Appendix_A_-_NVZR_12-0210_Drawings.pdf

PDF 12 MB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4814-14-R-0008
Issued by
Department of the Air Force Air Mobility Command

About this file

30 Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FA4814-14-R-0008-0005_(Amendment_05).pdf PDF
FA4814-14-R-0008-0004_(Amendment_04).pdf PDF
FA4814-14-R-0008-0003_(Amendment_03).pdf PDF
Attachment_01 _MACC_SOW_(Amendment_02_to_the_SOW).pdf PDF
FA4814-14-R-0008-0002_(Amendment_02).pdf PDF
Multiple_Award_Construction_Contract_Solicitation_RFIs.pdf PDF
FA4814-14-R-0008-01_Amendment_01.pdf PDF
20140625_MACC_Sample_Proj_Brief.pptx PPTX presentation
Pre-Bid_Sign-In_Sheet_25_Jun_14.pdf PDF
Attachment_4 _Performance_Survey.pdf PDF
Attachment_1 _MACC_Statement_of_Work_(SOW)-Amendment_01.pdf PDF
Attachment_F-FGUA_Fee_Memo.pdf PDF
Attachment_7 _Link_to_the_MacDill_Design_Guide.docx DOCX document
Appendix_B_-_Project_Bid_Schedule.xlsx XLSX spreadsheet
Attachment_1 _MACC_Statement_of_Work_(SOW).pdf PDF
Attachment_2 _Sample_Project_SOW.pdf PDF
FA4814-14-R-0008_MacDill_MACC_Solicitation.pdf PDF
Appendix_G_-_C_D_Disposal_Form.pdf PDF
Attahcment_4 _Performance_Survey.pdf PDF
Appendix_D-_HAZMAT_List.pdf PDF
Attachment_5 _Wage_Determination.pdf PDF
Appendix_E _Design_Requirments.pdf PDF
Appendix_H_-_UFC_3-520-05.pdf PDF
Appendix_C_-_12-0210_AF_Form_66.XLS XLS spreadsheet
Attachment_6 _Background_Check_Template.xls XLS spreadsheet
Appendix_F-_FGUA.pdf PDF
Attachment_3 _Past_Performance_Reference.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P I N K

F L A

M I N G O

A V E

E A G L E

S T A F F

C T

H E R O N

P L

A P R O N

A C C E S S

R D

FLORIDA KEYS AVE

H I L L S B O R O U G H

L O O P

D R

S E

M I

N O L E

I

N D I

A N

P L

H A N G A R

L O O P

D R I V E

OPERATIONS CT

MACHINE SHOP CT

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

26 25

14 7

N

N O

R T

H

M A

G

RE

V

200 4000 100

FEET

G-001.dgn

12-0210

COVER SHEET AND DRAWING INDEX1

SEE SHEET G-004 FOR DRAWING INDEX CONTINUATION

G-001

Sheet Description

Drawing Index

Sheet No.

G-001

G-002 HAUL ROUTE AND ABBREVIATIONS

G-003 GENERAL NOTES AND SYMBOLS LEGEND

Sheet 1 of 62

PROJECT LOCATION MAP

T

IT

L E

S H

T S .T

B L

PROJECT NO: NVZR 12-0210

DESIGN BUILD SOLICITATION

%APPROVED 30 DOCUMENTS FOR

J H

PROJECT SITES

G-701 PROJECT SLIDE

PROJECT SLIDEG-702

C-101

C-102

A-001

A-002

A-003

A-004

A-101

G-004 DRAWING INDEX CONTINUATION

H1, H3

(H1, H3)

MACDILL AFB, FL 33621

HANGAR LOOP DR

ARCHITECTURAL SPECIFICATIONS

ARCHITECTURAL SPECIFICATIONS

ARCHITECTURAL SPECIFICATIONS

ARCHITECTURAL SPECIFICATIONS

EXISTING FLOOR PLAN - HANGAR 1

DEFICIENCIES - PHASE 1

REPAIR (SUS) H1 CORROSION CONTROL

M A

R

13 MAR 14

HANGAR 1 SITE PLAN

HANGAR 3 SITE PLAN

A-102 EXISTING FLOOR PLAN - HANGAR 3

DN

MA

MOCYTILI

BOMRI

A

N

N O

R T

H

M A

G

NVZR:

BLDG 30

Antiterrorism Force Protection

MACDILL AIR FORCE BASE, FLORIDA

6th CIVIL ENGINEER SQUADRON

Sheet No.

Base Civil Engineer

Chief of Construction Management

Chief of Engineering

Facility I.D.

CADD Drawing Name:

Chief of Operations & Maintenance

Communications Squadron

Bioenvironmental

Security Forces

Environmental Engineering

Fire Department

Using Agency

Ground Safety

D A

L E

B R

Y

TAMPA

BAY

101 432 5

TAMPA

CLEARWATER

TO

ST. PETERSBURG

TO

M A

N H

A T

T A

N

GANDY

BRID

GE

VICINITY MAP

KENNEDY

60 AIRPORT

INTERNATL.

TAMPA

H E N

D E R S O N

H

IL

L S B O R O U

G H

B A Y

HAUL

M A

C D I L

L

B A Y S H

O R E

MACDILL AFB

MILES

ROUTE

TAMPA

PORT

BASE CIVIL ENGINEERS

AND CONTRACTING

HOWARD

FRANKLAND

BRID

GE

O

D R

A W

IN

G S

P r o j e c t N u m b e r

G .d g n

:0

:5

E o p lo t t in g

U s t a

V i\ p d f m a c d il l_ a n s ib .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s

T

IT

L E

S H

T S .t b l

.0 in

O

D R

A W

IN

G S

P r o j e c t N u m b e r

G .d g n

:0

E o p lo t t in g

U s t a

V i\ p d f m a c d il l_ a n s ib .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s

T

IT

L E

S H

T S .t b l

.0 in

GOLF COURSE AVE

O

N G

H O

R N

T L

M A R I N A

B A Y

D R

McCLELLAND AVE

B A

Y S

H O

B

V D

GOLF COURSE AVE

M A

R I

N

Y

D

B A

Y S

H O R E

B L

V D

T A

M P A

P O I

T

V D

S T A F F

C I R C L E

H A N G A R

L O O P

D R

BAYSHORE BLVD

H A N G A R

L O O P

D R I V E

P I N K

F L A

M I N G O

A V E

B R O

W N

P E L I C A N

A V E

E A G L E

S T A F F

C T

FLORIDA KEYS AVE

H E R O N

P L

H E R O N

P L

C O N D O R

S T

HILLSBOROUGH LOOP DR

S N

O W

Y

E

G R E T

S T

R

H

B I S

C U S

P L

H I L L S B O R O U G H

L O O P

D R

C Y P

R E S S

S T

A N

D

S T

M A R I N A

B A Y

D R

N I G H T H A

W K

P L

E

P L

H I L L S B O R O U G H

L O O P

D R

S E C O R D

A V E

G

P L

M A R I N A

B A Y

D R

C E N T C O

M

A V E

C O N D O R

S T

RACCOON

C R E E K

A P R O N

A C C E S S

R D

A P R O N

A C C E S S

R D

FLORIDA KEYS AVE

H I L L S B O R O U G H

L O O P

D R

S E

M I

N O L E

I

N D I

A N

P L

H A N G A R

L O O P

D R I V E

C Y P

R E S S

S T

A N

D

S T

M A

C D I

V E

SEA SWALLOW AVE

MACDILL GATE

M A

C D I

E

NORTH BOUNDARY BLVD

BAYSHORE GATE

S O U T H

B O U N D A R Y

B L V D

ZEMKE AVE

S T A F F

C I R C L E

ADMINISTRATION AVE

OPERATIONS CT

MACHINE SHOP CT

ZEMKE AVE

GREAT EGRET AVE

ROYAL TERN AVE

B L

A C

K B I

R D

S T

K I

N G F I S

H E

R

S T

EMERGENCY DR

C H I

N O

O K

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

N O R T H

A P R O N

SKEET RANGE

OLD DUMP

PAD, POWER CHECK WITH

NOISE SUPPRESORS (2 EA)

SOUTHSHORE AVE

GOLF COURSE AVE

N O

R

G

L F

C

O U

R S E

S T

63I

63A

63C

63D

63F

63G

SMALL ARMS

RANGE

IRRIGATION FIELD No. 2

IRRIGATION FIELD No. 4

811 810 809

812 813 814

819820

830831832838840

833837849

704A 947 1242

S O U T H

A P R O N

SAND

FILTER

10721080

26 25

14 7

502 504 503

501B

WASHRACK

POOL

P/A

P/A

MANGROVE SWAMP

P/A

E N L I S T

W

Y

CHEVRON PARK DR.

EAGLE PARK

P/A

P/A

767702

501C

POND

EFFLUENT

FIRST

T A X I

W

A X I

W

A

X I

W

TAXI

WAY

G

T A X I

W A Y

G

TAXIWAY D

T A

X I

W A

Y

J

TAXIWAY K TAXIWAY K TAXIWAY K

T A X I

W A Y

L

FIELD

SOCCER

HANGAR LOOP DR

P/A

84018402

19061908

1807 1805

C H I

N O

O K

S T

FAC 900

ANNEX

CAMP

FAM

63H

2014 2015

POND

EFFLUENT STORAGE

WET WEATHER

NO LONGER USED

OLD IRRIGATION FIELD

W E S

U N

D A

R Y

S T

LEVITOW ST

P/A

DOCK

LOADING

NORTH

CHEVRON PARK

SOUTH

CHEVRON PARK

TRAINING AREA)

(MILITARY ONLY

THUNDER VILLAGE

HILLSBOROUGH BAY

T U S K E G E E

C T

MOBILITY LN

SCALE

1907/09

1903/05

1908/10

1904/06 1840/42

1836/38 1832/34

1828/30

1837/39 1825/27

1841/43

1821/23

1809/11

1805/07

1804/06

1609/11

1613/15

1617/19

1621/23

1625/27

1705/07

1737/39 1733/35

1729/31 1725/27

1721/23

1717/19

1713/15

1709/11

1610/12

1620/22 1624/26

1634/36

1708/10

1736/38

1829/31

1819/21 1815/17

1811/13

1810/121814/161818/20

2401/03

2402/04

2405/07

2409/11

2413/15

2417/19

2406/08

BILLY MITCHELL LOOP

T A

N K

Y

/30

1732/34

/16

MITCHELL PARK

PARK 999

WATER TWR

CLOSED

CLOSED

CLOSED

C L

O S E

D

T A X I

W A Y

C L O S E D

T A X I

W A Y

C L O S E D

CLOSED

CLOSED

AND HOLDING

PAD, WARM-UP

506A

895896

GATE

TAMPA

PORT

MAIN GATE

CENTER PIER

DAVIS CONFERENCE

501A

TAXIWAY E

CENTCOM AVE

P/A

P/A

P/A

881A

P/A

WAYSOCOM

MEMORI

AL

T A X I

W A Y

E

T A X I

W A Y

E

P/A

P/A

287286

506E

B I

R D

B A T

H T

A X I

W A

Y

P

C L

O S E

D

CHECK

PAD, POWER

63J

T

T

T

T

T

T

T

T

T

T

O L E

A N

D E

R

P L

DOCK

LOADING807

P/A

MARAUDER DR

CONSTELLATION BLVDATLAS AVE

THUNDERJET PL

W A

R R I

Y

F O R T R E S S

D R

20032005

8518/20

8524/26

8530/32

8534/36

8540/42 85448538

ROY HODE CT

8426/28

8422/24

8416/18

8410/12

8406/08

TAMPA POINT BLVD

C H I

F

I

C

P H A N T O

M

D R

FAC 898

PARK

HAWK

FAC 1183

NORTH GOLF COURSE

FAC 1193

SOUTH GOLF COURSE

P/A

501D

501E

SUPPORT FACILITY

FUTURE MISSION

GOLF COURSE ACCESS RD

STRATOTANKER DR

B L

A C

K B I R

D

S T

306A

GARAGE

PARKING

FUTURE

STAND

FILL

TRUCK

SOUTHSHORE AVE

Z E

M K

E

GREAT E

GRET AVE

P/A

F L O R I D A

K E Y S

A V E

P O S T

C A B L E

T U R N S T O N E

A V

ET

A M P A

P O I

V D

VQ SITE

FUTURE

O

O R I D A

K E Y S

A V E

ZONE 7

JSOU

FUTURE

FACILITY

SCREENING

POSTAL

FUTURE

F O

R T

R E

PANAMA CANAL CT

RENNER CT

CIR

PITSENBARGER

HERITAGE PARK

BOYD CT

CABBAGE CT

OKINAWA CT

OKINAWA CT

ESTHER BLAKE CT

POOL

8422/20

8426/24

8430/28

8476/78

8480/82

2010 2012 2014

8504/06

8520/22

8516/18

1912/14

1918/20

1922/24

1921/23

2035/37

2047/49

1915/171903/05

2059/61

2053/55

2041/43

1911/13

1907/09 2015/17

2011/13 2007/09

1941/43

1944/46

1948/50

1952/54

1956/58

1960/62

1976/78

1972/74

1968/70

1964/661955/57

1959/61

1951/53

2008/10

2012/14

2016/18 2004/06

2008/10

2012/142011/13

2016/18

2021/23

2029/31

2020/2022

2025/27 2045/47

2041/43 2037/39

2033/35

2059/61

2060/62

2056/58

2052/54 2044/46

2038/40

2034/36

2051/53

2055/57

2030/32

2024/26

P/A

P/A

P/A

SAINT PETERSBURG

L O O P

1037 1033

TAMPA

POI

NT

BLVD

LUZON

DR

BASEBALL

LITTLE LEAGUE

TRACK

RUNNING

FIELD

FOOTBALL

FIELD

SOCCER

SENTRY POINT

2029/2027

8442/2031 2023/2021

2026/2024

2030/2028

8468/2032

CUP

FUTURE

SOD-C

FUTURE

T A

M

I

V D

ABBREVIATIONS

A B

B R

E V I

A T I

O N

S

H A

U

U

D

HAUL ROUTE

RE

V

G d g n

N

N O

R T

H

M A

G

G-002

OUTBOUND VEHICLES

ROUTE FOR ALL

IN NON-COMMERCIAL VEHICLES

INBOUND HAUL ROUTE FOR CONTRACTOR LABOR

COMMERCIAL VEHICLES

INBOUND HAUL ROUTE FOR

INTERBAY

AVE.

T A

N K

Y

M A

N H

A T T

E

T

IT

L E

S H

T S .T

B L

S Q

U I

T A

WOOD WD

VINYL COMPOSITION TILE VCT

UNLESS NOTED OTHERWISE UNO

TYPICAL TYP

TEMPORARY BENCH MARK TBM

STAINLESS STEEL SS

SQUARE FEET SF

SQUARE SQ

SPECIFICATION SPEC

SOLID CORE WOOD SCW

SIDEWALK S/W

SECTION SECT

ROOF DRAIN RD

REINFORCING REINF

REINFORCED CONCRETE PIPE RCP

PRESSURE TREATED P.T.

POUNDS LBS

POLYVINYL CHLORIDE PVC

OUTSIDE DIAMETER O.D.

ON CENTER O.C.

NOT TO SCALE NTS

NOT IN CONTRACT NIC

NOT APPLICABLE N/A

MINIMUM MIN

MECHANICAL MECH

MEAN SEA LEVEL MSL

MAXIMUM MAX

MANUFACTURER MANUF

LINEAR FEET LF

LIMEROCK L/R

LIGHTWEIGHT LT WT

KILOVOLT - AMPERES KVA

JOINT JT

INVERT INV

INSIDE DIAMETER ID

INCH IN

IN ACCORDANCE WITH IAW

HORIZONTAL HORIZ

HOLLOW METAL HM

HIGH INTENSITY DISCHARGE HID

GYPSUM BOARD GYP BD

GROUND FAULT INTERRUPTER GFI

GROUND GND

GALVANIZED GALV

FOOT FT

FLORIDA DEPT. OF TRANSPORTATION FDOT

FLOOR DRAIN F.D.

FIRE EXTINGUISHER F.E.

FIRE ALARM TRANSCEIVER PNL FATP

FIRE ALARM CONTROL PANEL FACP

FIELD VERIFY F.V.

FEET FT

EXTERIOR EXT

EXPANSION JOINT E.J.

ELLIPTICAL REINFORCED CONCRETE PIPE ERCP

ELEVATION EL OR ELEV.

ELECTRIC WATER COOLER E.W.C.

DUCTILE IRON PIPE DIP

DIMENSION DIM

DIAMETER DIA

DIAGONAL DIAG

DETAIL DET

COPPER CU

CONTINUOUS CONT

CONSTRUCT/CONTROL JOINT CJ

CONCRETE MONUMENT CM

CONCRETE MASONRY UNIT CMU

CONCRETE CONC

COLUMN COL

CIRCUIT CKT

CENTER LINE CL

BOTTOM BOT OR BT.

ASPHALT ASPH

ALUMINUM ALUM

ABOVE FINISH FLOOR A.F.F.

J H

M O

N

(H1, H3)

PROJECT SITES

DN

MA

MOCYTILI

BOMRI

A

E

O

P lo t t in g

U s t a

V i\

P D

F

M a c

D il l_

A N

S

IB

P

O .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s

T

IT

L E

S H

T S .t b l

.0 in

C A e a d e r

S I

Z

A W I

N G

R E

D U

C E

D

I T x

A N

A W I

N G

I.D.

Facility

M A

C D I

R

S

O R I

D A

Sheet No.

V

G I

N E

Q

U A

D R

O N

D a t e

D e s c r i p t i o n

D a t e

D r a w i n g a m e

D r a w y

D e s i g n d

A p p r o v

R e v i e w

M a r k A p p r

O

D R

A W

IN

G S

P r o j e c t N u m b e r

G .d g n

:4

62Sheet of

P R

O J

E

D E

SI

IL

D

SO

L

IC

IT

A T

IO

N

A P P R

O V E D

D

O C

U M

E N

T S

F O R

J

N R

Y

H1, H3

C O

N T

R

F I

C I

E N

C I

E S

P H

A

E

P A I

R

S U

R R

O S I

O N

R

RE

G d g n

A

M B

O

G E

N D

G E

N E

R

T

X X

ELEVATION SYMBOL

SECTION SYMBOL

SECTION LETTER

DETAIL NUMBER

DETAIL SYMBOL

CUTTING PLANE (TYP.)

INDICATES DIRECTION OF

ELEVATION LETTER

X X

X X

SYMBOLS LEGEND

SHEET NUMBER WHERE SHOWN

SHEET NUMBER WHERE SHOWN

SHEET NUMBER WHERE SHOWN

SHEET NUMBER REFERENCED FROM

SHEET NUMBER REFERENCED FROM

SHEET NUMBER REFERENCED FROM

GENERAL NOTES (CONT.)

GENERAL NOTES

SCHEMATIC DESIGN:

ROOM NUMBER/NAME

OFFICE

TITLE

DETAIL TITLE

SECTION/

ELEVATION/

SHEET NUMBER WHERE SHOWN

PLAN NUMBER

ENLARGED PLAN SYMBOL

SHEET NUMBER REFERENCED FROM

ABANDONED MONITORING WELL

ACTIVE MONITORING WELL

16. THE MACDILL DESIGN GUIDE SHALL BE CONSIDERED TO BE A PART OF THESE NOTES AS IF INCLUDED HEREIN.

15. ALL FINISHED WORK MUST BE PROPERLY PROTECTED FROM DAMAGE.

COMPREHENSIVENESS OF THEIR BID.

OCCUR IN EVERY PROJECT, BUT ARE INTENDED TO GIVE THE CONTRACTOR INFORMATION REGARDING THE EXPECTED

THIS WORK SHOULD BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT, IN WRITING. ALL ITEMS LISTED MAY NOT

FORMED REGARDING ALL THE MANY NECESSARY ITEMS REQUIRED TO PERFORM THE WORK. ANY QUESTIONS REGARDING

14. THE CONTRACTOR AND ITS SUBCONTRACTORS ARE EXPECTED TO BE KNOWLEDGEABLE IN THEIR TRADES AND WELL IN-

INTEGRITY OF THE MATERIAL AND / OR SYSTEM.

WHICH THEY ARE ADJACENT OR JUXTAPOSED TO, WITH APPROPRIATE TRANSITIONS TO MAINTAIN CONTINUITY AND

13. UNLESS NOTED OTHERWISE, NEW MATERIALS, SUBSTRATES, FINISHES ARE EXPECTED TO MATCH THE EXISTING TO

OF WHATSOEVER NATURE AND KIND, ARISING FROM OR ON ACCOUNT OF THE USE OF THIS CONCEPT DESIGN.

INCURRED OR PAID, ARISING OUT OF, OR ON ACCOUNT OF ANY ERRORS OR OMISSIONS, OR ANY OTHER DAMAGES

LIABILITIES, CLAIMS, OBLIGATIONS, JUDGEMENTS, SUITS, COSTS, DAMAGES, EXPENSES, ATTORNEYS’ FEES, GOVERNMENT, AKIMA, IT’S SUBCONTRACTORS, REPRESENTATIVES, OFFICERS, AND EMPLOYEES FROM ANY AND ALL

MATION SHOWN ON THESE PLANS. THE CONTRACTOR DOES HEREBY AGREE TO INDEMNIFY AND HOLD HARMLESS THE

THE GOVERNMENT, AKIMA, AND IT’S SUBCONTRACTORS HAVE NO LIABILITY OR RESPONSIBILITY FOR THE INFOR-

FEATURES MUST BE PERFORMED PRIOR TO CONSTRUCTION START.

THESE PLANS ARE NOT DETAILED FINAL DESIGNS. FIELD VERIFICATION OF ALL EXISTING UTILITIES AND

THE INFORMATION CONTAINED IN THESE PLANS IS SCHEMATIC AND BASED ON AVAILABLE AS-BUILT INFORMATION.

G-003

1ENLARGED PLAN

MDXX-XXXX

MDXX-XXXX

X-XXX X-401

MW

MW

TION MUST ALSO BE CLEARLY STATED AS WELL AS ANY COST DIFFERENTIAL.

TIONS, ALONG WITH ITS BID, IN ORDER FOR THE SUBSTITUTION TO BE CONSIDERED. REASON FOR THE SUBSTITU-

12. THE CONTRACTOR MUST PROVIDE COMPLETE SPECIFICATIONS AND ENGINEERING DATA FOR ANY PROPOSED SUBSTITU-

11. UNACCEPTABLE WORK MUST BE REMOVED AND REDONE AT THE CONTRACTORS EXPENSE.

DISCOVERY.

ANY SUCH CONFLICTS SHOULD BE BROUGHT TO THE ATTENTION, IN WRITING, OF THE GOVERNMENT IMMEDIATELY UPON

OR DO NOT AGREE CONSISTENTLY, THE BETTER, GREATER, LARGER QUANTITY OR HIGHER QUALITY SHALL BE PROVIDED.

10. IF MATERIALS, QUANTITIES, SIZES, GRADES, STRENGTHS CALLED FOR WITHIN THESE DOCUMENTS ARE IN CONFLICT

LABELS WHEN APPLICABLE.

9. UNLESS SPECIFIED OTHERWISE, ALL MATERIALS FOR THIS PROJECT SHALL BE NEW AND SHALL BEAR UNDERWRITERS

BRIS MUST BE PROPERLY DISPOSED OF OFF SITE.

CADE, WEATHERPROOF, SECURE THE PROJECT AS WELL AS PERFORM DAILY CLEAN-UP. ALL CONSTRUCTION RELATED DE-

8. THE CONTRACTOR MUST TAKE ALL NECESSARY STEPS THROUGHOUT THE DURATION OF THE PROJECT TO PROPERLY BARRI-

CONFLICTS, DELAYS AND REWORK.

PROPER MANPOWER, PROPER SURFACE PREPARATION FOR THE VARIOUS FINISHES AND MATERIALS, THEREBY MINIMIZING

CONTRACTOR. IN ORDER TO ENSURE PROPER SEQUENCING, PROPER TEMPORARY MEASURES, PROPER SUPPORT FRAMING,

7. ALL TRADES / WORKERS ARE EXPECTED TO COORDINATE THEIR WORK WITH THE OTHER TRADES / WORKERS THROUGH THE

BY THE CONTRACTOR, UNLESS SPECIFICALLY EXCLUDED.

AND / OR CUSTOMARILY REQUIRED FOR A PROJECT OF THIS SIZE AND TYPE WILL BE ASSUMED TO HAVE BEEN INCLUDED

6. THOSE ITEMS REASONABLY INFERRED BY THESE DOCUMENTS, READILY APPARENT BY A THOROUGH SITE INSPECTION

TO RESULT IN A COMPREHENSIVE, COMPLETE, FUNCTIONING AND FINISHED PROJECT.

CIPLINE AND CONTROL, SCHEDULING, EQUIPMENT, MATERIALS, SAFETY PROCEDURES, MEANS AND METHODS REQUIRED

CAPABLE OF PROVIDING THE FINAL DESIGN, AND LABOR, SUPERVISION, INSURANCES, COORDINATION, WORKER DIS-

WORK AND THOROUGHLY FAMILIARIZED HIMSELF WITH THE NATURE AND EXTENT OF THE WORK TO BE DONE AND IS

5. THE CONTRACTOR BY SUBMISSION OF ITS BID, ACKNOWLEDGES THAT HE HAS VISITED THE SITE OF THE PROPOSED

AND ELEMENTS AS WELL AS TO MAINTAIN COMPLIANCE WITH THE VARIOUS APPLICABLE CODES.

NEED TO BE ADJUSTED AS NECESSARY TO RESULT IN PROPER POSITIONING WITH RELATION TO EXISTING CONDITIONS

COMINGS IN THE BIDS FROM THOSE ENTITIES UPON WHICH THEY WILL RELY TO PERFORM THE WORK. NEW WORK WILL

WILL BE EXPECTED TO ENSURE THE COMPREHENSIVENESS OF THEIR BID AND TO ACCOUNT FOR ANY LACK, OR SHORT-

ORDER TO RESULT IN A COMPLETE, WEATHER PROOF, FULLY FUNCTIONING, FINISHED PROJECT. THE CONTRACTOR

BE EXTENSIVE ENOUGH TO PROPERLY EVALUATE THE EXTENT OF WORK NECESSARY AND TO PERFORM THE WORK IN

THE EXPERIENCE AND CONSTRUCTION KNOWLEDGE OF THE CONTRACTOR, DESIGNERS, AND JOBSITE PERSONNEL MUST

PIECE OF MATERIAL OR HARDWARE THAT EXISTS ON THE PROJECT. THEY SHOULD NOT BE SCALED FOR DIMENSIONS.

4. THESE DRAWINGS ARE SOMEWHAT DIAGRAMMATIC, AND ARE NOT INTENDED TO DEPICT EVERY DETAIL, CONDITION, REGULATIONS AND ALL RELATED/ REFERENCED DOCUMENTS.

DER THE REQUIREMENTS OF THE 2012 INTERNATIONAL BUILDING CODE, D.O.D. UFC’S, APPLICABLE GOVERNMENT

3. THE PROJECT IS LOCATED WITHIN THE JURISDICTION OF MACDILL AIR FORCE BASE, TAMPA, FL. AND FALLS UN-

SURED, EXPERIENCED AND QUALIFIED TO PERFORM ITS RESPECTIVE DUTIES.

SUBCONTRACTORS ARE FULLY INFORMED. THE CONTRACTOR HEREBY WARRANTS THAT ITS PROPERLY LICENSED, IN-

REQUIREMENTS OF THESE DOCUMENTS. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL OF IT’S

BE THEIR RESPONSIBILITY TO ENSURE THAT EACH OF THEIR BIDS IS IN COMPLIANCE AND AGREEMENT WITH THE

2. THESE NOTES ARE APPLICABLE TO THE CONTRACTOR AND ITS SUBCONTRACTORS ON THIS PROJECT AND IT SHALL

MUST NOTIFY THE GOVERNMENT IN YOUR BID SUBMITTAL PACKAGE.

WITHIN THESE DOCUMENTS THAT WILL NOT COMPLY WITH THESE "GREEN PROCUREMENT REQUIREMENTS", YOU

NATED MATERIALS WHICH WILL BE USED IN THIS PROJECT. IF THERE ARE SPECIFIC MATERIALS SPECIFIED

TO INCLUDE ALL THE NEEDED PAPERWORK TO SUPPORT COMPLIANCE WITH THESE REQUIREMENTS FOR THE DESIG-

SCOPE OF WORK AND SUPPLEMENTAL GENERAL REQUIREMENTS. THE CONTRACTOR’S BID SUBMITTAL IS EXPECTED

1. EPA MINIMUM RECOVERED CONTENT PERCENTAGES FOR VARIOUS MATERIALS ARE GIVEN IN THE ACCOMPANYING

J

N R

Y

J

B A

T C

H E

L D

E R

DN

MA

MOCYTILI

BOMRI

A

E

O

P lo t t in g

U s t a

V i\

P D

F

M a c

D il l_

A N

S

IB

P

O .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s s it e p la n g r e y

.t b l

.0 in

C A a d e r

S I

A W I

N G

R E

D U

C E

D

I T x

A N

A W I

N G

I.D.

Facility

M A

C D I

R

S

O R I

D A

Sheet No.

V

G I

N E

U A

D R

O N

D a t e

D e s c r i p t i o n

D a t e

D r a w i m e

D r a

D e s i g n

A p p r o v

R e v i e w

M a r k A p p r

O

D R

A W

IN

G S

P r o j e c t N u m b e r

G .d g n

:4

62Sheet of

P R

O J

E

D E

SI

IL

D

SO

L

IC

IT

A T

IO

N

A P P R

O V E D

D

O C

U M

E N

T S

F O R

N R

Y

H1, H3

C O

N T

R

F I

C I

E N

C I

E S

P H

A

E

P A I

R

S U

R R

O S I

O N

R

G d g n

M O

N

J H

G-004

C

O N

T I

N U

E D

D R

A W I

N G

I

N D

E X

Sheet Description

Drawing Index

Sheet No. Sheet Description

Drawing Index

Sheet No.

M-001

M-002

M-101

M-102

MECHANICAL SPECIFICATIONS

MECHANICAL SPECIFICATIONS

ELECTRICAL SPECIFICATIONS

ELECTRICAL SPECIFICATIONSE-002

E-100

E-101

ELECTRICAL SYMBOL LEGEND

N R

Y

MECHANICAL SPECIFICATIONS

MECHANICAL SPECIFICATIONS

M-003 MECHANICAL SPECIFICATIONS

M-004

M-005

E-102

A-401

A-402

A-403

A-404

A-405

A-406

A-407

A-408

A-901 PROJECT PHOTOS

A-902 PROJECT PHOTOS

A-903 PROJECT PHOTOS

A-904 PROJECT PHOTOS

A-905 PROJECT PHOTOS

A-906 PROJECT PHOTOS

A-907 PROJECT PHOTOS

A-908 PROJECT PHOTOS

A-909 PROJECT PHOTOS

A-910 PROJECT PHOTOS

A-911 PROJECT PHOTOS

A-912 PROJECT PHOTOS

A-201 INTERIOR ELEVATIONS AND SECTIONS

E-401

E-402

E-403

E-404

E-405

E-406

E-407

M-401

M-402

M-403

M-404

P-001 PLUMBING SPECIFICATIONS

P-002 PLUMBING SPECIFICATIONS

P-101

P-401

E-001

ENLARGED DEMO FLOOR PLAN - HANGAR 3(ABANDONED SPACE)

ENLARGED DEMO FLOOR PLAN - HANGAR 1(E&E OFFICES)

ENLARGED DEMO FLOOR PLAN - HANGAR 1(E&E BATTERY)

ENLARGED DEMO FLOOR PLAN-HANGAR 1(WASHRACK OFFICES)

ENLARGED FLOOR PLAN - HANGAR 3(NEW E&E OFFICES)

ENLARGED FLOOR PLAN - HANGAR 1(NEW WASHRACK OFFICES)

ENLARGED FLOOR PLAN - HANGAR 1(NEW FIBERGLASS SHOP)

ENLARGED DEMO FLOOR PLAN - HANGAR 1(FIBERGLASS SHOP)

OVERALL PLUMBING PLAN - HANGAR 3

ENLARGED PLUMBING PLAN - HANGAR 3

OVERALL HVAC PLAN - HANGAR 1

OVERALL HVAC PLAN - HANGAR 3

ENLARGED DEMO HVAC PLAN - HANGAR 3(ABANDONED SPACE)

ENLARGED HVAC PLAN - HANGAR 3(NEW E&E OFFICES)

ENLARGED HVAC PLAN - HANGAR 1(NEW WASHRACK OFFICES)

ENLARGED HVAC PLAN - HANGAR (NEW FIBERGLASS SHOP)

OVERALL ELECTRICAL PLAN - HANGAR 1

OVERALL ELECTRICAL PLAN - HANGAR 3

ENLARGED DEMO ELEC. PLAN-HANGAR 3(ABANDONED SPACE)

ENLARGED DEMO ELECTRICAL PLAN-HANGAR 1(E&E OFFICES)

ENLARGED DEMO ELECTRICAL PLAN-HANGAR 1(E&E BATTERY)

ENLARGED DEMO ELEC. PLAN-HANGAR 1(FIBERGLASS SHOP)

ENLARGED ELECTRICAL PLAN - HANGAR 3(NEW E&E OFFICES)

ENLARGED ELEC. PLAN - HANGAR 1(NEW WASHRACK OFFICES)

ENLARGED ELEC. PLAN - HANGAR 1(NEW FIBERGLASS SHOP)

DN

MA

MOCYTILI

BOMRI

A

E

O

P lo t t in g

U s t a

V i\

P D

F

M a c

D il l_

A N

S

IB

P

O .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s s it e p la n g r e y

.t b l

.0 in

C A a d e r

S I

A W I

N G

R E

D U

C E

D

I T x

A N

A W I

N G

I.D.

Facility

M A

C D I

R

S

O R I

D A

Sheet No.

V

G I

N E

U A

D R

O N

D a t e

D e s c r i p t i o n

D a t e

D r a w i m e

D r a

D e s i g n

A p p r o v

R e v i e w

M a r k A p p r

O

D R

A W

IN

G S

P r o j e c t N u m b e r

G .d g n

:4

62Sheet of

P R

O J

E

D E

SI

IL

D

SO

L

IC

IT

A T

IO

N

A P P R

O V E D

D

O C

U M

E N

T S

F O R

N R

Y

H1, H3

C O

N T

R

F I

C I

E N

C I

E S

P H

A

E

P A I

R

S U

R R

O S I

O N

R

REF TO SHEET A-101

FOR ACCURATE LAYOUT

HVAC

EXISTING

TOOL ROOM

RE

V

G d g n

J H

G-701

M O

N

N R

Y

P R

O J

E

I

D E

1KEYNOTES:

HANGAR 1

NUMBERS/ NAMES MAY VARY.

INCLUDED FOR ESTIMATING PURPOSES. ACTUAL ROOM

ARE SO NOTED. ADDITIONAL DETAILED DRAWINGS ARE

ITEMS WHICH ARE INCLUDED IN THIS PHASE 1 PROJECT

OVERALL CONCEPT OF THE CORROSION CONTROL PROJECT.

NOTE: THIS GENERAL ’BLOCK’ DRAWING IS FOR THE

RELOCATED TO E&E BATTERY SHOP, H1.

THIS AREA FUNCTION & PERSONNEL TO BE

RELOCATED TO E&E OFFICE AREA, H1.

THIS OFFICE AREA PERSONNEL TO BE

AS PER DRAWING A-101.

THIS AREA WILL BE RELOCATED TO H3

NO WORK FOR THIS PROJECT.

AND E&E FUNCTIONS ARE RELOCATED TO HANGAR 3.

THE HANGAR 3 WORK IS COMPLETED, ACCEPTED,

NOTE: WORK IN THIS HANGAR CANNOT BEGIN UNTIL

DN

MA

MOCYTILI

BOMRI

A

E

O

P lo t t in g

U s t a

V i\

P D

F

M a c

D il l_

A N

S

IB

P

O .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s s it e p la n g r e y

.t b l

.0 in

C A a d e r

S I

A W I

N G

R E

D U

C E

D

I T x

A N

A W I

N G

I.D.

Facility

M A

C D I

R

S

O R I

D A

Sheet No.

V

G I

N E

U A

D R

O N

D a t e

D e s c r i p t i o n

D a t e

D r a w i m e

D r a

D e s i g n

A p p r o v

R e v i e w

M a r k A p p r

O

D R

A W

IN

G S

P r o j e c t N u m b e r

G

.d g n

:4

62Sheet of

P R

O J

E

D E

SI

IL

D

SO

L

IC

IT

A T

IO

N

A P P R

O V E D

D

O C

U M

E N

T S

F O R

N R

Y

H1, H3

C O

N T

R

F I

C I

E N

C I

E S

P H

A

E

P A I

R

S U

R R

O S I

O N

R

G d g n

J H

G-702

M O

N

N R

Y

P R

O J

E

I

D E

KEYNOTES:

SEE SHEET A-102.

IN ORDER TO HOUSE THE E&E FUNCTIONS FROM HANGAR 1.

THIS AREA IN HANGAR 3 WILL BE RENOVATED/RECONFIGURED

HANGAR 3

NUMBERS/ NAMES MAY VARY.

INCLUDED FOR ESTIMATING PURPOSES. ACTUAL ROOM

ARE SO NOTED. ADDITIONAL DETAILED DRAWINGS ARE

ITEMS WHICH ARE INCLUDED IN THIS PHASE 1 PROJECT

OVERALL CONCEPT OF THE CORROSION CONTROL PROJECT.

NOTE: THIS GENERAL ’BLOCK’ DRAWING IS FOR THE

NOTE: THIS WORK MUST BE COMPLETED, ACCEPTED, AND OCCUPIED BEFORE HANGAR 1 WORK CAN START.

DN

MA

MOCYTILI

BOMRI

A

E

O

P lo t t in g

U s t a

V i\

P D

F

M a c

D il l_

A N

S

IB

P

O .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s s it e p la n g r e y

.t b l

.0 in

C A a d e r

S I

A W I

N G

R E

D U

C E

D

I T x

A N

A W I

N G

I.D.

Facility

M A

C D I

R

S

O R I

D A

Sheet No.

V

G I

N E

U A

D R

O N

D a t e

D e s c r i p t i o n

D a t e

D r a w i m e

D r a

D e s i g n

A p p r o v

R e v i e w

M a r k A p p r

O

D R

A W

IN

G S

P r o j e c t N u m b e r

G

.d g n

:5

:0

62Sheet of

P R

O J

E

D E

SI

IL

D

SO

L

IC

IT

A T

IO

N

A P P R

O V E D

D

O C

U M

E N

T S

F O R

N R

Y

H1, H3

C O

N T

R

F I

C I

E N

C I

E S

P H

A

E

P A I

R

S U

R R

O S I

O N

R

N G A R

L O O P

D R I V E

P I N K

F L A

M I N G O

A V E

E A G L E

S T A F F

C T

A P R O N

A C C E S S

R D

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

P/A

U P

U P

U P

U P

M E C H

S T A I R S

F L O O R

A R E A

M A I N T E N A N C E

S T O C K

M E C H

H A L L

S T A I R S

C O

M P U T E R

N C O I C

B R E A K

R O O

M

S T A I R S

S T O R A G E

P A I N T

S T O R A G E

E Q U I P

M E N T

H A L L

O F F I C E

O F F I C E

S T O R A G E

R O O

M T O O L

P A R T S

S H O P

P A R A C H U T E

H A L L

MECH

C O

S T A I R S

I N S P E C T I O N

L I F E

R A F T

S T O R A G E

B R E A K1

R O O

M E L E C

M E N

W O

M E N

M E N

W O

M E N

E L E C

M E C H

F I B E R G L A S S

S H O P

O F F I C E

O F F I C E

C O

A R E A

P A I N T

B O O T H

RE

V

C d g n

J H

M O

N

N R

Y

C-101

N

N O

R T

H

M A

G

0 100100

FEET

KEYNOTES:

X X1

FLIGHTLINE FENCE

H A

N G

A

A N

SCALE: 1"= 100’

HANGAR 1 SITE PLAN

IS PER MACDILL STANDARDS.

FENCING, GATES, AND SO FORTH

OCCUPIED BY THE E&E FUNCTIONS.

COMPLETE, ACCEPTED, AND

UNTIL THE WORK IN H3 IS

STAGING AREA CANNOT BE SETUP

BEGINNING OF WORK. THIS

USER BY CONTRACTOR PRIOR TO

AREA. MUST BE VERIFIED WITH

PROPOSED CONSTRUCTION STAGING

DN

MA

MOCYTILI

BOMRI

A

E o p lo t t in g

U s t a

V i\ p d f m a c d il l_ a n s ib .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s s it e p la n g r e y

.t b l

.0 in

C A a d e r

S I

A W I

N G

R E

D U

C E

D

I T x

A N

A W I

N G

I.D.

Facility

M A

C D I

R

S

O R I

D A

Sheet No.

V

G I

N E

U A

D R

O N

D a t e

D e s c r i p t i o n

D a t e

D r a w i m e

D r a

D e s i g n

A p p r o v

R e v i e w

M a r k A p p r

O

D R

A W

IN

G S

P r o j e c t N u m b e r

C .d g n

:5

62Sheet of

P R

O J

E

D E

SI

IL

D

SO

L

IC

IT

A T

IO

N

A P P R

O V E D

D

O C

U M

E N

T S

F O R

N R

Y

H1, H3

C O

N T

R

F I

C I

E N

C I

E S

P H

A

E

P A I

R

S U

R R

O S I

O N

R

G L E

S T A F F

C T

H E R O N

P L

H A N G A R

L O O P

D R I V E

OPERATIONS CT

MACHINE SHOP CT

14 7

42 27

OFFICE

STOR

MEN

ENTRY

CORRIDOR

STOR

OFFICE OFFICE OFFICE

OFFICE OFFICE

CORRIDOR

BREAKROOM

STOR

OFFICE

OFFICE

MECH

STOR

STOR

ENTRY

STOR

ENTRY

STOR

ENTRY

BREAKROOM/LOUNGE

WORKSHOP

WORKSHOP

WORKSHOP

MECHOFFICE

OFFICE

OFFICE

OFFICE

OFFICE

TELE

WORKSHOP

WORKSHOP

GENREATOR ROOM

MECH

STOR

OFFICE

CORRIDOR

ENTRY

STOR

OFFICEOFFICE

COMPUTER

OFFICE

WEATHER OFFICE

ENTRY

OPS RECEPTION

WEATHER OFFICE

STOR

STOR

STOR

STOR

OPS LOUNGE

KITCHENETTE

OFFICE

OFFICEOFFICE

OFFICEOFFICE

MEN

WOMEN

CORRIDOR

WOMEN

STOR

MEN

ENTRY

DV LOUNGE

OFFICE

UP

MECH

UP

UPUP

UP

WH

ROOM

AIR COMPRESSOR

KITCHEN

WOMEN

RE

V

J H

M O

N

N R

Y

N

N O

R T

H

M A

G

0 100100

FEET

SCALE: 1"= 100’

H3 SITE PLAN

C-102

A N

C d g n

KEYNOTES:

FLIGHTLINE FENCEX X1

IS PER MACDILL STANDARDS.

FENCING, GATES, AND SO FORTH

WORK MUST OCCUR BEFORE H1 WORK.

BEGINNING OF WORK. THIS H3

USER BY CONTRACTOR PRIOR TO

AREA. MUST BE VERIFIED WITH

PROPOSED CONSTRUCTION STAGING

DN

MA

MOCYTILI

BOMRI

A

E o p lo t t in g

U s t a

V i\ p d f m a c d il l_ a n s ib .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s s it e p la n g r e y

.t b l

.0 in

C A a d e r

S I

A W I

N G

R E

D U

C E

D

I T x

A N

A W I

N G

I.D.

Facility

M A

C D I

R

S

O R I

D A

Sheet No.

V

G I

N E

U A

D R

O N

D a t e

D e s c r i p t i o n

D a t e

D r a w i m e

D r a

D e s i g n

A p p r o v

R e v i e w

M a r k A p p r

O

D R

A W

IN

G S

P r o j e c t N u m b e r

C .d g n

:5

:4

62Sheet of

P R

O J

E

D E

SI

IL

D

SO

L

IC

IT

A T

IO

N

A P P R

O V E D

D

O C

U M

E N

T S

F O R

N R

Y

H1, H3

C O

N T

R

F I

C I

E N

C I

E S

P H

A

E

P A I

R

S U

R R

O S I

O N

R

A d g n

A-001

M O

N

ARCHITECTURAL SPECIFICATIONS:

S P

E C I

F I

C A

T I

O N

S

A R

C H I

T E

C T

U R

A L

J H

N R

Y

DN

MA

MOCYTILI

BOMRI

A

E o p lo t t in g

U s t a

V i\ p d f m a c d il l_ a n s ib .p lt c f g

O

P lo t t in g

U s t a

V i\

P e n t a b s s it e p la n g r e y

.t b l

.0 in

C A a d e r

S I

A W I

N G

R E

D U

C E

D

I T x

A N

A W I

N G

I.D.

Facility

M A

C D I

R

S

O R I

D A

Sheet No.

V

G I

N E

U A

D R

O N

D a t e

D e s c r i p t i o n

D a t e

D r a w i m e

D r a

D e s i g n

A p p r o v

R e v i e w

M a r k A p p r

O

D R

A W

IN

G S

P r o j e c t N u m b e r

A .d g n

:0

62Sheet of

P R

O J

E

D E

SI

IL

D

SO

L

IC

IT

A T

IO

N

A P P R

O V E D

D

O C

U M

E N

T S

F O R

N R

Y

H1, H3

C O

N T

R

F I

C I

E N

C I

E S

P H

A

E

P A I

R

S U

R R

O S I

O N

R

2. LOCATE AS PER ADA WITH THE TOP AT 48 INCHES.

4-A:60-B:C EXTINGUISHERS.

1. NEW FIRE EXTINGUISHER TO BE TRI CLASS ABC DRY CHEMICAL,

SECTION 10 44 FIRE EXTINGUISHERS AND CABINETS

CORNER GUARDS BEGIN ABOVE THE WALL BASE MATERIAL.

STEEL AND SHALL COVER ALL CORNERS AND END WALL CONDITIONS.

2. CORNER GUARDS SHALL BE SIX FOOT HEIGHT CO-8 AND SCO-8, 304 STAINLESS

MANUFACTURERS REQUIREMENTS.

SGROUP.COM) AND SHALL BE INSTALLED IN STRICT ACCORDANCE WITH

1. CORNER GUARDS SHALL BE AS MANUFACTURED BY C/S GROUP (WWW.C-

SECTION 10 26 WALL AND CORNER GUARDS

NAME INSERTION.

THAN ONE OCCUPANT SHALL HAVE SIGNS WITH 5 ONE INCH SLOTS FOR

WITH "ROOM NAME" 1 INCH LETTERING. COLOR TBD. AREAS WITH MORE

INTERIOR PHOTOPOLYMER, OGEE EDGE, 4 INCHES HIGH X 8 INCHES WIDE

2. INTERIOR SIGNS IDENTIFYING OFFICE, STORAGE AND COMM SHALL BE

INC, (WWW.SCOTTSIGNS.COM).

1. IDENTIFICATION SIGNAGE SHALL BE A PRODUCT OF SCOTT SIGN SYSTEMS

SECTION 10 13 PLASTIC SIGNS

DIVISION 10 - SPECIALTIES

ECO-EJF ULTRA COLOR T.B.D.

THREE MIL SYSTEM TOP LAYER WITH COLOR T.B.D. JOINTS TO BE FILLED WITH

ECO-MPE 20 MIL SYSTEM MIDDLE LAYER WITH COLOR T.B.D.; ECO-HTS 100

OF PROPERLY PREPARED SUBSTRATE; ECO-MVR 15 MIL SYSTEM FIRST LAYER;

7. THE BASIS OF DESIGN (SUBJECT TO 1 ABOVE): TENNANT COATINGS; CONSISTING

COVERAGE.

COATING: SLAB TESTING, SLAB PREP, MATERIALS, APPLICATION AND WARRANTY

6. THE GOVERNMENT EXPECTS A TOTALLY "TURNKEY" PROCESS FOR THE FLOOR

5. THE INSTALLERS MUST BE AUTHORIZED BY THE SPECIFIED COATING MANUFACTURER.

COATING MANUFACTURER AS AN AUTHORIZED CONTRACTOR / APPLICATOR.

MUST BE PERFORMED BY INDEPENDENT COMPANY APPROVED BY THE SPECIFIED

4. PROPER ON SITE TESTING OF THE CONCRETE PRIOR TO COATING APPLICATION

FOR EXCESSIVE MOISTURE VAPOR AS WELL AS UNACCEPTABLE PH READINGS.

3. THIS SPEC ASSUMES THAT THE CONCRETE SLAB MUST BE PROPERLY TREATED

MUST BE FOLLOWED.

2. ALL MANUFACTURERS SPECIFIC INSTALLATION AND PREPARATION INSTRUCTIONS

BATTERY ROOM CHEMICALS.

SPECIAL CAUTION FOR RM 161, BATTERY, MUST BE ABLE TO WITHSTAND

1. INTERIOR CONCRETE FLOOR SLAB TO BE COATED AS DESCRIBED HEREIN.

106, 161)

SECTION 09 96 INT. HIGH PERFORMANCE COATINGS (ROOMS 102, 103, 104, 105,

COLOR T.B.D. THIS APPLICATION TO BE FOR CEMENTITIOUS MATERIAL.

BRUSH ONLY MINIMUM OVER PROPERLY PREP’D AND PRIMED SUBSTRATE

P3 DULUX PROFESSIONAL EXTERIOR ACRYLIC LOW SHEEN - 3 COATS,

SUCH AS: STEEL DOORS, STEEL FRAMES, STEEL MISCELLANEOUS.

EXACT LOCATION. THIS APPLICATION WILL INCLUDE ELEMENTS/AREAS

PREP’D AND PRIMED SUBSTRATE - COLOR TO BE DETERMINED BY

TRIM PAINT - 3 COATS, BRUSH ONLY, MINIMUM OVER PROPERLY

P2 DULUX ULTRA-HIDE DURUS ALKYD GLOSS EXTERIOR HOUSE AND

COLOR TO BE DETERMINED BY EXACT LOCATION. (GYPSUM BOARD)

MINIMUM OVER PROPERLY PREP’D AND PRIMED SUBSTRATE -

P1 DULUX PROFESSIONAL ACRYLIC SEMI-GLOSS - 3 COATS, BRUSH,

FOR ALL PAINTS/COLORS)

4. PAINT CATEGORIES ARE LISTED BELOW: (DRAW DOWNS TO BE SUBMITTED

MATERIAL.

PAINTED/REPAINTED IN ORDER TO REACH A CORNER OR A DIFFERENT

REQUIRES PAINTING, THEN THE ENTIRE WALL WILL HAVE TO BE

3. PARTIAL/SPOT PAINTING WILL NOT BE ACCEPTABLE. IF PART OF A WALL

EXCLUDED.

OF THE APPROPRIATE COLOR. DARK BRONZED FINISHES ARE SPECIFICALLY

THIS INCLUDES SOME ITEMS WHICH MAY BE FACTORY FINISHED, BUT NOT BE

2. ALL SURFACES EXPOSED TO VIEW MUST BE PROPERLY PRIMED AND PAINTED.

DULUX, OR CURRENT EQUAL.

1. NEW PAINTS AND COATINGS SHALL BE AS MANUFACTURED BY ICI PAINTS

SECTION 09 91 PAINT

FINISHES.

VINYL BASE COLORS WILL BE REQUIRED DEPENDING ON FLOOR/WALL

ROOM 106 TO BE TILE COVE BASE, 6" HIGH. SEVERAL DIFFERENT

COVE BASE, COLOR T.B.D. ALL GYPSUM BOARD WALLS, BASE AT

3. 6" VINYL BASE THROUGHOUT, TO BE JOHNSONITE, 1/8" GAUGE,

OTHWERWISE.

2. V.C.T. ALL ROOMS EXCEPT AS SPECIFICALLY DESIGNATED

STRIPS AT ALL TRANSITIONS.

REQUIREMENTS. FURNISH AND INSTALL COORDINATED TRANSITION

SPECIFIC ROOM. IN STRICT ACCORDANCE WITH MANUFACTURERS

12X12. SEVERAL DIFFERENT COLORS WILL BE USED, DEPENDING ON

1. ALL V.C.T. TO BE ARMSTRONG STANDARD EXCELON, 1/8" THICK,

SECTION 09 65 RESILIENT FLOORING AND VINYL BASE

2. ACCESS DOORS THROUGH CEILING AS PER SECTION 08-31.

PAINT.

MAX. SUSPENDED FROM STRUCTURE ABOVE. LEVEL 5 FINISH, ENAMEL

1. 5/8" DENS GLASS ON 6", 24GA. STEEL JOISTS AT 16" ON CENTER,

CEILING TYPE GYP 1 (ROOM 106 & 161)

ARMSTRONG, PRELUDE XL, 1 5/16 INCH EXPOSED TEE.

CLASSIFICATION TYPE III, FORM 2, PATTERN CE; WHITE IN WHITE,

1. ARMSTRONG CORTEGA; 24" X 24’ X 5/8"; SQUARE EDGE; ASTM 1264

CEILING TYPE ACT 1 (UTILITY, OFFICE, COMM)

3. INSTALL HOLD DOWN CLIPS AS NOTED.

CENTERED WITHIN ROOM.

PENETRATIONS SHALL BE CENTERED IN TILES; SYSTEM SHALL BE

2. TILES SHALL BE SNUG TO GRID; GRID SHALL BE SQUARE AND LEVEL;

SIZE AS NEEDED TO ACHIEVE THIS REQUIREMENT)

VERTICAL, 4 DEGREES. (USE STEEL CROSS MEMBERS OF APPROPRIATE

BE PLUMB TO WITHIN 1 INCH HORIZONTAL FOR EACH 12 INCHES

BE SUPPORTED INDEPENDENTLY OF CEILING GRID; SUPPORT WIRE SHALL

636-96, EXCEPT THAT: LAY-IN LIGHT FIXTURES AND HVAC GRILLS WILL

THE PARTICULAR MANUFACTURERS SPECIFICATIONS AS WELL AS ASTM C

1. CEILING SYSTEM SHALL BE INSTALLED IN STRICT COMPLIANCE WITH

SECTION 09 53 SUSPENDED CEILING SYSTEMS

4. ALL GROUT WILL TYPICALLY BE LATICRETE SPECTRALOCK. COLOR T.B.D.

TERRA ANTICA, CELESTE/GRIG10 TA04.

3. ROOM 166 FLOOR TILE TO BE DALTILE: THROUGH BODY 12X12 PORCELAIN,

HANDBOOK.

2. ALL TILE WORK SHALL COMPLY WITH THE LATEST TCNA INSTALLATION

MEMBERS OF THE TILE COUNCIL OF NORTH AMERICA.

1. ALL TILE WORK SHALL BE PERFORMED ONLY BY COMPANIES THAT ARE

SECTION 09 30 TILE, CERAMIC/PORCELAIN

1-1/2" STEEL FURRING CHANNELS AT 16" O.C. MAX.

3-5/8" 24GA. STEEL STUDS AT 16" O.C. MAX. OR 24GA., GALV,

5. ALL VERTICAL GYPSUM BOARD IS TYPICALLY 5/8" THICK MATERIAL ON

4. NO IMPORTED BOARD SHALL BE ALLOWED.

HARDIE BOARD AND BE FINISHED AS REQUIRED PER LOCATION.

WET AREAS REQUIRING GYPSUM PRODUCTS WILL BE DENS SHIELD OR

3. NO ’MR’ OR ’GREEN BOARD’ WILL BE ALLOWED ON THE PROJECT. ALL

2. ALL FINISHES SHALL BE LEVEL 5 SMOOTH.

MANUFACTURERS SPECIFICATIONS AND ASTM C 840-99.

1. ALL NEW GYPSUM BOARD MATERIALS SHALL BE INSTALLED PER

SECTION 09 29 GYPSUM BOARD

DIVISION 09 - FINISHES

LOCKSMITH AND THE USER.

REQUIREMENTS) ALL KEYING MUST BE COORDINATED THROUGH THE BASE

(NO EXCEPTIONS, NO ALTERNATIVES DUE TO BASE STANDARD

1. ALL LOCKSETS SHALL BE AS MANUFACTURED BY BEST LOCK CORPORATION.

SECTION 08 71 FINISH HARDWARE

EXACT SPACING T.B.D.

6 ACCESS DOORS EACH FOR ACCESS TO SPACE ABOVE GYSUM BOARD CEILING.

TO BE PROVIDED AT RATED ASSEMBLIES. ROOMS 106 & 161 SHALL RECEIVE

COLOR TO MATCH CEILING; FLUSH KEYED LATCH; 24"x 24". RATED DOORS

DOOR; G90 GALVANIZED STEEL WITH BAKED ON ELECTROSTATIC POWDER COAT,

MILCOR, STANDARD FLUSH DOOR. STYLE DW: 16 GAUGE FRAME; 14 GAUGE

1. ACCESS DOORS/ PANELS BASIS OF DESIGN SHALL BE AS MANUFACTURED BY

SECTION 08 - 31 ACCESS DOORS/ PANELS

FUNCTION (A,B,G,I)

11. DOOR 7: NEW INTERIOR DOUBLE DOORS & FRAME, 3/0, 3/0, 7/0. STOREROOM

(A,B,E,J)

10. DOOR 6: NEW INTERIOR DOOR & FRAME, 3/0, 7/0. OFFICE FUNCTION.

(A,B,E,J)

9. DOOR 5: NEW INTERIOR DOOR & FRAME, 3/0, 7/0. PRIVACY FUNCTION.

(A,B,C)

8. DOOR 4: NEW INTERIOR DOOR, DOOR & FRAME 3/0, 7/0. STORE ROOM FUNCTION.

FUNCTION.(A,B,C,E,F,J)

7. DOOR 3: NEW INSULATED INTERIOR DOOR & FRAME, 3/0, 7/0. OFFICE LATCH

FUNCTION (A,B,C,D,F,G,I,J)

N.O.A. FULL WEATHER GASKETS, PANIC HARDWARE BAR. (CDX-09) ENTRANCE

6. DOOR 2: NEW INSULATED EXTERIOR DOOR AND FRAME 3/6, 3/6, 7/0. MIAMI-DADE

FUNCTION (A,B,C,D,F,J)

RATED FULL WEATHER GASKETS, PANIC HARDWARE BAR. (CDX-09) ENTRANCE

5. DOOR 1: NEW INSULATED EXTERIOR DOOR AND FRAME 3/0, 7/0. APPROPRIATELY

J) VIEW WINDOW: 3" WIDE X 30" HIGH WITH APPROPRIATE GLAZING.

I) ASTRAGAL: PEMKO 355PWS. PREP AND PAINT CORRECT COLOR AT JOB SITE.

H) DOOR VIEWER: HAGER 1756, 200 DEGREE

G) LEVER EXTENSION FLUSH BOLT: HAGER 282D, US26D.

F) CLOSER: LCN 4041 (NO MOUNTS ON EXTERIOR OF BUILDING).

E) AUTOMATIC DOOR BOTTOM: PEMKO 411RL, FULL MORTISE, DROP DOWN SEAL.

D) THRESHOLD: PEMKO 2005AT 9HAS GASKET AND PANIC STYLE RISE).

4 SIDES, COUNTER SUNK HOLES.

C) ARMOR PLATE: HAGER 34-INCH HIGH, .062 STAINLESS STEEL, BEVEL

B) FRAME GASKETING: PEMKO S88, CLEAR.

4-1/2 x 4-1/2, STAINLESS STEEL W/ SS NRP PIN, 32D FINISH.

A) HINGES: 1-1/2 PAIR PER DOOR LEAF, FULL MORTISE, HAGER BB 1191,

NUMBER BELOW)

(THE ANTICIPATED HARDWARE FOR EACH DOOR IS INDICATED AT EACH DOOR

4. SOME LIMITED HARDWARE IS LISTED BELOW BUT LIST IS NOT ALL INCLUSIVE.

B) ALL LEVER HANDLES TO BE STAINLESS STEEL BASE MATERIAL.

VERIFIED BY USER.

SEPARATE KEYING IS REQUIRED FOR ALL LOCKABLE DOORS AS TO BE

& BASE LOCKSMITH. INITIAL KEYING REQUIREMENTS ARE SA FOLLOWS:

SATIN STAINLESS STEEL; COORDINATE FINAL/EXACT KEYING WITH USER

CORES; LEVER STYLE 14; ESCUTCHEON J; COMPATIBLE STRIKE; 630

A) 45H SERIES, UNIVERSAL HEAVY DUTY MORTISE LOCKS; INTERCHANGEABLE

SYSTEMS AND SHALL HAVE THE FOLLOWING ATTRIBUTES:

REQUEST. ALL KEYED HARDWARE IS TO BE MANUFACTURED BY BEST ACCESS

AN OVERSIGHT OMISSION SHALL NOT BE GROUNDS FOR ADDITIONAL FUNDS

IN ORDER TO ACHIVE A COMPLETE FUNCTIONAL, FINISHED INSTALLATION.

3. BIDDERS MUST INCLUDE ALL REQUIRED MISCELLANEOUS RELATED ITEMS

7 GAUGE AT HINGES; 14 GAUGE AT STRIKE.

REINFORCED AT ALL HARDWARE LOCATIONS WITH GALVANNEALED STEEL:

GAUGE, G60 GALVANNEALED STEEL. PRIMED FOR JOB SITE FINISHING.

2. THE STEEL FRAMES SHALL BE AS MANUFACTURED BY STEELCRAFT, 16

FOAMED INSULATED CORE. DOORS SHALL BE FACTORY PRIMED/ ANSI A224.1.

COLD ROLLED G-60 GALVANNEALED STEEL. SEAMLESS WITH APPROPRIATE

MANUFACTURED BY STEELCRAFT. SLABS TO BE 14 GAUGE, 1 3/4 INCH THICK

1. THE STEEL DOORS AND FRAMES BASIS OF DESIGN SHALL BE AS

SECTION 08 - 13 METAL DOORS AND FRAMES

DIVISION 08 OPENINGS

REQUIRED SEALANTS/ADHESIVES.

FLASHING, AND SO FORTH MAY DICTATE ALTERNATE, INDUSTRY

PARTICULAR MANUFACTURER SUCH AS ROOFING, WINDOWS, DOORS,

3. SPECIFIC SYSTEM/ELEMENT INSTALLATION REQUIREMENTS OF A

TRANSITIONS; PLANE TRANSITIONS.

FRAMES TO ADJACENT SURFACES; DOOR FRAMES TO WALLS; MATERIAL

2. SIKAFLEX-15LM WILL GENERALLY BE USED AT SEALING OF STOREFRONT

FOR APPLICATION.

ENCOUNTERED. THE MANUFACTURERS SPECS SHALL BE FOLLOWED

BE APPROPRIATE FOR THE TYPES OF JOINTS AND MATERIALS

1. SEALANTS SHALL BE AS MANUFACTURED BY SIKA INDUSTRY AND SHALL

SECTION 07 92 SEALANTS

FOR ACHIEVING STC45 AS INDICATED IN THE ASTM DESCRIPTIONS.

ASTM C 919-98 REGARDING PROPER INSTALLATION AS PER DETAILS

2. ACOUSTICAL PERFORMANCE SHALL BE ENHANCED BY COMPLYING WITH

TO RECEIVE 6" THICKNESS INSULATION.

THERMAFIBER 3.0 PCF DENSITY FS25 SAFB. ALL 3-5/8" STUD WALLS

FOR SOUND CONTROL AND THERMAL REQUIREMENTS. BASIS OF DESIGN:

1. NEW STUD WALLS THROUGHOUT SHALL RECEIVE MINERAL WOOL BLANKETS

SECTION 07 21 THERMAL/ACOUSTICAL MATERIAL FOR INTERIOR PARTITIONS

INSULATION AGAINST THE CMU.

CHANNELS AT 16" O.C. MAX. RADIANT BARRIER SIDE OF THE

GYPSUM BOARD OVER 1-1/2" DEEP, 24 GAUGE GALV. FURRING

BUILDING SOLUTIONS. THE INSULATION IS ALWAYS COVERED WITH

CMU WALL SHALL BE THERMAX HEAVY DUTY AS MANUFACTURED BY DOW

2. THE 1-1/2" RIGID INSULATION BOARD AROUND THE EXTERIOR PERIMETER

FIRE FOAM SUGGESTED PRODUCT)

DEVELOPED ATTRIBUTES OF ANY INSULATION. (HILTI CP 620

MAINTAINS THE VAPOR BARRIER AS WELL AS THE FLAME SPREAD/SMOKE

SEALED WITH TAPE MUST BE SEALED WITH A UL LISTED FOAM WHICH

VOIDS, ANNULAR OPENINGS AND SO FORTH THAT CANNOT BE PROPERLY

PER THE MANUFACTURER OF THE INSULATION. ALL CRACKS, GAPS,

IN ORDER TO BE EFFECTIVE. ALL SEAMS MUST BE TAPE SEALED AS

1. THE PERIMETER THERMAL/AIR BARRIER MUST BE COMPLETELY SEALED

SECTION 07 05 PERIMETER EXTERIOR ENVELOPE

DIVISION 07 - THERMAL AND MOISTURE PROTECTION AND INSULATIONS

CORE MATERIAL: PLYWOOD.

UNLESS OTHERWISE INDICATED.

GOVERNMENT FROM MANUFACTURER’S STANDARD SELECTIONS,

PATTERNS, AND FINISHES: TO BE SELECTED BY THE

NEMA LD3-2000 VGL (VERTICAL GRADE LAMINATE). COLORS,

COMPLYING WITH THE FOLLOWING REQUIREMENTS:

MATERIALS FOR CONCEALED SURFACES: THERMOSET DECORATIVE OVERLAY

EDGES: GP-50, 0.050-INCH NOMINAL THICKNESS.

THICKNESS.

VERTICAL SURFACES: GP-50, 0.050-INCH NOMINAL

INCH NOMINAL THICKNESS.

HORIZONTAL SURFACES OTHER THAN TOPS: GP-50, 0.050-

COMPLYING WITH THE FOLLOWING REQUIREMENTS:

EXPOSED SURFACES: HIGH-PRESSURE DECORATIVE LAMINATE

OVERLAY, UNLESS OTHERWISE INDICATED. LAMINATE CLADDING FOR

GRADE: PREMIUM AWI TYPE OF CABINET CONSTRUCTION: FLUSH

REQUIREMENTS FOR LAMINATE CABINETS.

EACH FOR DOORS AND DRAWERS.

FOAM OR PLASTICTYPE BUMPERS ARE NOT ACCEPTABLE. PROVIDE TWO (2)

BUMPERS: SELF-ADHERING MOLDED RUBBER TYPE, OFF-WHITE COLOR.

INC. COLORS: TBD

D. WILSONART INTERNATIONAL; DIV. OF PREMARK INTERNATIONAL,

C. PIONEER PLASTICS CORP.

B. LAMINART.

A. FORMICA CORPORATION.

ARE NOT LIMITED TO, THE FOLLOWING:

LAMINATES THAT MAY BE INCORPORATED INTO THE WORK INCLUDE, BUT

REQUIREMENTS, MANUFACTURERS OFFERING HIGH-PRESSURE DECORATIVE

AVAILABLE MANUFACTURERS: SUBJECT TO COMPLIANCE WITH

STANDARD.

INDICATED, OR IF NOT INDICATED, AS REQUIRED BY WOODWORK QUALITY

HIGH-PRESSURE DECORATIVE LAMINATE: NEMA LD 3, GRADES AS

FINISH: ANY CLOSED-GRAIN HARDWOOD.

200.SOLID WOOD: AWI CUSTOM GRADE.WOOD SPECIES FOR OPAQUE

CORE PLYWOOD COMPLYING WITH AWI QUALITY STANDARDS SECTION

WOOD PRODUCTS: COMPLY WITH THE FOLLOWING: PLYWOOD: VENEER

15. PRODUCT INFORMATION OUTLINED BELOW:

AND INDICATE MEASUREMENTS ON SHOP DRAWINGS.

SUPPORT WOODWORK BY FIELD MEASUREMENTS BEFORE BEING ENCLOSED

14. LOCATE CONCEALED FRAMING, BLOCKING, AND REINFORCEMENTS THAT

CONSTRUCTION PROGRESS TO AVOID DELAYING THE WORK.

SHOP DRAWINGS. COORDINATE FABRICATION SCHEDULE WITH

MEASUREMENTS BEFORE FABRICATION AND INDICATE MEASUREMENTS ON

CONSTRUCTION, VERIFY DIMENSIONS OF OTHER CONSTRUCTION BY FIELD

FIELD MEASUREMENTS: WHERE WOODWORK IS INDICATED TO FIT TO OTHER

PRODUCTION AND INSTALLATION OF INTERIOR ARCHITECTURAL WOODWORK.

WOODWORKING FIRM T0 ASSUME UNDIVIDED RESPONSIBILITY FOR

13. QUALITY ASSURANCE SOURCE LIMITATIONS: ENGAGE A QUALIFIED

TRIMMING.

TOP EDGE OF THE BACK-SPLASH UPON INSTALLATION TO ALLOW

FULL SEALANT BEDS. THE SEALANT IS EXPECTED TO ’SQUEEZE’ OUT THE

’CAULK’ IT. COUNTERTOPS WITH INTEGRAL BACK-SPLASHES MUST HAVE

UNDER ANY CIRCUMSTANCE, INSTALL THE BACK-SPLASH AND THEN SIMPLY

WHERE IT MEETS THE COUNTER AS WELL AS ALONG THE WALL. DO NOT

BACK-SPLASH IS TO BE SET IN A FULL SEALANT BED AT ITS BASE

WITH SEALANT PRIOR TO INSTALLING THE BACK-SPLASH. THEN THE

THE JOINT BETWEEN THE BACK EDGE OF THE TOP AND THE WALL FILLED

12. WHERE COUNTERTOPS WITH SEPARATE BACK-SPLASHES ARE INSTALLED,

ADJUSTED, AND CABINETS LEFT IN A CLEAN NEAT CONDITION.

PRIOR TO FINAL ACCEPTANCE, DOORS SHALL BE ALIGNED, HARDWARE

WORKMANSHIP, AND THEY ARE CLEARLY SHOWN ON THE SHOP DRAWINGS.

SHALL BE PERMITTED PROVIDED THEY ARE NOT USED TO OVERCOME POOR

LIMITED USE OF CLOSER AND FILLER STRIPS AND FINISH MOLDINGS

PAINT AND SINK FLANGES SHALL BE SET IN A BED OF SEALANT.

PLASTIC TOPS SHALL BE PAINTED WITH A COAT OF SEMI-GLOSS ENAMEL

INSTRUCTIONS. THE INNER EDGE OF SINK CUT-OUTS IN LAMINATED

SHALL BE IN ACCORDANCE WITH THE MANUFACTURER’S APPROVED PRINTED

AND HARDWARE SHALL BE INSTALLED AS INDICATED. INSTALLATION

DEVICES TO SECURELY ANCHOR EACH UNIT. COUNTERTOPS, ACCESSORIES,

AND SHALL BE ATTACHED TO THE WALLS OR FLOORS WITH SUITABLE

11. CABINETS SHALL BE INSTALLED LEVEL, PLUMB, AND TRUE TO LINE,

* DRAWER PULLS: AMEROCK, BP24011-WNC PULLS ON DOORS & DRAWERS

EXTENSION

* DRAWER SUSPENSIONS: BALL BEARING ACTION, SIDEMOUNT WITH FULL

CLOSING, ADJUSTABLE, 120 DEGREE OPENING, NO. H811SMC-NPC

* HINGES: SELF CLOSING LIBERTY HARDWARE, CONCEALED, SELF

HARDWARE FOR A COMPLETE INSTALLATION.

KITCHEN CABINET USE, AND SHALL INCLUDE ALL MISCELLANEOUS

10. HARDWARE SHALL CONFORM TO BHMA A156.9, SHALL BE SUITABLE FOR

UNDERCOATED, TOP GRADE STAINLESS STEEL

9. KITCHEN SINKS SHALL BE SELF RIMMING, HIGHLY POLISHED,

MANUFACTURER’S STANDARD SELECTION, PRICE RANGE ’F’.

3/4 INCH. COLOR AND PATTERN AND FINISH SHALL BE SELECTED FROM

PLUMBING FITTINGS. SOLID SURFACING MATERIAL THICKNESS SHALL BE

SOLID SURFACING MATERIAL MANUFACTURER’S RECOMMENDATIONS FOR

FINISHED EDGES AND FIELD APPLIED END SPLASHES. COMPLY WITH

FABRICATE TOPS IN ONE PIECE WITH SHOP APPLIED BACKSPLASHES AND

8. COUNTER TOPS SHALL BE CORIAN, BASIS OF DESIGN.

HEIGHTS SHALL BE 6 INCHES HIGH.

7. COUNTERTOP AND BACKSPLASH SHALL BE CORIAN. BACK. SPLASH

MOISTURE.

BE OF SUCH COMPOSITION AS TO BE UNAFFECTED BY WATER AND/OR

CONTACT WITH THE FLOOR SHALL BE ALL PLYWOOD CONSTRUCTION AND

EXTERIORS AND INTERIOR TO MATCH. TOE KICKS AND ANY SURFACE IN

AND 1/2 INCH PLYWOOD, MINIMUM, WITH EXTERIOR TO MATCH REMAINING

VENEER. HANGING RAILS SHALL BE 3/4 INCH SOLID WOOD BASE RAILS

WALL CABINET BACKS SHALL BE 3/16 INCH PLYWOOD WITH LAMINATE

CABINET TOPS SHALL BE 1/2 INCH PLYWOOD WITH LAMINATE VENEER.

1/4 INCH BIRCH PLYWOOD FLOOR. BASE CABINET FLOORS AND WALL

PLYWOOD FRONTS AND 3/4 INCH 4-SIDED DOVETAIL DRAWER BOX WITH

TO MATCH CABINET FRONTS. DRAWERS SHALL HAVE 3/4 INCH

INCH THICK PLYWOOD WITH LAMINATE VENEER AND WITH FINISHED EDGE

SUPPORTED BY SELF-LOCKING CLIPS. SHELVES SHALL BE MINIMUM 3/4

APPROXIMATELY 1-1/4 INCH INCREMENTS. SHELVES SHALL BE

INDICATED. ADJUSTABLE SHELVES SHALL BE CAPABLE OF ADJUSTING ON

INCH SOLID PLYWOOD. SHELVES SHALL BE FULLY ADJUSTABLE AS

INCH, SOLID PLYWOOD FRAME SYSTEM. DOOR DESIGN SHALL BE 3/4

SAME OUTSIDE APPEARANCE. FACE FRAME CONSTRUCTION WITH 3/4

6. WALL AND BASE CABINETS SHALL BE OF THE SAME CONSTRUCTION AND

TO LIKE-NEW CONDITION SHALL BE REPLACED.

DAMAGE TO THE SURFACES. DAMAGED ITEMS THAT CANNOT BE RESTORED

AND HANDLING. CABINETS SHALL BE HANDLED CAREFULLY TO PREVENT

CONTAMINANTS AND IN A MANNER TO PERMIT ACCESS FOR INSPECTION

VENTILATED, DRY LOCATION THAT IS FREE OF DUST, WATER, OR OTHER

PROTECTIVE COVERING. CABINETS SHALL BE STORED IN AN ADEQUATELY

5. CABINETS SHALL BE DELIVERED TO THE JOBSITE WRAPPED IN A

INCHES SIZE.

* MELAMINE PLASTIC COLOR SAMPLES SHALL BE APPROXIMATELY 2 X 3

* DOOR AND DRAWER FRONT - ONE OF EACH, WITH HARDWARE MOUNTED.

BACKSPLASH - ONE SECTION, CONTAINING BOTH.

* CORIAN, PRICE GROUP F, BASIS OF DESIGN, COUNTER TOP AND

PATTERN AND METHOD OF ASSEMBLY.

ACCEPTABLE. SAMPLES SHALL BE OF SUFFICIENT SIZE TO SHOW COLOR

SHALL BE FURNISHED AS SAMPLES. MOCK-UP UNITS ARE NOT

4. IN LIEU OF INDIVIDUAL SAMPLES, COMPLETE MINIMUM SIZE CABINETS

REQUIREMENTS OF AWI AS A MINIMUM.

3. TEST REPORTS SHALL CERTIFY THAT ALL CABINETS COMPLY WITH THE

MATERIAL COMPOSITION, FABRICATION, AND ATTACHMENTS.

PERTINENT DETAILS OF CONSTRUCTION, ALL MATERIAL THICKNESS,

PLAN AND ELEVATIONS OF THE CABINETS AND ACCESSORIES AND

CABINET AND RELATED ITEM, AND CLEARLY INDICATING THE COMPLETE

2. SUBMITTAL SHOP DRAWINGS ARE REQUIRED SHOWING EACH TYPE OF

SHELVES SHALL BE FIXED OR ADJUSTABLE AS INDICATED.

POSITION STOPS TO AVOID ACCIDENTAL COMPLETE WITHDRAWALS.

DRAWERS SHALL BE REMOVABLE AND SHALL BE EQUIPPED WITH

UNITS WITHOUT AFFECTING THE REMAINDER OF THE INSTALLATION.

ACCOMPLISHED TO PERMIT REMOVAL AND REPLACEMENT OF INDIVIDUAL

UNITS JOINED INTO CONTINUOUS SECTIONS. FASTENINGS SHALL BE

WALL AND BASE CABINET ASSEMBLIES SHALL CONSIST OF INDIVIDUAL

WOOD WORK, CONSTRUCTION, FINISHES AND OTHER REQUIREMENTS.

STANDARDS’ LATEST EDITION, FPR GRADES OF INTERIOR ARCHITECTURAL

REQUIREMENTS OF AWI’S ’ARCHITECTURAL WOODWORK QUALITY

AS A MINIMUM, BE CONSTRUCTED AS SPECIFIED AND SHALL MEET THE

1. CABINETS SHALL BE OF ALL PLYWOOD CONSTRUCTION. CABINETS SHALL,

SECTION 06 - 22 CUSTOM BUILT CABINETS

DIVISION 06 - WOOD, PLASTICS, COMPOSITES

4. ALL WALL STUD SPACING IS 16" O.C. MAX

TRIANGLE FASTENER CORP. SD300, #10-16 X 3/4 " DP3 5/16 HWH.

’BULGE’ IN THE FINISH, THE MINIMUM SUGGESTED SCREW IS THE

WHERE THERE IS NO CONCERN FOR A COVER MATERIAL CREATING A

CORP. SD300, #12-14 X 1" DP3 T25 TORX WAFER HEAD. AT AREAS

HEAD, THE MINIMUM SUGGESTED SCREW IS THE TRIANGLE FASTENER

AREAS WHERE ANOTHER MATERIAL WILL BE APPLIED OVER THE TEK

3. TEK SCREW CONNECTIONS ARE BASED UPON THE FOLLOWING: AT

THE USE OF SELF DRILLING TEK SCREWS.

