CN-370000-HW685-DC028C.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|HW685|184b9800bda47b032a54413957b4b38d
Contract number
HW685
Issued by
Florida

About this file

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract HW685, designating TA Number DC028C. The assignment authorizes WSP USA Inc., an environmental consulting firm based in Jacksonville, Florida, to conduct annual groundwater sampling and expanded PFAS (per- and polyfluoroalkyl substances) monitoring at The Music Man property located at 799 Lane Avenue, Jacksonville, Duval County, Florida (DEP Facility ID: ERIC_4619). The task assignment is effective as of March 18, 2024, with a completion date of September 6, 2024. Patrick McGrane serves as the FDEP Project Manager, while Matt Crews represents WSP USA Inc. as the contractor's project manager.

The scope of work comprises four subtasks: (1) Project Management, calculated as a percentage of total labor in accordance with Contract HW685; (2) Annual Groundwater Monitoring, including collection and analysis of groundwater samples from 28 monitoring wells with specialized testing for chlorinated volatile organic compounds (VOCs), methane, ethane, and ethene (MEE), and PFAS analysis at the DEP Central Laboratory; (3) PFAS-related costs and investigative derived waste (IDW) transportation and disposal; and (4) preparation of an Annual Groundwater Monitoring Report with updated analytical results and conclusions. The total task assignment value is $24,705.04 on a fixed unit rate basis. Invoicing is structured in three phases: Subtask 2 for $8,412.58 (due May 24, 2024), Subtask 3 for $8,406.61 (due June 7, 2024), and Subtasks 1 & 4 for $7,885.85 (due July 5, 2024). The work includes 137 total labor hours and incorporates subcontractor costs for IDW disposal through Erwin Remediation, Inc., estimated at $390.00 for non-hazardous PFAS waste transportation and disposal.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01DCO1.pdf PDF
CN-370000-HW685-BF02B.pdf PDF
CN-370000-HW685-BF04A.pdf PDF
CN-370000-HW685-BIL01A.pdf PDF
CN-370000-HW685-BIL1ACO1.pdf PDF
CN-370000-HW685-BIL1ACO2.pdf PDF
CN-370000-HW685-BIL1ACO3.pdf PDF
CN-370000-HW685-BIL1BCO1.pdf PDF
CN-370000-HW685-DC001F.pdf PDF
CN-370000-HW685-DC001b.pdf PDF
CN-370000-HW685-DC002A.pdf PDF
CN-370000-HW685-DC002D.pdf PDF
CN-370000-HW685-DC002H.pdf PDF
CN-370000-HW685-DC003B.pdf PDF
CN-370000-HW685-DC004B.pdf PDF
CN-370000-HW685-DC008C.pdf PDF
CN-370000-HW685-DC009C.pdf PDF
CN-370000-HW685-DC010D.pdf PDF
CN-370000-HW685-DC014A.pdf PDF
CN-370000-HW685-DC015A.pdf PDF
CN-370000-HW685-DC016B.pdf PDF
CN-370000-HW685-DC016C.pdf PDF
CN-370000-HW685-DC018C.pdf PDF
CN-370000-HW685-DC01ACO3.pdf PDF
CN-370000-HW685-DC01ACO5.pdf PDF
CN-370000-HW685-DC021D.pdf PDF
CN-370000-HW685-DC024A.pdf PDF
CN-370000-HW685-DC024B.pdf PDF
CN-370000-HW685-DC024D.pdf PDF
CN-370000-HW685-DC026A.pdf PDF
CN-370000-HW685-DC026D.pdf PDF
CN-370000-HW685-DC028B.pdf PDF
CN-370000-HW685-DC028E.pdf PDF
CN-370000-HW685-DC02DCO1.pdf PDF
CN-370000-HW685-DC02ECO1.pdf PDF
CN-370000-HW685-DC02GCO1.pdf PDF
CN-370000-HW685-DC030A.pdf PDF
CN-370000-HW685-DC031B.pdf PDF
CN-370000-HW685-DC033B.pdf PDF
CN-370000-HW685-DC034C.pdf PDF
CN-370000-HW685-DC034D.pdf PDF
CN-370000-HW685-DC036A.pdf PDF
CN-370000-HW685-DC038A.pdf PDF
CN-370000-HW685-DC038D.pdf PDF
CN-370000-HW685-DC03ACO1.pdf PDF
CN-370000-HW685-DC03BCO1.pdf PDF
CN-370000-HW685-DC041A.pdf PDF
CN-370000-HW685-DC042C.pdf PDF
CN-370000-HW685-DC051B.pdf PDF
CN-370000-HW685-DC052D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW685

DC028C Completion September 6, 2024

This Task Assignment authorizes WSP to conduct Annual Groundwater Sampling at The Music Man in accordance with the March 11, 2024 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor

Contractor Matt Crews Contractor 904-363-3430

ERIC_4619

799 Lane Avenue, Jacksonville, Duval County

The Music Man

Contractor Contractor

✔ $ 24,705.04

$ 24,705.04

Scope of Work

WSP USA Inc.

Contractor Matthew Crews

Environmental Engineer

3/18/2024

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.03.18 16:12:11 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.03.14 14:17:21 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2 - Annual Groundwater Monitoring 05/24/2024

Subtask 3 - PFAS Related Costs and IDW Mangement 06/07/2024

Subtask 1 & 4 - Project Management; 2024 Annual Groundwater Report 07/05/2024

Subtask 2 - Submittal and FDEP approval of email summary with field documentation and certified laboratory analytical report for chlorinated VOCs and MEE $ 8,412.58

Subtask 3 - Submittal and FDEP approval of email summary with field documentation, certified laboratory analytical results for PFAS, IDW waste manifest $ 8,406.61

Subtask 1 & 4 - Project Management; Submittal and FDEP approval of the Annual Groundwater Report $ 7,885.85

$ 24,705.04

HW685

DC028C

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette NNuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File

Jacksonville, Duval County The Music Man

ERIC_4619

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary Task Assignment DC028C (HW685)

DATE: March 12, 2024

This Task Assignment authorizes WSP USA Inc. (WSP) to conduct Annual Groundwater Monitoring and expanded PFAS sampling at The Music Man (ERIC_4619) site.

The total cost for this project is $24,705.04 with 137 total labor hours. All work is to be completed in accordance with the March 11, 2024, scope of work, cost estimate, and bid documentation.

WSP may invoice according to the included schedule.

Subtask 1:

Project Management is automatically calculated as a percentage of total labor in accordance with

Contract HW685.

Subtask 2:

Following confirmation of an up-to-date access agreement with the current real property owner, WSP will collect groundwater samples from 28 monitoring wells. Out of these groundwater samples:

12 will be analyzed for chlorinated volatile organic compounds (VOCs) using EPA Method 8260B.

Eight will be analyzed for methane, ethane, and ethene (MEE) utilizing RSK 175.

o Unless significant changes in concentrations of MEE are found, this analysis will be dropped in future sampling events.

All 28 will be analyzed at the DEP Central Laboratory in Tallahassee, Florida for PFAS.

Subtask 3:

This subtask includes all costs involved with the labor for expanded PFAS sampling, labor for reporting

PFAS results, and IDW subcontractor costs.

Subtask 4:

Following the groundwater sampling event, WSP will submit an Annual Groundwater Report summarizing findings with updated analytical results and tables as well as conclusions and recommendations based on the most recent data.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

W S

P U

S A

In c.

D at e:

3/

/2

Ta sk

D C

8C

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

M us ic

M an

Ta sk

A nn ua l G ro un dw at er M on ito rin g

S ub

Ta sk

A ct iv ity

/P ha se

M on ito rin g

Ta sk

P

FA

S

R el at ed

C os ts a nd

ID

W T

D

S ub

Ta sk

P ro je ct

M an ag er

P at ric k M cG ra ne

Ta sk

R ep or tin g

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

T T ot al s

La bo r R at e

C at eg or y $6

9.

PP

ro je ct

M an ag er

(R D

M

.1 $7

0.

P ro gr am

L ea de r -

X -1

(J

C B

0.

0.

3.

$6 9.

P ra ct ic e

Le ad er

X -1

(R

D M

4.

.0

.0

$0 .0

P ra ct ic e

Le ad er

X -1

0.

0.

0.

$0 .0

S en io r S ci

/E ng

X

-1

0.

0.

0.

$4

8.

S en io r P ro je ct S ci /E ng

P -1

(B

L)

0.

3.

4.

$0 .0

P ro je ct S ci /E ng

P -9

0.

0.

0.

