Attachment_5_-_AF_Form_66_Submittal_Register.pdf
PDF 308 KB Posted
- Attached to
- Repair Squadron Operations Facility, Bldg 709 Federal contract opportunity
- Solicitation number
- FA4418-19-R-0001
About this file
Attachment 5 - AF Form 66, Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specification-_08_11_13.pdf | ||
| Wage_Determination-General_Decision_Number_SC180030_dated_06.29.2018.pdf | ||
| Q_&_A_B709_20190125-Final.pdf | ||
| Specification-_10_22_39.pdf | ||
| Solicitation_Amendment_FA441819RA0070002_SF_30.pdf | ||
| Attachment_9-SCH_B_REV_2_2019_0125.pdf | ||
| Specification-_01_22_00.00_10.pdf | ||
| Attachment_9-SCH_B_REV_1_2019_0118.pdf | ||
| Attachment_8_Drawings_Rev_1.pdf | ||
| Solicitation_Amendment_FA441819RA0070001_SF_30.pdf | ||
| Q_&_A_B709_20190118-Final.pdf | ||
| Attachment_10-Addendum_1_2019_0118.pdf | ||
| Attachment_4_-_Green_Procurement.pdf | ||
| Attachment_6_-_Furniture_Fixtures_Equipment.pdf | ||
| Attachment_2b_-_Drawings_36-70_-B709.pdf | ||
| Attachment_7_-_Structural_Interior_Design.pdf | ||
| Attachment_2a_-_Drawings_1-35_-_B709.pdf | ||
| Attachment_1_-_Specifications_B709.pdf | ||
| Attachment_3_-_General_Decision_Number_SC180030.pdf | ||
| Solicitation_-_FA441819RA007.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP NUMBER
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
01 11 00, Para 1.6.2, "Outage Requests"; G
01 11 00, Para 1.6.2, "Road
Closure Requests"; G
01 11 00, Para 1.6, "Work
Clearance"; G
01 14 00, Para 1.2.1.1, "List of Contact Personnel"; G
01 30 00, Para 1.2, "View
Location Map"; G
01 30 00, Para 1.3, "Progress and Completion
Pictures"; G
01 30 00, Para 1.6.2, "Resume for the proposed
Superintendent"; G
01 32 16.00 20, Para 1.2, "Qualifications"; G
01 32 16.00 20, Para 1.3, "Project Schedule"; G
01 32 16.00 20, Para 1.4.1, "Initial Contract Progress
Report (AF IMT 3065)"; G
01 32 16.00 20, Para 1.4.2, "Initial Contract Progress
Schedule (AF IMT 3064)"; G
01 32 16.00 20, Para 1.3.3, "Project Schedule Updates";
G
01 32 16.00 20, Para 1.4.1, "Monthly Contract Progress
Reports (AF IMT 3065)"; G
01 32 16.00 20, Para 1.4.2, "Monthly Contract Progress
Schedules (AF IMT 3064)";
G
01 33 00, Para 1.6, "Submittal Register"; G
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
IO
N
S U
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E R
'S
IN
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N C
E
D A
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
L
P O
R T
S
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C Typewritten Text Attachment 5
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
01 35 26, Para 1.6, "Accident
Prevention Plan (APP)"; G
01 35 26, Para 1.7, "Activity
Hazard Analysis (AHA)"; G
01 35 26, Para 1.6.1.1, "Critical Lift Plan"; G
01 35 26, Para 1.5.1.3, "Crane Operators"; G
01 35 26, Para 1.11, "Notifications and Reports"
01 35 26, Para 1.11.2, "Accident Reports"; G
01 35 26, Para 1.11.3, "Crane Reports"
01 35 26, Para 1.8.1, "Confined Space Entry
Permit"
01 35 26, Para 1.8.1, "Hot
Work Permit"
01 35 26, Para 1.13, "License Certificates"
01 45 00, Para 1.6, "QC
Plan"; G
01 45 35, Para 3.1.1, "SIOR
Letter of Acceptance"
01 45 35, Para 3.1.1, "Project Manual"
01 45 35, Para 3.1.1, "Project Manual"
01 45 35, Para 3.1.1, "Written Practices"
01 45 35, Para 3.1.3, "Written Practices"
01 45 35, Para 3.1.1, "NDT
Procedures and Equipment
Calibration Records"
01 45 35, Para 3.1.3, "NDT
Procedures and Equipment
Calibration Records"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
01 45 35, Para 3.1.1, "Daily
Reports"
01 45 35, Para 3.1.3, "Daily
Reports"
01 45 35, Para 3.1.3, "Daily
Reports"
01 45 35, Para 3.1.1, "Biweekly Reports"
01 45 35, Para 3.1.2, "Biweekly Reports"
01 45 35, Para 2.1, "Fabrication Plant"
01 45 35, Para 2.1, "Steel
Truss Plant"
01 45 35, Para 2.1, "Wood
Truss Plant"
01 45 35, Para 2.1, "AC472
Accreditation"
01 45 35, Para 2.1, "Steel
Joist Institute Membership"
01 45 35, Para 2.1, "Certified
Plant"
01 45 35, Para 2.1, "Certificate of Compliance"
01 45 35, Para 1.5.17, "Special Inspector of Record"
01 45 35, Para 1.5, "Special
Inspector"
01 45 35, Para 3.1.1, "Qualification Records"
01 45 35, Para 3.1.3, "Qualification Records"
01 45 35, Para 3.1.1, "Comprehensive Final
Report"
01 45 35, Para 3.1.3, "Comprehensive Final
Report"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
01 50 00, Para 1.3, "Construction Site Plan"; G
01 50 00, Para 3.4.1, "Traffic
Control Plan"; G
01 50 00, Para 1.4, "Backflow Preventers"
01 50 00, Para 2.2.5, "Backflow Preventer Tests"
01 50 00, Para 1.4.1, "Backflow Tester"
01 50 00, Para 1.4, "Backflow Preventers"
01 54 00.00 31, Para 1.5.2.1, "Affirmative Procurement
Reporting Form"; G
01 57 19.00 31, Para 1.7.1, "Preconstruction Survey"; G
01 57 19.00 31, Para 1.8.3, "Regulatory Notifications"; G
01 57 19.00 31, Para 1.5, "Environmental Protection
Plan"; G
01 57 19.00 31, Para 1.6, "Dirt and Dust Control Plan";
G
01 57 19.00 31, Para 3.9.2, "Disposal Requirements"
01 57 19.00 31, Para 1.8.4, "Erosion and Sediment
Control Inspection Reports"
01 57 19.00 31, Para 3.4, "Erosion and Sediment
Control Inspection Reports"
01 57 19.00 31, Para 3.4, "Storm Water Inspection
Reports for General Permit"
01 57 19.00 31, Para 1.8.5, "Solid Waste Disposal
Report"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR employee training records";
G
01 57 19.00 31, Para 3.4.2, "Storm Water Pollution
Prevention Plan compliance notebook"; G
01 57 19.00 31, Para 1.8, "Waste Determination
Documentation"
01 57 19.00 31, Para 3.7.2, "Waste Determination
Documentation"
01 57 19.00 31, Para 1.8.1, "Disposal Documentation for
Hazardous and Regulated
Waste"
01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR
Employee Training Records"
01 57 19.00 31, Para 1.7.2, "Solid Waste Disposal
Permit"
01 57 19.00 31, Para 1.8.5, "Solid Waste Disposal
Report"
01 57 19.00 31, Para 3.7.2, "Hazardous Waste/Debris
Management"
01 57 19.00 31, Para 1.8.3, "Regulatory Notifications"
01 57 20.00 31, Para , "Material Safety Data Sheets
(MSDS)"
01 57 20.00 31, Para 1.8, "Green Procurement"
01 57 20.00 31, Para 1.8, "Green Procurement"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
01 57 20.00 31, Para 1.3, "Recycling Report"
01 57 20.00 31, Para 1.3, "Recycling Report"
01 74 19.00 31, Para 1.3.3, "Construction Waste
Management Plan"; G
01 78 00, Para 1.5.1, "Warranty Management
Plan"
01 78 00, Para 1.5.4, "Warranty Tags"
01 78 00, Para 1.4, "Spare
Parts Data"
01 78 00, Para 3.9, "Preventative Maintenance"
01 78 00, Para 3.9, "Condition Monitoring"
01 78 00, Para 3.9, "Inspection"
