Repair Scherz project
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TE-5_Scherz_Handicap_Ramps.pdf | ||
| FA3030-16-R-0002-0003.pdf | ||
| Revised_SOW.pdf | ||
| FA3030-16-R-0002-0002.pdf | ||
| Site_Visit_Notes_and_Questions.pdf | ||
| FA3030-16-R-0002-0001.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Seed_Project.pdf | ||
| Insurance_Requirements.pdf | ||
| BAL_-_Base_Access_List.pdf | ||
| Combined_Drawings.pdf | ||
| Combined_SOW.pdf | ||
| AF_Form_66.pdf | ||
| Wage_Determination_TX160007.pdf | ||
| FA3030-16-R-0002_Pavements_IDIQ.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order Pavements IDIQ
Location: GAFB, Scherz Blvd. between W. Farrow Street & W. Valiant Street
Project #/Title: JCGU 01-1700A, Repair Scherz Blvd.
Point of Contact (Name/phone #): _Mr. Robin Mansfield, 654-3462 _______________
(1) Project Inspector: _Mr. Robin Mansfield or Ms. Cherokee Chambers________________
(2) Using Activity/Organization: _ BaseWide________________________________________
Scope of Work: The Contractor shall saw cut and remove flexible pavement down 7-1/2”, compact existing base material adding new base material to complete the elevation to within 1-1/2” (inches) of the finish grade of the pavement. Provide new valley gutter at all intersections, sidewalks, handicap ramps and curb & gutter that shall be located at the site visit. Provide adjustment of utility valve boxes. Provide new prime coat and overlay with “type D” 1-1/2” ACC. Provide new centerline striping, handicap parking, parking spaces, blocked off areas, and crosswalks at existing locations. Provide new raised reflectors for cross walks and fire hydrants. Striping and reflectors shall match the existing layout.
Phasing Requirements: A traffic control plan shall be submitted and approved by the Contracting Officer and Civil Engineering 14 days prior to the start of work. No deviation to this plan shall be permitted without 7 days prior written approval from Contracting Officer.
Special Requirements/Security/Submittals: The Contractor shall install traffic safety signage as needed throughout the project. Contractor shall ensure all vehicle and pedestrian traffic is routed around the construction area. See AF Form 66.
Desired Task Order Construction Completion Date: 180 Calendar Days
Work Hours: 7:30 AM to 4:30 PM, Monday – Friday, exclusive of Federal Holidays
Special Conditions: Side streets shall be accessible to thru traffic throughout the course of the project.
FA3030-16-R-0002
Attachment 9
Cost Estimate Breakdown Worksheet (Reference Bid Schedule) CLIN Description Estimated Unit Unit Total
Quantity Price 0001AA PCC Demolition: Includes
Base Material Demo
SF
0001AC Flexible Pavement Demolition: Includes ACC and Base Material Demolition
SY
0002 Provide Unclassified Excavation
CY
0004 Provide Compaction Of Existing Materials
SY
0005 Provide 6” Stabilized Aggregate Base Course
TN
0006 Provide Saw Cutting of Concrete & Asphalt
LF
0007 Provide Prime Coat SY
0009 Provide 1.5” Asphaltic Cement Concrete (ACC) Pavement
TN
0016 Provide PCC Fibermesh Sidewalk
SF
0017AA Provide PCC Curb & Gutter
LF
0019 Provide PCC Valley Gutters
SF
0022 Provide Handicap Curb Ramp
EA
0024 Adjust Valve Boxes SF
0031AA Provide 4” White Striping LF
0031AB Provide 4” Yellow Striping
LF
0031AE Provide Handicap Symbol Striping W/Blue Back
EA
0031AF Provide Crosswalk Striping
SF
0032 Provide Raised Pavement Reflectors (Red/White, Blue, White)
EA
0034AA Regulatory Sign/pole (Conventional Road)
EA
0034AB Warning Sign/pole (Conventional Road)
EA
0034AD Handicap Parking Sign EA
0035AA Provide Turf Hydromulch SY
Total Amount $
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRAC
TO:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
Section 01010, 2.1.1.5, Traffic Control/Maintenance Schedule
4 b GA
Section 01010, 2.1.1.6, Utilty Outage Plan
4 e GA
Section 01010, 2.2, Construction Schedule
4 b GA
Section 01010, 4.2, Accident Prevention Plan
4 a FIO
Section 01010, 4.4, Radiation Permit
4 a/b GA
Section 01010, 4.5, Confined Space Plan
4 e FIO
Section 01010, 7, Storage Area
4 b GA
Section 01010, 12.1, As-Builts, 12.3, DD Form 1354 Checklist
4 d/e GA
Section 01010, 12.2, Daily Reports
4 e GA
Section 01010, 15, Warranties
4 d FIO
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 01-1700A
SA
MP
LE
S
PROJECT TITLE: Repair Scherz Blvd
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
FORM66.xls
SOLICITATION/CONTRAC
TO:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 01-1700A
SA
MP
LE
S
PROJECT TITLE: Repair Scherz Blvd
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
Section 01020, 2.1, Work Clearance Request, AF Form
4 b GA
01020, Para 3.1, Planned Outages
4 d GA
Section 01020, 4, Fire Hydrant Use Request
4 b/e FIO
Section 01400, 2.4, NOI/NOT
4 b GA
Section 01400, 2.4, SWPPP
4 b GA
Section 01400, 2.6, Air Quality Report
4 b/e FIO
Section 01400, 3.3 & 7.1, Hazardous Wastes SDS
4 b GA
Section 01400, 3.3.5, Disposal of Waste
4 b GA
Section 01400, 4, Pollution Control Training
4 b GA
Section 01400, 5, Reports
4 b FIO
Section 01400, 6, EMS Awareness Training
4 b GA
FORM66.xls
SOLICITATION/CONTRAC
TO:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 01-1700A
SA
MP
LE
S
PROJECT TITLE: Repair Scherz Blvd
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
Section 01400, 7, EPCRA Information
4 b FIO
Section 01400, 7.1,
7.2 HazMat, EPCRA
4 b FIO
Section 01400, 9.1, 9.2, 10.1, Demolition Notification to State
4 b FIO
Section 01400, 12, AF-EMIS
Authorization Request Works and Construction Waste Management Form
4 b FIO
Section 01540, 1.3.1, Affirmative Procurement Reporting Form
4 a GA
Section 01540, 1.3.2, Manufacturer Data, Certificates, & Samples
4 a FIO
Section 02050, 1.3.1, Demolition Work Plan
4 b GA
Section 02050, 1.3.2, Procedures for Removal of Asbestos
4 b GA
FORM66.xls
SOLICITATION/CONTRAC
TO:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 01-1700A
SA
MP
LE
S
PROJECT TITLE: Repair Scherz Blvd
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
Section 02110, 1.5, 2.1, 2.2, 2.3 Crack Sealant Material Data
4 b GA
Section 02125, 1.4, Mix Design
4 b FIO
Section 02222, 1.3, Test Reports & Certificates
4 e GA
Section 02222, 1.3, Location of Stockpile Area
4 b FIO
Section 02241, 1.4, Test Reports and Results
4 e GA
Section 02241, 1.7, Records
4 e GA
Section 02310, Para 1.2, Sampling and Testing
4 e GA
Section 02511, Para 1.3, Test Reports
4 d GA
Section 02511, Para 1.3, Records
4 d GA
Section 02511, Para 1.3, Material Data/Certificates of Compliance
4 b FIO
FORM66.xls
SOLICITATION/CONTRAC
TO:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 01-1700A
SA
MP
LE
S
PROJECT TITLE: Repair Scherz Blvd
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
Section 02511, Para 1.3, Concrete Mix Design
4 b FIO
Section 02550, 1.2, Test Reports and Records
4 e GA
Section 02551, 1.3 & 1.8, Records, Sampling/Testing
4 e GA
Section 02555, 1.2, Records
4 e GA
Section 02555, 3.2, Manufacturer's Test Reports
4 d GA
Section 02558, 1.2, Test Results and Records
4 e GA
Section 02559, 1.2, Test Reports and Records
4 e GA
Section 02577, 1.2.1, Paint
4 b GA
Section 02577, 1.2.2, Pavement Markers
4 b GA
Section 02720, 1.2, Product Material, Pipeline Testing, Certified Test Results
4 b GA
FORM66.xls
SOLICITATION/CONTRAC
TO:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
REMARKS
DATE
RECEIVED IN
CON-TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
PROJECT NUMBER: JCGU 01-1700A
SA
MP
LE
S
PROJECT TITLE: Repair Scherz Blvd
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S R
EC
OM
ME
ND
AT
IO
NS
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION
DATE
Section 02940, 1.2, Site Plan and Product Data
4 b GA
Section 03200, 1.2.1, Detail Drawings
4 b GA
Section 03300, 1.2, Concrete Mix, Test Results, Certificate of Compliance
4 b,d GA
Section 03320, 1.2, Test Reports & Records
4 e GA
Section 03330, Para 1.2, 2.2.1, 2.2.2, Sampling and Testing
4 d GA
Section 03450, Para 1.4, Calculations/Mix Design/ Detailed Drawings
4 b GA
Section 03450, Para 1.4, Test Reports
4 d GA
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP for Basic Contract
(b) No Later Than 7 Calendar Days after Task Order NTP
(c) Prior to Final Inspection of Task Order
(d) Final Inspection of Task Order
(e) As Required per Specifications or Task Order
FORM66.xls
| Task Order Scherz Blvd Farrow_WVance 01-1700A |
| TE-1 Valley Gutter |
| TE-2 Asphalt Pavement |
| TE-3 Scherz Pavement |
| TE-4 Scherz Valley Gutter |
| AF Form 66 |