Questions from Grot 20200519.pdf
PDF 246 KB Posted
- Attached to
- Repair Electrical Distribution System, B2 Area Federal contract opportunity
- Solicitation number
- FA441820R0008
About this file
This document contains a request for clarification regarding drawings for a project to repair an electrical distribution system at Joint Base Charleston - Weapons Station in Goose Creek, South Carolina. The project involves removing and replacing asphalt, installing a new underground electrical service from a transformer to Building 900, removing existing conductors and conduit from a hand hole to a pole and abandoning underground conduit, and installing a secondary service from the transformer to a new hand hole with compression splices to existing conductors. The engineer provides clarification that drawing ES408 correctly depicts the work, with secondary hand holes to be installed to allow replacement of the electrical secondary within the time limits specified, as outages are restricted to outside normal working hours.
The related federal contract opportunity is a solicitation for the project to repair the electrical distribution system in the B2 Area at Joint Base Charleston - Weapons Station. The single award firm-fixed price contract requires providing personnel, equipment, tools, materials and supervision to complete the work within 270 calendar days. A pre-bid site visit was scheduled for May 6, 2020 at the base visitor control center. The solicitation was issued by the Department of the Air Force Air Mobility Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Proposal Submission Change Notice FA441820R0008 20200520.pdf | ||
| QA 2 B2 Area FA441820R0008 20200518.pdf | ||
| Questions - Electrical Distribution System B2 Area20200518.pdf | ||
| Q and A B2 Area FA441820R0008 20200513.pdf | ||
| FA441820R0008 Preproposal Site Visit Ktr Roster 20200506.pdf | ||
| DKGV 14-2085 Drawings.pdf | ||
| B1 and B2 Asbestos and Lead Based Paint Surveys.pdf | ||
| DKGV 14-2085 Submittal Register (AF Form 66).pdf | ||
| DKGV 14-2085 Repair Electrical Distribution B.2 Area SOW.docx | DOCX document | |
| DKGV 142085 Green Procurement Form.pdf | ||
| SC20190022 Wage Determination.pdf | ||
| FA441820R0008 2020042803.pdf | ||
| DKGV 14-2085 B2 Specs 20200427.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from Grot, Inc.
May 18, 2020
Request for clarification:
Drawing CS105- Asphalt is to be removed and replaced from new pad mount transformer to
Bldg.900.
Drawing ES407 – new Electrical Underground service from Transformer to Bldg. 900
Drawing ES408- Existing building 900 riser diagram – Remove existing conductors from new hand hole back to pole. Remove above grade conduit and abandon underground conduit in place.
Drawing ES 408-Bldg 900 Riser Diagram – Secondary service from transformer to new hand hole. Splice new secondary conductors to existing secondary conductors in hand hole with copper to aluminum compression splice.
Conflicting drawings in respect to new EUS to Bldg 900, Please clarify.
Answers from 628th CES
My answer would be to plan on completing the work in the most efficient and cost effective manner. Specifications 01 11 00, para. 1.6.2 and 01 14 00, para. 1.2.5 limit power outages to outside normal working hours (M-F, 7 am – 3:30 pm), so secondary hand holes are usually put in place to accommodate this requirement. If there’s no way that the entire electrical secondary could be replaced in the time limit set forth in the specifications, hand holes will be required.
The original intent was to install hand holes for this reason. Therefore, drawing ES408 would be correct and in congruence with the specifications.
Respectfully, Lawrence J. Pearl, P.E.