This solicitation is seeking offers for construction services to establish NAVAIDS facilities serving extended Runway 9R-27L at O'Hare International Airport in Chicago, Illinois. Offerors must have experience completing similar projects valued between $5 million to $10 million at operational airports. The performance period is 605 calendar days with an anticipated start of November 15, 2020. Interested firms must submit their offer by October 7, 2020 including details on past experience, ability to meet the schedule, financial capability, insurance requirements, and small business subcontracting plan. The soliciting agency is the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
o rd -d -a ld r-g .d g n
/2
/2
:1
:2
A
M G re g o ry C
T R S p e n c e r
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
C L
C L
GRADE.
MUST BE INSTALLED MIN. 42" BELOW FINISH
WHERE DUCT SAG IS UNAVOIDABLE, DUCT3.
SHALL BE MEASURED AT C.L. OF RUNS.
MIN. DEPTH FOR ALL DUCT RUNS2.
HANDHOLE/MANHOLE.
BUILDINGS SHALL BE DRAINED BACK TO A
INTO HANDHOLES/MANHOLES. DUCTS ENTERING
ALL DUCTBANKS SHALL BE PITCHED TO DRAIN 1.
(NOT TO SCALE)
DOUBLE SLOPE
SINGLE SLOPE
NOTES:
ALTERNATE:
TYPICAL CED MANHOLE & HANDHOLE
DUCTBANK RELATION
BUILDING FOUNDATION.
HANDHOLE/MANHOLE IS IN EXCESS OF 100’-0" TO
THIS ALTERNATE SHOULD BE CONSIDERED IF LAST
SEAL ALL DUCTS ENTERING BUILDING FOUNDATION.
BLDG. TO ALLOW FOR PROPER DUCT DRAINAGE.
PROVIDE HANDHOLE/MANHOLE 10’-0" FROM
2’-6" MIN. CL.
AVERAGE GRADE
2’-6" MIN. CL.
LEVEL GRADE (OR PAVEMENT SURFACE)
STEEP GRADE
DOWN
CABLES FROM SLIDING
SITUATION TO PREVENT
FOR ALL CABLES IN THIS
PROVIDE CABLE SUPPORTS
2’-6" MIN. CL.
C L
CIRCUIT HANDHOLE
5KV RUNWAY
DESCRIPTION AND NUMBERING.
CONVENTION FOR TITLE/
HANDHOLE NAMING
REFER TO OMP MANHOLE/
NOTE TO DESIGNER:
HANDHOLE
COMMUNICATIONS
CIRCUIT HANDHOLE
5KV TAXIWAY
LOCATIONS.
DRAINS MAY BE USED AT ALL OTHER
SYSTEM WHERE PRACTICAL. FRENCH
PIPE TO NEAREST STORM SEWER
4" SCHEDULE 80, PVC DRAIN
CONDUIT BENDS (TYP))
TRANSITION (MINIMUM 30" RADIUS
CONCRETE ENCASED DUCTBANK
F R
O M
S T
A R
F
A N
S
IT
IO
N
B
A N
H
U
T
M
IN
M
IN
4’ MIN.
REQUIREMENTS OF THE SPECIFIC PROJECT.
IN EACH DUCTBANK WILL DEPEND ON THE
IN A CLUSTER AND NUMBER OF CONDUITS
THE ACTUAL NUMBER OF HANDHOLES 2.
COVERS, REFER TO SPECIFICATION L-115.
FOR LABEL/MARKING ON HANDHOLE1.
COMMON ELECTRICAL DUCTBANK (CED)
(NOT TO SCALE)
RUNS OF COMED AND A MAIN CED DUCTBANK.
4’ MIN. OUT TO OUT SEPARATION BETWEEN
FOR DUCTBANK UNDER PAVEMENT, MAINTAIN3.
EDISON STANDARDS AND SPECIFICATIONS.
MANHOLES REFER TO THE COMMONWEALTH
FOR DIMENSIONS AND DETAILS OF COMED2.
REQUIREMENTS OF THE SPECIFIC PROJECT.
IN EACH DUCTBANK WILL DEPEND ON THE
IN A CLUSTER AND NUMBER OF CONDUITS
THE ACTUAL NUMBER OF HANDHOLES 1.
DUCTBANK (CED)
COMMON ELECTRICAL
5KV RUNWAY CIRCUIT HANDHOLE
5KV TAXIWAY CIRCUIT HANDHOLE
DUCTBANK)
(FURTHEST FROM COMED
COMMUNICATION HANDHOLE
HANDHOLE (TYP.)
FROM THE MAIN DUCTBACK TO EACH
CONCRETE ENCASED TRANSITION DUCTBANK
DUCTBANK (CED). SEE NOTE 1
24-WAY-4" MAIN COMMON ELECTRICAL
COMED MH (SEE NOTE 2)
DUCTBANK
CECO (COMED)
T R
A N
S
IT
IO
N
ALL ELECTRICAL MANHOLES MUST FOLLOW OMP STANDARD DETAILS.2.
SHEETS FOR ACTUAL LOCATION AND LAYOUT FOR MANHOLE CLUSTERS.
ELECTRICAL MANHOLES SHOWN ARE FOR REPRESENTATION ONLY. REFER TO PLAN1.
(NOT TO SCALE)
(NOT TO SCALE)
(NOT TO SCALE)
(NOT TO SCALE)
SECTION
TWO-WAY MANHOLE
SECTIONPLAN
TYPICAL CED MANHOLE AND HANDHOLE DETAILS
HANDHOLE
SECTION
DUCTBANK TO CED HANDHOLE TRANSITION LAYOUT
NOTES:
NOTE:
NOTES:
TYPICAL COMED MANHOLE AND CED HANDHOLE
DUCTBANK SEPARATION REQUIREMENTS
TYPICAL ELECTRICAL MANHOLE DRAIN PLAN
4" PVC SCH. 80 PIPE
DUCTILE IRON
MANHOLE DRAIN (TYP.)
GRADE (OR PAVEMENT)
GRADE (OR PAVEMENT)
PLAN
(NOT TO SCALE)
FOUR-WAY MANHOLE
GRADE (OR PAVEMENT)
PLAN
HANDHOLE
(NOT TO SCALE)
SEE NOTE 2
(6) 4" CONDUITS, COMMUNICATIONS (TYP.)
SEE NOTE 2
(9) 4" CONDUITS, RUNWAY LIGHTING (TYP.)
SEE NOTE 2
(9) 4" CONDUITS, TAXIWAY LIGHTING (TYP.)
2. HANDHOLES REQUIRE CABLE SLACK TO WORK CABLES/SPLICES ABOVE GRADE (TYPICAL).
STRUCTURE WHERE PRACTICAL. FRENCH DRAINS MAY BE USED AT ALL OTHER LOCATIONS.
1. DRAIN ALL MANHOLES AND HANDHOLES TO THE NEAREST OUTFALL OR DRAINAGE
NOTE:
NOTE 2
4’ MIN.
E D
M
IS
S
U E
D F
O R
NAVAIDS
IL
07/24/2019 1898272
ORD-D-ALD09R-G019
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
ALD
CHICAGO O’HARE INTERNATIONAL AIRPORTCHICAGO
PROJECT ENGINEER MGR: ENGINEERING
o rd -d -a ld r-g .d g n
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
RUNWAY 9R-27L NAVAIDS
MANHOLE AND HANDHOLE DETAILS
RC
| 2020-07-02T13:24:06-0500 | |
| RAFAEL CRAME |
| 2020-07-09T12:40:19-0500 | |
| LUIS N DOMINGUEZ |
File details come from the government source that posted it. Updated .