This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW685 to authorize environmental remediation services at the former Dixie Cleaners site (ERIC_4531) located at 1931 Blanding Boulevard in Jacksonville, Duval County. The contractor is Golder Associates USA Inc., with project manager Matt Crews (904-363-3430) working under FDEP project manager Ben Grubbs (850-245-8992). The Task Assignment Number is DC027A with a completion date of January 13, 2023.
The scope of work authorizes Golder to conduct soil and groundwater sampling activities in accordance with the May 23, 2022 Scope of Work, Cost Estimate, and Bid Documentation. The work encompasses four subtasks: Project Management ($2,427.32), Soil Sampling including utility location and analysis of 28 soil boring samples for chlorinated volatile organic compounds ($12,371.22), Annual Groundwater Monitoring involving sampling from 22 monitoring wells and six injection wells with waste characterization and disposal ($9,565.14), and Reporting including preparation of the final monitoring report and GIS updates ($8,626.54). The total fixed unit rate Task Assignment value is $30,562.90 with 158 direct labor hours. Golder may invoice following a schedule tied to deliverable completion: Subtask 2 deliverables due August 19, 2022 ($12,371.22); Subtask 3 deliverables due September 16, 2022 ($9,565.14); and Subtasks 1 and 4 deliverables due October 28, 2022 ($8,626.54). Subcontractors identified include GeoTek for utility location ($750.00) and Erwin Remediation for investigation-derived waste disposal ($100.00 per drum).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC027A Completion January 13, 2023
This Task Assignment authorizes Golder to conduct soil and groundwater sampling activities in accordance with the May 23, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Ben Grubbs 850-245-8992 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews 904-363-3430
ERIC_4531
1931 Blanding Boulevard, Jacksonville, Duval County
Lakeshore Plaza - Dixie Cleaners
✔ $ 30,562.90
$ 30,562.90
Scope of Work
Don E. Grigg
Local Business Leader
Don E. Grigg Digitally signed by Don E. Grigg Date: 2022.05.23 16:04:30 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.05.23 15:00:19 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Soil Sampling Field Documentation and Laboratory Report 08/19/2022
Subtask 3: Groundwater Monitoring Field Documentation and Laboratory Report;
IDW Disposal Documentation 09/16/2022
Subtasks 1 & 4: Soil and Groundwater Sampling Report; ADaPT/GIS Update; Project Management 10/28/2022
Subtask 2: Submittal and FDEP approval of the Soil Sampling Field Documentation and Laboratory Report $ 12,371.22
Subtask 3: Submittal and FDEP approval of the Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 9,565.14
Subtasks 1 & 4: Submittal and FDEP approval of the Soil and Groundwater Sampling Report; ADaPT/GIS Update; Project Management $ 8,626.54
$ 30,562.90
HW685
DC027A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW685 Contract Negotiation File Lakeshore Plaza - Dixie Cleaners Jacksonville, Duval County
ERIC_4531
From: Ben Grubbs, Project Manager Date: May 23, 2022 Subject: Negotiation Summary
HW685 DC027A
This Task Assignment authorizes Golder to conduct soil and groundwater sampling activities in accordance with the May 23, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Soil Sampling Golder will collect twenty-eight soil samples from the boring locations identified on Figure 1A.
The samples will be analyzed for chlorinated volatile organic compounds (VOCs). Prior to sampling, Golder will oversee a utility locate. Golder requested bids for the utility locate from GeoTek, ProCheck, and GPRS. GeoTek was selected as the lowest responsive and responsible bidder.
Subtask 3: Annual Groundwater Monitoring Golder will collect groundwater samples from sixteen monitoring wells (MW001, MW016, MW018, MW019, MW024, MW028 – MW032, and MW034 – MW039) and six injection wells (IW010, IW017, IW018, and IW021 – IW023). Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for VOCs. Samples from MW029, MW034, and MW035 will also be analyzed for total organic carbon (TOC), total dissolved solids (TDS), and color. Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste, and M & D Industrial Services. Erwin was selected as the lowest responsive and responsible bidder.
Subtask 4: Reporting Golder will submit the Soil and Groundwater Sampling Report and ADaPT and GIS deliverables to FDEP.
MEMORANDUM
Lakeshore Plaza - Dixie Cleaners May 23, 2022 Page Two
Golder and the FDEP confirmed on May 23, 2022, that an Access Agreement with the current real property owner of the Lakeshore Plaza - Dixie Cleaners (ERIC_4531) site has been executed.
The purpose of this soil and groundwater sampling event is to determine whether a Remedial Action Plan Modification is an appropriate next step for remediation of the site.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $30,562.90 with 158 labor hours.
Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 5/23/2022
Task #: DC027A SubTask 1 Project Management SubTask 6
Site: Dixie Cleaners SubTask 2 Soil Sampling SubTask 7
Activity/Phase: Monitoring SubTask 3 Groundwater Sampling SubTask 8
Project Manager: Benjamin Grubbs SubTask 4 Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.23 Project Manager (RFM) 16 15.8 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JB) 22 12 6 4 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0
$51.23 Senior Sci/Eng - X-11 (RFM) 20 0 0 20 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 5 0 0 5 0 0 0 0 0 0 $44.15 Project Sci/Eng - P-10 (JT) 11 0 0 10.5 0 0 0 0 0 0 $38.61 Staff Sci/Eng - P-8 (LS) 42 19 23 0 0 0 0 0 0 0 $34.84 Staff Sci/Eng - P-8 (HB) 40 18.0 22 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 3 0 0 3 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 158 15.8 49.0 51.0 42.5 0 0 0 0 0 0
Direct Labor $7,038.83 $809.78 $2,124.51 $2,036.41 $2,068.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $12,141.98 $1,396.87 $3,664.78 $3,512.81 $3,567.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $19,180.81 $2,206.65 $5,789.29 $5,549.22 $5,635.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 5/23/2022
Task #: DC027A SubTask 1 Project Management SubTask 6
Site: Dixie Cleaners SubTask 2 Soil Sampling SubTask 7
Activity/Phase: Monitoring SubTask 3 Groundwater Sampling SubTask 8
Project Manager: Benjamin Grubbs SubTask 4 Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $560.00 $320.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $560.00 $320.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $850.00 $750.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $85.00 $75.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $935.00 $825.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $5,981.00 $4,088.00 $1,893.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $560.00 $300.00 $260.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $6,541.00 $4,388.00 $2,153.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $120.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,128.00 $350.00 $778.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,428.00 $470.00 $958.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $28,644.81 $2,206.65 $11,792.29 $9,010.22 $5,635.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,918.09 $220.67 $578.93 $554.92 $563.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $30,562.90 $2,427.32 $12,371.22 $9,565.14 $6,199.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dixie Cleaners SUBTASK 2: Soil Sampling
DATE: 5/23/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (J Brown) 12
Staff Sci/Eng L. Swindle) 19
Staff Sci/Tech (H.Brooks) 18
TOTAL LABOR 49
VEHICLE TYPE RATE UNIT USEAGE
Truck (Soil sampling) $120.00 Per Day 2 $240.00 Car (J. Brown) $80.00 Per Day 1 $80.00
TOTAL VEHICLE $320.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
GeoTek Utility Locates $750.00 Each 1 $750.00
TOTAL $750.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B Total VOHs EPA Method 8260B $73.00 56 0 $4,088.00 Sample Shipping Large $150.00 2 $300.00
TOTAL LAB $4,388.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 3 $120.00 Soil Sampling Kit $175.00 Per Day 2 $350.00
TOTAL EQUIPMENT $470.00
Mobilize and collect soils samples from 28 soil borings around the 2005 and 2016 source removals to a depth of 2 feet bgs collecting 2 samples per location (56 samples) analyzed for VOCs (16 hours). Field event preparation (1 hour). Round trip travel 2 days at 1 hour per day (2 hours).
Communication with RPO, verification of property ownership, schedule GeoTek, get a new signed site access agreement prior to site access (4 hr), prepare and submit field notes, sample forms, laboratory report in an email deliverable to the DEP (3 hours), meet with GeoTek on site and mark out locations (4 hours), round trip travel (1 hour per day = 1 hour).
Mobilize and collect soils samples from 28 soil borings around the 2005 and 2016 source removals to a depth of 2 feet bgs collecting 2 samples per location (56 samples) analyzed for VOCs (16 hours). Round trip travel 2 days at 1 hour per day (2 hours).
Contact property owner and DEP, get a new site access agreement, schedule field work, collect soil samples from 28 boring locations for VOC analysis.
FINAL --7/24/96
SUBTASK 3: Groundwater Sampling
DATE: 5/23/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (J Brown) 6
Staff Sci/Eng L. Swindle) 23
Staff Sci/Tech (H.Brooks) 22
TOTAL LABOR 51
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOHs - EPA Method 8260B $73.00 22 0 $1,606.00 IDW VOCs EPA Method 8260B $110.00 1 $110.00
TOC Method 9060 / SM5310 B $30.00 3 $90.00 UIC Sampling Color $13.00 3 $39.00
TDS Method 160.1 $16.00 3 $48.00 Sample Shipping Small (IDW) $110.00 1 $110.00 Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $2,153.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00 Tubing, Poly HDPE $0.30 Per Foot 440 $132.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 22 $66.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $958.00
Contact property owner and DEP schedule field work, collect groundwater samples from 22 existing monitoring wells for VOC analysis, three wells (MW029, MW034, and MW035) for UIC and TOC, and IDW characterization and waste profile for transportation and disposal.
Communication with RPO (1 hr), prepare and submit field notes, sample forms, laboratory report in an email deliverable to the DEP (3 hours), characterization and waste profile for transportation and disposal of IDW drum(s) (2 hr).
Collect samples from a portion of 22 wells: six shallow zone monitoring wells (MW001, MW016, MW028, MW031, MW034, and MW038); seven intermediate zone monitoring wells (MW018, MW019, MW029, MW032, MW035, MW037, and MW039); six injection wells (IW010, IW017, IW018, IW021, IW022, and IW023), and three deep zone monitoring wells (MW024, MW030, and MW036). Field event preparation (1 hour). Round trip travel (1 hour per day x 2 days = 2 hours). Water levels, instrument pre and post calibration, and sampling (20 hours).
Collect samples from a portion of 22 wells: six shallow zone monitoring wells (MW001, MW016, MW028, MW031, MW034, and MW038); seven intermediate zone monitoring wells (MW018, MW019, MW029, MW032, MW035, MW037, and MW039); six injection wells (IW010, IW017, IW018, IW021, IW022, and IW023), and three deep zone monitoring wells (MW024, MW030, and MW036). Round trip travel (1 hour per day x 2 days = 2 hours). Water levels, instrument pre and post calibration, and sampling (20 hours).
SUBTASK 4: Reporting
DATE: 5/23/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 4
Senior Sci/Eng (R Mongillo) 20
Senior Project Sci/Eng (J. Thomas) 10.5
Senior Project Sci/Eng (B. Lucero) 5
Staff Sci/Eng (A. Strayer) 3
TOTAL LABOR 42.5
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Reporting: Updating tables document production, binding and shipping. Create pdf for OCULUS.
Develop conclusions and recommendations and prepare final Annual Monitoring Report.
Data entry, prepare tables and figures, and draft Annual Monitoring Report
Update FDEP GIS Tables, run data checker, create and edit error report, and annotate error report (56 soil data and 22 groundwater data points x 8 min/point = 624 minutes). Submit FDEPGIS tables; submit ADaPT deliverable (10.5)
CADD Update Figures (one soil, three groundwater flow, and three VOC detection figures)
Golder Associates USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445 golder.com
May 23, 2022 Proposal No. 202208346
Mr. Ben Grubbs Florida Department of Environmental Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR THE FORMER DIXIE CLEANERS
2022 ANUAL GROUNDWATER MONITORING AND SOIL ASSESSMENT
10500 SAN JOSE BOULEVARD
JACKSONVILLE, DUVAL COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4531
PROPOSED TASK ASSIGNMENT: HW685_DC027A
Dear Mr. Grubbs:
Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for biennial groundwater monitoring at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The scope of work is based on the recommendations accepted by the DEP in the June 25, 2020 electronic mail correspondence to Golder. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – SOIL SAMPLING
Golder will contact Sunshine 811 to initiate a utility locate for underground utilities and use a private utility locator to complete an underground utility locate where the proposed 28 soil borings are located on the attached Figure 1A.
The soil borings located around the 2005 and 2016 source removals where chlorinated volatile organic compound
Mr. Ben Grubbs Proposal No. 202208346
Florida Department of Environmental Protection May 23, 2022
(VOC) concentrations exceeded the soil cleanup target levels (SCTL) in several samples collected in the top 2 feet.
Soil samples will be collected at depths of 0.5 and 2.0 feet below ground surface at each boring location and submitted to a laboratory under proper chain-of-custody procedures for VOC analysis by EPA Method 8260. A total of 56 soil samples will be collected for chlorinated VOC analysis.
Soil samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). The soil will be collected and placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program (NELAP)-certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260.
For cost estimating purposes, Golder plans to return the soil from each boring back into the hole on site. Golder estimates two days for a two-person field crew to complete soil sampling activities.
SUBTASK 3 – ANNUAL GROUNDWATER MONITORING
Golder will collect groundwater samples from 22 wells: six shallow zone monitoring wells (MW001, MW016, MW028, MW031, MW034, and MW038); seven intermediate zone monitoring wells (MW018, MW019, MW029, MW032, MW035, MW037, and MW039); six injection wells (IW010, IW017, IW018, IW021, IW022, and IW023), and three deep zone monitoring wells (MW024, MW030, and MW036). The attached figures (Figures 5, 6, and 7) from the 2021 Annual Groundwater Monitoring Report show the site layout and chlorinated VOC results for the three surficial zones of the surficial aquifer.
Prior to groundwater sampling, depth-to-water measurements will be collected using an electronic water level indicator to determine groundwater depth. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.
Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B. Groundwater samples from three of the monitoring wells (MW029, MW034, and MW035) will also be analyzed for total organic carbon using EPA Method 9060 and CHITOREM® Underground Injection Control parameters including total dissolved solids using EPA Method 160.1 and color. Upon receipt of the laboratory analytical results, Golder will evaluate the groundwater concentrations to determine if off-site notification is required.
Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.
Upon completion of Subtask 3, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.
SUBTASK 4 – REPORTING
The soil and annual groundwater monitoring report will include a description of the sampling procedures, evaluation of the analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will also update the DEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the DEP data checker on the completed tables; and submit the updated tables and error reports under this subtask. Additionally, Golder will forward the Automated Data Processing Tool (ADaPT) data deliverables for the groundwater sampling event provided by the laboratory.
HEALTH AND SAFETY
Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $30,562.90. Golder anticipates the monitoring event will take place in the late July 2022. The LOE/CEF sheets are included in Attachment A. Utility locator and disposal subcontractor IDW quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 2,427.32 November 25, 2022
Subtask 2 – Soil Assessment $12,371.22 August 19, 2022 (Field documentation and laboratory analytical report via E-mail)
Subtask 3 – Annual Groundwater Monitoring $ 9,565.14 September 16, 2022 (Field documentation and laboratory analytical report via E-mail)
Subtask 4 – Reporting $ 6,199.22 October 28, 2022 (Annual Groundwater Monitoring Report)
Total/Completion Date $30,562.90 December 30, 2022
Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.
Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, Golder Associates USA Inc.
Ralph F. Mongillo, Jr., PG Jesse C. Brown, PE Lead Consultant / Senior Geologist Director, Environmental Engineer
RFM/JCB/as
Attachments: Figure 1A – Approved Soil Sample Locations Figures 5, 6, and 7 – Groundwater Analytical Results CVOCs
Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes
G:\Projects\DEP-Drycleaning\Projects\Jax\Dixie - HW685\Proposal\HW685 Dixie Annual GW Monitoring and Soil Assessment Proposal - ERIC_4531.docx
GeoTek Services, LLC
19 May 2022
To: Jesse Brown
Golder Associates, Inc.
9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256
From: GeoTek Services, LLC 4060 Sparrow Hawk Road
Melbourne, Florida 32934
RE: Utility Locating Services – 1931 Blanding Boulevard, Jacksonville, Florida
Mr. Brown, GeoTek Services is pleased to respond to your request for Utility Locating services at 1931 Blanding Boulevard located in Jacksonville, Florida. We will scan a 10’ x 10’ area around the twenty-eight bore locations shown in your PDF drawing with the goal of locating underground utilities. We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as landscaping, fencing, buildings. We will scan as close as reasonably possible to fixed objects such as walls, landscaping, fences, etc. Our deliverable will be marking paint and/or flags indicating the location of potential underground utilities. It is the client’s responsibility to protect and preserve all marks.
We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.
We request access to any as-built site plans of the scan areas prior to rendering services. Our fixed price quote for this effort is $750.00. No out-of-pocket expenses are expected for this project. This quote is valid for sixty days.
Best Regards, Martin (Bud) Connor GeoTek Services, LLC
4060 Sparrow Hawk Road ● Melbourne, FL 32934-8525 ● info@GeoTekServices.com ● 321.473.7498
Jonathan H. Fish | (904) 710-7290 Jonathan.Fish@ProCheckInspections.net • www.procheck-inspections.net
Headquarters: P.O. Box 125 Macclenny, FL. 32063 EIN #: 87-2187749
Date: 05/17/2022 To: WSP/Golder Attn: Jesse Brown | Director, Environmental Engineer Project: 1931 Blanding Blvd. Jacksonville, FL
ProCheck Inspections appreciates the opportunity to provide this proposal. Feel free to contact me at any time if you have any questions, or if you need additional information.
SCOPE OF WORK
We understand the scope to be to search for underground utilities as identified by the customer within (x28) 10’x10’ areas prior to conducting soil borings. We will attempt to trace any utilities for which there are structures visible from the work area, and mark said utilities with paint and flags where possible. The client will be responsible to provide drawings or notify ProCheck Inspections of any utilities known to be entering the work area for which there are no apparent surface features or structures that are visible from the work area. The areas should be laid out, marked, and cleared of obstructions prior to our arrival.
EQUIPMENT
• 350 MHz Hyperstacking GPR Antenna. The antenna is mounted in a stroller frame which rolls over the surface. The surface needs to be reasonably smooth and unobstructed in order to obtain readable scans. Obstructions such as curbs, landscaping, standing water, and vegetation will limit the feasibility of GPR. The data is displayed on a screen and marked in the field in real time. GPR works by sending pulses of energy into a material and recording the strength and the time required for the return of the reflected signal. Reflections are produced when the energy pulses enter a material with different electrical properties from the material it left. The strength of the reflection is determined by the contrast in signal speed between the two materials. The total depth achieved can be as much as 8’ or more with this antenna but can vary widely depending on the conductivity of the materials. The patented hyperstacking antenna can improve depth penetration and resolution when compared with a traditional GPR antenna.
• Electromagnetic Pipe Locator. The EM locator can detect the electromagnetic fields from live power or radio frequency signals. It can also be used in conjunction with a transmitter to connect directly to accessible, metallic pipes, risers, or tracer wires. A current is sent through the pipe or tracer wire at a specific frequency and the resulting EM field can then be detected by the receiver. The receiver is moved over the surface without contacting the ground, so it is not affected by terrain. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. Depths achieved can be as much as 20’ depending on the type of signal being traced or methods used.
mailto:Jonathan.Fish@ProCheckInspections.
http://www.procheck-inspections.net/
Jonathan H. Fish | (904) 710-7290 Jonathan.Fish@ProCheckInspections.net • www.procheck-inspections.net
Headquarters: P.O. Box 125 Macclenny, FL. 32063 EIN #: 87-2187749
PROJECT COSTS
SERVICE SCOPE PRICE
SCANNING/FIELD MARKINGS Described on Page 1 $650 MOBILIZATION Included
TOTAL *$750
OPTIONAL SERVICES (INITIAL IF DESIRED)
SEWER CAMERA Trace accessible cleanouts and storm drains and provide a copy of video.
Initial ____ $400
GPS/GOOGLE EARTH MAP $75 for 1-2 hrs. then a flat $150 thereafter. Initial ____ $75 FORMAL WRITTEN REPORT Basic report of findings + photos + example
GPR data.
Initial ____ $300
REPORT WITH GPS Report with findings collected by GPS overlaid in Google Earth.
Initial ____ $375
CAD DRAWING Findings added as a layer to existing CAD dwg or to an aerial image background.
Initial ____ $600
*This price assumes that we will be given access to perform the work during normal weekday business hours (7am-5pm). As-builts and any other applicable drawings should be made available to ProCheck Inspections prior to the project. A thorough utility search can only be completed if ProCheck Inspections is given access to all utility structures. This service is never a replacement for the use of the state One Call system (811). All ProCheck Inspections personnel have OSHA-10 safety training. Site-specific safety training is not included in this quote. Please notify us if this project requires additional safety training. Fees associated with specific safety trainings will be added at time of invoicing if not made known prior to quotation.
TERMS & CONDITIONS
1. ProCheck Inspections provides Ground Penetrating Radar (GPR) services in underground applications, including assisting in location services in accordance with ASCE Standard 38-02, Quality Level “B”. GPR is a great tool for detecting objects underground, however, site restrictions and environmental conditions can limit the accuracy and effective depth of GPR. For underground scanning, depth is completely dependent on the composition of soils in the area being surveyed. Customer fully understands that for every foot in depth penetration with the GPR equipment, the pipe/utility must be at least 1” in diameter to be located. For example, at 4 feet in depth, the pipe/utility must be 4” or larger to be detected. Some types of pipes are very difficult to locate, such as clay or concrete pipes, transite piping, and empty PVC type pipes. Given these factors, ProCheck Inspections CANNOT guarantee it will be able to locate ALL utilities on site.
2. Our goal is to provide you with the best answers possible to your questions regarding what lies below the surface, and where it is located. Customer acknowledges that they understand the fact that our answers are based upon the quality of the data retrieved and what ProCheck Inspections believes lies below the surface. The decision to proceed with boring or excavations of any manner, type, or method, it under the sole discretion of the customer and customer assumes full liability for aforementioned processes.
3. ProCheck Inspections will not accept liability for an inaccurate interpretation or any other reason, and customer agrees to release and indemnify ProCheck Inspections and its owners and agents from all losses and damages from all alleged negligence and/or contract claims by customer or any third party. These terms and conditions supersede any other previous terms and conditions either oral or written.
4. Payment is due upon receipt of invoice unless otherwise specified in writing.
5. If for some reason ProCheck Inspections arrives on site and the work is cancelled without prior notification, there will be a charge of
$300.00.
ACCEPTED AND AGREED:
Billing Company Name: WSP / Golder
Billing Address: 9428 Baymeadows Rd. Jacksonville, FL
Company Phone/Email: 904.610.8761 PO#: Job#:__AR-Pat’s Dry Cleaners
Print Name: Jesse Brown Signature: Date: 05/17/2022 mailto:Jonathan.Fish@ProCheckInspections.
http://www.procheck-inspections.net/
GPRS is the nation’s premier company specializing in the detection of underground utilities and underground storage tanks, video pipe inspection, leak detection, drone inspection and the imaging of concrete structures.
Our services enable your projects to stay safe, on time and on budget.
WHAT'S UNDERNEATH
MATTERS.
UTILITY LOCATING n LEAK DETECTION n VIDEO PIPE INSPECTION n CONCRETE IMAGING
GPRSINC.COM
In Pursuit of Subsurface Damage Prevention
TM
SIM-CERTIFIED FIELD STAFF
Our SIM-Certified Project Managers are equipped with the latest technology, industry leading training and a methodology that has produced over 99.8% accuracy on over 300,000 projects.
NATIONWIDE FOOTPRINT
GPRS is the largest company of our kind. With over 350+ highly trained Project Managers across America we can provide Rapid Response to your job site — wherever it may be located.
CONSULTATIVE APPROACH
GPRS Project Managers are trained to help you remove barriers that could impact your project being safe, on time and on budget. They provide industry-leading deliverables such as CAD, 3D drawings, NASSCO reports, and a complimentary .KMZ and .PDF map which accelerates planning, and organizes operations and increases communication.
PROPOSAL Golder
GPRSQUOTE-18816 Page 2 of 4
May 18, 2022
Client: Golder
Attn: Jesse Brown, PE
904 631 2433 | jesse_brown@golder.com
Project: Former Dixie Cleaners 1931 Blanding Boulevard, Jacksonville FL
Submitted By:
Megan Meyers
419-767-2456 megan.meyers@gprsinc.com
GPRS appreciates the opportunity to provide this proposal. I encourage you to visit our website (www.gprsinc.com) and contact any of the numerous references listed. Our insurance certificate and W-9 can also be downloaded here. Please feel free to contact me if you have any questions, or if you need additional information.
SCOPE OF WORK
Soil Borings We understand the scope to be to search for underground utilities within a radius of approximately 10’ around 28 soil borings. We will attempt to trace any utilities for which there are structures visible from the work area. Utilities will be marked on the surface using paint, flags, or other appropriate means. The client will be responsible to provide drawings or notify GPRS of any utilities known to be entering the work area for which there are no apparent surface features or structures that are visible from the work area. The areas should be laid out, marked, and cleared of obstructions prior to our arrival in order to avoid additional charges. Please visit www.simspec.org for an overview of our industry-leading best practices that will be applied to this project.
EQUIPMENT
Underground Scanning GPR Antenna. The antenna frequencies range from 250 MHz-450 MHz is mounted in a stroller frame which rolls over the surface. The surface needs to be reasonably smooth and unobstructed in order to obtain readable scans. Obstructions such as curbs, landscaping, and vegetation will limit the feasibility of GPR. The data is displayed on a screen and marked in the field in real time.
The total depth achieved can be as much as 8’ or more with this antenna but can vary widely depending on the types of materials being scanned through. Some soil types such as clay may limit maximum depths to 3’ or less. As depth increases, targets must be larger in order to be detected and non-metallic targets can be especially difficult to locate. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
Electromagnetic Pipe Locator. The EM locator can passively detect the signals from live AC power or radio signals travelling along some conductive utilities. It can also be used in conjunction with a transmitter to connect directly to accessible, metallic pipes, risers, or tracer wires. A current is sent through the pipe or tracer wire at a specific frequency and the resulting signal can then be detected by the receiver. A utility’s ability to be located depends on a variety of factors including access to the utility, conductivity, grounding, interference from other utilities, and many others. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
Traceable Rodder. The rodder has a copper wire encased in fiberglass. The line is pushed through accessible pipes before placing a current on the wire and the signal is then traced from the surface. The maximum traceable depth is 10’ depending on the soil conditions and the maximum distance is 200’. The line can be pushed through a pipe with direct access such as a sewer line at a cleanout or a storm drain catch basin. It may not be able to be pushed through deeper pipes within manholes. Electrical conduits will not be accessed by GPRS. The signal cannot be located through metallic pipes. For more information, please visit: Link
GPS. This handheld GPS unit offers accuracy down to 4 inches, however, the accuracy achieved will depend on the satellite environment at the time of collection and should not be considered to be survey-grade. Features can be collected as points, lines, or areas and then exported as a KML/KMZ or overlaid on a CAD drawing. For more information, please visit: Link www.gprsinc.com https://www.gp-radar.com/resources/downloadable http://www.simspec.org/ https://www.gp-radar.com/equipment/350-400-mhz-gpr-antenna https://www.gp-radar.com/equipment/electromagnetic-pipe-locators https://www.gp-radar.com/Duct-Hunter-Traceable-Rodders.html https://www.gp-radar.com/equipment/gprs-data-sheets
GPRSQUOTE-18816 Page 3 of 4
PROJECT COSTS
SERVICE DESCRIPTION PRICE
SCANNING/FIELD MARKINGS Described on Page 2 Included
MOBILIZATION Included
GPS MAP For exterior locations only. Findings will be collected with GPS and displayed with an aerial image background. Results are not survey-grade accuracy See example: Link
Included
TOTAL $1,950.00
ACCEPTED AND AGREED:
Billing Company Name: Golder
Billing Address: , Company Phone/Email:___________________________ PO #:___________ Job #:______________
Print Name:_____________________ Signature:_____________________ Date:________________
Standard full-day rates are based on an 8-hour workday. Time-on-site in excess of 8-hours will be billed at overtime rates.• This price assumes that we will be given access to perform the work during normal, weekday business hours. Work performed outside of 7am-5pm Monday-Friday will be billed at overtime rates.
As-builts and any other applicable drawings should be made available to GPRS prior to the project if possible.• A thorough utility search can only be completed if GPRS is given access to all utility structures, interior and exterior. This service is never a replacement for the use of the state One Call system (811).
All of our technicians have OSHA-10 safety training or greater. Site-specific safety training is not included in this quote. Please notify us if this project requires additional safety training.
These rates assume that there are no certified payroll requirements. GPRS has not been notified of any PLA, DIR, or Certified Payroll requirements. If GPRS receives notice that any of these conditions exist, there will be additional costs.
https://www.gp-radar.com/insights/deliverables-examples#GPSMap
GPRSQUOTE-18816 Page 4 of 4
This proposal is subject to the General Terms and Conditions for Services of Ground Penetrating Radar Systems, LLC posted at Link (the “Terms and Conditions”) and is hereby incorporated by reference into and made a part of this proposal. Customer acknowledges it has read and agrees to be bound by such Terms and Conditions. In the event of any conflict between the terms of this proposal and the Terms and Conditions, the Terms and Conditions will prevail. Customer also acknowledges that Ground Penetrating Radar Systems, LLC may, from time to time and at its discretion, modify the Terms and Conditions and Customer agrees to be bound by such Terms and Conditions as modified.
PROPOSAL-SPECIFIC TERMS & CONDITIONS
Customer agrees to meet and perform all requirements described in this document and has fully read and understands all items listed within this document.
1.
It is the customer’s responsibility to prepare the site for scanning, including clearly identifying areas to be scanned, securing access to all areas required for scanning, and keeping these areas clear and free of obstructions. Delays caused by customer’s failure to do so may result in an increased price.
2.
GPRS does not conduct an investigation, analysis, or interpretation of soil composition, soil/concrete conditions, or geophysical, geological, engineering, or land surveying information. Customer acknowledges it understands that we are merely reporting retrieved data and that we do NOT provide geophysical, geological, engineering, or land surveying services. Customer should contact a professional in those fields if such services are needed.
3.
If any work to be performed is within a road or street, unless specifically included by GPRS within this proposal, it is the customer’s responsibility to provide adequate traffic control to allow GPRS’ personnel to safely and efficiently work in the road/street.
4.
If this proposal is not accepted within 90 days of the date shown on Page 1 then the pricing may be subject to review.5.
If for some reason the technician arrives on site and the work is cancelled there will be a charge of $500 per requested technician.6.
https://www.gp-radar.com/terms-conditions
From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png
AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png
EXTERNAL EMAIL
EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.
Ralph
We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.
Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790
Sent from Mail for Windows
From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com
File details come from the government source that posted it. Updated .