CONNECT BOTH

OUTLET TO BE INSTALLED TO NOT INTERFERE WITH CABINETS, WORKBENCHES, EQPT E.T.C.

THIS APPIES TO ALL WIREWAYS AT ALL FACILITIES.

MINIMUM 6 AWG INSULATED GREEN COPPER CONDUCTOR PER FAA-STD-019F, PARAGRAPH 4.2.6.4.2.

ALL INDIIVIDUAL SECTIONS OF ALL METALLIC WIREWAYS SHALL BE BONDED TOGETHER WITH A

PROVIDED SHALL BE SUITABLE FOR ELECTRICAL FIRES.

CONTRACTOR TO FURNISH AND MOUNT FIRE EXTINGUISHERS AS SHOWN. ALL FIRE EXTINGUISHERS

CONNECTING CONDUITS SHALL BE SEALED WITH DUCT SEAL AS REQUIRED BY FAA-STD-019F.

ALL FACILITIES).

PVC TO RIGID CONDUIT ADAPTERS MUST NOT BE ENCASED IN CONCRETE. (TYPICAL FOR

CARRYING ONLY GROUND WIRE SHALL BE SCHEDULE 80 PVC.

WALLS OF THE BUILDING MUST BE PVC COATED GRS CONDUIT OF THE SIZE INDICATED. CONDUITS

ALL CONDUITS THAT COME IN CONTACT WITH THE EARTH AND EXTENDING 10’ BEYOND THE OUTSIDE

TO THEIR ALSF EQUIPMENT.

COORDINATE WITH THE CITY’S CONTRACTOR ON THE LOCATION AND PROPER CONDUIT CONNECTIONS

E-17 E-16 E-15 E-14 E-12 E-10 E-9 E-8 E-7 E-6 E-5 E-4 E-3 E-2 E-1

DME EQUIPMENT RACK

STORAGE CABINET

WORK BENCH

SURGE PROTECTION UNIT FOR PANEL E-3

LOCALIZER POWER PULLBOX

MULTI-POINT GROUNDING PLATE

CONTROL CABLE JUNCTION BOX

RF JUNCTION BOX

FLOOR-MOUNTED BATTERY BOX

INNER MARKER CABINET

FAR FIELD MONITOR CABINET

FIBER OPTICS EQUIPMENT RACK

LOCALIZER ROOM DISTRIBUTION PANEL

LOCALIZER JUNCTION BOX

LOCALIZER EQUIPMENT RACK

2020-07-02T13:53:03-0500
RAFAEL CRAME
2020-07-09T15:09:43-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .