CN-370000-HW685-CSS2ACO1.pdf
PDF 1 MB Posted
- Contract number
- HW685
- Issued by
- Florida
About this file
Summary
This is a Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. under Contract Number HW685. The change order amends Task Assignment CSS2A for the Former Clark Pest Control site (Project Number ERIC_14705) located in Jacksonville, Duval County. The FDEP's Project Manager is Claire Field (850-245-8970), and the contractor's Project Manager is Jonathan Whipple (904-363-3430). The change order was executed on August 22, 2025, per a TACO request from WSP received on August 15, 2025.
This change order reduces the total contract cost from $15,318.93 to $14,854.70, representing a cost decrease of $464.23. The reduction results from changes in WSP field personnel: D. McDaniels was replaced by J. Whipple and L. Kamikazi was replaced by K. Straight in Subtask 3 (Preliminary Assessment Activities). Although the number of labor hours remained constant, the replacement staff have different labor rates, resulting in a cost decrease of $410.81. Additionally, the Project Management fee (Subtask 1) decreased by $53.54 due to reduced labor rates in Subtask 3. No scope or schedule changes were made; deliverables remain due on their original dates (Field Sampling Plan by 07/11/2025, Preliminary Assessment Activities by 08/29/2025, and final report by 09/15/2025). The fixed unit rate contract structure remains unchanged, with invoice payments tied to FDEP approval of specific deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
CSS2A 1 HW685
This Task Assignment Change Order (TACO) authorizes a reduction in cost due to changes in WSP field personnel. It is being executed per the TACO request from WSP received on August 15, 2025.
Claire Field 850-245-8970 Contractor WSP USA Inc. Contractor
Contractor Jonathan Whipple Contractor 904-363-3430
ERIC_14705
Former Clark Pest Control
✔ $ 14,854.70 $ 15,318.93
$ 14,854.70 $ 15,318.93 ✔ Completion
Completion 0
✔ 1 1 1
WSP USA Inc.
Contractor Matthew Crews, P.E.
Environmental Engineer
8/22/2025
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.08.22 10:33:42 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.08.22 09:07:57 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW685
CSS2A
$ 14,854.70
Preliminary Assessment with Sampling Report and Project Management (Subtask 1 & 4).
Field Sampling Plan/Quality Assurance Project Plan and HASP (Subtask 2).
Preliminary Assessment Activities, Field documentation (Site access and utility locate, sampling, QA/QC control, IDW management, logs, field notes, and photographs) (Subtask 3).
FDEP approval of Project Management and Preliminary Assessment with Sampling Report (Subtask 1 & 4).
Upon completion and FDEP approval of Preliminary Assessment with Sampling activities and field documentation(Subtask 3).
Upon completion FDEP approval of Field Sampling Plan/Health & Safety Plan (Subtask 2).
09/15/2025
07/11/2025
08/29/2025
$ 3,304.86
$ 5,704.27
$ 5,845.57
Memorandum
TO: WSP USA Inc., HW685 Contract File
FROM: Claire Field, Contract Manager
SUBJECT: Negotiation Summary – Change Order #1 CSS2A C1 Former Clark Pest Control - Site ID # ERIC_14705 Preliminary Assessment with Sampling Activities
DATE: August 18, 2025
This Task Assignment Change Order (TACO) authorizes a reduction in cost due to changes in WSP field personnel and differences in labor rates. Specific changes are detailed below:
Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. Due to changes in field personnel and resulting reduced labor rates under Subtask 3, the overall project fee percentage was also reduced. This change resulted in a cost actual decrease of $(53.54).
Subtask 2: Field Sampling Plan/Quality Assurance Project Plan and Health and Safety Plan There are no scope or cost changes associated with this subtask.
Subtask 3: Preliminary Assessment Activities WSP field personnel performing the Preliminary Assessment activities under this Subtask were changed. D. McDaniels was replaced by J. Whipple and L. Kamikazi was replaced by K. Straight.
The number of labor hours remained the same, but the WSP staff have different labor rates.
This change resulted in a cost actual decrease of $(410.81).
Subtask 4: Preliminary Assessment with Sampling Report There are no scope or cost changes associated with this subtask.
www.FloridaDEP.gov
Negotiation Summary – Change Order TA CSS2A C1 Former Clark Pest Control ERIC_14705, Jacksonville, Duval County Preliminary Assessment and Sampling and Report August 18, 2025
Summary DEP’s CSS Project Manager and WSP’s Project Manager have both agreed to the scope of work, associated costs, and above changes. All changes noted above represent a total overall cost decrease of ($464.23), as shown in the Final LOE. The final cost associated with this TA decreased from $15,318.93 to $14,854.70. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Final LOE spreadsheet, and the TACO form for CSS2A C1, prepared by the Department. The final deliverable due date and task assignment completion date have not changed.
www.FloridaDEP.gov
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
In c.
D at e:
8/
/2
Ta sk
C S
S 2A
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
Fo rm er
C la rk P es t C on tro l S ub Ta sk
Fi el d S am pl in g
P la n/ Q
A P
P a nd H
A S
P S ub Ta sk
A ct iv ity
/P ha se
P re lim in ar y
S ite
A ss es sm en
S ub
Ta sk
P re lim in ar y A ss es sm en t A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
C la ire
F ie ld S ub Ta sk
R ep or tin g S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
La bo r R at e
C at eg or y $3
8.
PP
ro je ct
M an ag er
(J W
.9
$0 .0
P ro gr am L ea de r - X
-1
$7 2.
P ra ct ic e
Le ad er
X -1
(M
C
$0 .0
S en io r C on su lta nt
X -1
$4
5.
S en io r S ci /E ng
X -1
(A
M
$5 4.
S en io r S ci
/E ng
X
-1
(B L)
$4 5.
S en io r P ro je ct
S ci
/E ng
P
-1
(D M
$3
8.
P ro je ct
S ci
/E ng
P
-9 (J
W
$3 4.
S ta ff
S ci
/E ng
P
-8 (L
K
$3 6.
S ta ff
S ci
/E ng
P
-8 (A
S
$0 .0
S ci /E ng /A dm in
P
-7
$3 1.
S ta ff
S ci
/E ng
P
-8 (K
S
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
H ou rs
.9
.0
.0
.0
D ire ct L ab or
$4
,3
.6
$4
.4
$1 ,0
.1
$1
,3
.5
$1 ,4
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
2.
$7
,4
.3
$8
.0
$1 ,8
.8
$2
,3
.8
$2 ,4
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L
$1
1, 2.
$1 ,3
.4
$2
,8
.9
$3 ,7
.3
$3
,8
.2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
GO
LD
ER
Pa ge
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
/2
Ta sk
C S
S 2A
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
Fo rm er
C la rk P es t C on tro l S ub Ta sk
Fi el d S am pl in g
P la n/ Q
A P
P a nd H
A S
P S ub Ta sk
A ct iv ity
/P ha se
P re lim in ar y
S ite
A ss es
Ta sk
P re lim in ar y A ss es sm en t A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
C la ire
F ie ld S ub Ta sk
R ep or tin g S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
TT
ra ve l
V eh ic le
R en ta l
$2
.0
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $$2
.0
$1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en
t) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en
t) D ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til ity
L oc at io n $7
.0
$0
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $8
.0
$0
.0
$8
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$8 2.
$0
.0
$8 2.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $9
.5
$0
.0
$9
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$8 0.
$4
0.
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $5
.0
$0
.0
$5
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
F ie ld E xp en se s
$7
.0
$4 0.
$7
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $1
3, 6.
$1 ,3
.4
$3
,0
.9
$5 ,4
.8
$3
,8
.2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$1 ,1
.2
$1
.5
$2
.9
$3
.7
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t $1
4, 4.
$1 ,4
.9
$3
,3
.8
$5 ,8
.5
$4
,2
.2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C os t f ro m P rio r C
E F:
$1 5, 8.
M an ua l E nt ry C os t f ro m
D el ta C
E F;
4.
M an ua l E nt ry C os t (
P rio r + D el ta
$1
4, 4.
Au to
-C al cu la te d
R ou nd in g E rr or
$0
.0
Au to
-C al cu la te d
RE
V:
2/
CE
F
GO
LD
ER
Pa
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
/2
C S
S 2A
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
Fo rm er
C la rk P es t C on tro l S ub Ta sk
Fi el d S am pl in g
P la n/ Q
A P
P a nd H
A S
P S ub Ta sk
A ct iv ity
/P ha se
P re lim in ar y
S ite
A ss es
Ta sk
P re lim in ar y A ss es sm en t A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
C la ire
F ie ld S ub Ta sk
R ep or tin g S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
FFi na l T ot al C os t:
$1 4, 4.
Au to -C al cu la te d
RE
V:
2/
CE
F
GO
LD
ER
Pa
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Clark Pest Control SUBTASK 3: Preliminary Assessment Activities
DATE: 8/15/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Sci/Eng (J. Whipple) 11
Senior Project Sci/Eng (D. McDaniels) 14
Senior Project Sci/Eng (D. McDaniels) -14
Project Sci/Eng (J. Whipple) 14
Staff Sci/Eng (L. Kamikazi) 13
Staff Sci/Eng (L. Kamikazi) -13
Staff Sci/Eng (K. Straight) 13
TOTAL LABOR 38
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
GPRS Utility Locate $700 LS 1 $700.00 Erwin T&D - Non-Haz OCPs/Metals Water $125.00 per drum 1 $125.00
TOTAL $825.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 270 $81.00 Tubing, Silicon 1/4 x 7/16 $3.00 Per Foot 7 $21.00 Soil Assessment Kit $175.00 Per Day 1 $175.00 Drum (55-gallon) $100.00 Each 1 $100.00
TOTAL EQUIPMENT $707.00
Verification of property ownership for site access (2 hours). Complete forms to arrange for sample bottle order delivery and shipment from DEP Central Laboratory (2 hours). Characterize IDW and prepare waste profile for transportation and disposal of IDW (3 hours). Prepare and submit email summary with field documentation and certified laboratory reports (4 hours).
Field event preparation (1 hour). Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours).
Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours). Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Field event preparation (1 hour). Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours).
Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Field event preparation (1 hour). Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours).
Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours). Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours). Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
FINAL --7/24/96
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
/2
Ta sk
C S
S 2A
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
Fo rm er
C la rk P es t C on tro l S ub Ta sk
Fi el d S am pl in g
P la n/ Q
A P
P a nd H
A S
P S ub Ta sk
A ct iv ity
/P ha se
P re lim in ar y
S ite
A ss es
Ta sk
P re lim in ar y A ss es sm en t A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
C la ire
F ie ld S ub Ta sk
R ep or tin g S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
La bo r R at e
C at eg or y $3
8.
PP
ro je ct
M an ag er
(J W
-0
.5 -0
.5 $0
.0
P ro gr am
L ea de r -
X -1
$7
2.
P ra ct ic e Le ad er
X
-1
(M C
$0
.0
S en io r C on su lta nt
X
-1
$4 5.
S en io r S ci
/E ng
X
-1
(A M
$5
4.
S en io r S ci /E ng
X -1
(B
L)
$4
5.
S en io r P ro je ct S ci /E ng
P -1
(D
M
-1
-1
$3 8.
P ro je ct S ci /E ng
P -9
(J W
$3
4.
S ta ff S ci /E ng
P -8
(L K
-1
-1
$3
6.
S ta ff S ci /E ng
P -8
(A S
$0
.0
S ci
/E ng
/A dm in
$3
1.
S ta ff S ci /E ng
P -8
(K S
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
H ou rs -0
.5 -0
.5 0.
0.
0.
D ire ct L
4.
.8 2)
$0 .0
7.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
2.
7.
.7 4)
$0 .0
6.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L
2.
.5 6)
$0 .0
3.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
GO
LD
ER
Pa
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
/2
C S
2A
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fo rm er
C la rk P es t C on tro l
Ta sk
Fi el d
S am pl in g P la n/
Q A
P P a nd
H A
S P
S ub
Ta sk
A ct iv ity
/P ha se
P re lim in ar y
S ite
A ss es
Ta sk
P re lim in ar y A ss es sm en t A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
C la ire
F ie ld
Ta sk
R ep or tin g
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
TT
ra ve l
V eh ic le
R en ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m t) ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til ity L oc at io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s er so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l
2.
.5 6)
$0 .0
3.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e
.2
1)
4.
$0
.0
.3 5)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t
4.
.4 2)
$0 .0
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
GO
LD
ER
Pa
SUBTASK 3: Preliminary Assessment Activities
DATE: 8/15/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Project Sci/Eng (D. McDaniels) -14
Project Sci/Eng (J. Whipple) 14
Staff Sci/Eng (L. Kamikazi) -13
Staff Sci/Eng (K. Straight) 13
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
TOTAL EQUIPMENT $0.00
Field event preparation (1 hour). Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours).
Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Field event preparation (1 hour). Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours).
Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours). Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours). Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
6/
/2
Ta sk
C S
S 2A
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
Fo rm er
C la rk P es t C on tro l S ub Ta sk
Fi el d S am pl in g
P la n/ Q
A P
P a nd H
A S
P S ub Ta sk
A ct iv ity
/P ha se
P re lim in ar y
S ite
A ss es
Ta sk
P re lim in ar y A ss es sm en t A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
C la ire
F ie ld S ub Ta sk
R ep or tin g S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
La bo r R at e
C at eg or y $3
8.
PP
ro je ct
M an ag er
(J W
.4
$0 .0
P ro gr am L ea de r - X
-1
$7 2.
P ra ct ic e
Le ad er
X -1
(M
C
$0 .0
S en io r C on su lta nt
X -1
$4
5.
S en io r S ci /E ng
X -1
(A
M
$5 4.
S en io r S ci
/E ng
X
-1
(B L)
$4 5.
S en io r P ro je ct
S ci
/E ng
P
-1
(D M
$3
8.
P ro je ct
S ci
/E ng
P
-9 (J
W
$3 4.
S ta ff
S ci
/E ng
P
-8 (L
K
$3 6.
S ta ff
S ci
/E ng
P
-8 (A
S
$0 .0
S ci /E ng /A dm in
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
H ou rs
.4
.0
.0
.0
D ire ct L
$4
,4
.5
$5
.2
$1 ,0
.1
$1
,5
.5
$1 ,4
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
2.
$7
,7
.4
$8
.7
$1 ,8
.8
$2
,6
.2
$2 ,4
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L
$1
2, 4.
$1 ,4
.0
$2
,8
.9
$4 ,1
.8
$3
,8
.2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
GO
LD
ER
Pa
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
6/
/2
C S
S 2A
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
Fo rm er
C la rk P es t C on tro l S ub Ta sk
Fi el d S am pl in g
P la n/ Q
A P
P a nd H
A S
P S ub Ta sk
A ct iv ity
/P ha se
P re lim in ar y
S ite
A ss es
Ta sk
P re lim in ar y A ss es sm en t A ct iv iti es S ub Ta sk
P ro je ct
M an ag er
C la ire
F ie ld S ub Ta sk
R ep or tin g S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
TT
ra ve l
V eh ic le
R en ta l
$2
.0
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $$2
.0
$1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en
t) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en
t) D ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til ity
L oc at io n $7
.0
$0
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $8
.0
$0
.0
$8
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$8 2.
$0
.0
$8 2.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $9
.5
$0
.0
$9
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$8 0.
$4
0.
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $5
.0
$0
.0
$5
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $1
.0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
F ie ld E xp en se s
$7
.0
$4 0.
$7
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $1
4, 8.
$1 ,4
.0
$3
,0
.9
$5 ,8
.3
$3
,8
.2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$1 ,2
.4
$1
.4
$2
.9
$4
.0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t $1
5, 8.
$1 ,5
.4
$3
,3
.8
$6 ,2
.3
$4
,2
.2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
RE
V:
2/
CE
F
GO
LD
ER
Pa
SUBTASK 3: Preliminary Assessment Activities
DATE: 6/18/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Sci/Eng (J. Whipple) 11
Senior Project Sci/Eng (D. McDaniels) 14
Staff Sci/Eng (L. Kamikazi) 13
TOTAL LABOR 38
VEHICLE TYPE RATE UNIT USAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
GPRS Utility Locate $700 LS 1 $700.00 Erwin T&D - Non-Haz OCPs/Metals Water $125.00 per drum 1 $125.00
TOTAL $825.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 270 $81.00 Tubing, Silicon 1/4 x 7/16 $3.00 Per Foot 7 $21.00 Soil Assessment Kit $175.00 Per Day 1 $175.00 Drum (55-gallon) $100.00 Each 1 $100.00
TOTAL EQUIPMENT $707.00
Verification of property ownership for site access (2 hours). Complete forms to arrange for sample bottle order delivery and shipment from DEP Central Laboratory (2 hours). Characterize IDW and prepare waste profile for transportation and disposal of IDW (3 hours). Prepare and submit email summary with field documentation and certified laboratory reports (4 hours).
Field event preparation (1 hour). Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours).
Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours). Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).
Ground Penetrating Radar Systems, LLC 1901 Indian Wood Cir.
Maumee, OH 43537
(419) 843-9804 http://www.gprsinc.com
INVOICE: 904206
INVOICE DATE: 7/29/2025
DUE DATE: 7/29/2025
ACH Bank Information Signature Bank, N.A.
Bank Routing/ABA Number: 041215621 Account Number: 2009900 Payment Reference:904206 Email remittance to ar@gprsinc.com
Remit Check To:
Ground Penetrating Radar Systems, LLC PO Box 932 Toledo, OH 43697-0932 Please include Invoice# with Remittance
Bill To Job Location
WSP USA INC
2000 SW 1ST AVE
STE 220
PORTLAND OR 97201
2204 Boulevard Jacksonville FL 32206
Work Order # PO Number Job Number Terms GPRS Technician(s) Service Date 804365 P134256US001 PWP Bill Lessig 2025-07-23
Services Amount
Utility Locating $700.00
Invoice Amount $700.00
Tax $0.00
Total Invoice $700.00
Payments/Credits ($0.00)
Amount Due $700.00
We are going green! Please send your accounts payable contact name and email address to billing@gprsinc.com
Click HERE or scan the QR Code below to pay this invoice online.
TERMS AND CONDITIONS - Full terms and conditions at : http://www.gprsinc.com/termsandconditions.html
Requested By: Jonathan Whipple Phone: 904-263-7858 Email: jonathan.whipple@wsp.com
File details come from the government source that posted it. Updated .