AF_Form_66.pdf

PDF 553 KB Posted

Attached to
FY16 Pavements IDIQ Federal contract opportunity
Solicitation number
FA3030-16-R-0002
Issued by
Department of the Air Force Air Education and Training Command

About this file

Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to FY16 Pavements IDIQ, newest first.
File Type Posted
Revised_SOW.pdf PDF
FA3030-16-R-0002-0003.pdf PDF
TE-5_Scherz_Handicap_Ramps.pdf PDF
FA3030-16-R-0002-0002.pdf PDF
Repair_Scherz_Combined_Files.pdf PDF
FA3030-16-R-0002-0001.pdf PDF
Site_Visit_Notes_and_Questions.pdf PDF
Combined_SOW.pdf PDF
Wage_Determination_TX160007.pdf PDF
FA3030-16-R-0002_Pavements_IDIQ.pdf PDF
Combined_Drawings.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Seed_Project.pdf PDF
Insurance_Requirements.pdf PDF
BAL_-_Base_Access_List.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Section 01010, 2.1.1.5, Traffic Control/Maintenance Schedule

4 b GA

Section 01010, 2.1.1.6, Utilty Outage 4 e GA

Section 01010, 2.2, AF Form 3064 & 4 b GA

Section 01010, 4.2, Accident Prevention Plan

4 a FIO

Section 01010, 4.4, Radiation Permit 4 a/b GA

Section 01010, 4.5, Confined Space Plan 4 e FIO

Section 01010, 7, Storage Area 4 b GA

Section 01010, 12.1, As-Builts, 12.3, DD Form 1354 Checklist

4 d/e GA

Section 01010, 12.2, Daily Reports 4 e GA

Section 01010, 15, Warranties 4 d FIO

Section 01020, 2.1, Work Clearance Request, AF Form

4 b GA

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 15-1700

SA

MP

LE

S

PROJECT TITLE: Base Pavements IDIQ

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

FORM66.xls

FA3030-16-R-0002

Attachment 4

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 15-1700

SA

MP

LE

S

PROJECT TITLE: Base Pavements IDIQ

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

01020, Para 3.1, Planned Outages 4 d GA

Section 01020, 4, Fire Hydrant Use Request

4 b/e FIO

Section 01400, 2.4,

2.4.3 NOI/NOT 4 b GA

Section 01400, 2.4.1, SWPPP 4 b GA

Section 01400, 2.6, Air Quality Report 4 b/e FIO

Section 01400, 3.3 & 7.1, Hazardous Wastes SDS

4 b GA

Section 01400, 3.3.5, Disposal of Waste 4 b GA

Section 01400, 4, Pollution Control Training

4 b GA

Section 01400, 5, Reports 4 b FIO

Section 01400, 6, EMS Awareness Training

4 b GA

Section 01400, 7, EPCRA Information 4 b FIO

Section 01400, 7.1,

7.2 HazMat, EPCRA 4 b FIO

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 15-1700

SA

MP

LE

S

PROJECT TITLE: Base Pavements IDIQ

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Section 01400, 9.1, 9.2, 10.1-3, Demolition ifi i S

4 b FIO

Section 01400, 12, AF-EMIS

Authorization Request Works and Construction Waste Management Form

4 b FIO

Section 01540, 1.3.1, Affirmative Procurement Reporting Form

4 a GA

Section 01540, 1.3.2, Manufacturer Data, Certificates, & Samples

4 a FIO

Section 02050, 1.3.1, Demolition Work 4 b GA

Section 02050, 1.3.2, Procedures for Removal of Asbestos

4 b GA

Section 02110, 1.5, 2.1, 2.2, 2.3 Crack Sealant Material Data

4 b GA

Section 02125, 1.4, Mix Design 4 b FIO

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 15-1700

SA

MP

LE

S

PROJECT TITLE: Base Pavements IDIQ

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Section 02222, 1.3, Test Reports & Certificates

4 e GA

Section 02222, 1.3, Location of Stockpile Area

4 b FIO

Section 02241, 1.4, Test Reports and Results

4 e GA

Section 02241, 1.7, Records 4 e GA

Section 02310, Para 1.2, Sampling and Testing

4 e GA

Section 02511, Para 1.3, Test Reports 4 e, d GA

Section 02511, Para 1.3, Records 4 d GA

Section 02511, Para 1.3, Material Data/Certificates of Compliance

4 b FIO

Section 02511, Para 1.3, Concrete Mix Design

4 b FIO

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 15-1700

SA

MP

LE

S

PROJECT TITLE: Base Pavements IDIQ

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Section 02550, 1.2, Test Reports and Records

4 e GA

Section 02551, 1.3,

1.8 & 1.11, Records, Sampling/Testing, Waybill/delivery tickets

4 e GA

Section 02555, 1.2, Records/Waybills/De livery tickets

4 e GA

Section 02555, 3.2, Manufacturer's Test Reports

4 d GA

Section 02558, 1.2, Test Results/Records/Way bill & Tickets

4 e GA

Section 02559, 1.2, Test Reports and Records

4 e GA

Section 02577, 1.2.1, Paint 4 b GA

Section 02577, 1.2.2, Pavement Markers 4 b GA

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 15-1700

SA

MP

LE

S

PROJECT TITLE: Base Pavements IDIQ

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Section 02720, 1.2, Product Material, Pipeline Testing, Certified Test Results

4 b GA

Section 02932, 2.1 thru 2.8 Materials and SDS's

4 b GA

Section 02940, 1.2, Site Plan and Product Data

4 b GA

Section 03200, 1.2.1, Detail Drawings 4 b GA

Section 03300, 1.2, Concrete Mix, Test Results, Certificate of Compliance

4 b,d GA

Section 03320, 1.2, Test Reports & R d

4 e GA

Section 03330, Para 1.2, 2.2.1, 2.2.2, Sampling and Testing

4 d GA

Section 03450, Para 1.4, Calculations/Mix Design/ Detailed Drawings

4 b GA

Section 03450, Para 1.4, Test Reports 4 d GA

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 15-1700

SA

MP

LE

S

PROJECT TITLE: Base Pavements IDIQ

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP for Basic Contract

(b) No Later Than 7 Calendar Days after Task Order NTP

(c) Prior to Final Inspection of Task Order

(d) Final Inspection of Task Order

(e) As Required per Specifications or Task Order

FORM66.xls

File details come from the government source that posted it. Updated .