FA3030-16-R-0002-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_SOW.pdf | ||
| TE-5_Scherz_Handicap_Ramps.pdf | ||
| FA3030-16-R-0002-0002.pdf | ||
| Repair_Scherz_Combined_Files.pdf | ||
| FA3030-16-R-0002-0001.pdf | ||
| Site_Visit_Notes_and_Questions.pdf | ||
| Combined_SOW.pdf | ||
| AF_Form_66.pdf | ||
| Wage_Determination_TX160007.pdf | ||
| FA3030-16-R-0002_Pavements_IDIQ.pdf | ||
| Combined_Drawings.pdf | ||
| Insurance_Requirements.pdf | ||
| BAL_-_Base_Access_List.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Seed_Project.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
17TH CONTRACTING SQUADRON -FA3030
210 SCHERZ BLVD
DANIEL.NEWELL.4@US.AF.MIL
GOODFELLOW AFB TX 76908-4705
JGCU 10-1700
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate revised documents for Scherz Blvd.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA3030-16-R-0002
X 9B. DATED (SEE ITEM 11)
25-Mar-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-May-2016
CODE
17TH CONTRACTING SQUADRON -FA3030
210 SCHERZ BLVD
JOHN.HEBDON@US.AF.MIL
GOODFELLOW AFB TX 76908-4705
FA3030 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE FA3030
FACILITY CODECODE
EMAIL:TEL:
FA3030-16-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
DESCRIPT OF AMENDMENT
The purpose of this amendment is to incorporate new Task Order Statement of Work for Scherz Blvd project and to add new drawing showing Scherz Blvd handicap ramps locations.
a. Replace original Statement of Work for Scherz Blvd with the attached revised Statement of Work for Scherz Blvd.
b. Incorporate new drawing showing Scherz Blvd Handicap Ramp locations.
c. The following are questions and answers addressed at the site visit to investigate and take measurements of Scherz Blvd.
Question 1. Will sidewalks be installed?
Response1. Sidewalks shall be installed to connect the handicap ramps.
Question 2. Will there be new handicap ramps Response 2. Yes, there will be new handicap ramps. See attached drawing showing locations of handicap ramps.
Question 3. Will the Valley Gutter at the intersection of Farrow and Scherz be replaced?
Response 3. No, the valley gutter at the intersection of Farrow and Scherz will not be replaced.
Question 4. Where is a Phasing Plan and/or Traffic Control Plan addressed in the IDIQ Statement of Work?
Response 4. A traffic control plan is addressed under Section 01010, paragraph 2.1.1.5 of the IDIQ Statement of work. A traffic control plan is required per the task order and could include a Phasing Plan depending on how the contractor proceeds with their work.
d. As a result of the changes addressed above, the required response date/time has changed from 12-May-2016 02:00 PM CST to 19-May-2016 02:00 PM CST.
e. All other terms and conditions remain unchanged.
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 12-May-2016 02:00 PM to 19-May-2016 02:00 PM.
(End of Summary of Changes)