Specification-_01_22_00.00_10.pdf

PDF 8 KB Posted

Attached to
Repair Squadron Operations Facility, Bldg 709
Solicitation number
FA4418-19-R-0001
Issued by

About this file

Specifications 01 22 00.00 10

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repai r Squadr on Op Faci l i t y , B709 JBC No. 1053939 Januar y 17, 2019 ADC No. 17230

SECTI ON 01 22 00. 00 10

UNI T PRI CE PAYMENT

04/06

PART 1 GENERAL

1. 1 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i s t ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce items.

1. 1. 1 Gypsum Boar d

1. 1. 1. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h r epl acement of exi st i ng 5/ 8" t ype X gypsum boar d damaged by r emoval of wal l cover i ng, and ot her i nci dent al s necessar y t o compl et e t he wor k r equi r ed by Sect i on 09 29 00 GYPSUM BOARD. No payment wi l l be made f or def ect i ve ar eas unt i l cor r ect ed.

1. 1. 1. 2 Measur ement

Gypsum boar d wi l l be measur ed f or payment based upon t he number of square feet used i n t he accept ed wor k.

1. 1. 1. 3 Uni t of Measur e

Uni t of measur e: Squar e f eet .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

- - End of Sect i on - -

SECTI ON 01 22 00. 00 10 Page 1

File details come from the government source that posted it.