01 78 00, Para 1.5.1, "Instructions"
01 78 00, Para 3.7, "Operation and Maintenance
Manuals"; G
01 78 00, Para 3.1, "As-Built
Drawings"; G
01 78 00, Para 3.3, "Record
Drawings"; G
01 78 00, Para 3.6, "As-Built
Record of Equipment and
Materials"
01 78 00, Para 3.4, "Final
Approved Shop Drawings"
01 78 00, Para 3.5, "Construction Contract
Specifications"
01 78 00, Para 3.1, "Interim
DD FORM 1354"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
01 78 00, Para 3.1, "Checklist for DD FORM
1354"; G
02 41 00, Para 1.2.1, "Demolition Plan"; G
02 41 00, Para 1.1, "Existing
Conditions"
02 41 00, Para 1.6, "Notification"; G
02 41 00, Para 3.2.2, "Receipts"
03 30 00, Para 1.6.3, "Quality Control Plan"
03 30 00, Para 1.6.4, "Quality Control Personnel
Certifications"
03 30 00, Para 1.6.4, "Quality Control
Organizational Chart"
03 30 00, Para 1.6.6, "Laboratory Accreditation"
03 30 00, Para 1.6.2.1, "Reinforcing Steel"; G
03 30 00, Para 2.4.5, "Joint
Sealants"
03 30 00, Para 2.1, "Materials for Forms"
03 30 00, Para 2.4.1, "Cementitious Materials"
03 30 00, Para 2.3.3, "Concrete Curing Materials"
03 30 00, Para 2.5, "Reinforcement"
03 30 00, Para 2.6.1, "Liquid
Chemical Floor Hardener"
03 30 00, Para 2.4.4, "Admixtures"
03 30 00, Para 2.4.6, "Biodegradable Form
Release Agent"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
03 30 00, Para 2.3.1, "Mix
Design"; G
03 30 00, Para 1.6.1.1, "Concrete Mix Design"; G
03 30 00, Para 2.4.3, "Aggregates"
03 30 00, Para 3.11.2.2, "Compressive Strength
Tests"; G
03 30 00, Para 3.11.2.3, "Air
Content"
03 30 00, Para 3.11.2.1, "Slump Tests"
03 30 00, Para 2.4.2, "Water"
03 30 00, Para 2.5.1, "Reinforcing Bars"
03 30 00, Para 2.3.3, "Curing
Compound"
03 30 00, Para 1.6.4.2, "Field
Testing Technician and
Testing Agency"
03 45 00, Para 1.8.1, "Precast Drawings"; G
03 45 00, Para 1.8.2, "Concrete Shapes and
Finish"; G
03 45 00, Para 2.1.1, "Contractor-Furnished Mix
Design"; G
03 45 00, Para 2.3.9, "Repair of Surface Defects"; G
03 45 00, Para 1.4, "Manufacturer's
Qualifications"; G
03 45 00, Para 3.3, "Installation"; G
03 45 00, Para 3.7, "Cleaning"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
04 20 00, Para 2.5.3, "Cement"; G
04 20 00, Para 1.6.2, "Cold
Weather Installation"; G
04 20 00, Para 2.2, "Clay or
Shale Brick"; G
136 04 20 00, Para 2.7, "Anchors
04 20 00, Para 2.1, "Expansion-Joint Materials";
G
04 20 00, Para 2.8, "Joint
Reinforcement"; G
04 20 00, Para 2.5.4, "Pre-mixed Mortar"; G
04 20 00, Para 1.2.1.1, "Unit
Strength Method"; G
04 20 00, Para 2.2, "Clay or
Shale Brick"
142 04 20 00, Para 2.7, "Anchors
04 20 00, Para 2.1, "Expansion-Joint Materials"
04 20 00, Para 2.8, "Joint
Reinforcement"
04 20 00, Para 2.5.3, "Masonry Cement"
04 20 00, Para 2.5.3, "Masonry Cement"
05 12 00, Para 1.4.1.1, "Erection Drawings"
05 12 00, Para 1.4.2, "Fabrication Drawings"; G
05 12 00, Para 2.6.2, "Shop
Primer"
05 12 00, Para 2.4.1, "Welding Electrodes and
Rods"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
05 12 00, Para 2.3.2.3, "Direct Tension Indicator
Washers"
05 12 00, Para 2.4.2, "Non-
Shrink Grout"
05 12 00, Para 2.3.3, "Tension Control Bolts"
154 05 12 00, Para 2.3, "Bolts
05 12 00, Para 3.7.2.1, "Direct Tension Indicator
Washer Inspection Reports"
156 05 12 00, Para 2.2, "Steel" 5
05 12 00, Para 2.5, "Galvanizing"
05 12 00, Para 1.3, "AISC
Fabrication Plant Quality
Certification"
05 12 00, Para 1.3, "AISC
Erector Quality Certification"
05 12 00, Para 1.4.3.1, "Welding Procedures and
Qualifications"
161 05 40 00, Para 2.1, "Studs
05 40 00, Para 2.1, "Recycled Content of Steel
Products"
06 41 16.00 10, Para 2.1, "Shop Drawings"; G
06 41 16.00 10, Para 3.1, "Installation"; G
06 41 16.00 10, Para 2.1, "Wood Materials"; G
06 41 16.00 10, Para
2.10.8.3, "Finish Schedule";
G
06 41 16.00 10, Para 2.6, "Cabinet Hardware"; G
06 41 16.00 10, Para 2.8, "Adhesives
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
06 41 16.00 10, Para 2.3, "Plastic Laminates"; G
06 41 16.00 10, Para 1.4, "Quality Assurance"; G
06 41 16.00 10, Para 3.1, "Laminate Clad Casework";
G
06 61 16, Para 1.4.2, "Detail
Drawings"; G
06 61 16, Para 3.1, "Installation"; G
06 61 16, Para 2.1, "Solid polymer material"; G
06 61 16, Para 1.4.1, "Qualifications"; G
06 61 16, Para 2.3, "Fabrications"; G
06 61 16, Para 2.1, "Material"; G
06 61 16, Para 2.3.4, "Countertops"; G
06 61 16, Para 2.1, "Solid polymer material"; G
06 61 16, Para 2.3, "Fabrications"; G
06 61 16, Para 1.4.1, "Qualifications"; G
06 61 16, Para 3.2, "Clean-up"; G
07 84 00, Para 2.1, "Firestopping System"; G
07 84 00, Para 2.2, "Firestopping Materials"; G
07 84 00, Para 3.3, "Inspection"; G
07 84 00, Para 1.5.2, "Inspector Qualifications"
07 84 00, Para 2.2, "Firestopping Materials"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
07 84 00, Para 1.5.1, "Installer Qualifications"; G
07 92 00, Para 2.1, "Sealants"; G
07 92 00, Para 2.2, "Primers"; G
07 92 00, Para 2.3, "Bond
Breakers"; G
07 92 00, Para 2.4, "Backstops"; G
08 11 13, Para 2.1, "Doors";
G
08 11 13, Para 2.1, "Doors";
G
08 11 13, Para 2.4, "Frames"; G
08 11 13, Para 2.4, "Frames"; G
08 11 13, Para 2.2, "Accessories"; G
08 11 13, Para 2.5, "Weatherstripping"; G
08 11 13, Para 2.1, "Doors";
G
08 11 13, Para 2.4, "Frames"; G
08 11 13, Para 2.2, "Accessories"; G
08 14 00, Para 2.1, "Doors";
G
08 14 00, Para 2.1, "Doors";
G
08 14 00, Para 1.5, "Warranty"; G
08 14 00, Para 2.1, "Doors";
G
08 14 00, Para 2.2.4.1, "Door
Finish Colors"; G
08 14 00, Para 2.3, "Cycle-
Slam"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
08 14 00, Para 2.3, "Hinge
Loading Resistance"; G
08 14 00, Para 1.3.1, "Certificates of Grade"; G
08 14 00, Para 1.5, "Warranty"; G
08 31 00, Para 1.3, "Access
Panels"; G
08 31 00, Para 1.3, "Access
Panels"; G
08 31 00, Para 1.3.2, "Hardware"; G
08 31 00, Para 2.1.6, "Accessories"; G
08 31 00, Para 2.4, "Finishes"; G
08 33 13, Para 1.3, "Detail
Drawings"; G
08 33 13, Para 1.5, "Warranty"; G
08 33 13, Para 2.1, "Rolling
Counter Doors"; G
08 33 13, Para 3.1, "Installation"; G
08 33 13, Para 3.3, "Cleaning"; G
08 33 13, Para 2.3, "Rolling
Counter Door (Non-Rated)"
08 43 13, Para 1.2.1, "Sample Warranty"; G
08 43 13, Para 1.2.1, "Listing of Product Installations"; G
08 43 13, Para 1.2.1, "Installation Drawings"; G
08 43 13, Para 1.2.1, "Fabrication Drawings"; G
08 43 13, Para 1.2.1, "Manufacturer's Catalog
Data"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
08 43 13, Para 1.2.1, "Finish and Color Samples"; G
08 43 13, Para 1.2.1, "Certified Test Reports"; G
08 43 13, Para 3.4, "Manufacturer's Product
Warranty"; G
08 71 00, Para 1.3, "Hardware schedule"; G
08 71 00, Para 2.3.5, "Keying system"; G
08 71 00, Para 2.3, "Hardware items"; G
08 71 00, Para 3.1, "Installation"; G
08 71 00, Para 1.3, "Hardware Schedule"; G
08 71 00, Para 1.4, "Key
Bitting"; G
08 81 00, Para 1.6.1, "Insulating Glass"; G
08 81 00, Para 1.3, "Glazing
Accessories"; G
08 81 00, Para 1.6.1, "Insulating Glass"; G
08 81 00, Para 2.3, "Setting and sealing materials"; G
08 81 00, Para 3.2, "Glass setting"; G
09 22 00, Para 2.1, "Metal support systems"; G
09 29 00, Para 1.3, "Certifications"; G
09 29 00, Para 2.2.1, "Gypsum Board"; G
09 29 00, Para 2.2, "Asbestos Free Materials"; G
09 29 00, Para 1.3.1, "Indoor
Air Quality"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
09 29 00, Para 2.2.1, "Indoor
Air Quality for Gypsum
Board"; G
09 29 00, Para 2.2.2, "VOC
Content of Joint Compound";
G
09 30 10, Para 3.2, "Detail
Drawings"; G
09 30 10, Para 2.1, "Porcelain Tile"; G
09 30 10, Para 2.1, "Glazed
Wall Tile"; G
09 30 10, Para 2.2, "Setting-
Bed"; G
252 09 30 10, Para 2.4, "Mortar
253 09 30 10, Para 2.1, "Tile"; G 2
09 30 10, Para 2.1, "Accessories"; G
09 30 10, Para 2.1, "Transition Strips"; G
09 30 10, Para 2.5, "Transition Strips"; G
09 30 10, Para 2.4.3, "Grout"; G
09 30 10, Para 3.7, "Maintenance Instructions"
09 30 10, Para 3.2, "Installation"; G
09 51 00, Para 2.1, "Approved Detail Drawings";
G
09 51 00, Para 2.1, "Acoustical Ceiling Systems";
G
09 51 00, Para 2.2, "Acoustical Units"; G
09 51 00, Para 2.2.1.1, "Acoustical Ceiling Tiles"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
09 65 00, Para 2.1, "Resilient
Flooring and Accessories"; G
09 65 00, Para 2.6, "Adhesives"
09 65 00, Para 2.1, "Resilient
Flooring and Accessories"; G
09 65 00, Para 2.2, "Rubber
Tile"; G
09 65 00, Para 2.4, "Wall
Base"; G
09 65 00, Para 2.1, "Vinyl
Composition Tile"; G
09 65 00, Para 2.3, "Luxury
Vinyl Tile"; G
271 09 65 00, Para 3.3, "Moisture
09 65 00, Para 3.2, "Surface
Preparation"; G
09 65 00, Para 3.1, "Installation"; G
09 65 00, Para 2.1, "Resilient
Flooring and Accessories"; G
09 68 00, Para 3.4, "Installation Drawings"; G
09 68 00, Para 2.2, "Carpet";
G
09 68 00, Para 2.5, "Moldings"; G
09 68 00, Para 2.2, "Carpet";
G
09 68 00, Para 2.5, "Moldings"; G
09 68 00, Para 3.2, "Moisture and Alkalinity Tests"; G
09 68 00, Para 1.3.1, "Indoor
Air Quality"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
09 68 00, Para 1.6, "Warranty"; G
09 68 00, Para 3.1, "Surface
Preparation"; G
09 68 00, Para 3.5, "Cleaning and Protection"; G
09 68 00, Para 2.4, "Indoor
Air Quality for Aerosol
Adhesives and Sealants"; G
09 68 00, Para 2.4, "Indoor
Air Quality for Non-Aerosol
Adhesives"; G
09 68 00, Para 2.4, "Indoor
Air Quality for Concrete
Primer"; G
09 68 00, Para 1.6, "Warranty"
09 90 00, Para 3.1, "Piping identification"
290 09 90 00, Para 3.1, "stencil" 5
09 90 00, Para 2.1, "Coating"; G
09 90 00, Para 2.1, "Manufacturer's Technical
Data Sheets"
09 90 00, Para 1.9, "Color";
G
09 90 00, Para 1.3, "Applicator's qualifications"
09 90 00, Para 1.4.1.2, "Qualification Testing"; G
09 90 00, Para 3.6.1, "Application instructions"
09 90 00, Para 3.6.2, "Mixing"
09 90 00, Para 1.7.2, "Manufacturer's Material
Safety Data Sheets"
09 90 00, Para 2.1, "Coatings:"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
10 14 00.20, Para 1.4.2, "Detail Drawings"; G
10 14 00.20, Para 3.1, "Installation"; G
10 14 00.20, Para 1.6, "Warranty"; G
10 14 00.20, Para 1.4.1, "Interior Signage"; G
10 14 00.20, Para 3.1, "Approved Manufacturer's
Instructions"; G
10 14 00.20, Para 3.1.2, "Protection and Cleaning"; G
10 21 13, Para 2.1, "Fabrication Drawings"; G
10 21 13, Para 3.3, "Installation Drawings"; G
10 21 13, Para 2.1, "Cleaning and Maintenance
Instructions"; G
10 21 13, Para 2.7, "Colors
And Finishes"; G
10 21 13, Para 2.2.1, "Sound-
Deadening Cores"; G
10 21 13, Para 2.2.2, "Anchoring Devices and
Fasteners"; G
10 21 13, Para 2.2.4, "Hardware and Fittings"; G
10 21 13, Para 2.2.3, "Brackets"; G
10 21 13, Para 2.2.5, "Door
Hardware"; G
10 21 13, Para 2.5, "Pilaster
Shoes"; G
10 21 13, Para 2.2.4.2, "Finishes"; G
10 21 13, Para 2.7, "Colors and Finishes"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
10 21 13, Para 1.5, "Warranty"; G
10 21 13, Para 2.3, "Recycled content for plastic
10 22 19, Para 3.3, "Installation"; G
10 22 19, Para 1.6, "Warranty"; G
10 22 19, Para 2.2, "Partition
System"; G
10 22 19, Para 2.2, "Partition
System"; G
10 22 19, Para 2.4, "Partition
System Samples"; G
10 22 19, Para 2.1.1, "Burning Characteristics"; G
10 22 19, Para 2.1.2, "Acoustical Performance"; G
10 22 19, Para 2.1.3, "Structural Performance"; G
10 22 19, Para 2.3.1, "Assembly Manuals"; G
10 22 19, Para 3.5, "Maintenance Manuals"; G
10 28 13, Para 2.1.2, "Finishes"; G
10 28 13, Para 2.2, "Accessory Items"; G
10 28 13, Para 2.1.2, "Finishes"; G
10 28 13, Para 2.2, "Accessory Items"; G
10 28 13, Para 2.2, "Accessory Items"
10 44 16, Para 2.1.1, "Fire
Extinguishers"; G
10 44 16, Para Part 2, "Cabinets"; G
10 44 16, Para 2.1.1, "Fire
Extinguishers"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
10 44 16, Para Part 2, "Cabinets"; G
10 44 16, Para 3.2.1, "Replacement Parts List"; G
10 44 16, Para 2.1.1, "Fire
Extinguishers"; G
10 44 16, Para 2.1.1, "Manufacturer's Warranty with Inspection Tag"; G
10 51 13, Para 2.1, "Types";
G
10 51 13, Para 1.4, "Location"; G
10 51 13, Para 3.1, "Installation"
10 51 13, Para 3.2, "Numbering system"
10 51 13, Para 2.2, "Material"; G
10 51 13, Para 2.3.1, "Locking Devices"; G
10 51 13, Para 2.3.3, "Handles"; G
10 51 13, Para 2.2.3, "Finish"; G
10 51 13, Para 2.3, "components"; G
10 51 13, Para 3.1, "Assembly"
10 51 13, Para 1.5.1, "Color chips"; G
12 21 00, Para 3.3, "Installation"; G
12 21 00, Para 2.1, "Window
Blinds"; G
12 21 00, Para 3.3, "Installation"
12 21 00, Para 2.1, "Window
Blinds"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
12 21 00, Para 2.1, "Window
Blinds"
12 21 00, Para 2.1, "Window
Blinds"; G
12 21 00, Para 2.1, "Window
Blinds"; G
21 13 13.00 20, Para 1.5.2, "Shop Drawings"; G
21 13 13.00 20, Para 2.1.1, "Pipe"; G
21 13 13.00 20, Para 2.1.1, "Fittings"; G
21 13 13.00 20, Para 2.1.5, "Valves"; G
21 13 13.00 20, Para 2.1.4, "Sprinklers"; G
21 13 13.00 20, Para 2.1.6, "Pipe hangers and supports";
G
21 13 13.00 20, Para 2.1.1, "Mechanical couplings"; G
21 13 13.00 20, Para 2.1.6, "Seismic Bracing"; G
21 13 13.00 20, Para 1.3, "Hydraulic Calculations"; G
21 13 13.00 20, Para 3.6, "request to schedule
Preliminary Tests"; G
21 13 13.00 20, Para 3.6, "Preliminary Test Report"; G
21 13 13.00 20, Para 3.7, "request to schedule Final
Acceptance Test"; G
21 13 13.00 20, Para 3.7, "Final Acceptance Test
Report"; G
21 13 13.00 20, Para 3.1, "Inspection by Fire
Protection Engineer"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
21 13 13.00 20, Para 1.5.1, "Fire Protection Engineer"; G
21 13 13.00 20, Para 1.5.2, "Sprinkler System Installer";
G
21 13 13.00 20, Para 3.8, "Operating and Maintenance
Instructions"
21 13 13.00 20, Para 3.7, "As-built drawings"
21 13 13.00 20, Para 3.8, "On-site training"
22 00 00, Para 2.4, "Fixtures"
22 00 00, Para 2.4.1, "Flush
Valve Water Closets"
22 00 00, Para 2.4.2, "Flush
Valve Urinals"
22 00 00, Para 2.4.4, "Countertop Lavatories"
22 00 00, Para 2.4.5, "Kitchen Sinks"
22 00 00, Para 2.5.2, "Shower Faucets"; G
22 00 00, Para 1.5.1, "Welding"
386 22 00 00, Para 3.6, "Tests
22 00 00, Para 1.3, "Materials and Equipment"
388 22 00 00, Para 2.1.1, "Bolts" 5
23 00 00, Para 1.4.3, "Detail
Drawings"; G
23 00 00, Para 2.8.1.1, "Metallic Flexible Duct"
23 00 00, Para 2.8.2, "Duct
Access Doors"; G
23 00 00, Para 2.8.4, "Registers And Grilles"; G
23 00 00, Para 2.9.1.1, "In-
Line Centrifugal Fans"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
23 00 00, Para 2.1, "Air
Handling Units"; G
23 00 00, Para 2.11.1.1, "Variable Volume
23 00 00, Para 2.11.1.2, "Variable Volume
23 00 00, Para 1.4.4, "Test
Procedures"; G
23 00 00, Para 2.8.3, "Fire
Dampers"
23 00 00, Para 2.9.3, "Air
Filters"; G
23 00 00, Para 2.9.3.1, "Air
Filters"; G
23 00 00, Para 2.11.1.3, "Reheat Units"; G
23 00 00, Para 3.9, "Performance Tests"; G
23 00 00, Para 3.7, "Damper
Acceptance Test"; G
23 00 00, Para 3.2, "Manufacturer's Installation
Instructions"; G
23 00 00, Para 3.11.2, "Operation and Maintenance
Training"
23 00 00, Para 3.11.1, "Operation and Maintenance
Manuals"; G
23 00 00, Para 2.9.1.1, "In-
Line Centrifugal Fans"; G
23 00 00, Para 2.1, "Air
Handling Units"; G
23 00 00, Para 2.11.1.1, "Variable Volume
23 00 00, Para 2.11.1.2, "Variable Volume
23 05 48.00 40, Para 1.2, "Installation Drawings"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
23 05 48.00 40, Para 1.2, "Outline Drawings"; G
23 05 48.00 40, Para 1.2, "Equipment and
Performance Data"; G
23 05 48.00 40, Para 2.2.5, "Isolators"; G
23 05 48.00 40, Para 2.4, "Type of Isolator"; G
23 05 48.00 40, Para 2.4, "Type of Base"; G
23 05 48.00 40, Para 2.4, "Allowable Deflection"; G
23 05 48.00 40, Para 2.4, "Measured Deflection"; G
23 05 93, Para 1.3.3, "TAB
Schematic Drawings and
Report Forms"; G
23 05 93, Para 1.3, "Equipment and
Performance Data"; G
23 05 93, Para 3.3.5, "Completed Pre-Final DALT
Report"; G
23 05 93, Para 3.3.8, "Certified Final DALT
Report"; G
23 05 93, Para 1.5.1, "Independent TAB Agency and Personnel
Qualifications"; G
23 07 00, Para 3.2.2.4, "MICA Plates"; G
23 07 00, Para 2.3, "Pipe
Insulation Systems"; G
23 07 00, Para 3.2, "Pipe
Insulation Systems"; G
23 07 00, Para 3.3, "Duct
Insulation Systems"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
23 07 00, Para 3.4, "Equipment Insulation
Systems"; G
23 07 00, Para 2.3, "Pipe
Insulation Systems"; G
23 07 00, Para 3.2, "Pipe
Insulation Systems"; G
23 07 00, Para 3.3, "Duct
Insulation Systems"; G
23 07 00, Para 3.4, "Equipment Insulation
Systems"; G
23 07 00, Para 2.2.1.3, "Thermal Insulation"; G
23 07 00, Para 2.3, "Pipe
Insulation Systems"; G
23 07 00, Para 3.2, "Pipe
Insulation Systems"; G
23 07 00, Para 3.3, "Duct
Insulation Systems"; G
23 07 00, Para 3.4, "Equipment Insulation
Systems"; G
23 09 23.13 20, Para 1.4.1.1, "Control system drawings title sheet"; G
23 09 23.13 20, Para 1.4.1.2, "List of I/O Points"; G
23 09 23.13 20, Para 1.4.1.3, "Control System
Components List"; G
23 09 23.13 20, Para 1.4.1.4, "Control system schematics";
G
23 09 23.13 20, Para 1.4.1.5, "HVAC Equipment Electrical
Ladder diagrams"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
23 09 23.13 20, Para 1.4.1.6, "Component wiring diagrams"; G
23 09 23.13 20, Para 1.4.1.7, "Terminal strip diagrams"; G
23 09 23.13 20, Para 1.4.1.8, "BACnet communication architecture schematic"; G
23 09 23.13 20, Para 2.1.1, "Direct Digital Controllers"; G
23 09 23.13 20, Para
2.1.1.13, "BACnet
Gateways"; G
23 09 23.13 20, Para 2.1.3, "BACnet Protocol Analyzer";
G
23 09 23.13 20, Para 2.1.2, "DDC Software"; G
23 09 23.13 20, Para 2.2, "Sensors and Input
Hardware"; G
23 09 23.13 20, Para 2.2.6, "Air Flow Monitoring Station";
G
23 09 23.13 20, Para 2.3, "Output Hardware"; G
23 09 23.13 20, Para 2.4.2, "Surge and transient protection"; G
23 09 23.13 20, Para 2.6, "Indicators"; G
23 09 23.13 20, Para 2.5.1, "Duct smoke detectors"; G
23 09 23.13 20, Para 2.7, "Variable frequency (motor) drives"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
23 09 23.13 20, Para 3.4.2, "Performance Verification
Testing Plan"; G
23 09 23.13 20, Para 3.4.4, "Pre-Performance
Verification Testing
Checklist"; G
23 09 23.13 20, Para 3.4.11, "Performance Verification
Testing Report"; G
23 09 23.13 20, Para 1.6.6, "Contractor's Qualifications";
G
23 09 23.13 20, Para 3.4.1, "Pre-PVT Checklist"; G
23 09 23.13 20, Para 1.4, "BACnet Direct Digital
Control Systems"; G
23 09 23.13 20, Para 3.3, "Controls System Operators
Manuals"; G
23 09 23.13 20, Para 2.7.2, "VFD Service Manuals"; G
23 09 23.13 20, Para 3.5.1, "Training documentation"; G
23 11 25, Para 1.5.3, "Gas
Piping System"; G
23 11 25, Para 2.2, "Gas
Piping System"; G
23 11 25, Para 3.2, "Gas
Piping System"; G
23 11 25, Para 1.6.1, "Pipe and Fittings"; G
23 11 25, Para 1.5.3, "Gas
Equipment Connectors"; G
23 11 25, Para 1.5.3, "Gas
Piping System"; G
23 11 25, Para 2.2, "Gas
Piping System"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
1179187112C Typewritten Text
FA441819R0002
1179187112C
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
PROJECT TITLE
Repair Squadron Operations Facility, Building 709
CONTRACT NO. / TASK ORDER NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SUBMITTAL REGISTER
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
23 11 25, Para 3.2, "Gas
Piping System"; G
23 11 25, Para 2.1, "Pipe
Coating Materials"; G
23 11 25, Para 2.6, "Pressure Regulators"; G
23 11 25, Para 2.4, "Risers";
G
23 11 25, Para 2.3, "Valves";
G
23 11 25, Para 2.2.4, "Warning and Identification
Tape"; G
23 11 25, Para 3.16, "Testing"; G
23 11 25, Para 3.16.1, "Pressure Tests"; G
23 11 25, Para 3.16.2, "Test with Gas"; G
23 11 25, Para 1.5.1, "Welders Procedures and
Qualifications"; G
23 11 25, Para 1.5.1, "Assigned Number
23 11 25, Para 1.5.2, "PE
Pipe and Fittings"; G
23 11 25, Para 2.1, "Pipe
Coating Materials"; G
23 11 25, Para 1.3.1, "Gas
Facility System and
Equip…