ord-d-als27l-c002.pdf
PDF 441 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This solicitation is for construction services to establish NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, materials, equipment, and supervision to perform the project in accordance with contract documents, drawings, and specifications. The performance period is 605 calendar days with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Interested firms must demonstrate successful completion of similar airport projects both in dollar amount and scope of work. Offers are due by October 7, 2020. The solicitation requires offerors to provide past performance references, a construction schedule, financial documents, insurance certificates, bonding confirmation, and a small business subcontracting plan. The Federal Aviation Administration Southwestern Region is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40’-0"20’-0"
COURSE
6" CA-6 FROST PROTECTION
GRADING LIMITS
EXISTING CONTOURS
CONTOURS
PROPOSED 0.5’ MINOR
CONTOURS
PROPOSED 0.5’ MAJOR
RIPRAP
SCALE: 1" = 20’
20’ 40’020’
N
AIRSIDE SERVICE ROAD
SHELTER PARKING LOT
LOCALIZER COMBINED
27L ALSF-2 AND 9R
NUMBERED LEGEND:
7.
.0
638.0
.0
.0
639.0
639.
639.0
639.0
639.0
.0
640.0
0.
640.0
640.0
.0
.0
641.0
641.0
.0
1.
2.0
.0
642.0
642.0
.0
643.0
.0
643.0
.0
643.
643.0
.0
644.0
644.0
.0
644.0
644.0
644.0
644.0
645.0
5.
645.0
645.0
6.
.0
638.0
639.0
.0
.0
639.0639.0
640.0 640.0
.0
640.0640.0
641.0 641.0
.0
641.0 .0
642.0 642.0
.0
642.0
2.
.0
643.0
.0
.0
643.0643.0
.0
644.0 644.0
C E
D C
E D
C E
D C
E D
C E
D C
E D
F A
A F
A A
F A
A F
A A
F A
A F
A A
F A
A
F A
A F
A A
F A
A
C E
D
C E
D
C E
D
C E
D C
E D
C E
D
C E
D
C E
D
C E
D
C E
D
C E
D
C E D
C E
D
C E
D
C E
D
C E
D
C E
D C
E D
C E
D C E
D
F A
A
CED CED CED
CED
CED
CED
CED
CED
SS RSARSARSARSARSARSARSARSARSARSARSA
R O
F A
R O
F A
R O
F A
R O
F A
R O
F A
R O
F A
ROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFAROFA
C E
C O
C E
C O
C E
C O
C E
C O
C E
C O
C E
C O
R S
A
CRITICAL AREA
R/W 27L LOCALIZER
INSTALL LOCALIZER CABLES IN EXISTING DUCTS.
EXISTING DUCTBANK & HANDHOLES (BY OTHERS)
HANDHOLES.
INSTALL UNDERGROUND CABLES & DUCTBANK CONNECTIONS TO CITY INSTALLED
INSTALL GUARDRAIL AROUND PERIMETER PER ORD-D-ALD09R-G023
EXISTING STORM DRAIN STRUCTURE.
POINT PER FAA COTR.
INSTALL 12" CULVERT WITH FLARED ENDS PER ORD-D-ALD09R-G014 AT LOWEST
INSTALL TRENCH DRAIN PER ORD-D-ALD09R-G024 & G024-1.
PARKING/TURNAROUND AREA.
APPROXIMATE CONNECTION POINT BETWEEN ROAD & FAA CONTRACTOR-INSTALLED
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
RPZ
XXX XXX XXX XXX XXX RPZ
XXX
XXX
XXX
XXX
XXX
XXX
ORD-D-ALD09R-G013.
INSTALL RUNWAY 27L ALSF/9R LOCALIZER SIGN PER12
LEGEND:
COMM
COMM
TW
RW
HV
HV
LV
COMM
DME
INSTALL PARKING/TURNAROUND AREA PER ORD-D-ALS27L-C002.
INSTALL CULVERT PER ORD-D-ALD09R-G024 & G024-1. WITH RIP-RAP BED (BOTH ENDS)
INSTALL ALSF-2 REGULATOR SUBSTATION SHELTER PER ORD-D-ALS27L-C003.
NOTES:
THE SURFACE.
SILT FENCING TO PREVENT OTHERS FROM PARKING/TRAVERSING
1. AFTER PAVING, TO PROJECT THE SURFACES, INSTALL TEMPORARY
E D
M
IS
S
U E
D
F O
R
IL
12/23/2005 9807507
ORD-D-ALS27L-C002 B
189827202/21/2020B
HR12/21/20069807507INSTALL GUARDRAIL (AS BUILT)04/04/2007A
ENGINEERING SERVICES
OPERATIONS
ALS
RUNWAY 27L ALSF-2/9R LOCALIZER
GRADING PLAN
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
CHRIS KEILHERB ROMAN
PROJECT ENGINEER MGR: ENGINEERING
OMP - INSTALLATION OF NAVAIDS SUPPORTING
o r d d a ls l-c .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
C O
N S
T R
U C
T
IO
N
RC
o rd -d -a ls l-c .d g n
/2
/2
:0
:1
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
File details come from the government source that posted it. Updated .