This solicitation is seeking offers for construction services to establish NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. Offerors must provide all labor, supervision, materials, and equipment to perform the project in accordance with contract documents including drawings and specifications. The performance period is 605 calendar days with an anticipated start date of November 15, 2020. The estimated price range for this procurement is $5 million to $10 million. Interested firms must demonstrate successful completion of similar projects both in dollar amount and scope of work at operational airports. Offers are due by October 7, 2020. Offerors must submit documentation including proof of insurance, bonding capability, and a small business subcontracting plan. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ls r-e .d g n
/2
/2
:0
:2
P
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
3’-0"
D-7
T-3
E-12
E-8
E-5
E-6
E-1
E-4 E-2
E-10
E-7
D-3
T-1
D-17
D-9
D-1
D-18
D-8
D-20
D-2
D-11
D-6
HVAC-3
HVAC-2
EF-1
CD-1
D-16
D-4
ROOM
GENERATOR
ENGINE /
C-10
A-23R C-5
C-1C-2
C-7
D-15
FE FE
FE
FE
D-10
D-13
D-5
(C-3)
NO. 5
CCR
(C-3)
NO. 4
CCR
(C-3)
NO. 3
CCR
(C-3)
NO. 2
CCR
(C-3)
NO. 1
CCR
E-7
E-7
E-7
D-23
D-19
C-18
C-17
C-16
E-11
ALSF-2 EQUIPMENT ROOM
6’-3 1/2"4’-3"5’-11 1/4"
HVAC-1
4’-6"
N
WITH FLASHER CONTROL CABLES
2-2" CONCRETE ENCASED CONDUIT
A 1-2" CONCRETE ENCASED SPARE WITH PULL CORD
5KV LOOPS WITH 5 KV LOOP POWER CABLES
5-2" CONCRETE ENCASED CONDUIT TO
SEE NOTE 12
CONDUIT
(2) - 1"
SEE NOTE 15
C-13
2" CONDUIT
4" CONDUIT
SEE NOTE 15
2" CONDUIT
EUH-1
2" CONDUIT
1-1/2" CONDUIT
1" CONDUIT
C-11
C-9
C-6 C-8A
C-8
C-12
E-9
E-14
E-3
C-18
C-13
C-18
MC-1
C-14
SEE NOTE 15SEE NOTE 15SEE NOTE 15
2" CONDUIT
3" CONDUIT
T-2
CONDUIT
1"
8" SQUARE DUCT
CD-2
6" SQUARE DUCT
C-4
T-2
A-23E
1" CONDUIT
NOTE
CONDUIT
1"
ON ALS C008
NOT SHOWN
TO HANDHOLE
ENCASED CONDUIT
4 - WAY 4" CONCRETE
ENCASED TO HANDHOLE
2-4" CONCRETE
THIS ITEM WILL BE FURNISHED AND INSTALLED BY FAA INSTALLATION PERSONNEL
E/G CONTROL CABLE JUNCTION BOXA-23E
A-23R REGULATOR ROOM CONTROL CABLE JUNCTION BOX
SUBSTATION CONTROL & MONITOR ASSEMBLY, UNIT 3C-1
C-2
C-3
480 VAC INPUT CABINET, UNIT 4
CONSTANT CURRENT REGULATOR, UNIT 5
HIGH VOLTAGE OUTPUT CABINET, UNIT 6C-4
C-5 REMOTE MONITORING SUBSYSTEM, UNIT 12
DISTRIBUTION PANEL, UNIT 13C-6
C-7 50 KVA TRANSFORMER, UNIT 14
SAFETY DISCONNECT SWITCH, UNIT 15C-8
C-8A INPUT SURGE ASSEMBLY, UNIT 15A
CODEX MODEM WITH SHELF C-9
C-10 CONTROL CABLE TRANSIENT SUPPRESSION BOX
UNINTERRUPTABLE POWER SUPPLY
C-12
C-11
KOHLER E/G MONITORING UNIT
MAIN GROUNDING PLATEC-13
C-14 FLASHER TEST STATION AND FLASHER HEAD
DIESEL ENGINE GENERATOR FRAMED-1
D-2 AUTOMATIC TRANSFER AND BYPASS SWITCH
37.5 KVA TRANSFORMERD-3
D-4 LOAD BANK DISCONNECT SWITCH
VENTILATION POWER AND CONTROL BOXD-5
BATTERY CHARGER
AUTOMATIC LOAD BANKD-7
D-6
LOAD BANK CONTROL PANEL
DAY TANK
TRANSIENT SURGE SUPPRESSORD-10
D-9
D-8
C-15 SERVICE ENTRANCE SWITCH
D-11 E/G REMOTE CONTROL & MONITOR BOX
METER ENCLOSURED-12
D-14 CURRENT TRANSFORMER CABINET
D-15
D-16 POWER DISTRIBUTION PANELBOARD
D-17 FUEL TANK MONITOR CONTROL PANEL
EYE WASH STATIOND-18
D-19
EXHAUST FAN EF-1 THERMOSTAT T-1
T-2 INSIDE TEMPERATURE SENSOR (2 REQUIRED)
HVAC-3 THERMOSTATT-3T-3
EUH WALL-MOUNTED HEATER UNIT
HVAC UNIT MASTER CONTROLLERMC-1
EF-1 WALL-MOUNTED EXHAUST FAN
CONTROL DAMPER WITH MOTORIZED ACTUATOR
E-1 LOCALIZER EQUIPMENT RACK
LOCALIZER JUNCTION BOXE-2
E-3
FIBER OPTICS EQUIPMENT RACKE-4
E-5 FAR FIELD MONITOR CABINET
INNER MARKER CABINETE-6
D-20
D-23
ALSF DISTRIBUTION PANEL BOARD
DISCONNECT SWITCH FOR D-16
D-13 SERVICE ENTRANCE DISCONNECT SWITCH
DISCONNECT SWITCH
LOCALIZER ROOM DISTRIBUTION PANEL
STORAGE CABINET
LOCALIZER EQUIPMENT ROOM PANELBOARD
E-7 FLOOR-MOUNTED BATTERY BOX
RF JUNCTION BOXE-8
E-9
MULTI-POINT GROUNDING PLATEE-10
E-12
E-15
E-16 STORAGE CABINET
LOCALIZER POWER PULLBOX
WITH FIBER OPTIC INTERFACE PANEL
NEMA1 CONTROL CABLE JUNCTION BOX
E-14 SURGE PROTECTION UNIT FOR PANEL E-3
1.
2.
USING EXOTHERMIC WELDS PER SPECIFICATIONS.
BARE CONDUCTOR TO 3/4" X 10’ STAINLESS STEEL GROUNDING
SHALL BE INSTALLED 2’-6" BELOW GRADE. CONNECT 4/0 AWG
4/0 AWG BARE COPPER PERIMETER GROUNDING CONDUCTOR
SHALL BE SCHEDULE 80 PVC.
SIZE INDICATED. CONDUIT CARRYING ONLY GROUND WIRE
BUILDING MUST BE PVC COATED GRS CONDUIT OF THE
AND EXTENDING 10’ BEYOND THE OUTSIDE WALLS OF THE
ALL CONDUITS THAT COME IN CONTACT WITH THE EARTH
3.
4.
5.
6.
8.
9.
CONNECTIONS.
APPLY ANTI-SIEZE COMPOUND TO ALL THREADED EXTERIOR
GROUNDING LUGS SHALL BE REPAIRED TO PREVENT RUSTING.
ANY PAINT REMOVED TO SECURE THE ATTACHMENT OF THE
AND COVER. USE GROUNDING LUGS TO SECURE THE BRAID.
JUNCTION BOXES AND ENCLOSURES BETWEEN THE J.B. BODY
PROVIDE GROUNDING BRAID ON ALL CONTRACTOR PROVIDED
10. SHARED NEUTRALS/GROUNDS WILL NOT BE PERMITTED.
11.
MINIMUM TRAVEL AND AN EXTERNAL BONDING STRAP.
FROST HEAVE COUPLING. THE COUPLING SHALL HAVE 8"
EXPOSED GRS CONDUIT ENTERING BUILDING SHALL HAVE A
12.
UNDER THIS CONTRACT.
REQUIRING THE RELOCATION OF THE PANEL TO BE INSTALLED
THAT A FUTURE PATCH PANEL MAY BE INSTALLED WITHOUT
FOTS PATCH PANEL SHALL BE INSTALLED IN SUCH A MANNER
13.
PROVIDED WIREWAYS AND COVERS. USE GROUNDING LUGS
TO SECURE THE BRAID. ANY PAINT REMOVED TO SECURE
THE ATTACHMENT OF THE GROUNDING LUGS SHALL BE
REPAIRED TO PREVENT RUSTING.
14.
ELECTRICAL EQUIPMENT AS SHOWN AND APPROVED BY THE FAA.
PENETRATIONS OF CONCRETE SLABS FOR PROPER ENTRY TO
THE CONTRACTOR IS RESPONSIBLE FOR LOCATING CONDUIT
15.
BELOW THE HOUSEKEEPING PAD.
A ROUGH FINISH ON THE FLOOR SLAB AREA IMMEDIATELY
EXTENDED 2" BEYOND THE EQUIPMENT FOOTPRINT. PROVIDE
PROVIDE 4" THICK HOUSEKEEPING PAD WITH STEEL MESH
6 AWG GROUND WIRE BETWEEN ALL CONTRACTOR #PROVIDE
BE PVC-COATED BY THE MANUFACTURER.
BE PVC. BELOW-GRADE SECTIONS OF GRS CONDUITS SHALL
OTHER CONDUIT COMPLETELY BELOW SLAB OR GRADE SHALL
PENETRATING SLAB SHALL BE GALVANIZED RIGID STEEL (GRS).
ROCK ACCESS ROADS AND SUBSTATION PLOT AREAS AND
GROUNDING CONNECTORS. CONDUITS BELOW CRUSHED
TO PVC SHALL BE GROUNDED USING BURNDY GAR-SERIES
CONDUITS CONTINUING FROM SUBSTATION AND TRANSITIONING
CONTINUES TO PERIMETER GROUNDING CONDUCTOR (EES).
2 AWG THWN GREEN GROUNDING CONDUCTOR WHICH #A
BUSHINGS INSTALLED AT BOTH ENDS, INTER-CONNECTED BY
ALL PVC COATED GRS CONDUITS SHALL HAVE GROUNDING
PROPER INSTALLATION.
BY OTHERS. COORDINATE TO ENSURE
CLOUDED ITEMS TO BE INSTALLED
NOTES:
LEGEND:
: K102-1102 OR EQUAL#LAN WORK BENCH. ITEM
WORK BENCH: KENDALL HOWARD 48" PERFORMANCE
7.
FACILITIES).
MUST NOT BE ENCASED IN CONCRETE (TYPICAL TO ALL
THE PVC TO PVC-COATED RIGID STEEL CONDUIT ADAPTERS
C-16
C-17 STORAGE CABINET
THE SIZE AS INDICATED.
CONDUIT COUPLINGS FOR TRANSITION TO PVC CONDUIT OF
IN AND OUT OF THE REGULATOR SUBSTATION.. PROVIDE
MINIMIZE TURNING AND BENDING OF THE CONDUITS COMING
CD-1
4’ X 10’ WORKBENCH
IN 2" CONDUIT
GROUNDING CONDUCTOR
ORANGE TRACER THWN
4/0 AWG GREEN WITH
TO A-23R
CONTROL JUNCTION BOX
CONTROL CABLES FROM
2" CONDUIT W/12 PR 19 AWG
AND 7 (TYPICAL)
SEE NOTES 2, 3
PVC ADAPTER,
PVC-GRS TO
WITH FLASHER POWER CABLES
2-2" CONCRETE ENCASED CONDUIT
GROUNDING CONDUCTOR (TYPICAL)
EXOTHERMIC WELD TO 4/0 AWG PERIMETER
CONDUCTOR IN 1" CONDUIT
2/0 AWG THWN GREEN GROUNDING
(TYPICAL FOR EACH CCR)
GROUNDING CONDUCTOR
2/0 AWG THWN GREEN
1 1/2" CONDUIT WITH
IN 1" CONDUIT
GROUNDING CONDUCTOR
2 AWG THWN GREEN
FOR FUEL TANK LOCATION
SEE SUBSTATION SITE PLAN
TO FUEL TANK VENT PIPE.
GROUNDING CONDUCTOR
2 AWG THWN GREEN
ROD. SEE NOTE 1
3/4" x 10’ GROUNDING
STEP-UP TRANSFORMERS
DISCONNECT SWITCHES AND
4-2" CONDUITS TO
CONDUIT W/EXPANSION COUPLING
GROUNDING CONDUCTOR IN 1"
2 AWG THWN GREEN INSULATED
COUPLING
W/EXPANSION
3-1/2" CONDUIT
CONDUCTORS IN 2" CONDUIT
GREEN GROUNDING
TWO 4/0 AWG THWN
TRANSFORMER
2-4" CONDUIT TO UTILITY
CONDUCTOR (TYPICAL)
PERIMETER GROUNDING
GROUNDING ROD AND
EXOTHERMIC WELD TO
CONDUCTOR PER NOTE 1
PERIMETER GROUNDING
4/0 AWG BARE COPPER
2" CONDUIT
CABLES IN
CONTROL
TO CCRS (TYPICAL)
2" CONDUIT FROM C-5
CONTROL CABLES IN
TO CCRS (TYPICAL)
IN 2" CONDUIT FROM C-4
1/C #6 GREEN GROUND
2-1/C #8 5KV AND
C-2 TO CCRS (TYPICAL)
IN 2" CONDUIT FROM
1/C #6 GREEN GROUND
2-1/C #1/0 AWG AND
SEE NOTE 2 (TYP)
2" CONDUIT
SEE NOTE 15
SEE NOTE 15
NOTE 15
SEE
(OPTION)
TO WORKBENCH
1" GRS EMBED
CONDUIT, E-2 AND E-5
CONDUCTOR IN 1"
TRACER THWN GROUND
6 AWG GREEN W/RED
2" CONDUIT
CONDUCTOR IN
THWN GROUNDING
500 KCMIL
FROM A-23R
2" CONDUITMATTING, B-2
SWITCHBOARD
EDGE OF
CONDUIT
3-1/2"
NOTE 15
SEE
FOR DME CONTROL
6 GREEN#19 & #CONTAINING 12PR
2’ CONDUIT BETWEEN E-8 & A23R
CONDUIT, E-6 AND E-8
CONDUCTOR IN 1"
TRACER THWN GROUND
4 AWG GREEN W/RED
MARKER ANTENNA
WITH 1/2" HELIAX CABLE TO INNER
3" CONCRETE ENCASED CONDUIT
DISTRIBUTION UNIT
GND TO LOCALIZER ANTENNA
6#CONDUCTORS AND 1/C
8 AWG POWER#4/C
1 1/4" CONDUIT WITH
FIELD MONITOR ANTENNA
WITH 1/2" HELIAX CABLE TO FAR
2-3" CONCRETE ENCASED CONDUIT
E-15
E-16
LOCALIZER ANTENNA DISTRIBUTION UNIT
19 AWG SH CONTROL CABLE TO
FOUR 5/8" HELIAX CABLES AND 12 PR
2-4" CONCRETE ENCASED CONDUIT WITH
NOTE 5
SEE
(SPARE)
2-1" CONDUIT
EXTERIOR ELECTRICAL EQUIPMENT IS NEMA 4X, STAINLESS STEEL.
FOR EQUIPMENT SCHEDULES, SEE DRAWINGS -E007 & -E008.
LOCATION FOR FINAL CONNECTIONS.
BE COORDINATED WITH SITE CONDUIT ROUTING AND EQUIPMENT
CONDUIT PENETRATIONS AS SHOWN. EACH PENETRATION MUST
IN FOUNDATION WALL SIZED AND LOCATED TO ACCOMMODATE
CONTRACTOR SHALL PROVIDE CONDUIT ENTRANCE OPENINGS
TO HH (SPARE)
2-1" GRS CONDUIT
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-ALS09R-E004
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALS
RUNWAY 9R ALSF-2/27L LOCALIZER
UNDERGROUND CONDUIT LAYOUT PLAN
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ls r-e .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
LKN
SCALE: 3/8" = 1’-0"
4’ 6’2’02’
| 2020-07-02T13:39:16-0500 | |
| RAFAEL CRAME |
| 2020-07-09T14:13:29-0500 | |
| LUIS N DOMINGUEZ |