2. NUMEROUS METAL TO METAL CONNECTIONS REQUIRED ARE BASED UPON

FURRING, JOISTS AND SO FORTH IS DIETRICH INDUSTRIES, INC.

1. THE BASIS OF DESIGN FOR THE STEEL STUDS, HAT CHANNELS,

SECTION 05 42 COLD FORMED METAL FRAMING

DIVISION 05 - METALS

IN LIKE KIND.

HEADS AND REROUTE PIPING AS NEEDED. REPLACE ALL DAMAGED ITEMS

1. PROTECT EXISTING PIPING AROUND BUILDING AS REQUIRED. ADJUST

SECTION 02 05 LAWN SPRINKLER PIPING

DIVISION 02 - EXISTING CONDITIONS

ALLOWED.

TO THIS PROJECT. PART TIME AND SHARED SUPERVISION WILL NOT BE

2. THE PRIME CONTRACTOR MUST PROVIDE A SUPERINTENDENT DEDICATED

BREACHES.

OF EXISTING, AS WELL AS NEW WORK, FROM WEATHER AND SECURITY

ITEMS TO PREVENT DAMAGE, DEGRADATION AND TAMPERING; PROTECTION

SPECIFICATIONS AND REQUIREMENTS; PROTECTION OF ALL INSTALLED

INSTALLED IN STRICT COMPLIANCE WITH THE MANUFACTURERS

TIMELY FASHION; CONFIRMATION THAT THE MATERIALS ARE BEING

THE NECESSARY SKILLS TO PERFORM THEIR WORK IN A FIRST CLASS,

THEY ARE PROVIDING THE NEEDED QUANTITY OF WORKERS WHO POSSESS

WORK OF YOUR VARIOUS SUBS, TRADES AND VENDORS TO ENSURE THAT

THE TRADES; DAILY AND IF NECESSARY, HOURLY, MONITORING OF THE

PROTECTION OF MATERIALS FOR THE WORK; ALL COORDINATION AMONG

MATERIALS; RECEIPT OF AND PROPER HANDLING, STORAGE AND

SUITABILITY OF SUBSTRATES PRIOR TO INSTALLATION OF SUBSEQUENT

BUT NOT BE LIMITED TO: INSPECTION AND VERIFICATION OF THE

APPROPRIATE QUALITY CONTROL PROCEDURES. THIS WILL INCLUDE,

1. THE PRIME CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING

SECTION 01 45 QUALITY CONTROL

TOTAL, OVERALL SCOPE OF THE WORK.

THE JOB SITE PRIME CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR THE

JOB SITE MEANS AND METHODS; JOB SITE SAFETY MEASURES AND CONTROLS.

COORDINATION OF WORK AND/OR MATERIALS WITH THE VARIOUS TRADES;

FABRICATION PROCESSES AND TECHNIQUES OF CONSTRUCTION;

CORRELATION OF QUANTITIES AND DIMENSIONS; SELECTION OF

WILL NOT INCLUDE NOR SANCTION SUCH ITEMS AS: CONFIRMATION AND

CONFORMANCE WITH THE DESIGN CONCEPT. THE GOVERNMENTS REVIEW

REVIEW WILL BE ONLY FOR THE PURPOSE OF DETERMINING GENERAL

SUPPORTING DOCUMENTATION MUST BE INCLUDED. THE GOVERNMENTS

ALL AREAS OF DEVIATION MUST BE CLEARLY SPELLED OUT AND

THE SUBMITTAL AND THAT IT COMPLIES WITH THE CONTRACT DOCUMENTS.

FACIE EVIDENCE THAT YOU HAVE THOROUGHLY REVIEWED AND APPROVED

1. YOUR SUBMITTAL TO THE GOVERNMENT WILL BE CONSIDERED PRIMA

SECTION 01 43 SUBMITTAL PROCEDURES

WORKERS AS WELL AS THE GENERAL PUBLIC.

PRODUCTS ARE USED AT THE WORK SITE IN ORDER TO PROTECT THE

AND MEASURES WHICH MUST BE TAKEN WHEN THE VARIOUS MATERIALS AND

IS UNDER CONTRACT TO THE GOVERNMENT. THIS INCLUDES PRECAUTIONS

THE CONTROL AND RESPONSIBILITY OF THE PRIME CONTRACTOR WHICH

1. ALL SAFETY RELATED MATTERS, MEANS AND METHODS ARE SOLELY UNDER

SECTION 01 41 ENVIRONMENTAL AND SAFETY REQUIREMENTS

FM, AISC.

BHMA, DHI, GA, NEMA, SMACNA, TCA, UL, NEC, NRCA, NFPA, NAIMA,

INSTALLED IN THIS PROJECT ARE AS FOLLOWS: ASTM, ANSI, ASHRAE,

WHICH WILL BE USED TO EVALUATE THE PRODUCTS AND SYSTEMS

2. SOME OF THE NATIONAL AND INDUSTRY SPECIFIC TRADE ORGANIZATIONS

THAT THE GOVERNMENT REQUIRES.

ORDER TO ENSURE LONG TERM DURABILITY AND MINIMAL MAINTENANCE

’FIRST COST’ WILL NOT PROVIDE THE HIGH FRONT END QUALITY IN

PUBLICATIONS WHENEVER YOU ARE WORKING AT THIS JOB SITE. LOWEST

ADVISED THAT YOU ARE IN POSSESSION OF YOUR TRADE PERTINENT

GOVERNMENT WILL REQUIRE FOR THIS PROJECT. IT IS STRONGLY

RESULT IN THE LEVEL OF QUALITY AND DURABILITY THAT THE

’MEET CODE’. CODE COMPLIANCE IS ONLY A MINIMUM WHICH DOES NOT

ENSURE COMPLIANCE. DO NOT ASSUME THAT THE WORK SIMPLY MUST

AND THESE REFERENCED PUBLICATIONS WILL BE USED FREQUENTLY TO

WILL BE EXPECTED TO ACHIEVE A VERY HIGH LEVEL OF PERFORMANCE

FORM THE BACKBONE OF THEIR CHOSEN FIELD. THE WORK INSTALLED

FAMILIAR WITH THEIR RESPECTIVE PUBLICATIONS WHICH, IN THEORY,

PERFORMANCE. THE VARIOUS BIDDERS ARE EXPECTED TO BE INTIMATELY

DOCUMENTS AS A MEANS TO ESTABLISH A MINIMUM LEVEL OF WORK

1. NUMEROUS PUBLICATIONS ARE REFERENCED THROUGHOUT THESE

SECTION 01 06 REFERENCED PUBLICATIONS AND STANDARDS

BARRICADES AND CONTAINMENT BARRIERS WILL BE REQUIRED.

TREES AND PARKING AREAS WHICH YOU MUST PROTECT FROM DAMAGE.

EXISTING, OPERATIONAL FACILITIES, WALKWAYS, STREETS, MATURE

1. THE PROPOSED WORK WILL TAKE PLACE WITHIN CLOSE PROXIMITY TO

SECTION 01 05 FACILITY PRESERVATION/PROTECTION

DIVISION 01 - GENERAL REQUIREMENTS

THRESHOLDS.

INTERIOR FLOOR AND SHALL HAVE APPROPRIATE ADA COMPLIANT

FF EXTERIOR SLABS AT DOORS SHOULD BE 3/8" LOWER THAN THE

TO PREVENT MOISTURE BREACH.

MULTIPLE LAYERED INSTALLATIONS MUST BE STAGGERED/OFFSET

END TO END LAP SHALL BE 6 INCHES MINIMUM. LAPS OF ALL

PREVENT WATER INFILTRATION WHILE ALLOWING THERMAL MOVEMENT.

EE ALL FLASHINGS SHALL BE PROPERLY LAPPED AND SEALED TO

APPROPRIATE REQUIREMENTS OF THE F.A.R.

AREA EXPECTED TO BE AMERICAN MADE AND COMPLY WITH ALL

DD MATERIALS, ASSEMBLIES AND PRODUCTS USED FOR THIS PROJECT

CRACKS, ANNULAR RINGS, AND SO FORTH.

R-VALUE MUST BE INSTALLED IN ORDER TO FILL/SEAL GAPS,

AS NEEDED, UL RATED FOAMED INSULATION WITH COMPARABLE

CONTINUOUS AND UNIFORM, FLOOR SLAB TO INSULATED ROOF DECK.

CC THE EXTERIOR THERMAL ENVELOPE OF THE BUILDING MUST BE

INFILTRATION OF WARM HUMID AIR.

COMPLETELY SEALED AND AIR TIGHT IN ORDER TO PREVENT

BB THE EXTERIOR PERIMETER ENVELOPE OF THE BUILDING MUST BE

DOORS.

NOT BE READILY VISIBLE. FOR EXAMPLE, TOPS AND BOTTOMS OF

SEALED AND SO FORTH, EVEN THOUGH THAT PARTICULAR EDGE MAY

AA ALL EDGES OF VISIBLE ELEMENTS ARE EXPECTED TO BE ’FINISHED’

A LIGHT BROOM FINISH UNLESS SPECIFICALLY DESIGNATED OTHERWISE.

Z EXTERIOR CONCRETE WALKWAYS, RAMPS, LANDINGS SHALL RECEIVE

3 INCHES.

CORNER TO THE EDGE OF A DOOR FRAME/TRIM SHOULD BE 2 TO

Y TYPICALLY, THE DISTANCE FROM A GYPSUM BOARD WALL 90 DEGREE

GAS LINES AND SO FORTH.

ELEMENTS SUCH AS ELECTRICAL, PLUMBING, FIRE SPRINKLERS,

MUST BE PERFORMED IN ORDER TO AVOID DAMAGE TO CONCEALED

THOROUGH INVESTIGATION/VERIFICATION OF EXISTING CONDITIONS

X PRIOR TO ANY DEMOLITION, SAW CUTTING AND SO FORTH, A

I.E., CMU WITH CMU, PLASTER WITH PLASTER, ETC.

LIKE KIND MATERIAL UNLESS SPECIFICALLY NOTED OTHERWISE.

REQUIRE THAT THE DEMO’D MATERIAL BE REPLACED WITH MATCHING/

CONCEALED/OBSTRUCTED ELEMENTS, SUCH AS PLUMBING, WILL

W ALL DEMOLITION OF EXISTING MATERIALS FOR ACCESS TO

OF FINAL CLEANING AND PROTECT UNTIL FINAL ACCEPTANCE

V WAX, BUFF, POLISH, BURNISH ALL V.C.T. FLOORING AS PART

FINISH CHANGES

U TRANSITION STRIPS OF APPROPRIATE MATERIAL AT ALL FLOOR

(APPROPRIATE PRIME/PREP AND MINIMUM 3 COATS OF PAINT)

ROOFS, GLAZING WILL REQUIRE, AS A MINIMUM A PAINTED FINISH

T ALL VISIBLE SURFACES, EXCEPT CONCRETE WALKWAYS, PREFINISHED

# 5 REBAR.

MUST BE TIED INTO THE EXISTING WALL WITH FILLED CELLS AND

LINTELS FOR SUPPORT OF THE REMAINING WALL AND THE NEW LINTEL

S NEW DOOR OPENINGS IN EXISTING CMU WALLS…