Seed_Project.pdf

PDF 847 KB Posted

Attached to
FY16 Pavements IDIQ Federal contract opportunity
Solicitation number
FA3030-16-R-0002
Issued by
Department of the Air Force Air Education and Training Command

About this file

Seed Project Documents

View the file

Other files for this federal contract opportunity

Other files attached to FY16 Pavements IDIQ, newest first.
File Type Posted
FA3030-16-R-0002-0003.pdf PDF
TE-5_Scherz_Handicap_Ramps.pdf PDF
Revised_SOW.pdf PDF
Repair_Scherz_Combined_Files.pdf PDF
FA3030-16-R-0002-0002.pdf PDF
FA3030-16-R-0002-0001.pdf PDF
Site_Visit_Notes_and_Questions.pdf PDF
Combined_Drawings.pdf PDF
Insurance_Requirements.pdf PDF
BAL_-_Base_Access_List.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Combined_SOW.pdf PDF
AF_Form_66.pdf PDF
Wage_Determination_TX160007.pdf PDF
FA3030-16-R-0002_Pavements_IDIQ.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order

Base Pavements IDIQ

JCGU-15-1700B

Location: West Canberra Street Between Kearney Blvd. and Troopwalk

Project #/Title: JCGU 15-1700B, Re-const. East Side of West Canberra Street

Point of Contact (Name/phone #): Mr. Robin Mansfield 325-654-3462

(1) Project Inspectors: Mr. Robin Mansfield or Ms. Cherokee Chambers

(2) Using Activity/Organization: Base Wide ______________________________

Scope of Work: Reconstruct west side of W. Canberra Street from troopwalk to Kearney Blvd.

Flex Pavement demo, re-compaction of subgrade. Remove damaged curb and gutter. Provide new curb & gutter, provide new compacted base material, prime coat, provide new Asphalt

Cement Concrete (ACC) (Hot Mix type “D”). Provide expansion joint at both East and West ends where the asphalt connects the Portland Cement Concrete (PCC). Provide PCC crack seal for expansion joints at the drive entrance from Kearney Blvd. to new ACC on West Canberra.

Phasing Requirements: NONE

Special Requirements/Security/Submittals: AF Form 103 Construction Permit

Desired Task Order Construction Completion Date: 30 Sep 2016

FA3030-16-R-0002

Attachment 6

(cont’d, task order)

Cost Estimate Breakdown Worksheet (Reference Bid Schedule)

CLIN Description Estimated

Quantity

Unit Unit

Price

Total

0001AA PCC Demolition, including base material

SF

0001AC Flexible Pavement

Demolition: Includes ACC & base material demolition

SY

0001AD Curb & gutter demolition:

includes base material demo

LF

0002 Provide unclassified excavation

CY

0004 Provide compaction of existing material

0005 Provide stabilized aggregate base course

TN

0006 Provide saw cutting of concrete/asphalt 6” depth

LF

0007 Provide bituminous prime coat

0009 Provide Asphaltic Cement

Concrete (ACC) Pavement

TN

0015AB Clean/seal PCC cracks/joints LF

0016 Provide Portland

Cement(PCC) Fibermesh

Sidewalk

SF

0017AA Provide PCC Curb and Gutter LF

0031AB Provide 4” Yellow Striping LF

0031AD Provide Stop Line Striping EA

0031AF Provide Crosswalk Striping SF

0032 Provide Raised Pavement

Reflectors

EA

Total Amount $

Work Hours: 7:30 AM to 5:00 PM, Monday – Friday, exclusive of Federal Holidays

Special Conditions: Note: All Scheduled Utility Outages road closures shall be submitted in writing, to the Contracting Officer, 7 days in advance.

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Section 01010, 2.1.1.5, Traffic

Control/Maintenance

Schedule

4 b GA

Section 01010, 2.1.1.6, Utilty Outage

Plan

4 e GA

Section 01010, 2.2, AF Form 3064 &

4 b GA

Section 01010, 4.2, Accident Prevention

Plan

4 a FIO

Section 01010, 4.4, Radiation Permit 4 a/b GA

Section 01010, 4.5, Confined Space Plan 4 e FIO

Section 01010, 7, Storage Area 4 b GA

Section 01010, 12.1, As-Builts, 12.3, DD

Form 1354 Checklist

4 d/e GA

Section 01010, 12.2, Daily Reports 4 e GA

Section 01010, 15, Warranties 4 d FIO

Section 01020, 2.1, Work Clearance

Request, AF Form

4 b GA

01020, Para 3.1, Planned Outages 4 d GA

PROJECT NUMBER: JCGU 15-1700B

S A

M P

L E

S

PROJECT TITLE: East Side of W. Canberra St. Task

Order

FINAL

APPROVAL

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

C O

L O

R S

E L

E C

T

IO

N

S E

E P

A R

A O

N C

O P

IE

S

O T

H E

R S

A S

S P

E C

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-TOR

RE-SUBMITTAL

L

I

N

E

U

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: JCGU 15-1700B

S A

M P

L E

S

PROJECT TITLE: East Side of W. Canberra St. Task

Order

FINAL

APPROVAL

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

C O

L O

R S

E L

E C

T

IO

N

S E

E P

A R

A O

N C

O P

IE

S

O T

H E

R S

A S

S P

E C

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-TOR

RE-SUBMITTAL

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

Section 01020, 4, Fire Hydrant Use

Request

4 b/e FIO

Section 01400, 2.4,

2.4.3 NOI/NOT

4 b GA

Section 01400, 2.4.1, SWPPP

4 b GA

Section 01400, 2.6, Air Quality Report 4 b/e FIO

Section 01400, 3.3 &

7.1, Hazardous

Wastes SDS

4 b GA

Section 01400, 3.3.5, Disposal of Waste 4 b GA

Section 01400, 4, Pollution Control

Training

4 b GA

Section 01400, 5, Reports 4 b FIO

Section 01400, 6, EMS Awareness

Training

4 b GA

Section 01400, 7, EPCRA Information 4 b FIO

Section 01400, 7.1,

7.2 HazMat, EPCRA

4 b FIO

Section 01400, 9.1, 9.2, 10.1-3, Demolition

Notification to State

4 b FIO

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: JCGU 15-1700B

S A

M P

L E

S

PROJECT TITLE: East Side of W. Canberra St. Task

Order

FINAL

APPROVAL

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

C O

L O

R S

E L

E C

T

IO

N

S E

E P

A R

A O

N C

O P

IE

S

O T

H E

R S

A S

S P

E C

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-TOR

RE-SUBMITTAL

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

Section 01400, 12, AF-EMIS

Authorization

Request Works and

Construction Waste

Management Form

4 b FIO

Section 01540, 1.3.1, Affirmative

Procurement

Reporting Form

4 a GA

Section 01540, 1.3.2, Manufacturer Data, Certificates, &

Samples

4 a FIO

Section 02050, 1.3.1, Demolition Work

Plan

4 b GA

Section 02050, 1.3.2, Procedures for

Removal of Asbestos

4 b GA

Section 02110, 1.5, 2.1, 2.2, 2.3 Crack

Sealant Material Data

4 b GA

Section 02125, 1.4, Mix Design 4 b FIO

Section 02222, 1.3, Test Reports &

Certificates

4 e GA

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: JCGU 15-1700B

S A

M P

L E

S

PROJECT TITLE: East Side of W. Canberra St. Task

Order

FINAL

APPROVAL

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

C O

L O

R S

E L

E C

T

IO

N

S E

E P

A R

A O

N C

O P

IE

S

O T

H E

R S

A S

S P

E C

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-TOR

RE-SUBMITTAL

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

Section 02222, 1.3, Location of Stockpile

Area

4 b FIO

Section 02241, 1.4, Test Reports and

Results

4 e GA

Section 02241, 1.7, Records 4 e GA

Section 02310, Para

1.2, Sampling and

Testing

4 e GA

Section 02511, Para

1.3, Test Reports 4 e, d GA

Section 02511, Para

1.3, Records 4 d GA

Section 02511, Para

1.3, Material

Data/Certificates of

Compliance

4 b FIO

Section 02511, Para

1.3, Concrete Mix

Design

4 b FIO

Section 02550, 1.2, Test Reports and

Records

4 e GA

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: JCGU 15-1700B

S A

M P

L E

S

PROJECT TITLE: East Side of W. Canberra St. Task

Order

FINAL

APPROVAL

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

C O

L O

R S

E L

E C

T

IO

N

S E

E P

A R

A O

N C

O P

IE

S

O T

H E

R S

A S

S P

E C

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-TOR

RE-SUBMITTAL

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

Section 02551, 1.3,

1.8 & 1.11, Records, Sampling/Testing, Waybill/delivery tickets

4 e GA

Section 02555, 1.2, Records/Waybills/De livery tickets

4 e GA

Section 02555, 3.2, Manufacturer's Test

Reports

4 d GA

Section 02558, 1.2, Test

Results/Records/Way bill & Tickets

4 e GA

Section 02559, 1.2, Test Reports and

Records

4 e GA

Section 02577, 1.2.1, Paint 4 b GA

Section 02577, 1.2.2, Pavement Markers 4 b GA

Section 02720, 1.2, Product Material, Pipeline Testing, Certified Test Results

4 b GA

Section 02932, 2.1 thru 2.8 Materials and SDS's

4 b GA

FORM66.xls

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: JCGU 15-1700B

S A

M P

L E

S

PROJECT TITLE: East Side of W. Canberra St. Task

Order

FINAL

APPROVAL

M A

N U

F A

C T

U R

E R

'S R

E C

O M

M E

N D

A T

IO

N

S

C O

L O

R S

E L

E C

T

IO

N

S E

E P

A R

A O

N C

O P

IE

S

O T

H E

R S

A S

S P

E C

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-TOR

RE-SUBMITTAL

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

Section 02940, 1.2, Site Plan and Product

Data

4 b GA

Section 03200, 1.2.1, Detail Drawings 4 b GA

Section 03300, 1.2, Concrete Mix, Test

Results, Certificate of

Compliance

4 b,d GA

Section 03320, 1.2, Test Reports &

Records

4 e GA

Section 03330, Para

1.2, 2.2.1, 2.2.2, Sampling and Testing

4 d GA

Section 03450, Para

1.4, Calculations/Mix

Design/ Detailed

Drawings

4 b GA

Section 03450, Para

1.4, Test Reports 4 d GA

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP for Basic Contract

(b) No Later Than 7 Calendar Days after Task Order NTP

(c) Prior to Final Inspection of Task Order

(d) Final Inspection of Task Order

(e) As Required per Specifications or Task Order

FORM66.xls

JCGU 15-1700B Canberra Task Order SEED
East Side of W_Canberra
AF Form 66

File details come from the government source that posted it. Updated .