Revised_SOW.pdf

PDF 1013 KB Posted

Attached to
FY16 Pavements IDIQ Federal contract opportunity
Solicitation number
FA3030-16-R-0002
Issued by
Department of the Air Force Air Education and Training Command

About this file

Revised Scherz Blvd SOW

View the file

Other files for this federal contract opportunity

Other files attached to FY16 Pavements IDIQ, newest first.
File Type Posted
FA3030-16-R-0002-0003.pdf PDF
TE-5_Scherz_Handicap_Ramps.pdf PDF
Repair_Scherz_Combined_Files.pdf PDF
FA3030-16-R-0002-0002.pdf PDF
FA3030-16-R-0002-0001.pdf PDF
Site_Visit_Notes_and_Questions.pdf PDF
Combined_Drawings.pdf PDF
Combined_SOW.pdf PDF
AF_Form_66.pdf PDF
Wage_Determination_TX160007.pdf PDF
FA3030-16-R-0002_Pavements_IDIQ.pdf PDF
Insurance_Requirements.pdf PDF
BAL_-_Base_Access_List.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Seed_Project.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order Pavements IDIQ

Location: GAFB, Scherz Blvd. between W. Farrow Street & W. Valiant Street

Project #/Title: JCGU 01-1700A, Repair Scherz Blvd.

Point of Contact (Name/phone #): _Mr. Robin Mansfield, 654-3462 _______________

(1) Project Inspector: _Mr. Robin Mansfield or Ms. Cherokee Chambers________________

(2) Using Activity/Organization: _ BaseWide________________________________________

Scope of Work: The Contractor shall saw cut and remove flexible pavement down 7-1/2”, compact existing base material adding new base material to complete the elevation to within 1-1/2” (inches) of the finish grade of the pavement. Provide new valley gutter at intersections (located on drawing), sidewalks & handicap ramps (see drawing) and curb & gutter that is located on the TE-5 drawing. Provide adjustment of utility valve boxes. Provide new prime coat and overlay with “type D” 1-1/2” ACC. Provide new centerline striping, parking spaces, blocked off areas, and crosswalks at existing locations. Provide new raised reflectors for cross walks and fire hydrants. Striping and reflectors shall match the existing layout.

Phasing Requirements: A traffic control plan shall be submitted and approved by the Contracting Officer and Civil Engineering 14 days prior to the start of work. No deviation to this plan shall be permitted without 7 days prior written approval from Contracting Officer.

Special Requirements/Security/Submittals: The Contractor shall install traffic safety signage as needed throughout the project. Contractor shall ensure all vehicle and pedestrian traffic is routed around the construction area. See AF Form 66.

Desired Task Order Construction Completion Date: 180 Calendar Days

Work Hours: 7:30 AM to 4:30 PM, Monday – Friday, exclusive of Federal Holidays

Special Conditions: Side streets shall be accessible to thru traffic throughout the course of the project.

FA3030-16-R-0003

Amendment 0003

Cost Estimate Breakdown Worksheet (Reference Bid Schedule) CLIN Description Estimated Unit Unit Total

Quantity Price 0001AA PCC Demolition: Includes

Base Material Demo

SF

0001AC Flexible Pavement Demolition: Includes ACC and Base Material Demolition

SY

0002 Provide Unclassified Excavation

CY

0004 Provide Compaction Of Existing Materials

SY

0005 Provide 6” Stabilized Aggregate Base Course

TN

0006 Provide Saw Cutting of Concrete & Asphalt

LF

0007 Provide Prime Coat SY

0009 Provide 1.5” Asphaltic Cement Concrete (ACC) Pavement

TN

0016 Provide PCC Fibermesh Sidewalk

SF

0017AA Provide PCC Curb & Gutter

LF

0019 Provide PCC Valley Gutters

SF

0022 Provide Handicap Curb Ramp

EA

0024 Adjust Valve Boxes SF

0031AA Provide 4” White Striping LF

0031AB Provide 4” Yellow Striping

LF

0031AF Provide Crosswalk Striping

SF

0032 Provide Raised Pavement Reflectors (Red/White, Blue, White)

EA

0035AA Provide Turf Hydromulch SY

Total Amount $

FA3030-16-R-0003

Amendment 0003