About this file

This federal solicitation is for construction services for the establishment of NAVAIDS facilities serving an extended runway at Chicago O'Hare International Airport. Interested firms must have experience with similar airport projects valued between $5 million to $10 million. Offerors must submit their responses by October 7th, 2020 with the required forms, past performance questionnaires, schedule, financial documents, insurance certificates, and small business subcontracting plan. The work includes all labor, supervision, materials, and equipment to perform the project in accordance with the drawings, specifications, and contract terms. The performance period is 605 calendar days beginning November 15th, 2020. The Department of Transportation Federal Aviation Administration Southwestern Region is the issuing agency.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ls r-e .d g n

/2

/2

:5

:4

A

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

10/31/2019 1898272

ORD-D-ALS09R-E003

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

ALS

RUNWAY 9R ALSF-2/27L LOCALIZER

PANEL SCHEDULES

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

PROJECT ENGINEER MGR: ENGINEERING

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

o rd -d -a ls r-e .d g n

LOC RM PANEL

UNIT 13

DISTR PANEL

CABINET

480 VAC INPUT

15380

15380

E/G RM PANEL

93007570 7570

15380 64.115.3

COORDINATE AND PREP FOR INSTALL

BY CITY CONTRACTOR,

CLOUDED PANEL TO BE INSTALLED

NOTES:

1.

2.

3. FILL ALL BLANK SPACES WITH IP-20A CB SPARES EXCEPT IN C-2.

POWER ROUTING UNTIL THEN.

INSTALL AND TERMINATE CONNECTIONS AFTER CITY INSTALLATION. PROVIDE TEMP

CABLES, ETC. IN PREPARATION PRIOR TO THE INSTALLATION OF PNL C-2.

PANEL C-6 POWERED FROM PANEL C-2 (INSTALLED BY CITY). RUN ALL CONDUITS,

DEVICE.

PHASE LOADED ABOVE 80% OF THE RATING OF ITS OVERCURRENT PROTECTIVE

OF CURRENT READINGS TAKEN BEFORE AND AFTER INSTALLATION, AND ANY

TWO PHASES. THE CONTRACTOR SHALL ALSO BE REQUIRED TO NOTIFY THE COTR

WHERE THERE IS A GREATER THAN A 20% DIFFERENCE BETWEEN READINGS IN ANY

DERIVED SOURCE. THE CONTRACTOR SHALL REDISTRIBUTE SINGLE-PHASE LOADS

EACH FEEDER PANELBOARD, EACH BRANCH PANELBOARD, AND EACH SEPARATELY

OF LOAD BALANCING. THESE READINGS SHALL BE TAKEN AT THE SERVICE ENTRANCE,

SHALL TAKE CURRENT READINGS WITH A TRUE RMS AMMETER FOR THE PURPOSE

AFTER THE ELECTRICAL INSTALLATION HAS BEEN COMPLETED, THE CONTRACTOR

FAA-C-1217G:

PROVIDE A LOAD BALANCE STUDY IN ACCORDANCE WITH

2020-07-02T13:38:41-0500
RAFAEL CRAME
2020-07-09T14:09:20-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .