Repair_Scherz_Combined_Files.pdf

PDF 1 MB Posted

Attached to
FY16 Pavements IDIQ Federal contract opportunity
Solicitation number
FA3030-16-R-0002
Issued by
Department of the Air Force Air Education and Training Command

About this file

Repair Scherz project

View the file

Other files for this federal contract opportunity

Other files attached to FY16 Pavements IDIQ, newest first.
File Type Posted
TE-5_Scherz_Handicap_Ramps.pdf PDF
FA3030-16-R-0002-0003.pdf PDF
Revised_SOW.pdf PDF
FA3030-16-R-0002-0002.pdf PDF
Site_Visit_Notes_and_Questions.pdf PDF
FA3030-16-R-0002-0001.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Seed_Project.pdf PDF
Insurance_Requirements.pdf PDF
BAL_-_Base_Access_List.pdf PDF
Combined_Drawings.pdf PDF
Combined_SOW.pdf PDF
AF_Form_66.pdf PDF
Wage_Determination_TX160007.pdf PDF
FA3030-16-R-0002_Pavements_IDIQ.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order Pavements IDIQ

Location: GAFB, Scherz Blvd. between W. Farrow Street & W. Valiant Street

Project #/Title: JCGU 01-1700A, Repair Scherz Blvd.

Point of Contact (Name/phone #): _Mr. Robin Mansfield, 654-3462 _______________

(1) Project Inspector: _Mr. Robin Mansfield or Ms. Cherokee Chambers________________

(2) Using Activity/Organization: _ BaseWide________________________________________

Scope of Work: The Contractor shall saw cut and remove flexible pavement down 7-1/2”, compact existing base material adding new base material to complete the elevation to within 1-1/2” (inches) of the finish grade of the pavement. Provide new valley gutter at all intersections, sidewalks, handicap ramps and curb & gutter that shall be located at the site visit. Provide adjustment of utility valve boxes. Provide new prime coat and overlay with “type D” 1-1/2” ACC. Provide new centerline striping, handicap parking, parking spaces, blocked off areas, and crosswalks at existing locations. Provide new raised reflectors for cross walks and fire hydrants. Striping and reflectors shall match the existing layout.

Phasing Requirements: A traffic control plan shall be submitted and approved by the Contracting Officer and Civil Engineering 14 days prior to the start of work. No deviation to this plan shall be permitted without 7 days prior written approval from Contracting Officer.

Special Requirements/Security/Submittals: The Contractor shall install traffic safety signage as needed throughout the project. Contractor shall ensure all vehicle and pedestrian traffic is routed around the construction area. See AF Form 66.

Desired Task Order Construction Completion Date: 180 Calendar Days

Work Hours: 7:30 AM to 4:30 PM, Monday – Friday, exclusive of Federal Holidays

Special Conditions: Side streets shall be accessible to thru traffic throughout the course of the project.

FA3030-16-R-0002

Attachment 9

Cost Estimate Breakdown Worksheet (Reference Bid Schedule) CLIN Description Estimated Unit Unit Total

Quantity Price 0001AA PCC Demolition: Includes

Base Material Demo

SF

0001AC Flexible Pavement Demolition: Includes ACC and Base Material Demolition

SY

0002 Provide Unclassified Excavation

CY

0004 Provide Compaction Of Existing Materials

SY

0005 Provide 6” Stabilized Aggregate Base Course

TN

0006 Provide Saw Cutting of Concrete & Asphalt

LF

0007 Provide Prime Coat SY

0009 Provide 1.5” Asphaltic Cement Concrete (ACC) Pavement

TN

0016 Provide PCC Fibermesh Sidewalk

SF

0017AA Provide PCC Curb & Gutter

LF

0019 Provide PCC Valley Gutters

SF

0022 Provide Handicap Curb Ramp

EA

0024 Adjust Valve Boxes SF

0031AA Provide 4” White Striping LF

0031AB Provide 4” Yellow Striping

LF

0031AE Provide Handicap Symbol Striping W/Blue Back

EA

0031AF Provide Crosswalk Striping

SF

0032 Provide Raised Pavement Reflectors (Red/White, Blue, White)

EA

0034AA Regulatory Sign/pole (Conventional Road)

EA

0034AB Warning Sign/pole (Conventional Road)

EA

0034AD Handicap Parking Sign EA

0035AA Provide Turf Hydromulch SY

Total Amount $

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRAC

TO:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Section 01010, 2.1.1.5, Traffic Control/Maintenance Schedule

4 b GA

Section 01010, 2.1.1.6, Utilty Outage Plan

4 e GA

Section 01010, 2.2, Construction Schedule

4 b GA

Section 01010, 4.2, Accident Prevention Plan

4 a FIO

Section 01010, 4.4, Radiation Permit

4 a/b GA

Section 01010, 4.5, Confined Space Plan

4 e FIO

Section 01010, 7, Storage Area

4 b GA

Section 01010, 12.1, As-Builts, 12.3, DD Form 1354 Checklist

4 d/e GA

Section 01010, 12.2, Daily Reports

4 e GA

Section 01010, 15, Warranties

4 d FIO

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 01-1700A

SA

MP

LE

S

PROJECT TITLE: Repair Scherz Blvd

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

FORM66.xls

SOLICITATION/CONTRAC

TO:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 01-1700A

SA

MP

LE

S

PROJECT TITLE: Repair Scherz Blvd

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Section 01020, 2.1, Work Clearance Request, AF Form

4 b GA

01020, Para 3.1, Planned Outages

4 d GA

Section 01020, 4, Fire Hydrant Use Request

4 b/e FIO

Section 01400, 2.4, NOI/NOT

4 b GA

Section 01400, 2.4, SWPPP

4 b GA

Section 01400, 2.6, Air Quality Report

4 b/e FIO

Section 01400, 3.3 & 7.1, Hazardous Wastes SDS

4 b GA

Section 01400, 3.3.5, Disposal of Waste

4 b GA

Section 01400, 4, Pollution Control Training

4 b GA

Section 01400, 5, Reports

4 b FIO

Section 01400, 6, EMS Awareness Training

4 b GA

FORM66.xls

SOLICITATION/CONTRAC

TO:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 01-1700A

SA

MP

LE

S

PROJECT TITLE: Repair Scherz Blvd

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Section 01400, 7, EPCRA Information

4 b FIO

Section 01400, 7.1,

7.2 HazMat, EPCRA

4 b FIO

Section 01400, 9.1, 9.2, 10.1, Demolition Notification to State

4 b FIO

Section 01400, 12, AF-EMIS

Authorization Request Works and Construction Waste Management Form

4 b FIO

Section 01540, 1.3.1, Affirmative Procurement Reporting Form

4 a GA

Section 01540, 1.3.2, Manufacturer Data, Certificates, & Samples

4 a FIO

Section 02050, 1.3.1, Demolition Work Plan

4 b GA

Section 02050, 1.3.2, Procedures for Removal of Asbestos

4 b GA

FORM66.xls

SOLICITATION/CONTRAC

TO:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 01-1700A

SA

MP

LE

S

PROJECT TITLE: Repair Scherz Blvd

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Section 02110, 1.5, 2.1, 2.2, 2.3 Crack Sealant Material Data

4 b GA

Section 02125, 1.4, Mix Design

4 b FIO

Section 02222, 1.3, Test Reports & Certificates

4 e GA

Section 02222, 1.3, Location of Stockpile Area

4 b FIO

Section 02241, 1.4, Test Reports and Results

4 e GA

Section 02241, 1.7, Records

4 e GA

Section 02310, Para 1.2, Sampling and Testing

4 e GA

Section 02511, Para 1.3, Test Reports

4 d GA

Section 02511, Para 1.3, Records

4 d GA

Section 02511, Para 1.3, Material Data/Certificates of Compliance

4 b FIO

FORM66.xls

SOLICITATION/CONTRAC

TO:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 01-1700A

SA

MP

LE

S

PROJECT TITLE: Repair Scherz Blvd

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Section 02511, Para 1.3, Concrete Mix Design

4 b FIO

Section 02550, 1.2, Test Reports and Records

4 e GA

Section 02551, 1.3 & 1.8, Records, Sampling/Testing

4 e GA

Section 02555, 1.2, Records

4 e GA

Section 02555, 3.2, Manufacturer's Test Reports

4 d GA

Section 02558, 1.2, Test Results and Records

4 e GA

Section 02559, 1.2, Test Reports and Records

4 e GA

Section 02577, 1.2.1, Paint

4 b GA

Section 02577, 1.2.2, Pavement Markers

4 b GA

Section 02720, 1.2, Product Material, Pipeline Testing, Certified Test Results

4 b GA

FORM66.xls

SOLICITATION/CONTRAC

TO:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

PROJECT NUMBER: JCGU 01-1700A

SA

MP

LE

S

PROJECT TITLE: Repair Scherz Blvd

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

Section 02940, 1.2, Site Plan and Product Data

4 b GA

Section 03200, 1.2.1, Detail Drawings

4 b GA

Section 03300, 1.2, Concrete Mix, Test Results, Certificate of Compliance

4 b,d GA

Section 03320, 1.2, Test Reports & Records

4 e GA

Section 03330, Para 1.2, 2.2.1, 2.2.2, Sampling and Testing

4 d GA

Section 03450, Para 1.4, Calculations/Mix Design/ Detailed Drawings

4 b GA

Section 03450, Para 1.4, Test Reports

4 d GA

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP for Basic Contract

(b) No Later Than 7 Calendar Days after Task Order NTP

(c) Prior to Final Inspection of Task Order

(d) Final Inspection of Task Order

(e) As Required per Specifications or Task Order

FORM66.xls

Task Order Scherz Blvd Farrow_WVance 01-1700A
TE-1 Valley Gutter
TE-2 Asphalt Pavement
TE-3 Scherz Pavement
TE-4 Scherz Valley Gutter
AF Form 66

File details come from the government source that posted it. Updated .