Appendix_C_-_12-0210_AF_Form_66.XLS

Air Force Form XLS spreadsheet 103 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA4814-14-R-0008
Issued by

About this file

AF Form 66

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
FA4814-14-R-0008-0005_(Amendment_05).pdf PDF
FA4814-14-R-0008-0004_(Amendment_04).pdf PDF
Attachment_01 _MACC_SOW_(Amendment_02_to_the_SOW).pdf PDF
FA4814-14-R-0008-0003_(Amendment_03).pdf PDF
FA4814-14-R-0008-0002_(Amendment_02).pdf PDF
Multiple_Award_Construction_Contract_Solicitation_RFIs.pdf PDF
FA4814-14-R-0008-01_Amendment_01.pdf PDF
20140625_MACC_Sample_Proj_Brief.pptx PPTX presentation
Pre-Bid_Sign-In_Sheet_25_Jun_14.pdf PDF
Attachment_1 _MACC_Statement_of_Work_(SOW)-Amendment_01.pdf PDF
Attachment_F-FGUA_Fee_Memo.pdf PDF
Attachment_4 _Performance_Survey.pdf PDF
Appendix_H_-_UFC_3-520-05.pdf PDF
Attahcment_4 _Performance_Survey.pdf PDF
Appendix_E _Design_Requirments.pdf PDF
Attachment_7 _Link_to_the_MacDill_Design_Guide.docx DOCX document
Attachment_2 _Sample_Project_SOW.pdf PDF
Appendix_D-_HAZMAT_List.pdf PDF
Appendix_B_-_Project_Bid_Schedule.xlsx XLSX spreadsheet
FA4814-14-R-0008_MacDill_MACC_Solicitation.pdf PDF
Appendix_G_-_C_D_Disposal_Form.pdf PDF
Attachment_5 _Wage_Determination.pdf PDF
Appendix_A_-_NVZR_12-0210_Drawings.pdf PDF
Attachment_1 _MACC_Statement_of_Work_(SOW).pdf PDF
Appendix_F-_FGUA.pdf PDF
Attachment_3 _Past_Performance_Reference.pdf PDF
Attachment_6 _Background_Check_Template.xls XLS spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 66 GENERAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NUMBER
NVZR 12-0210RPR (SUS) H1 Corrosion Control Deficiencies, Phase 1
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
*INDICATES ITEMS THAT REQUIRE ENGINEER/ARCHITECT OF RECORD REVIEW & ACCEPTANCE PRIOR TO SUBMITTAL TO GOVERNMENTCertification Of ComplianceShop DrawingsSamplesColor selectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionPLAN OR FORMTESTREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
GENERALAPPROVEDDISAPPROVED
G1WORK CLEARANCE REQUEST (AF FORM 103)1Ph 1 NTP+10 DAYS
G2*AS-BUILT DATA121 days after construction completion
G3CONSTRUCTION PROGRESS SCHEDULE1Ph 1 NTP+ 10 DAYS
G4TESTING LABORATORY IDENTIFICATION195% Design + 10 days
G5WARRANTIES110 DAYS BEFORE Final
G6OPERATION AND MAINTENANCE MANUALS110 DAYS BEFORE Final
G7CONSTRUCTION AND UTILITY DATA SHEETS110 DAYS BEFORE Final
G8PROJECT SPECIFIC SAFETY PLAN1Ph 1 NTP+20 DAYS
G9*COMPLETE MATERIALS & COLOR BOARDE33EEEE7 DAYS BEFORE 65% SUBMITTAL
G10*65% DESIGN3/ESEE SCHEDULE
G11*95% DESIGN3/ESEE SCHEDULE
G12*100% DESIGN3/ESEE SCHEDULE
G13Approved FGUA Form 427195% Design + 10 days

BROCK, APRIL E GS-11 USAF AMC 6 CONTRACTING SQ/LGCM:

missing G7See

AF 66 ARCHITECTURAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NUMBER
NVZR 12-0210RPR (SUS) H1 Corrosion Control Deficiencies, Phase 1
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
*INDICATES ITEMS THAT REQUIRE ENGINEER/ARCHITECT OF RECORD REVIEW & ACCEPTANCE PRIOR TO SUBMITTAL TO GOVERNMENTCertification Of ComplianceShop DrawingsSamplesColor selectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionPLANTESTREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
ARCHITECTURALAPPROVEDDISAPPROVED
A1*MILLWORKE3/E33EEE7 DAYS BEFORE 65% SUBMITTAL
A2*DOORS AND HARDWAREEEEEEEWITH 65% SUBMITTAL
A3*THERMAL BOARD INSULATION FOR PERIMETER WALLS AT H3EEEEE65% SUBMITTAL + 7 DAYS
A4*CEILING SYSTEMSEE33EEEE65% SUBMITTAL + 7 DAYS
A5*PAINTS AND COATINGSE33EEE65% SUBMITTAL + 10 DAYS
A6*VCT TILE AND PORECLAIN TILEE33EEE65% SUBMITTAL + 10 DAYS
A7*CEILING ACCESS HATCHESEE3EEEEE65% SUBMITTAL + 14 DAYS
A8*WALL & CORNER GUARDSE33EEEWITH 95% SUBMITTAL
A9*FIRE EXTINGUISHERSEEEEWITH 95% SUBMITTAL
0

AF 66 CIVILSTRUCTURAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NUMBER
NVZR 12-0210RPR (SUS) H1 Corrosion Control Deficiencies, Phase 1
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
*INDICATES ITEMS THAT REQUIRE ENGINEER/ARCHITECT OF RECORD REVIEW & ACCEPTANCE PRIOR TO SUBMITTAL TO GOVERNMENTCertification Of ComplianceShop DrawingsSamplesColor selectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionPLANTESTREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CIVIL & STRUCTURALAPPROVEDDISAPPROVED
S1STRUCTURAL LINTELS FOR ANY NEW OPENINGSEEEEE65% SUBMITTAL PLUS 21 DAYS
0

AF 66 MECHANICAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NUMBER
NVZR 12-0210RPR (SUS) H1 Corrosion Control Deficiencies, Phase 1
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
*INDICATES ITEMS THAT REQUIRE ENGINEER OF RECORD REVIEWCertification Of ComplianceShop DrawingsSamplesColor selectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionPLANTESTREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
MECHANICALAPPROVEDDISAPPROVED
M1HVAC EQUIPMENT AND CONTROLS1111195% design + 10 days
M2DUCTWORK, DAMPERS, HANGERS, FITTINGS111195% design + 10 days
M3DUCT INSULATION111195% design + 10 days
M4REFRIGERANT PIPING AND INSULATION111195% design + 10 days
M5EXHAUST FAN1111195% design + 10 days
M6TEST AND BALANCE CREDENTIALS195% design + 10 days
M7TEST AND BALANCE REPORT195% design + 10 days
M8PLUMBING FIXTURES111195% design + 10 days
M9DOMESTIC WATER PIPING AND INSULATION111195% design + 10 days
M10SANITARY SEWER PIPING AND INSULATION111195% design + 10 days
0

AF 66 ELECTRICAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NUMBER
NVZR 12-0210RPR (SUS) H1 Corrosion Control Deficiencies, Phase 1
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
*INDICATES ITEMS THAT REQUIRE ENGINEER/ARCHITECT OF RECORD REVIEW & ACCEPTANCE PRIOR TO SUBMITTAL TO GOVERNMENTCertification Of ComplianceShop DrawingsSamplesColor selectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionPLANTESTREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
ELECTRICALAPPROVEDDISAPPROVED
E1*receptacles and data devices and1195% DESIGN + 10 DAYS
cabling
E2*lighting fixtures and controls1195% DESIGN + 10 DAYS
E3*electrical panel and breakers11195% DESIGN + 10 DAYS
E4*surge protection devices1195% DESIGN + 10 DAYS
E5*electrical relays/contactors1195% DESIGN + 10 DAYS
E6*Communications hardware and1195% DESIGN + 10 DAYS
equipment
0

AF 66 ENVIRONMENTAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NUMBER
NVZR 12-0210RPR (SUS) H1 Corrosion Control Deficiencies, Phase 1
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
*INDICATES ITEMS THAT REQUIRE ENGINEER/ARCHITECT OF RECORD REVIEW & ACCEPTANCE PRIOR TO SUBMITTAL TO GOVERNMENTCertification Of ComplianceShop DrawingsSamplesColor selectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionPLAN OR FORMTESTREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
ENVIRONMENTALAPPROVEDDISAPPROVED
V1ASBESTOS NESHAP SURVEY AND LEAD-BASED PAINT SCREENING RESULTS1WITH 65% DESIGN
V2ASBESTOS RENOVATION OR DEMOLITION NOTIFICATION FORM195% Design + 10 days
V3POST ABATEMENT REPORT110 DAY AFTER ABATEMENT
V4HAZMAT LIST AND MSDS SHEETS FOR NON-EXEMPT HAZMAT195% Design + 10 days
V5CONTRACTOR HAZMAT PROFILE WORKSHEET110 DAYS BEFORE Final
V6GREEN PROCUREMENT COMPLIANCE FOR FINISHING MATERIALS110 DAYS BEFORE Final
V7CONSTRUCTION AND DEMOLITION DEBRIS TRACKING FORM150% and 100% Completion
V8EMERGENCY GENERATOR TECHNICAL DATA SHEET195% + 10 days

Sheet2