ord-d-als09r-c004.pdf
PDF 345 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, materials, equipment, and supervision to perform the project in accordance with contract documents including drawings and specifications. The performance period is 605 calendar days with an anticipated start date of November 15, 2020. The estimated price range for this procurement is between $5 million and $10 million. Interested offerors must have successfully completed similar airport projects and submit their offer by October 7, 2020. The solicitation requires offerors to provide past performance references, a construction schedule, financial documents, insurance certificates, and a small business subcontracting plan. The Federal Aviation Administration Southwestern Region is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ls r-c .d g n
/2
/2
:1
:4
A
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
17 17
AND COLOR AS THE WALL PANELS.
USING THE SAME GAUGE, MATERIAL, FINISH,
FABRICATE GUTTERS AND DOWNSPOUTS
(TYP)
30°
HOOD W/DAMPER, CD-2
60"W X 48"H INTAKE
FUEL TANK
UNDERGROUND
TO
SWEEP RADIUS SHALL BE 12" MINIMUM.
ENCASED IN 1" DIA. SCHEDULE 80 PVC @ 12" BELOW GRADE.
DIAGONALLY OPPOSITE BUILDING CORNERS. CONDUCTOR MUST BE
WELD BOTH ENDS OF THIS CONDUCTOR TO GROUNDING ELECTRODES AT
ROOF AND DOWN CONDUCTOR, THOMPSON CAT. NO. 32. EXOTHERMICALLY
BASES TO ROOF WITH ROOF ADHESIVE THOMPSON CAT. NO. 731.
CAT. NO. 730 SPACED 30" O.C. MAXIMUM ON ROOF. FASTEN ADHESIVE POINT
STAMPED ADHESIVE CABLE HOLDER WITH BREAK-AWAY TABS, THOMPSON
SHOWN. ITEMS NOT SHOWN BONDED DO NOT REQUIRE BONDING.
DOWN CONDUCTOR TO WALL-MOUNTED EQUIPMENT AND DOOR FRAME AS
TINNED BRONZE BONDING PLATE, THOMPSON CAT. NO. 702, BONDING ROOF AND
TO ROOF AND DOWN CONDUCTOR.
PARALLEL CLAMP, THOMPSON CAT. NO. 565, CONNECTING BONDING CONDUCTOR
BONDED TO ROOF AND DOWN CONDUCTOR.
509X, CONNECTING PARALLEL CLAMP TO BONDING PLATE AT ITEMS TO BE
BONDING CONDUCTOR, 6 AWG BARE COPPER OR THOMPSON CAT. NO. 14X OR
DOOR HOLDERS WITH HOOK LATCH
DOOR HOLDER STOP
GUTTERING DOWNSPOUT
5" CONCRETE SPLASH BLOCK AND ROOF
ABOVE GRADE, CARRYING ROOF AND DOWN CONDUCTOR.
1" SCHEDULE 80PVC CONDUIT FROM 12" BELOW GRADE TO MIN 6’-0"
DOOR SIGN, SEE NOTE 11
SEE NOTE 12
EXTERIOR TEMPERATURE SENSOR
JUNCTION BOX
CONTROL WIRING
4" X 4" X 4" NEMA 3R
DISCONNECT SWITCH (UNIT C-18)
9 8
VENTILATION FAN, EF-1
E/G EXHAUST PIPE SEE NOTES 9 & 10
2" GRS U/G FUEL TANK VENT
TYP
HVAC-3
BONDING STRAP, THOMPSON CAT. NO. 588, FROM DOOR FRAME TO DOOR.
TYP
CONTINUOUS RIDGE VENT
C-18
PERSONNEL)
BY FAA INSTALLATION
(FURNISHED AND INSTALLED
FLIGHT CHECK ANTENNA
1’-0"
(TYPICAL)
INTERIOR EQUIPMENT TO AVOID CONFLICT
COORDINATE LOCATION OF UNIT C-18 WITH
SCALE: 1/4" = 1’-0"
REAR ELEVATION
ADHESIVE, M1 BY CHEMLINK.
THOMPSON CAT. NO. 71A. FASTEN ADHESIVE SADDLE TO ROOF WITH
AND ADAPTER THOMPSON CAT. NO. 665 AND ADJUSTABLE RIDGE SADDLE
LONG COPPER AIR TERMINAL WITH NICKEL-PLATED ROUNDED BLUNT TIP
AIR TERMINAL ASSEMBLY (5 REQUIRED) CONSISTING OF A 5/8" DIA X 12"
DAY TANK VENTS, NOTE 10
U/G FUEL TANK VENT, NOTE 10
GFI RECEPTACLE IN WATERPROOF HOUSING & IN-USE COVER
NUMBERED LEGEND:
FLIGHT INSPECTION ANTENNA
1 1/4" GRS MAST FOR
FURNISH AND INSTALL
SEE NOTE 15
3/4" LIQUID-TIGHT FLEXIBLE CONDUIT.
6 INSULATED GREEN GROUND IN #6 AWG AND 1#2
FINISHED GRADE (MINIMUM).
3/4" X 10’ STAINLESS STEEL GROUNDING ELECTRODE, 12" BELOW
4/0 AWG BARE COPPER PERIMETER GROUNDING CONDUCTOR, 30" BELOW GRADE.
SNOW GUARD ABOVE ALL EXTERIOR DOORS.
SHOP DRAWINGS FOR SUBSTITUTION. COLOR SHALL BE WHITE. SEE NOTE 1.
STEEL AND NEOPRENE WASHER WITH COLOR TO MATCH PANEL. PROVIDE
SHEATHING USING WHITE SS SCREWS WITH A NO. 14 X 1" COMBINATION
FROM FABRAL MEETS SPECIFICATIONS. PANELS SHALL BE FASTENED TO
FADE AND CHALK WARRANTY. MIGHTI-RIB PBR METAL SIDING SYSTEM
10-YEAR WARRANTY AGAINST EDGE RUST AND ACID RAIN, AND 30-YEAR
STEEL, EXPOSED FASTENERS, LIFETIME FILM INTEGRITY WARRANTY.
STRUCTURAL EXPOSED FASTENER WALL SYSTEM, 26 GA., GRADE 80 KSI
(STAINLESS STEEL)
HOOD W/DAMPER, BD-1
64"W X 52"H EXHAUST
DRAWINGS FOR SUBSTITUTION. SEE NOTE 1
FROM FABRAL MEETS SPECIFICATIONS. COLOR SHALL BE WHITE. PROVIDE SHOP
WARRANTY ON FACTORY FINISH. DECOR-FLUSH METAL SOFFIT AND FASCIA SYSTEM
ALUMINIUM WITH HIDDEN FASTENERS, CONTINUOUSLY VENTED AND 20 YEAR
WARRANTY ON FACTORY FINISH. SOFFIT SHALL BE CUSTOM PAINTED HEAVY GUAGE
FASCIA MATERIAL SHALL BE 24 GA. STEEL WITH HIDDEN FASTENERS AND 20 YEAR
SHEATHING AND CONTINUOUS ICE AND WATER SHIELD UNDERLAYMENT.
COLOR SHALL BE WHITE. PANELS SHALL BE INSTALLED OVER 3/4"
FABRAL METAL WALL AND ROOFING SYSTEMS MEETS SPECIFICATIONS.
ROOFING MATERIAL. SLIM SEAM METAL ROOFING (16" COVERAGE) FROM
20 YEAR WARRANTY ON FACTORY FINISH, LIFETIME WARRANTY ON
STANDING SEAM METAL ROOFING SYSTEM, 24 GA., GRADE 40 STEEL,
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
10/31/2019 1898272
ORD-D-ALS09R-C004
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALS
RUNWAY 9R ALSF-2/27L LOCALIZER
EXTERIOR ELEVATIONS
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ls r-c .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
2.
3.
4.
5.
6.
7.
8.
9.
11.
12.
13.
10.
1.
NOTES:
14.
PRIOR TO SIDING ENTIRE SHELTER.
PROVIDE A MOCK-UP OF A BUILDING CORNER TO DEMONSTRATE TO THE FAA
DOWNSPOUTS SHALL BE BONDED TO THE LIGHTNING PROTECTION SYSTEM.
ORD-D-ALD09R-G012.
NUMBER AND EXACT LOCATION WITH THE FAA R.E. TYPICAL TWO PLACES.
DENOTING THE FIRE DEPARTMENT BUILDING NUMBER. COORDINATE BUILDING
CONTRACTOR SHALL PROVIDE AND INSTALL A SIGN ON THE BLDG SIDE, FACING ROAD
ENGINEER APPROVAL. ORD-D-ALD09R-G012.
COORDINATE SIGN SIZE, COLORING AND ROOM DESIGNATIONS WITH FAA RESIDENT
ROOM. THE SIGN SHALL INCLUDE A COLOR REPRESENTATION OF THE FAA LOGO.
DESIGNATES THE ROOM’S USE, I.E., GENERATOR ROOM, LOCALIZER ROOM, EQUIPMENT
CONTRACTOR SHALL PROVIDE AND INSTALL A SIGN ON EACH EXTERIOR DOOR THAT
TOP CAP TO PREVENT MOISTURE AND SMALL ANIMAL INFILTRATION.
PROVIDE E/G MUFFLER EXHAUST PIPE DAY TANK VENT AND UST VENT WITH
PROVIDE STAINLESS STEEL E/G MUFFLER EXHAUST PIPE.
ALL EXTERIOR LIGHTS MUST BE LED TYPE WITH PHOTO CONTROL ONLY.
APPLY ANTI-SEIZE COMPOUND TO ALL THREADED EXTERIOR CONNECTIONS.
GUTTERS SHALL BE CONTINUOUS AND SEAMLESS, BONDED TO LIGHTNING PROTECTION.
PROVIDE SNOW GUARDS ABOVE ALL EXTERIOR DOORS. 14
PROVIDE PIPE WITH EYEBOLT AND HASP FOR ALL EXTERIOR SERVICE DOORS. 15
BOND ALL EXTERIOR METALLIC ITEMS TO THE LIGHTNING PROTECTION SYSTEM VIA 2
SEALER, EXTERIOR GRADE.
CONTRACTOR SHALL SEAL ALL PENETRATIONS THROUGH BUILDING WALLS WITH SILICONE
BOOK. SUBMIT SUBSTITUTIONS PER SPECIFICATIONS.
MANUFACTURER WITH A DETAILED LIST OF MATERIAL AND AN INSTALLATION INSTRUCTION
WITH WARRANTY, PER SPECIAL SPECIFICATIONS. MATERIAL SHALL BE PROVIDED BY THE
TRIM SYSTEM SHALL BE FABRICATED BY ONE MANUFACTURER AS A COMPLETE SYSTEM,
STANDING SEAM METAL ROOFING PANELS, SIDING PANELS, AND SOFFIT, FASCIA, AND
| 2020-07-02T13:32:36-0500 | |
| RAFAEL CRAME |
| 2020-07-09T14:00:24-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .