This solicitation is for construction services for the establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. The contractor shall provide all labor, supervision, materials, and equipment to perform the project in accordance with drawings, specifications, and contract terms. The performance period is 605 calendar days beginning November 15, 2020, with an estimated price range of $5 million to $10 million. Offerors must have experience on similar airport projects and submit responses by October 7, 2020. Eligible submissions must include a cover letter, signed solicitation form, past performance references, schedule, financial documents, insurance certificates, bonding letter, and subcontracting plan. Offers should be emailed to the point of contact by the deadline.

View the file

Other files

File Type Posted
697DCK-20-R-00436 - Amendment 0001.pdf PDF
ord-d-als09r-e009.pdf PDF
ord-d-gs09r-c004.pdf PDF
ord-d-als09r-m001.pdf PDF
ord-d-gs27l-c006.pdf PDF
ord-d-als27l-c007.pdf PDF
ord-d-ald09r-g024.pdf PDF
ord-d-ald09r-g015.pdf PDF
ord-d-gs27l-a001.pdf PDF
ord-d-ald09r-g008.pdf PDF
ord-d-gs27l-c003.pdf PDF
ord-d-als09r-e006.pdf PDF
ord-d-loc27l-c007.pdf PDF
ord-d-ald09r-g017.pdf PDF
ord-d-als27l-c006.pdf PDF
ord-d-als09r-c006.pdf PDF
ord-d-als27l-e006.pdf PDF
Attachment No. 12 - Required Checklist for Underground Storage Tank Installation.pdf PDF
ord-d-gs27l-e001.pdf PDF
ord-d-loc27l-c003.pdf PDF
ord-d-als09r-e005.pdf PDF
Attachment No. 20 - Past Performance Questionnaire.doc DOC document
ord-d-gs09r-a001.pdf PDF
ord-d-im09r-c001.pdf PDF
ord-d-als27l-e005.pdf PDF
ord-d-als27l-m002.pdf PDF
ord-d-als09r-e012.pdf PDF
ord-d-ald09r-g031.pdf PDF
ord-d-als09r-e008.pdf PDF
ord-d-gs27l-c004.pdf PDF
ord-d-ald09r-g004.pdf PDF
ord-d-gs09r-c005.pdf PDF
ord-d-als27l-m003.pdf PDF
ord-d-als09r-c011.pdf PDF
ord-d-als09r-m004.pdf PDF
ord-d-loc09r-c003.pdf PDF
ord-d-ald09r-g022.pdf PDF
ord-d-gs27l-c005.pdf PDF
Attachment No. 18 - Contract Insurance Requirements - Chicago Department of Aviation.pdf PDF
ord-d-als27l-c012.pdf PDF
Attachment No. 02 - Special Specifications.pdf PDF
ord-d-ald09r-g014.pdf PDF
Attachment No. 14 - Ground Resistance Testing Form.xlsx XLSX spreadsheet
ord-d-ald09r-g002.pdf PDF
ord-d-als27l-c014.pdf PDF
Attachment No. 19 - Small Business Subcontracting Plan - 697DCK-20-R-00436.pdf PDF
697DCK-20-R-00436.pdf PDF
ord-d-loc27l-c004.pdf PDF
ord-d-loc09r-c002.pdf PDF
ord-d-als09r-e013-1.pdf PDF
Show 40 more

Latest 50 of 158 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

o rd -d -a ld r-g .d g n

/2

/2

:4

:2

A

M G re g o ry C

T R S p e n c e r

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

DETAIL

A

NOT TO SCALE

CONDUIT SUPPORT

UNISTRUT CHANNEL

1 5/8" STAINLESS STEEL

SS PIPE CLAMP FOR 1 5/8"

SS UNISTRUT CHANNEL

1" PVC

2 1/2" PVC

12" DIA X 6’-0"

OUTSIDE

DRILLED CONCRETE PIER

P-1000 GALVANIZED UNISTRUT

BUILDING WALL

EXTERIOR

DETAIL- PIPE SUPPORT

SCALE: 1/2" = 1’ -0"

B

BOXES

JUNCTION

EXTERIOR

E D

M

IS

S

U E

D F

O R

NAVAIDS

IL

ORD-D-ALD09R-G027

ALD

CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO

o rd -d -a ld r-g .d g n

ENGINEERING SERVICES

RC

PROJECT ENGINEER MGR: ENGINEERING

10/31/2019 1898272

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

C O

N S

T R

U C

T

IO

N

RUNWAY 9R - 27L

LKN

GLIDE SOPE CONDUIT SUPPORT

MID-SPAN

2020-07-02T13:29:17-0500
RAFAEL CRAME
2020-07-09T13:32:27-0500
LUIS N DOMINGUEZ

File details come from the government source that posted it. Updated .