DKGV 14-2085 Submittal Register (AF Form 66).pdf
PDF 101 KB Posted
- Attached to
- Repair Electrical Distribution System, B2 Area Federal contract opportunity
- Solicitation number
- FA441820R0008
About this file
This submittal register outlines the required submissions for a firm-fixed-price contract to repair the electrical distribution system at Joint Base Charleston - Weapons Station in Goose Creek, South Carolina. The contractor must provide personnel, equipment, tools, materials and supervision to complete the project within 270 calendar days.
The submittal register lists over 100 submission requirements across 41 specification sections, including preconstruction plans for scheduling, safety, environmental protection and waste management. It also requires as-built drawings, operation and maintenance manuals, test reports for electrical systems, hazardous material abatement and equipment certifications. Submissions are due at various stages for review by the government and other approving authorities. This register establishes the submissions the contractor must complete and submit to the Air Force to fulfill contract requirements for repairing the electrical distribution system at the specified military base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Proposal Submission Change Notice FA441820R0008 20200520.pdf | ||
| QA 2 B2 Area FA441820R0008 20200518.pdf | ||
| Questions - Electrical Distribution System B2 Area20200518.pdf | ||
| Questions from Grot 20200519.pdf | ||
| Q and A B2 Area FA441820R0008 20200513.pdf | ||
| FA441820R0008 Preproposal Site Visit Ktr Roster 20200506.pdf | ||
| DKGV 14-2085 Drawings.pdf | ||
| SC20190022 Wage Determination.pdf | ||
| FA441820R0008 2020042803.pdf | ||
| DKGV 14-2085 B2 Specs 20200427.pdf | ||
| B1 and B2 Asbestos and Lead Based Paint Surveys.pdf | ||
| DKGV 14-2085 Repair Electrical Distribution B.2 Area SOW.docx | DOCX document | |
| DKGV 142085 Green Procurement Form.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 10 PAGES
DKGV 14-2085
Repair Electrical Distribution, B2 Area
01 11 00 SD-01 Preconstruction Submittals
1.6.2 GOutage Requests
1.6.2 GRoad Closure Requests
GWork Clearance 01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 Glist of contact personnel
01 30 00 SD-01 Preconstruction Submittals
1.2 GView location map
1.3 GProgress and completion pictures
1.6.1 GResume
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GQualifications
1.3 GProject schedule
1.4.1 GInitial Contract Progress Report
(AF IMT 3065)
1.4.2 GInitial Contract Progress
Schedule (AF IMT 3064) SD-07 Certificates
1.3.3 GProject Schedule Updates
1.4.1 GMonthly Contract Progress
Report (AF IMT 3065)
1.4.2 GMonthly Contract Progress
Schedule (AF IMT 3064) 01 33 00 SD-01 Preconstruction Submittals
1.6 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 10 PAGES
Repair Electrical Distribution, B2 Area
01 35 26 1.6 GAccident Prevention Plan (APP)
1.7 GActivity Hazard Analysis (AHA)
1.6.1 GCrane Critical Lift Plan
1.5.1.2 GCrane Operators
SD-06 Test Reports 1.11Notifications and Reports
1.11.2 GAccident Reports
1.11.3Crane Reports
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.13License Certificates
01 45 00 SD-01 Preconstruction Submittals
1.6 GQC Plan
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
01 54 00.00 31 SD-03 Product Data Affirmative Procurement Reporting Form
Proposed environmentally preferred products.
01 57 19.00 31 SD-01 Preconstruction Submittals GPreconstruction Survey GRegulatory Notifications GEnvironmental Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 10 PAGES
Repair Electrical Distribution, B2 Area
01 57 19.00 31 GDirt and Dust Control Plan SD-06 Test Reports Disposal Requirements Erosion and Sediment Control Inspection Reports
GStorm Water Inspection Reports for General Permit
GSolid Waste Disposal Report SD-07 Certificates
GContractor 40 CFR employee training records
SD-11 Closeout Submittals GStorm Water Pollution Prevention
Plan compliance notebook Waste Determination Documentation
Disposal Documentation for Hazardous and Regulated Waste
Contractor 40 CFR Employee Training Records
Solid Waste Disposal Permit Solid Waste Disposal Report Hazardous Waste/Debris Management
Regulatory Notifications 01 57 20.00 31 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 10 PAGES
Repair Electrical Distribution, B2 Area
01 57 20.00 31 Material Safety Data Sheets
(MSDS)
SD-06 Test Reports 1.8Green Procurement 1.8Green Procurement 1.3Recycling Report 1.3Recycling Report
01 78 00 SD-03 Product Data 1.5.1Warranty Management Plan 1.5.4Warranty Tags 1.4Spare Parts Data
SD-08 Manufacturer’s Instructions 3.9Preventative Maintenance 3.9Condition Monitoring (Predictive
Testing) 3.9Inspection 1.5.1Instructions
SD-10 Operation and Maintenance Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2.1 GRecord Drawings
3.3 GRecord Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 10 PAGES
Repair Electrical Distribution, B2 Area
01 78 00 3.6.1As-Built Record of Equipment and Materials
3.4FINAL APPROVED SHOP
DRAWINGS
3.5CONSTRUCTION CONTRACT
SPECIFICATIONS
3.10 GInterim DD FORM 1354
3.10 GChecklist for DD FORM 1354
02 82 33.13 20 SD-03 Product Data
1.6.4 GVacuum Filters
1.6.1 GRespirators
SD-06 Test Reports
1.5.2.3 GSampling Results
1.5.2.3 GOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.1 GQualifications of CP
1.5.1.3 GTesting Laboratory
3.1.1.1 GOccupant Notification
1.5.1.2 GTraining Certification
3.1.1.1 GNotification of the
Commencement of (LBP) Hazard Abatement
1.5.1.4 GThird Party Consultant
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 10 PAGES
Repair Electrical Distribution, B2 Area
02 82 33.13 20 1.5.3 GLead-based paint/paint with lead removal/control plan
1.6.3 GRental equipment notification
1.5.2.6 GRespiratory Protection Program
1.5.2.7 GHazard Communication Program
3.5.2 GEPA approved hazardous waste
treatment, storage, or disposal facility
1.5.2.8 GLead Waste Management Plan
1.6.4 GVacuum filters
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
1.5.2.4 GMedical Examinations
1.5.1.2 GTraining Certification
3.5.2.1 GTurn-In Documents or Weight
Tickets 02 84 33 SD-07 Certificates
1.7.1Training certification 1.7.2Qualifications of CIH 1.7.3PCB removal work plan 1.7.4PCB disposal plan 1.7.5Notification 3.8Transporter certification 3.5.4Certification of Decontamination 3.5.5Post cleanup sampling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 10 PAGES
Repair Electrical Distribution, B2 Area
02 84 33 3.8.1Certificate of disposal 26 08 00 SD-06 Test Reports
3.1Acceptance tests and inspections SD-07 Certificates
1.4.1Qualifications 1.4.3Acceptance test and inspections procedure 26 12 19.10 SD-02 Shop Drawings
1.5.1Pad-mounted Transformer Drawings
SD-03 Product Data 2.2Pad-mounted Transformers
SD-06 Test Reports 3.6.1Acceptance Checks and Tests
SD-07 Certificates 2.2.2.1Transformer Efficiencies
SD-09 Manufacturer’s Field Reports
2.5.1Transformer Test Schedule 2.5.3Routine and Other Tests
SD-10 Operation and Maintenance Data
1.6.1Transformer(s) 26 20 00 SD-02 Shop Drawings
2.7Panelboards SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 10 PAGES
Repair Electrical Distribution, B2 Area
26 20 00 2.7.3Circuit breakers 2.12Metering
Meter base only 2.13Surge protective devices
SD-06 Test Reports 3.4.2600-volt wiring test 3.4.3Grounding system test
26 27 13.10 30 SD-03 Product Data
2.1 GPower Meters
GCurrent SD-06 Test Reports
3.3.1Acceptance Checks and Tests SD-10 Operation and Maintenance Data
2.1Power Meters Communications Module
SD-11 Closeout Submittals 3.3.2System Function Verification
26 28 21.00 40 SD-02 Shop Drawings 2.1Installation Drawings
SD-06 Test Reports Operation Tests
33 71 01 SD-03 Product Data 2.6Conductors 2.5Insulators 2.2.1Wood Poles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 10 PAGES
Repair Electrical Distribution, B2 Area
33 71 01 2.13Cutouts 2.15Transformer 2.12Surge arresters 2.8Guy strand 2.10Anchors
SD-06 Test Reports 1.5.4.1Field Test Plan 3.5Field Quality Control 1.5.3Ground resistance test reports
SD-07 Certificates 2.2.1Wood poles
Transformer Losses SD-09 Manufacturer’s Field Reports
2.18.1routine and other tests SD-11 Closeout Submittals Transformer test schedule
33 71 02 SD-03 Product Data 2.5Medium voltage cable 2.7Medium voltage cable joints 2.6Medium voltage cable terminations SD-06 Test Reports Medium voltage cable qualification and production tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 10 PAGES
Repair Electrical Distribution, B2 Area
33 71 02 3.10.1Field Acceptance Checks and Tests
SD-07 Certificates 1.5.1Cable splicer/terminator 1.5.2Cable Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .