ord-d-ald09r-g025.pdf
PDF 303 KB Posted
- Solicitation number
- 697DCK-20-R-00436
About this file
This document provides details for a federal construction contract opportunity with the Department of Transportation Federal Aviation Administration. The solicitation is for establishment of NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. Interested firms must provide construction services including labor, materials, and equipment in accordance with contract clauses, drawings, and specifications. The performance period is 605 calendar days starting November 15, 2020. The estimated price range for this procurement is $5 million to $10 million. Offerors must demonstrate successful past performance on similar projects of equal size and scope at operational airports. Offers are due by October 7, 2020 and must include details such as past experience, schedule, insurance, bonding, and subcontracting plans.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ld r-g .d g n
/2
/2
:3
:4
A
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
12" 3’-10" 1
12"
9" 2’-4"
13"
8"
1’-7"
1’-7"
1’-3"
1’-3"
5’-9"
CL
FOUNDATION
OF
LOCATION
CONDUIT
SECONDARY
RODS BY ComEd
GROUND GRID AND
TRENCH BY CUSTOMER
FRONT OF TRANSFORMER
GROUND WIRE
1" CONDUIT FOR ComEd
LOCATION
CONDUIT
PRIMARY
OPENING
CONDUIT
BOX OUT
MANHOLE
DUCT 22 TO
BAY-4 FUSE
EMH-013
MANHOLE
DUCT 21 TO
BAY-3 FUSE
CONTINUOUS TO MANHOLE
ALL CONDUIT SHALL EXTEND
DEGREE BENDS AS SHOWN.
POSITION 5 INCH DIA., 90
TO MANHOLE
DUCT 12
BAY-1 DISC
TO MANHOLE
DUCT 11
BAY-2 DISC
PER COMED C5302.B
COMED SWITCHGEAR FOUNDATION
PRECAST 4-BAY
COMED STANDARD #C5288
TRANSFORMER PAD PER
REINFORCING #3 @ 6" (NOTE 2)
ROUND EDGES
FINAL GRADE
CRUSHED AGGREGATE
4" MINIMUM CA-6
1/0
TO CECO MANHOLE
PRIMARY (2) 5" CONDUIT
TO NAVAIDS FACILITY
SECONDARY 3" CONDUIT
NOTE 5
NOTE 7
NOTE 6
6" MINIMUM CRUSHED STONE OR GRAVEL (NOTE 4)
(SEE NOTES 1 & 2)
FINAL GRADE
NOTE 3
TO CECO MANHOLE
PRIMARY (2) 5" CONDUIT
TO NAVAIDS FACILITY
SECONDARY 3" CONDUIT
C-C
A-A
PLAN
A-A
SECTION
C-C
COMED SECTIONALIZER FOUNDATION
COMED PAD
PROPOSED SECTIONALIZER FOUNDATION, PLAN VIEW
SECTION
NOT TO SCALE
TRANSFORMER PAD DETAIL
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
07/24/2019 1898272
ORD-D-ALD09R-G025
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALD
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ld r-g .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
1.
2.
3.
NOTES:
18" (W) X 14" (L).
RANGE 112.5KVA THRU 300KVA, THE SECONDARY CONDUIT FEED BOX OUT DIMENSIONS ARE
TRANSFORMER RATINGS BETWEEN 45KVA AND 75KVA. FOR TRANSFORMERS RATING IN THE
FOR TRANSFORMER PADS, SECONDARY FEED BOX OUT DIMENSIONS ARE 14" (W) x 14" (L) FOR
COMED REPRESENTATIVE PRIOR TO PREPARING THE PAD FOUNDATIONS.
CONTRACTOR REFERED TO COMED SPECIFICATIONS STANDARDS "C5288" AND COORDINATED WITH
TRANSFORMER DETAIL SHOWN IS FOR UP TO 167 kVA. COORDINATED WITH COMED FOR REQUIRED DIMENSIONS.
9. TERMINATED PRIMARY AND SECONDARY CONDUITS FLUSH WITH TOP OF FOUNDATION.
BENDS AT SECTIONALIZER ARE HEAVY WALL PVC CONDUIT CONCRETE ENCASED.8.
COVERED FLANGE WITH 2 INCHES TO 3 INCHES OF EXCAVATED MATERIAL PRIOR TO BACKFILL.7.
FOUNDATION LEVELED BEFORE BACKFILLING.6.
PLUGGED UNUSED CABLE OPENINGS IN PRECAST FOUNDATION.5.
AND POURING FOUNDATION.
SAND OR FINE EXCAVATED MATERIAL. COMPACTED THOROUGHLY BEFORE PLACING AGGREGATE
AFTER PRIMARY AND SECONDARY CONDUITS ARE IN PLACE, BACKFILLED WITH SCREENINGS, 4.
IN THE SWITCHGEAR.
THE ENTRANCE OF RODENTS, GASES, OR DAMP AIR WHICH MAY CAUSE CONDENSATION
SEALED THE CONDUITS EXITING OR ENTERING THE SWITCHGEAR FOUNDATION. THIS PREVENTED 3.
FINAL GRADE WELL DRAINED AT ALL TIMES.2.
WILLEY BLOCK CO., b. UTILITY CONCRETE PRODUCTS CO., c. WELCH BROS., INC., AND d. CONCAST, INC.
DISTRIBUTION ENGINEERING FOR ANY QUESTIONS. APPROVED MANUFACTURERS ARE a. ELLER &
PRECAST EXTENSION USED WITH CONCRETE FOUNDATION CAT ID 0000701115. CONTACTED
MANUFACTURER IN ACCORDANCE WITH CECO DETAIL C5302G, SHEET 4. SPECIFY CAT ID 0001600733 18"
CONTRACTOR PROVIDED PRECAST SECTIONALIZER FOUNDATION FROM AN APPROVED CECO1.
NOTES:
SECONDARY CABLE AND ALL DUCT ALSO TO BE INSTALLED BY THE CONTRACTOR.
INSTALL/TERMINATE CONNECTIONS TO THEIR TRANSFORMER SECONDARY CONNECTIONS,
SHALL BE CONSTRUCTED BY THE CONTRACTOR. COORDINATE WITH COMED TO
RODENT INFESTATION AND NESTING.
INSTALLED, THE BOX OUTS SHALL BE FILLED WITH CRUSHED STONE TO PREVENT
HAS BEEN INSTALLED AT THE DIRECTION OF COMED. AFTER CONDUITS ARE
BACKFILL PRIMARY & SECONDARY BOX-OUTS WITH CRUSHED AGGREGATE AFTER CONDUIT
THE TOP OF THE PAD.
BUSHINGS. THE TOP OF BELL ENDS AND GROUNDING BUSHINGS MUST BE LEVEL WITH
EQUIPPED WITH BELL ENDS. ALL GRS CONDUIT MUST BE EQUIPPED WITH GROUNDING
ALL PVC CONDUITS ENTERING TRANSFORMER OR SECTIONALIZER FOUNDATIONS MUST BE
APPROVAL OF PRE-CAST TRANSFORMER PAD PRIOR TO PROCURING STRUCTURE.
CONTRACTOR MUST COORDINATE WITH THE CONTRACTING OFFICER IN ORDER TO OBTAIN
TO BE ACCOMPLISHED BY FAA CONTRACTOR.
BACKFILL, TRENCH FOR COMED-INSTALLED GROUND RING AND SITE RESTORATION
FINAL GRADE MUST BE WELL DRAINED AT ALL TIMES.
TOP OF FOUNDATION MUST BE SMOOTH AND LEVEL.
MAY BE POURED ON SITE AND SHALL MEET ALL APPLICABLE COMED REQUIREMENTS.
MUST BE PURCHASED FROM ACCEPTABLE, APPROVED COMED SUPPLIER. CAST-IN-PLACE
TRANSFORMER FOUNDATION CAN BE PRECAST OR CAST-IN-PLACE. PRECAST VERSION
CAST-IN-PLACE VERSION IS NOT ACCEPTABLE.
IT MUST BE PURCHASED FROM ACCEPTABLE, APPROVED COMED SUPPLIER.
SECTIONALIZER FOUNDATION SHALL BE PRECAST VERSION PER COMED STANDARD AND
PLACING CRUSHED STONE OR GRAVEL AND PLACING FOUNDATION.
SCREENINGS, SAND OR FINE EXCAVATED MATERIAL THOROUGHLY COMPACTED BEFORE
AFTER PRIMARY AND SECONDARY CONDUITS ARE IN PLACE, BACKFILL WITH
AREAS.
PRIMARY AND SECONDARY CONDUIT MUST COME THROUGH FOUNDATION IN DESIGNATED
INSTALLING CONDUIT.
DO NOT DISTURB GROUND IN FOUNDATION AREA MORE THAN NECESSARY WHEN
PAD.
SEE COMED STANDARD C5302.G FOR ADDITIONAL INFORMATION ON THE SECTIONALIZER
PAD.
SEE COMED STANDARD C5293.A FOR ADDITIONAL INFORMATION ON THE TRANSFORMER 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
NOTES:
COMED ELECTRICAL DETAILS
CECO EQUIPMENT FOUNDATION DETAILS
RC
| 2020-07-02T13:28:08-0500 | |
| RAFAEL CRAME |
| 2020-07-09T13:30:52-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .