This document provides details for a federal solicitation seeking construction services for the establishment of NAVAIDS facilities at O'Hare International Airport in Chicago, Illinois. The solicitation requests offers for all labor, supervision, materials, and equipment to construct the facilities in accordance with contract drawings and specifications. The performance period is 605 calendar days beginning November 15, 2020, with an estimated price range of $5,000,000 to $10,000,000. Offerors must demonstrate experience with similar airport projects and provide schedules, financial statements, insurance, and bonding assurances meeting the requirements specified. Small business subcontracting plans are also required. Offers must be submitted by October 7, 2020 to the Federal Aviation Administration contact provided.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ls r-c .d g n
/2
/2
:4
:5
A
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
FE FE
FE
FE
12’-11 1/4" 3’-0" 34’-1 3/4" 17’-0"
5"6"
68’-0"
9’-0"
13’-1 3/4"10’-0"8’-0"
31’-1 3/4" 3’-0"3’-0" 6"5" 5’-9 1/8"3’-0"3’-0"5’-2 7/8"
D-7
OPENING REQUIRED
12" X 12" WALL
EXHAUST FAN, EF-1
EF-1
D-15
D-9
D-12
D-14
D-13
D-4
D-8
D-10A
D-20
D-2
A-23E
D-11
T-2
D-10
CD-2
CD-1
SEE NOTE 15
2 X 6 HEADER
SEE NOTE 15
2 X 12 HEADER
INACTIVE DOORSEE NOTE 6
ACTIVE DOOR,
SEE NOTE 12
DOOR HOLDER.
D-18
D-10B
D-23
D-19
D-16
D-3
T-1
D-17
D-1
(C-3)
NO. 1
CCR
(C-3)
NO. 2
CCR
(C-3)
NO. 3
CCR
(C-3)
NO. 4
CCR
(C-3)
NO. 5
CCR
C-16
SEE NOTE 6
ACTIVE DOOR,
INACTIVE DOOR
SPACER REQUIRED)
2 X 6 AND ONE 1/2"
NOTE 15 (ONLY TWO
2 X 6 HEADER SEE
C-2
C-7 C-5
C-1
C-10
A-23R
C-13
T-2
C-11
C-9C-6 C-12
C-8A
C-8
C-14
C-17
HVAC-2
MC-1
HVAC-1
C-4
C-18 C-18
SEE NOTE 15
2 X 12 HEADER
E-4
E-7
E-7
E-9 E-11
HVAC-3 C-18
SEE NOTE 7
E-7 E-1
E-6
E-7
E-5
E-8
E-16
E-15
T-3
E-14
E-3
E-12
SEE NOTE 12
DOOR HOLDER.
B
A
CENTERED 3’-7 1/2" AFF
OPENING: 30" W X 16" H,
7’-2 1/2" AFF, RETURN
30" W X 10" H, CENTERED
SUPPLY OPENING:
HVAC THRU-WALL UNIT ENGINE/GENERATOR ROOM
ALSF-2 EQUIPMENT ROOM
LOCALIZER EQUIPMENT ROOM
2’ O. C. SPACING
OF BUILDING,
FROM THIS SIDE
INSTALLATION
START TRUSS
SEE NOTE 15
2 X 12 HEADER
E-17
C011
C011
B
C011
A
C011
C-13
E-10
3’-0 1/16" 3’-0"3’-0"3’-0"6 1/4" 5"
1.
2.
3.
4.
5.
6.
DEVICE.
DOOR SWEEP WITH TRIM. ACTIVE LEAF TO HAVE PANIC EXIT
AND WEATHER STRIPPING ON THE DOUBLE DOOR AND EXTERIOR
AT BOTTOM OF BOTH DOORS. PROVIDE AN INTERIOR ASTRAGAL
ASTRAGAL ON OUTSIDE FACE. INSTALL HINGED DOOR STOP
35H-7-F-3-J-626-LHRB. THE ACTIVE DOOR SHALL HAVE AN
INSULATED DOOR, 6’-0" x 6’-8" x 1 3/4" WITH BEST LOCK SET
EXTERIOR DOUBLE DOOR SHALL BE A HOLLOW METAL
7.
8.
9.
INTERIOR) SHALL HAVE A TOE KICK.
INSTRUCTIONS. INTERIOR SIDE OF ALL DOORS (EXTERIOR AND
LATEX PAINT. REFER TO DOOR MANUFACTURER’S FINISHING
PAINT DOORS AND FRAMES LIGHT GRAY USING EXTERIOR
10.
11.
12.
FOUNDATION. CAP HOLDER WITH A DOME TOP.
TO 2’-2" ABOVE GRADE, 4’-0" BELOW GRADE IN 12" DIA. CONCRETE
STAINLESS STEEL LATCHING HOOK AND EYEBOLTS. SET PIPE
PROVIDE 2" SCH. 40 GALV. STEEL PIPE DOOR HOLDER WITH
13. PROVIDE SNOW GUARDS ABOVE ALL EXTERIOR DOORS.
14.
15.
CONTRACTOR. COORDINATE EXACT LOCATION WITH FAA RE.
ASSEMBLY OF WORK BENCH REQUIRED BY ELECTRICAL
SPECIFICATIONS. PROVIDE PANIC EXIT DEVICE.
TRIM AND DOOR CLOSER, LCN 4O41 SERIES, HEAVY DUTY MEETS
OF DOOR. PROVIDE AND INSTALL EXTERIOR DOOR SWEEP WITH
35H-7-F-3-J-626-RHRB. INSTALL HINGED DOOR STOP AT BOTTOM
DOOR, 3’-0" x 6’-8" x 1 3/4", WITH BEST LOCK SET
EXTERIOR SINGLE DOOR SHALL BE A HOLLOW METAL INSULATED
MEETS SPECIFICATIONS.
OF DOOR AND DOOR CLOSER, LCN 4110 SERIES, HEAVY DUTY
35H-0-N-3-J-626-RHRB. INSTALL HINGED DOOR STOP AT BOTTOM
DOOR, 3’-0" x 6’-8" x 1 3/4", WITH BEST LOCK SET
INTERIOR SINGLE DOORS SHALL BE A HOLLOW METAL INSULATED
FINISHED SMOOTH. NO GAPS.
TOP AND BOTTOM OF DOORS SHALL BE PLUGGED AND
ADDITIVE.
COVERING, 2-COAT, GRAY, SATIN, WITH NON-SKID, NON-SLIP
AS FOLLOWS: UTILIZE A TWO PART EPOXY TYPE FLOOR
CONCRETE FLOOR SLAB IN ALL ROOMS SHALL BE SEALED
PLYWOOD SHEATHING.
APPLY 5/8" TYPE X GYPSUM BOARD OVER THE INTERIOR
WHITE.
INTERIOR SURFACES SHALL BE MADE SMOOTH AND PAINTED
16.
17.
BE PAINTED OVER.
WHEN OPENING THE DOOR. THE STAMP OR LABEL SHALL NOT
SHALL BE INDICATED BY A STAMP OR METAL LABEL VISIBLE
DOORS AND DOOR FRAMES SHALL BE FIRE RATED. FIRE RATING
INTERIOR OF THE DOOR.
PLUGGED TO PREVENT MOISTURE FROM ENTERING THE
ANY HOLES AT THE TOP OR BOTTOM OF THE DOORS SHALL BE
18. DOOR HARDWARE MUST BE EQUIPPED WITH HEAVY DUTY CLOSERS.
19.
20.
DOORS SHALL BE FABRICATED WITH COLD-ROLLED STEEL.
21.
22.
NOTES:
CONDUITS. ALL ELSE INSTALLED BY THIS CONTRACT.
COORDINATE & CONNECT WITH
CLOUDED ITEMS ARE INSTALLED BY OTHERS, PREPARE,
02’ 2’ 4’ 6’
SCALE: 3/8" = 1’-0"
BE FIRE RETARDANT TREATED FRT-PLYWOOD.
SCREWS SPACED 16" O.C. ALL PLYWOOD SHEATHING SHALL
STUDS. SECURE PLYWOOD TO EACH STUD USING WOOD
APPLY 3/4" PLYWOOD SHEATING ON THE INSIDE OF THE WOOD
AROUND PERIMETER.
TO FOUNDATION USING J-BOLT ANCHORS SPACED 3’ O.C.
USING 8D RING-SHANK NAILS SPACED 16" O.C. SECURE WALLS
STRAND BOARD (OSB). SECURE PLYWOOD TO EACH STUD
EXTERIOR WALLS SHALL BE SHEATHED WITH 1/2" ORIENTED
BE PERMITTED FOR LOCK SETS THAT ACCEPT BEST LOCK CORP. CORES.
SUBSTITUTIONS FOR BEST LOCK CORPORATION LOCK SETS WILL
GUTTERS SHALL BE SEAMLESS AND CONTINUOUS.
SEE NOTE 15
2 X 12 HEADER
METAL FOLD-DOWN STAIR
CEILING SCUTTLE WITH
SPACER REQUIRED)
2 X 6 AND ONE 1/2"
NOTE 15 (ONLY TWO
2 X 6 HEADER SEE
SEE NOTE 6
ACTIVE DOOR,
INACTIVE DOOR
CENTERED 4’-11/2" AFF
RETURN OPENING: 28"Wx14"H, CENTERED 6’-6" AFF, SUPPLY OPENING: 28"Wx8"H, HVAC THRU-WALL UNIT
LOCATION
ROOF TRUSS
BETWEEN THE TRUSSES
STAIR WILL FIT
ENSURE THE FOLD-DOWN
ROOF TRUSS LOCATION.
COLD-ROLLED FURNITURE QUALITY STEEL.
DOOR FRAMES SHALL BE FROM MINIMUM 16-GAUGE GALVANIZED
NO OPENINGS ON TOP OR BOTTOM OF DOOR.
MODEL 1, FULL FLUSH, MINIMUM 16 GA FACES, 1 3/4" THICK.
DOORS SHALL BE SD1-100, GRADE III, EXTRA HEAVY-DUTY,
PROVIDE EMERGENCY PUSH BAR ON ALL EXTERIOR DOORS.
INTERIOR DOORS SHALL HAVE LEVER TYPE DOOR HANDLES.23.
SEE NOTE 15
2 X 12 HEADER
LIGHT SWITCH
DOOR HOLDER. SEE NOTE 12 (TYP ALL DOORS)
N
SCALE: 3/8" = 1’-0"
FRAMING PLAN
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-ALS09R-C010
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALS
RUNWAY 9R ALSF-2/27L LOCALIZER
FRAMING PLAN
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ls r-c .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
LKN
| 2020-07-02T13:36:33-0500 | |
| RAFAEL CRAME |
| 2020-07-09T14:05:25-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .