Specification-_10_22_39.pdf
PDF 33 KB Posted
- Attached to
- Repair Squadron Operations Facility, Bldg 709 Federal contract opportunity
- Solicitation number
- FA4418-19-R-0001
About this file
Specifications 10 22 39
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repai r Squadr on Op Faci l i t y , B709 JBC No. 1053939 Januar y 17, 2019 ADC No. 17230
SECTI ON 10 22 39
FOLDI NG PANEL PARTI TI ONS
08/17
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM B221 ( 2014) St andar d Speci f i cat i on f or Al umi num and Al umi num- Al l oy Ext r uded Bar s, Rods, Wi r e, Pr of i l es, and Tubes
ASTM E413 ( 2016) Cl assi f i cat i on f or Rat i ng Sound Insulation
ASTM E557 ( 2012) I nst al l at i on of Oper abl e Par t i t i ons
ASTM E84 ( 2017) St andar d Test Met hod f or Sur f ace Bur ni ng Char act er i st i cs of Bui l di ng Materials
ASTM E90 ( 2009) St andar d Test Met hod f or Labor at or y Measur ement of Ai r bor ne Sound Tr ansmi ssi on Loss of Bui l di ng Par t i t i ons and El ement s
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 101 ( 2018; TI A 18- 1) Li f e Saf et y Code
SCI ENTI FI C CERTI FI CATI ON SYSTEMS ( SCS)
SCS SCS Gl obal Ser vi ces ( SCS) I ndoor Advant age
UNDERWRI TERS LABORATORI ES ( UL)
UL 2818 ( 2013) GREENGUARD Cer t i f i cat i on Pr ogr am For Chemi cal Emi ssi ons For Bui l di ng Mat er i al s, Fi ni shes And Fur ni shi ngs
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y eNot ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
SECTI ON 10 22 39 Page 1
Manuf act ur er ' s Qual i f i cat i ons; G
Manuf act ur er ' s Sampl e War r ant y
Ver i f i cat i on of Fi el d Measur ement s; G
SD- 02 Shop Dr awi ngs
Installation ; G
Layouts ; G
Fabr i cat i on Dr awi ngs; G
SD- 03 Pr oduct Dat a
Fol di ng Panel Par t i t i ons; G
I nst al l at i on I nst r uct i ons; G
SD- 04 Sampl es
Fol di ng Panel Par t i t i ons; G
SD- 06 Test Repor t s
Fl ame and Smoke Devel opment Test s; G
SD- 07 Cer t i f i cat es
Materials
Fol di ng Panel Par t i t i ons
I ndoor Ai r Qual i t y
SD- 10 Oper at i on and Mai nt enance Dat a
Fol di ng Panel Par t i t i ons
1. 3 CERTIFICATIONS
1. 3. 1 I ndoor Ai r Qual i t y Cer t i f i cat i on
1. 3. 1. 1 Fi ni sh Cover i ng
Pr ovi de pr oduct s cer t i f i ed t o meet i ndoor ai r qual i t y r equi r ement s by UL 2818 ( Gr eenguar d) Gol d, SCS Gl obal Ser vi ces I ndoor Advant age Gol d or pr ovi de cer t i f i cat i on or val i dat i on by ot her t hi r d- par t y pr ogr am t hat pr oduct s meet t he r equi r ement s of t hi s Sect i on. Pr ovi de cur r ent pr oduct cer t i f i cat i on document at i on f r om cer t i f i cat i on body.
1. 4 DELI VERY, STORAGE, AND HANDLI NG
Del i ver mat er i al s t o t he j obsi t e i n t he manuf act ur er ' s or i gi nal , unopened, SECTI ON 10 22 39 Page 2 and undamaged packages wi t h l abel s l egi bl e and i nt act . Pr ovi de l abel s t o i ndi cat e t he manuf act ur er , br and name, s i ze, f i ni sh, and pl acement l ocat i on. St or e par t i t i ons and accessor i es i n unopened packages i n a manner t hat wi l l pr event damage. Handl e par t i t i on mat er i al s i n accor dance wi t h manuf act ur er ' s i nst r uct i ons. Pr ot ect mat er i al s f r om t he weat her , humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s.
1. 5 WARRANTY
Pr ovi de Manuf act ur er ' s st andar d per f or mance guar ant ees or war r ant i es t hat ext end beyond a 1 year per i od. I n addi t i on, pr ovi de guar ant ee of t he pant ogr aphs, t r ol l eys and t r acks f or 10 year s f r om dat e of accept ance f or benef i c i al use.
PART 2 PRODUCTS
2. 1 SYSTEM DESCRI PTI ON
a. No l ess t han 30 cal endar days pr i or t o t he schedul ed commencement of i nst al l at i on, submi t t he f ol l owi ng t o t he Cont r act i ng Of f i cer :
Manuf act ur er ' s Qual i f i cat i ons
Manuf act ur er ' s Sampl e War r ant y
Ver i f i cat i on of Fi el d Measur ement s
Fabr i cat i on Dr awi ngs
I nst al l at i on I nst r uct i ons
b. Pr ovi de manual oper at i on, acoust i cal f ol di ng panel par t i t i ons, f act or y f i ni shed, suppor t ed f r om over head t r ack wi t hout f l oor gui des, as shown on t he dr awi ngs i ncl udi ng al l har dwar e, seal s, t r ack and r ol l er s as needed t o c l ose t he speci f i ed openi ng.
c. Submi t dr awi ngs t o demonst r at e t hat t he syst em has been coor di nat ed and wi l l pr oper l y f unct i on as a uni t . Show l ayout of t he wor k; t r ack and j amb f ast eni ng met hods; seal and i nst al l at i on det ai l s ; and equi pment r el at i onshi p t o ot her par t s of t he wor k i ncl udi ng c l ear ances f or mai nt enance and oper at i on.
2. 1. 1 Manual Oper at i on
The manual oper at i on must be a f or ce no gr eat er t han 20 l bf t o st ar t movement at t he r at e of 3. 33 f t / s ( 200 f t / mi n) . Use a r emovabl e handl e t o ext end and r et r act t he bot t om oper abl e seal s; ver t i cal movement of seal s must be 2 i nches. Pr ovi de c l osur e t o t he l ead wal l wi t h t he use of a f l exi bl e bul b; accompl i sh f i nal c l osi ng by means of a l ever exer t i ng pr essur e agai nst t he wal l .
2. 1. 2 Per f or mance Requi r ement s
2. 1. 2. 1 Fi r e Endur ance
For par t i t i ons mor e t han 60 squar e f eet i n ar ea, pr ovi de cover i ng and l i ni ng wi t h f l ame spr ead r at i ng of 25 or l ess, f uel cont r i but i on r at i ng of
SECTI ON 10 22 39 Page 3
15 or l ess, smoke gener at i on of 50 or l ess i n accor dance wi t h NFPA 101 when t est ed i n accor dance wi t h ASTM E84. Submi t f l ame and smoke devel opment tests r epor t s. Pr ovi de door and par t i t i on f i ni shes wi t h a Cl ass A r at i ng when t est ed i n accor dance wi t h ASTM E84.
2. 1. 2. 2 Labor at or y Acoust i cal Requi r ement s
Pr ovi de par t i t i ons t est ed i n accor dance wi t h ASTM E90, by a l abor at or y accr edi t ed by t he U. S. Bur eau of St andar ds, t hat have at t ai ned a sound t r ansmi ssi on c l ass ( STC) of not l ess t han 39 i n a f ul l y ext ended posi t i on, wi t h a Noi se Reduct i on Coef f i c i ent ( NRC) of 0. 25- 0. 30 f or napped, t uf t ed or l ooped f abr i c . Pr ovi de document at i on t hat t he par t i t i on t est ed i s t he same const r uct i on, mat er i al s, and model number as t he par t i t i on t o be pr ovi ded and be f ul l y oper abl e. Test speci men must be not l ess t han 126 squar e f eet i n ar ea . Panel wei ght must be a mi ni mum of 5. 5 psf f or STC up t o 40, 7. 5 psf f or STC up t o 45, and 8. 5 psf f or STC up t o 50, 10. 0 psf f or STC up t o 53. Desi gn panel t hi ckness ( 4 i nch nomi nal ) and composi t i on t o pr ovi de t he r equi r ed STC r at i ng i n accor dance wi t h ASTM E90 and ASTM E413.
2. 2 MATERIALS
Pr ovi de mat er i al and equi pment whi ch ar e t he st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n t he manuf act ur e of such pr oduct s and essent i al l y dupl i cat e i t ems t hat have been i n sat i sf act or y use f or at l east 2 year pr i or t o bi d openi ng. Submi t Cer t i f i cat e at t est i ng t hat t he mat er i al s meet t he r equi r ement s speci f i ed. Equi pment must be suppor t ed by a ser vi ce or gani zat i on t hat i s , i n t he opi ni on of t he Cont r act i ng Of f i cer , r easonabl y conveni ent t o t he s i t e. Pr ovi de heavy- dut y t ype har dwar e st andar d wi t h t he manuf act ur er . Pr ovi de pul l s and l at ches f or al l par t i t i ons. Pr ovi de par t i t i ons wi t h pr i vacy l at ches . Pr ovi de anodi zed al umi num cl ear f i ni sh har dwar e.
2. 3 FOLDI NG PANEL PARTI TI ONS
Pr ovi de f ol di ng panel par t i t i ons usi ng t op hung bal l bear i ng car r i er s whi ch suppor t modul ar panel s.
a. Pr ovi de par t i t i ons made up of a ser i es of r i gi d panel s, each panel bei ng a one- pi ece assembl y. Unl ess ot her wi se speci f i ed, use t he l east number of panel s. The mechani cal seal of t he panel must act uat e wi t h a s i ngl e oper at i ng act i on.
2. 3. 1 Panels
Pr ovi de panel s of st eel ski n, l ami nat ed t o appr opr i at e st r uct ur al acoust i cal backi ng, mount ed i n f ul l per i met er pr ot ect i ve f r ame. St eel f or t he panel f r ames must be a mi ni mum of 22 gauge t hi ck st eel wi t h mi ni mum 22 gauge t hi ck f ace panel s spot wel ded t o t he f r ame. Fr ame must encl ose and pr ot ect al l edges of t he sur f ace mat er i al . Panel s must be not mor e t han 4 feet wi de, except f or end cl osur e panel s, and be f ul l hei ght t o t r ack.
Panel s must l ock i n pl ace t o f or m a st abl e, r i gi d par t i t i on; l ow pr of i l e hi nges may not pr oj ect mor e t han 1/ 4 i nch maxi mum f r om panel edge. Panel sur f aci ng must wr ap ar ound t he ver t i cal panel edges wi t hout ver t i cal t r i m.
2. 3. 2 Fi ni sh Cover i ng
Fi ni sh cover i ng mat er i al must be mi ni mum 54 i nches wi de, ver t i cal l y- r i bbed
SECTI ON 10 22 39 Page 4 acoust i cal mat er i al of 100 per cent pol yol ef i n . Pr ovi de cer t i f i cat i on of i ndoor ai r qual i t y f or f i ni sh cover i ng.
2. 3. 3 Track
Pr ovi de r ecess ext r uded al umi num t r ack as shown. Conf or m al umi num t o ASTM B221 . Pr ovi de t r ack t hat i s t he manuf act ur er ' s st andar d pr oduct desi gned f or t he wei ght of t he f i ni shed par t i t i on, i ncl udi ng door . Pr ovi de t r ack sect i ons i n t he maxi mum l engt hs pr act i cabl e, and not l ess t han 6 f eet l ong except f or nar r ow door s and at ends of r uns wher e shor t l engt h i s r equi r ed. Pr ovi de sui t abl e j oi nt devi ces such as i nt er l ocki ng keys at each j oi nt t o pr ovi de per manent al i gnment of t r ack.
2. 3. 4 Suspensi on Syst em
Pr ovi de a suspensi on syst em consi st i ng of st eel t r ack connect ed t o t he st r uct ur al suppor t by t hr eaded r ods, and t r ol l eys desi gned t o suppor t t he wei ght of t he par t i t i on. Pr ovi de st eel t r ack of 7 gage mi ni mum, phosphat e t r eat ed or pai nt ed.
2. 4 ACCESSORIES
2. 4. 1 Doors
Pr ovi de non- f i r e r at ed, manual l y oper at ed door s wi t h v i nyl sweep t op seal s whi ch compr ess agai nst t he bot t om of t he t op t r ack.
2. 4. 2 Cei l i ng Guar ds
Fur ni sh par t i t i ons wi t h cei l i ng guar ds or i nt egr al t r ack and cei l i ng guar ds as r ecommended by t he manuf act ur er .
2. 4. 3 Met al Sof f i t
Pr ovi de sof f i t when st eel t r ack i s r ecessed. Pr ovi de met al sof f i t of adequat e t hi ckness t o pr ot ect t he cei l i ng f r om damage by door oper at i on and wi t h t he door manuf act ur er ' s st andar d neut r al - col or appl i ed f i ni sh. Sof f i t on al umi num t r ack must be an i nt egr al par t of t he t r ack
2. 5 SEALS AND SWEEPSTRI PS
Pr ovi de per i met er seal s or sound i nsul at i on, of manuf act ur er ' s st andar d pr oduct , t o achi eve t he sound t r ansmi ssi on c l ass speci f i ed , wi t hout cr ack or cr aze when subj ect ed t o sever e usage. Pr ovi de manuf act ur er ' s ver t i cal seal s bet ween panel s t o ensur e acoust i cal r at i ng. Bot t om seal s must consi st of a v i nyl sweep mechani cal seal whi ch wi l l expand i n pl ace, or pr ovi de panel s whi ch can be l ower ed by a r emovabl e oper at i ng devi ce.
Pr ovi de ver t i cal seal bet ween panel s whi ch i s anodi zed, ar chi t ect ur al gr ade, al umi num ext r usi on wi t h v i nyl sound seal . Sweep st r i ps must be v i nyl or ot her mat er i al t hat wi l l not cr ack or cr aze wi t h sever e usage.
Pr ovi de sweep st r i p STC t o t he speci f i ed r at i ng.
2. 6 COLOR
Col or sel ect ed f r om manuf act ur er s st andar d col or s . .
Submi t t hr ee col or sampl es of speci f i ed sur f aces and f i ni shes t o mat ch t hose speci f i ed. Fi ni sh and col or r equi r ement s ar e not l i mi t ed t o manuf act ur er ' s st andar d sel ect i ons i n or der t o meet t hese r equi r ement s.
SECTI ON 10 22 39 Page 5
Al so submi t cer t i f i cat e at t est i ng t hat par t i t i ons have speci f i ed acoust i cal and f l ame r et ar dant pr oper t i es, as det er mi ned by t est .
PART 3 EXECUTI ON
3. 1 INSTALLATION
Do not i nst al l bui l di ng const r uct i on mat er i al s t hat show vi sual evi dence of bi ol ogi cal gr owt h. I nst al l i n accor dance wi t h t he manuf act ur er ' s appr oved instructions.
3. 1. 1 Pr epar at i on Wor k
Ver i f y di mensi ons and condi t i on of openi ngs schedul ed t o r ecei ve f ol di ng panel par t i t i ons. I nst al l par t i t i ons i n accor dance wi t h t he appr oved partition layouts , manuf act ur er ' s di r ect i ons, and ASTM E557. Pr ovi de st r uct ur al suppor t f or t he t r ack suppor t el ement s as i ndi cat ed.
3. 1. 2 Adjustment
Adj ust manual l y oper at ed par t i t i ons t o open and cl ose f r om any posi t i on wi t h a maxi mum hor i zont al f or ce as speci f i ed i n par agr aph Manual Oper at i on appl i ed t o pendant pul l , box or handl e.
3. 2 FI ELD TESTS
3. 2. 1 Oper at i onal Test
I n t he pr esence of t he Cont r act i ng Of f i cer , oper at e par t i t i on at l east t hr ee t i mes t o demonst r at e t hat par t i t i on i s capabl e of bei ng moved f r om t he st or ed posi t i on t o t he f ul l y ext ended posi t i on smoot hl y and qui et l y and wi t hout over l oadi ng t he dr i ve component s. Act i vat e . Adj ust par t i t i ons whi ch do not oper at e pr oper l y and r et est .
3. 2. 2 Vi sual Test
Conduct v i sual f i el d t est s f or l i ght l eakage wi t h al l r oom l i ght s t ur ned on i n t he space on one si de of t he par t i t i on. Dar ken space on t he ot her s i de of t he par t i t i on. Li ght l eakage f r om t he l i ght ed space t o t he dar kened space i s not accept abl e. I f l i ght l eakage does occur , adj ust t he par t i t i on t o cor r ect t he pr obl em and r et est .
3. 3 CLEANING
Cl ean any soi l ed par t s of t he par t i t i on i n accor dance wi t h manuf act ur er ' s pr i nt ed i nst r uct i ons.
3. 4 MAINTENANCE
Submi t s i x compl et e copi es of mai nt enance i nst r uct i ons expl ai ni ng r out i ne mai nt enance pr ocedur es i ncl udi ng i nspect i on, adj ust ment s, l ubr i cat i on, and cl eani ng. Li st possi bl e br eakdown, met hods of r epai r , and a t r oubl eshoot i ng gui de. I ncl ude i nst r uct i ons f or equi pment l ayout and si mpl i f i ed wi r i ng and cont r ol di agr ams of t he syst em as i nst al l ed and al so t he manuf act ur er ' s name, model number , ser vi ce manual , par t s l i s t , and br i ef descr i pt i on of al l equi pment and oper at i ng f eat ur es. I ncl ude a compl et e l i s t of par t s and suppl i es, wi t h cur r ent uni t pr i ces and sour ce of suppl y, and a l i s t of t he par t s r ecommended by t he manuf act ur er t o be r epl aced af t er 1 year and 3 year s of ser vi ce.
SECTI ON 10 22 39 Page 6
Submi t Dat a Package 1 f or f ol di ng panel par t i t i ons, and Dat a Package 5 f or el ect r i cal oper at or s i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND
MAI NTENANCE DATA.
- - End of Sect i on - -
SECTI ON 10 22 39 Page 7
File details come from the government source that posted it.