Solicitation_Amendment_FA441819RA0070001_SF_30.pdf
PDF 551 KB Posted
- Attached to
- Repair Squadron Operations Facility, Bldg 709 Federal contract opportunity
- Solicitation number
- FA4418-19-R-0001
About this file
Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specification-_08_11_13.pdf | ||
| Wage_Determination-General_Decision_Number_SC180030_dated_06.29.2018.pdf | ||
| Q_&_A_B709_20190125-Final.pdf | ||
| Specification-_10_22_39.pdf | ||
| Solicitation_Amendment_FA441819RA0070002_SF_30.pdf | ||
| Attachment_9-SCH_B_REV_2_2019_0125.pdf | ||
| Specification-_01_22_00.00_10.pdf | ||
| Attachment_9-SCH_B_REV_1_2019_0118.pdf | ||
| Attachment_8_Drawings_Rev_1.pdf | ||
| Q_&_A_B709_20190118-Final.pdf | ||
| Attachment_10-Addendum_1_2019_0118.pdf | ||
| Attachment_5_-_AF_Form_66_Submittal_Register.pdf | ||
| Attachment_4_-_Green_Procurement.pdf | ||
| Attachment_6_-_Furniture_Fixtures_Equipment.pdf | ||
| Attachment_2b_-_Drawings_36-70_-B709.pdf | ||
| Attachment_7_-_Structural_Interior_Design.pdf | ||
| Attachment_2a_-_Drawings_1-35_-_B709.pdf | ||
| Attachment_1_-_Specifications_B709.pdf | ||
| Attachment_3_-_General_Decision_Number_SC180030.pdf | ||
| Solicitation_-_FA441819RA007.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The Purpose of This Amendment Is: The purpose of this amendment is to:
1. Provide Questions and Answers resulting from the Pre-Proposal Conference and Site Visit held on 7 January 2019.
2. Incorporate Attachment 8, Drawings (Rev 1) dated 9 January 2019.
3. Incorporate Attachment 9, Schedule B (Rev 1) dated 18 January 2019.
4. Incorporate Attachment 10, Addendum 1 dated 18 January 2019.
5. Due to system errors, the amendment reflects in block 11 that 'The hour and date specified for receipt is extended and not extended however please note that the Proposal Due Date 'IS EXTENDED' from 22 January 2019 to 29 January 2019 at 1300 hrs (EST).
Section B - Supplies or Services & Prices or Costs
Section C - Specification/SOW/SOO/ORD
Miscellaneous text in this section has been modified to:
Attachment 1 Specifications 748 Pages July 10, 2018
Attachment 2 Drawings 70 Pages July 10, 2018
Attachment 3 Wage Determination 5 Pages November 2, 2018
Attachment 4 Green Procurement 2 Pages August 8, 2018
Attachment 5 AF Form 66, Submittal Register 37 Pages July 10, 2018
Attachment 6 Furniture, Fixtures & Equipment 124 Pages July 10, 2018
Attachment 7 Structural Interior Design 59 Pages July 10, 2018
Attachment 8 Drawings (Rev 1) (Sheets 6, 7, 10, 11, 15, 20, and 67) 7 pages January 9, 2019
Attachment 9 Schedule B (Rev 1) 1 Page January 18, 2019
Attachment 10 Addendum 1 1 Page January 18, 2019
PERFORMANCE AND PAYMENT BOND REQUIREMENTS (IAW FAR 28.101-2 and FAR 28.102-3)
PROPOSAL BOND: The offeror shall submit a Proposal Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government. Proposal Bond, in the amount of 20 percent (20%) of the proposal price. The Proposal Bond penalty may be expressed in terms of a percentage of the proposal price or may be expressed in dollars and cents.
The contractor shall submit a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25-A) with good and sufficient surety and sureties to the Government within 15 days of award.
The penal sum of such bonds will be as follows:
a. PERFORMANCE BOND: The penal sum of the performance bonds shall equal one hundred percent (100%) of the contract price.
b. PAYMENT BOND: The penal sum of the payment bonds shall equal one hundred percent (100%) of the contract price.
BUSINESS LICENSE TAX - SOUTH CAROLINA
In accordance with Contract Clause entitled, "Federal, State and Local Taxes" dated APR 2003/FAR 52.229-3 incorporated by reference, be advised that the Cities of North Charleston, South Carolina and/or Goose Creek South Carolina imposes a business license tax on all contract work within the cities of North Charleston, South Carolina and/or Goose Creek South Carolina. The cities interpret this to include contractors performing work for the United States government within the limits of North Charleston and/or Goose Creek. Joint Base Charleston - Air Base is included within the City of North
FA441819RA0070001
Charleston, South Carolina and Joint Base Charleston - Weapons Station is included within the city limits of Goose Creek. The cost of the license is proportional to the dollar amount of work being executed. Information for the North Charleston City Tax may be obtained by calling 843-740-2632, and for the Goose Creek City Tax by calling 843-797-6220.
PKI CERTIFICATE FOR PAST PERFORMANCE EVALUATION
Past Performance Evaluations are required on all completed DoD construction contracts. These evaluations are used in past performance evaluations conducted on your future proposals. The evaluations are placed in a computer database called Construction Contractor Appraisal Support System (CCASS). This system requires the contractor to include their comments in their evaluation.
In order to access the system, it is required that you obtain a PKI (Public Key Infrastructure) certificate. A PKI certificate is software which is purchased from an approved commercial vendor and installed on your computer. Approved vendors are listed at https://www.cpars.csd.disa.mil/ main/pki_info.htm under the heading "Approved ECA Vendors". You will be required to purchase an "Identity Certificate" to access the CCASS system or the Past Performance Information Report System (PPIRS), which will contain all past performance evaluations for your firm for any DoD contracts. The average cost for a PKI certificate is about $100 - $120 per certificate, per year.
REQUIRED INSURANCE (IAW FAR 28.306 (b))
Reference FAR clause 52.228-5 entitled "Insurance..." the Contractor shall, as its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
a. Workman's Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory.
The required Workman's Compensation Insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.
b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. The insurance shall be required on the comprehensive form of policy and shall provide bodily liability injury and property damage liability covering the operation of all automobiles used in connection with the performance of this contract. At least the minimum amount of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
CONTRACTOR CONSENT TO BACKGROUND CHECKS
The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant, are currently on probation or parole, or are on the state/national Sex Offender Register as identified by south Carolina Law Enforcement Division (SLED)/National Crime Information Center (NCIC). All contractor and subcontractor personnel must consent to NCIC criminal history background checks. Contractor and subcontractor personnel who do not consent to an NCIC check will be denied access to the installation. Information required to conduct an NCIC check includes: full name, driver's license number, social security number, date of birth of the person entering the installation. The contractor shall provide this information using the JB CHS-AB/WS Contract Security Worksheet for Base Access and shall submit it in conjunction with the contractor's request for either base or vehicle passes.
Completion of a successful NCIC check does not invalidate the requirement for an escort when contractor or subcontractor personnel are working within controlled or restricted areas. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Persons later found to be undocumented or illegal aliens will be remanded to the proper authorities. The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this provision. Furthermore, nothing in this provision shall excuse the contractor from proceeding with the contract as required.
Badges - Contractors and subcontractors shall submit the completed and approved Contract Security Worksheet for Base Access prior to planning to work. Upon completion of the background check, the employee will report to the installation entry control center, with a photo identification issued by a Federal/State activity, for receipt of a badge with a designation of the area of the base he will be allowed access. Badges will be worn in a visible manner to government personnel at all times. At the conclusion of work for the prime contractor and any subcontractor, all badges will be turned in to the entry control center.
Contractor Registration of Vehicles on Joint Base Charleston - All contractor or contractor employees' vehicles used for the performance of this contract shall comply with all local, state and federal regulations. To register a privately owned/commercial vehicle and obtain a vehicle pass, contractor personnel shall provide a valid driver's license, current vehicle registration, and valid vehicle insurance certificate. Additionally, any pass shall be surrendered to Security Forces upon demand to positively identify a person's need to be on Joint Base Charleston.
Access to Installation During Force Protection Conditions (FPCONs) -
Contractors will be assigned a mission essential designation IAW requirements contained in CAFBI 31-101, Installation Security Instruction. Only the installation commander or the unit commander requesting contract support will assign the mission essential designation.
Contractors Working in Controlled or Restricted Areas - The unit requesting contract support will provide escort (s) for contractors' at all times when within a controlled area. Contractors shall not escort other contractor employees within controlled or restricted areas. In addition, contractors shall fulfill, maintain, and comply with all security requirements IAW AFI 31-101, The Air Force Installation Security Program, and command/local directives.
Contractors Responsibilities while Working within Controlled or Restricted Areas - Only contractor personnel with proper authority and qualifications shall enter a controlled or restricted area. Certain facilities require the issuance of an AF Form 1199 or AF Form 1199CD. The government, at any time, may revoke the AF Form 1199. The procedures for the issuance of an AF Form 1199CD are contained in CAFBI 31-101, Installation Security Instruction. Contractors shall not escort other contractor employees within controlled or restricted areas. In addition, contractors shall fulfill, maintain, and comply with all security requirements contained in CAFBI
31-101, Installation Security Instruction.
Access To Government Facilities with Controlled or Restricted Areas -
The contractor shall comply with security regulations imposed by the installation commander and/ or the agency responsible for the project location. Due to specific mission requirements inherent in the nature of controlled or restricted areas on Joint Base Charleston, the government may direct the contractor to leave the controlled or restricted areas at any given time.
FORCE PROTECTION CONDITIONS
Force Protection Conditions (FPCON) are implemented on the base to increase protective measures in anticipation of, or in response to, the threat of terrorist attack. The DoD FPCON consists of five progressive levels of increasing protective measures. The circumstances that apply and the purposes of each protective posture are as follows:
- FPCON NORMAL: Applies when a general global threat of possible terrorist activity exists and warrants a routine security posture. At a minimum, access control will be conducted at all DoD installations and facilities.
- FPCON ALPHA: Applies when there is an increased general threat of possible terrorist activity against personnel or facilities, and the nature and extent of the threat are unpredictable. ALPHA measures must be capable of being maintained indefinitely.
- FPCON BRAVO: Applies when an increased or more predictable threat of terrorist activity exists.
Sustaining BRAVO measures for a prolonged period may affect operational capability and military-civil relationships with local authorities.
- FPCON CHARLIE: Applies when an incident occurs or intelligence is received indicating some form of terrorist action or targeting against personnel or facilities is likely. Prolonged implementation of CHARLIE measures may create hardship and affect the activities of the unit and its personnel.
- FPCON DELTA: Applies in the immediate area where a terrorist attack has occurred or when intelligence has been received that terrorist action against a specific location or person is imminent.
This FPCON is usually declared as a localized condition. FPCON DELTA measures are not intended to be sustained for an extended duration.
GREEN PROCUREMENT
The Green Procurement Program (GPP) is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. Many different items are covered by the GPP. Recycled-content products are designated by the Environmental Protection Agency (EPA). "Biobased" products made from renewable plant materials are designated by the Department of Agriculture (USDA). Energy and water efficient products are designated by the Department of Energy (DOE). GPP also requires us to avoid purchasing Ozone Depleting Substances (ODS) and EPA-designated Priority Chemicals. Environmentally preferable purchasing (EPP) is a voluntary program, and it encourages the purchase of goods and services that have decreased effects on human health and the environment (compared to the competing goods and serve the same purpose), but are not already required by one of the mandatory GPP elements.
The Environmental Protection Agency (EPA) promulgates this product information via the Federal Register and the World Wide Web/Internet http://www.epa.gov/cpg/products/htm. Green Procurement is mandated, except when the Contractor can show that the product with recycled content does not meet intended specifications, has excessive cost, or cannot be delivered in time to support the schedule of the contract. If the Contractor is unable to locate a specified product meeting the GPP requirement, identify the issue to the Contracting Officer's Technical Representative for guidance. GPP is based on legal requirements and the Department of Defense facilities are subject to enforcement action if these requirements are ignored.
Section J - List of Attachments
Miscellaneous text in this section has been modified to:
Attachment 1 Specifications 748 Pages July 10, 2018
Attachment 2 Drawings 70 Pages July 10, 2018
Attachment 3 Wage Determination 5 Pages November 2, 2018
Attachment 4 Green Procurement 2 Pages August 8, 2018
Attachment 5 AF Form 66, Submittal Register 37 Pages July 10, 2018
Attachment 6 Furniture, Fixtures & Equipment 124 Pages July 10, 2018
Attachment 7 Structural Interior Design 59 Pages July 10, 2018
Attachment 8 Drawings (Rev 1) (Sheets 6, 7, 10, 11, 15, 20, and 67) 7 pages January 9, 2019
Attachment 9 Schedule B (Rev 1) 1 Page January 18, 2019
Attachment 10 Addendum 1 1 Page January 18, 2019
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
Section L - Instructions, Conditions, and Notices to Offerors
PROPOSAL PREPARATION INSTRUCTIONS
A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. The response shall consist of (1) separately bound parts, Part I - Price Proposal, and Part II - Past Performance Information and
(1) compact disc (CD).
B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required.
However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness of the price.
C. Specific Instructions:
1. PART I - PRICE PROPOSAL - Submit (1) bound and (1) CD
(a) Complete blocks 14 through 20 of the RFP Section A, SF 1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in attached Price Schedule for each Contract Line Item
(CLIN).
(c) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.
(d) If applicable, provide a letter from the Small Business Administration (SBA) showing proof of HUBZone or Section 8(a) status.
(e) Standard Form (SF) 24, Bid Bond
2. PART II - PAST PERFORMANCE INFORMATION - Limited to no more than 3 pages per contract listed. Only references for same or similar type contract desired. Submit (1) bound and (1)
CD.
(a) Quality and Satisfaction Rating for Contracts Completed in the Past Five Years: Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed product for same or similar type contract. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc.
(b) Performance Surveys: The Government will evaluate the quality and extent of offeror's performance deemed relevant to the requirements of this RFP. The Government will use information submitted by the offeror and other sources such as other Federal Government offices and commercial sources, to assess performance. Provide a list of no more than five (5) of the most relevant contracts performed for Federal agencies and commercial customers within the last five (5) years. Relevant contracts consist of repair / alteration of facilities. The evaluation of past performance information will take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition. Furnish the following information for each contract referenced:
(i) Company/Division name
(ii) Product/Service
(iii) Contracting Agency/Customer
(iv) Contract Number
(v) Contract Dollar Value
(vi) Period of Performance
(vii) Verified, up-to-date name, address, FAX & telephone number of the contracting officer
(viii) Comments regarding compliance with contract terms and conditions
(ix) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.
If a teaming arrangement is contemplated, provide complete information as to the arrangement:
including any relevant and recent past/present performance information on previous teaming arrangements with same partner, and evidence of tasking appropriate to meet the subcontracting qualification. If this is a first time joint effort, each part to the arrangement must provide a list of past relevant projects. Teaming partners will be treated and evaluated as subcontractor arrangements.
(c) Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor's consent. Provide with the proposal a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor.
D. Documents submitted in response to this RFP must be fully responsive to and consistent with the following:
1. Requirements of the RFP (Contract Line Items (CLINs) & Specifications/Drawings) and government standards and regulations pertaining to this project.
2. Evaluation Factors for Award in Section M of this RFP.
3. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this Section L will not be read nor evaluated, but will be removed from the proposal.
4. Format for proposal Part I & II shall be as follows:
(a) The proposal will be on 8 1/2" X 11" paper except for fold-outs used for charts, tables, or diagrams, which may not exceed 11" X 17" information.
(b) A page is defined as one face of an 8-1/2" x 11" sheet of paper containing information.
(c) Typing shall not be less than 12 pitch.
(d) ELABORATE FORMATS, BINDINGS OR COLOR PRESENTATIONS ARE NOT DESIRED OR
REQUIRED.
E. Offeror's shall submit a complete, original signed proposal to be received in the Contracting Office no later than the date and time posted for receipt of proposals. Faxed proposals will not be accepted. The Contracting Office will accept modifications and revisions to the proposal by FAX sent to 843-963-2829. Any modifications or revisions submitted by FAX must be followed with an original signed copy.
VISITOR CONTROL
Offerors are cautioned that Joint Base Charleston has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN HANDCARRYING OFFERS. Offerors should allow sufficient time to obtain a visitor pass (requiring valid driver's license, vehicle registration and current proof of insurance) and arrive at the location for submission PRIOR to the time established for receipt of offers. Late proposals will be processed in accordance with the provisions of FAR 52.215-1(c)(3), "Submission, modification, revision, and withdrawal of proposals."
DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS (IAW FAR 36.204(f))
The estimated amount of this project is between $5,000,000.00 and $10,000,000.00.
OFFER GUARANTEE AND BOND REQUIREMENTS
A. The proposal price, for purposes of the offer guarantee, is construed to mean the total of CLIN 0001.
B. The contract price, for purpose of the performance and payment bonds, is construed to mean the total of CLIN 0001.
| IDCode: |
| Page: 1 |
| Pages: 7 |
| AmendNo: 0001 |
| EffDate: 1/18/2019 |
| ReqNo: A001106 |
| ProjNo: 1053939 |
| IssCode: FA4418 |
| AdmCode: |
| IssuedBy: FA4418 628 CONS LGC |
CP 843 963 5155
101 E HILL BLVD
CHARLESTON AFB, SC 29404-5021
United States Brandon Rawlings, Email: brandon.rawlings@us.af.mil Telephone: 843-963-4491
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA441819RA007 |
| SolDate: 1/9/2019 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: 1 |
| Require: |
| Copies: |
| Descript: |
SEE CONTINUATION PAGE
| ContNameTitle: |
| CoNameTitle: Laurie Richman |
Email: laurie.richman@us.af.mil Telephone: 843-963-3337
| ContDate: |
| CODate: |