Revised_SOW.pdf
PDF 1013 KB Posted
- Attached to
- FY16 Pavements IDIQ Federal contract opportunity
- Solicitation number
- FA3030-16-R-0002
About this file
Revised Scherz Blvd SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA3030-16-R-0002-0003.pdf | ||
| TE-5_Scherz_Handicap_Ramps.pdf | ||
| Repair_Scherz_Combined_Files.pdf | ||
| FA3030-16-R-0002-0002.pdf | ||
| FA3030-16-R-0002-0001.pdf | ||
| Site_Visit_Notes_and_Questions.pdf | ||
| Combined_Drawings.pdf | ||
| Combined_SOW.pdf | ||
| AF_Form_66.pdf | ||
| Wage_Determination_TX160007.pdf | ||
| FA3030-16-R-0002_Pavements_IDIQ.pdf | ||
| Insurance_Requirements.pdf | ||
| BAL_-_Base_Access_List.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Seed_Project.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order Pavements IDIQ
Location: GAFB, Scherz Blvd. between W. Farrow Street & W. Valiant Street
Project #/Title: JCGU 01-1700A, Repair Scherz Blvd.
Point of Contact (Name/phone #): _Mr. Robin Mansfield, 654-3462 _______________
(1) Project Inspector: _Mr. Robin Mansfield or Ms. Cherokee Chambers________________
(2) Using Activity/Organization: _ BaseWide________________________________________
Scope of Work: The Contractor shall saw cut and remove flexible pavement down 7-1/2”, compact existing base material adding new base material to complete the elevation to within 1-1/2” (inches) of the finish grade of the pavement. Provide new valley gutter at intersections (located on drawing), sidewalks & handicap ramps (see drawing) and curb & gutter that is located on the TE-5 drawing. Provide adjustment of utility valve boxes. Provide new prime coat and overlay with “type D” 1-1/2” ACC. Provide new centerline striping, parking spaces, blocked off areas, and crosswalks at existing locations. Provide new raised reflectors for cross walks and fire hydrants. Striping and reflectors shall match the existing layout.
Phasing Requirements: A traffic control plan shall be submitted and approved by the Contracting Officer and Civil Engineering 14 days prior to the start of work. No deviation to this plan shall be permitted without 7 days prior written approval from Contracting Officer.
Special Requirements/Security/Submittals: The Contractor shall install traffic safety signage as needed throughout the project. Contractor shall ensure all vehicle and pedestrian traffic is routed around the construction area. See AF Form 66.
Desired Task Order Construction Completion Date: 180 Calendar Days
Work Hours: 7:30 AM to 4:30 PM, Monday – Friday, exclusive of Federal Holidays
Special Conditions: Side streets shall be accessible to thru traffic throughout the course of the project.
FA3030-16-R-0003
Amendment 0003
Cost Estimate Breakdown Worksheet (Reference Bid Schedule) CLIN Description Estimated Unit Unit Total
Quantity Price 0001AA PCC Demolition: Includes
Base Material Demo
SF
0001AC Flexible Pavement Demolition: Includes ACC and Base Material Demolition
SY
0002 Provide Unclassified Excavation
CY
0004 Provide Compaction Of Existing Materials
SY
0005 Provide 6” Stabilized Aggregate Base Course
TN
0006 Provide Saw Cutting of Concrete & Asphalt
LF
0007 Provide Prime Coat SY
0009 Provide 1.5” Asphaltic Cement Concrete (ACC) Pavement
TN
0016 Provide PCC Fibermesh Sidewalk
SF
0017AA Provide PCC Curb & Gutter
LF
0019 Provide PCC Valley Gutters
SF
0022 Provide Handicap Curb Ramp
EA
0024 Adjust Valve Boxes SF
0031AA Provide 4” White Striping LF
0031AB Provide 4” Yellow Striping
LF
0031AF Provide Crosswalk Striping
SF
0032 Provide Raised Pavement Reflectors (Red/White, Blue, White)
EA
0035AA Provide Turf Hydromulch SY
Total Amount $
FA3030-16-R-0003
Amendment 0003
File details come from the government source that posted it. Updated .