$0

.0

S ta ff S ci /E ng

P -8

0.

0.

0.

$3 9.

S ta ff

S ci

/E ng

P

-8 (L

S

.0

.0 0.

$3

4.

S ta ff S ci /E ng

P -8

(A S

0.

0.

2.

$3 3.

S ta ff

S ci

/E ng

P

-8 (J

W

.0

.0 0.

$0

.0

0.

0.

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

H ou rs

.1

.0

.0

.0

D ire ct L ab or

$6

,6

.2

$7

.9

$1 ,5

.8

$2

,5

.6

$1 ,8

.9

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

2.

$1

1, 4.

$1 ,3

.0

$2

,6

.7

$4 ,3

.2

$3

,2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or

$1 8, 6.

$2

,0

.0

$4 ,2

.5

$6

,8

.9

$5 ,0

.9

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

RE

V:

2/

CE

F

GO

LD

ER

Pa ge

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

W S

P U

S A

In c.

at e:

3/

/2

Ta sk

D C

8C

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

M us ic

M an

Ta sk

A nn ua l G ro un dw at er M on ito rin g

S ub

Ta sk

A ct iv ity

/P ha se

M on ito rin g

Ta sk

P

FA

S

R el at ed

C os ts a nd

ID

W T

D

S ub

Ta sk

P ro je ct

M an ag er

P at ric k M cG ra ne

Ta sk

R ep or tin g

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

T T ot al s

T ra ve l

V eh ic le

R en ta l

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m en t) ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$3

.0

$0 .0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til ity L oc at io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$3

.0

$0 .0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $3

9.

$0 .0

$3

9.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

S ub co nt ra ct or C os t

$4

.0

$0 .0

$4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry

A na ly tic al C os ts

$2 ,4

.0

$2

,4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

L ab or at or y

$2 ,7

.0

$2

,7

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s

P er so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $8

0.

$8 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$9

.0

$7

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $2

.0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al

F ie ld E xp en se s

$1 ,2

.0

$8

.0

$4

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $2

2, 1.

$2 ,0

.0

$7

,9

.5

$7 ,7

.9

$5

,0

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$1 ,8

.6

$2

.8

$4

.0

$6

.6

$5

.1

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

T ot al E st im at ed

C os t $2

4, 5.

$2 ,3

.8

$8

,4

.5

$8 ,4

.6

$5

,5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

2/

CE

F

GO

LD

ER

Pa ge

SITE : Music Man SUBTASK 2: Annual Groundwater Monitoring

DATE: 3/11/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (R. McCann) 4.0

Staff Sci/Eng (L. Swindle) 18.0

Staff Sci/Eng (J. Whipple) 17.0

TOTAL LABOR 39.0

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B

Total VOHs EPA Method 8260B $73.00 12 $876.00

MEE RSK175 $180.00 8 $1,440.00

PID/Hall Series EPA Method 8021 - IDW $110.00 1 $110.00

Sample Shipping Large $150.00 2 $300.00

TOTAL LAB $2,726.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 2 $80.00

Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00 Tubing, Poly HDPE $0.30 Per Foot 350 $105.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 13 $39.00

TOTAL EQUIPMENT $804.00

Verification of property ownership prior to groundwater sampling (1 hour). Prepare and submit email summary with field documentation and certified laboratory report with chlorinated VOC results (3 hours).

Round trip travel (1 hour per day x 2 days = 2 hours). Field event preparation (1 hour).

Instrument calibration, measure water levels, measure field parameters, collect samples from 12 wells: five shallow zone monitoring wells (SW-4, SW-10, SW-13, SW-15, and SW-17), and seven intermediate zone monitoring wells (IW-1, IW-4, IW-9, IW-10, IW-13, IW-15, and IW-17), including IDW sampling and staging (15 hours).

Round trip travel (1 hour per day x 2 days = 2 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from 12 wells: five shallow zone monitoring wells (SW-4, SW-10, SW-13, SW-15, and SW-17), and seven intermediate zone monitoring wells (IW-1, IW-4, IW-9, IW-10, IW-13, IW-15, and IW-17), including IDW sampling and staging (15 hours).

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 3: PFAS Related Costs and IDW T&D

DATE: 3/11/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (R. McCann) 11.0

Staff Sci/Eng (L. Swindle) 24.0

Staff Sci/Eng (J. Whipple) 20.0

Senior Project Sci/Eng (B. Lucero) 3.0

TOTAL LABOR 58.0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 2 $390.00

TOTAL $390.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $110.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Tubing, Poly HDPE $0.30 Per Day 650 $195.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Day 17 $51.00

Drum, 55-gallon $100.00 Per Day 2 $200.00

TOTAL EQUIPMENT $446.00

Complete forms to arrange for PFAS sample bottle order delivery and shipment from DEP Central Laboratory (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (3 hours). Prepare and submit email summary with field documentation and certified laboratory report with PFAS results (3 hours). Prepare PFAS section for the draft annual report (4 hours).

Collect samples from 16 wells for PFAS analysis only; collect samples from 12 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (18 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours). Prepare data tables with PFAS analytical results (4 hours).

Collect samples from 16 wells for PFAS analysis only; collect samples from 12 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (18 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours).

Prepare CADD Figures (shallow and intermediate zones) with PFAS data for Annual Groundwater Monitoring Report.

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 4: Reporting

DATE: 3/11/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 3.0

Practice Leader (R. McCann) 20.0

Sr Project Sci/Eng (B. Lucero) 4.0

Staff Sci/Eng (A. Strayer) 2.0

TOTAL LABOR 29.0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Develop conclusions and recommendations and prepare final Annual Monitoring Report.

Data entry, prepare tables and figures, and draft Annual Monitoring Report

Prepare potentiometric maps and VOC figures for Annual Monitoring Report.

Reporting: Updating tables, document production. Create pdf for OCULUS.

FINAL --7/24/96

WSP USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA

T: +1 904 363-3430 F: +1 904 363-3445 wsp.com

March 11, 2024 Proposal No. 2024US208823

Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR ANNUAL GROUNDWATER MONITORING

THE MUSIC MAN

799 LANE AVENUE

JACKSONVILLE, DUVAL COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_4619

PROPOSED TASK ASSIGNMENT: DC028C

Dear Mr. McGrane:

WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual groundwater monitoring and expanded Per- and Polyfluoroalkyl Substances (PFAS) monitoring at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services.

The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – ANNUAL GROUNDWATER MONITORING

Groundwater Monitoring Following authorization to proceed, WSP will coordinate with the real property owner for access to complete the scope of work. WSP will collect groundwater samples from 28 monitoring wells. The attached Figures 3 through 6 from the February 2023 sampling event show the monitoring well locations, groundwater flow direction, and chlorinated volatile organic compound (VOC) results for each zone. The attached Figure 7 shows the 2021 PFAS screening results.

Mr. Patrick McGrane Proposal No. 2024US208823

Florida Department of Environmental Protection March 11, 2024

Prior to groundwater sampling, the depth-to-groundwater will be measured at the wells sampled using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.

Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018) and DEP SOPs for Sampling with and Analysis of PFAS, dated August 2020. Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

The groundwater samples to be analyzed for chlorinated VOCs and methane, ethane, and ethene (MEE) will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified, fixed-base laboratory along with the completed chain-of-custody documentation. The selected groundwater samples to be analyzed for PFAS will be shipped to the DEP Central Laboratory in Tallahassee, Florida. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if off-site notification is required.

The samples will be analyzed as follows:

Sample ID Chlorinated VOCs (EPA Method 8260B)

MEE

(RSK 175)

PFAS

(DEP SOP: LC001-3 or

Similar)

SW-1 --- X X

SW-2 --- --- X

SW-3 --- --- X

SW-4 X X X

SW-5 --- --- X

SW-6 --- --- X

SW-7 --- --- X

SW-9 --- --- X

SW-10 X X

X

(Sampled in July 2021)

SW-13 X --- X

SW-14 --- --- X

SW-15 X X

X

(Sampled in July 2021)

SW-16 --- --- X

SW-17 X --- X

IW-1 X X

X

(Sampled in July 2021)

Sample ID Chlorinated VOCs (EPA Method 8260B)

MEE

(RSK 175)

PFAS

(DEP SOP: LC001-3 or

Similar)

IW-2 --- --- X

IW-3 --- --- X

IW-4 X --- X

IW-5 --- --- X

IW-6 --- --- X

IW-7 --- --- X

IW-9 X X X

IW-10 X X X

IW-12 --- --- X

IW-13 X --- X

IW-15 X X

X

(Sampled in July 2021)

IW-16 --- --- X

IW-17 X --- X

Equipment Blank --- --- X

Investigative Derived Waste (IDW) Total VOCs --- X

Interim Deliverable Upon completion of Subtask 2, an e-mail deliverable will be submitted for the chlorinated VOC samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.

SUBTASK 3 – PFAS-RELATED COSTS AND IDW TRANSPORTATION AND DISPOSAL

WSP will include costs associated with the expanded PFAS monitoring activities in this subtask. These activities include completing bottle order requests with the DEP Central Laboratory; waste characterization and waste profiling; packaging and shipping PFAS samples to the DEP Central Laboratory; labor involved in sampling wells associated with PFAS analysis only; and investigation derived waste (IDW) transportation and disposal.

Quality Assurance/Quality Control WSP will collect one equipment blank sample during the groundwater sampling event. The equipment blank will be collected by pumping (peristaltic pump) PFAS-free water through silicon and/or HDPE tubing and into laboratory-supplied containers. The equipment blank will be analyzed for PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table.

IDW Transportation and Disposal WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum(s). WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260 and PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table. The drum(s) will be temporarily staged onsite, pending waste characterization. For cost estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates two drums of IDW purge water will be generated during the field activities.

Interim Deliverable Upon completion of Subtask 3, an e-mail deliverable will be submitted for the PFAS samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated data tables and figures.

SUBTASK 4 – REPORTING

WSP will prepare an Annual Groundwater Monitoring Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.

HEALTH AND SAFETY

WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $24,705.04. WSP anticipates the groundwater monitoring event will take place in March or April 2024. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 2,307.80 July 19, 2024

Subtask 2 – Annual Groundwater Monitoring

$ 8,412.58 May 10, 2024 (E-mail summary with field documentation and certified laboratory analytical report for chlorinated VOCs)

Subtask 3 – PFAS Related Costs and IDW Transportation and Disposal

$ 8,406.61 May 24, 2024 (E-mail summary with field documentation and certified laboratory analytical report for PFAS and non-hazardous waste manifest for IDW)

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 4 – Reporting $ 5,578.05 June 21, 2024 (Annual Groundwater Monitoring Report)

Total/Completion Date $ 24,705.04 August 16, 2024

WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, WSP USA Inc.

Richard D. "Rick" McCann, PG Matthew C. Crews, PE Vice President, Geologist (US) Assistant Vice President, Environmental Engineer

RDM/MCC/as

Attachments: Figure 3 – Potentiometric Map - Shallow Zone of the Surficial Aquifer (February 23, 2023) Figure 4 – Potentiometric Map – Intermediate Zone of the Surficial Aquifer (February 23, 2023) Figure 5 – Chlorinated Hydrocarbon Concentrations in the Shallow Zone of the Surficial Aquifer

(February 2023) Figure 6 – Chlorinated Hydrocarbon Concentrations in the Intermediate Zone of the Surficial Aquifer

(February 2023) Figure 7 – PFOA and PFOS Concentrations in the Shallow and Intermediate Surficial Aquifer (July 2021)

Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes

G:\Projects\DEP-Drycleaning\Projects\Jax\Music Man\HW685\DC028C - 2024 Ann GW Mon\Proposal\DC028C - Music Man Annual GW Mon Proposal.docx

L

N E

V E

N U

E

HOME DEPOT ENTRANCE

SW-21

SW-18

UES TMW-1

IW-7

PICCADILLY

CAFETERIA

IW-16

IW-8

UES TMW-2

R A M O N A B O U L E V A R D

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

IW-21

IW-9

IW-11

IW-12

IW-2

IW-1

DW-1

IW-3

IW-6

IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-20

IW-19

IW-18

SW-20

SW-19

SW-14

SW-5

SW-16

SW-15

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-24

MW-27

MW-25

MW-15

MW-17R

MW-8R

MW-18 MW-7

MW-23

MW-6R

MW-21MW-19

MW-5R

MW-26

MW-12R

MW-22

9.67

11.08*

10.23

10.40

10.70

11.22

FORMER

BUILDING

FOOTPRINT

10.00

10.00

10.50

10.50

11.00

11.00

GROUNDWATER ELEVATION CONTOUR

INFERRED DIRECTION OF GROUNDWATER FLOW

(DASHED WHERE INFERRED)

GROUNDWATER ELEVATION IN FEET ABOVE MEAN

SEA LEVEL

9.57

DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

in

31404452.4619 Control No.

4619-DC028B-003

FIGURE

2023-03-07

BCL

RFM

RFM

MCC

GRACE PROPERTY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

POTENTIOMETRIC MAP - SHALLOW ZONE OF THE SURFICIAL

AQUIFER (APPROXIMATELY 2 TO 14 FT. BGS)

(FEBRUARY 23, 2023)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028B\Active Drawings\ | File Name: 4619-DC028B-003.dwg

LEGEND

0 1000 2000

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

3. GROUNDWATER ELEVATION FROM SW-15 WAS NOT USED

BECAUSE OF ERRONEOUS DEPTH TO WATER MEASUREMENT.

REFERENCE(S)

E

N U

E

HOME DEPOT ENTRANCE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

UES TMW-2UES TMW-1

IW-7IW-9

IW-8

IW-11

IW-12

IW-2

IW-1DW-1

IW-3

IW-6

IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19 SW-20

SW-14

SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-15

MW-25

MW-23

MW-17R

MW-24

MW-7MW-21

MW-18

MW-19

MW-5R

MW-6R

MW-12R

MW-8R

MW-22

MW-26

MW-27

9.72

10.23

10.26

10.46

10.49

10.55

10.65

FORMER

BUILDING

FOOTPRINT

10.50

10.25 10.25

10.50

9.75

9.75

10.00

10.00

GROUNDWATER ELEVATION CONTOUR

INFERRED DIRECTION OF GROUNDWATER FLOW

(DASHED WHERE INFERRED)

GROUNDWATER ELEVATION IN FEET ABOVE MEAN

SEA LEVEL

9.95

DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

in

31404452.4619 Control No.

4619-DC028B-004

FIGURE

2023-03-07

BCL

RFM

RFM

MCC

GRACE PROPERTY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

POTENTIOMETRIC MAP - INTERMEDIATE ZONE OF THE SURFICIAL

AQUIFER (APPROXIMATELY 14 TO 31 FT. BGS)

(FEBRUARY 23, 2023)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028B\Active Drawings\ | File Name: 4619-DC028B-004.dwg

LEGEND

0 40 80

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

NOTE(S)

E

N U

E

HOME DEPOT ENTRANCE

CONCRETE

POWER POLE

POWER POLE

CONCRETE

FIRE HYDRANT

BACK OF WALK

GRASS ISLAND

TELEPHONE

WIRE

AREA OF

EXCAVATION

CONCRETE

POWER POLE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

UES TMW-2

UES TMW-1

IW-7

IW-9

IW-8

IW-11

IW-12

IW-2

DW-1

IW-3

IW-6

IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19

SW-20

SW-14 SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-25

MW-15

MW-23

MW-17R

MW-24

MW-7MW-21MW-18MW-19

MW-5R

MW-6R

MW-12R

MW-8R

MW-22

MW-26

MW-27

IW-1

FORMER

BUILDING

FOOTPRINT

INFERRED EXTENT OF

CHLORINATED

HYDROCARBONS

EXCEEDING THE FDEP

NADCs

INFERRED EXTENT OF CHLORINATED

HYDROCARBONS (EXCEEDING THE

FDEP GROUNDWATER CLEANUP

TARGET LEVELS)

DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

CHITIN COLUMNS

in

31404452.4619 Control No.

4619-DC028B-005

FIGURE

2023-03-07

BCL

RFM

RFM

MCC

GRACE PROPERTY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

CHLORINATED HYDROCARBON CONCENTRATIONS IN THE

SHALLOW ZONE OF THE SURFICIAL AQUIFER

(FEBRUARY 2023)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028B\Active Drawings\ | File Name: 4619-DC028B-005.dwg

LEGEND

1. ALL UNITS REPORTED IN MICROGRAMS PER LITER (μg/L).

2. < = BELOW THE LABORATORY REPORTED METHOD

DETECTION LIMIT.

3. I - REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND LABORATORY PRACTICAL

QUANTITATION LIMIT.

4. BOLD/YELLOW HIGHLIGHTED VALUE INDICATES

CONCENTRATION IS ABOVE THE FDEP GROUNDWATER

CLEANUP TARGET LEVEL (GCTL).

5. BOLD/BLUE HIGHLIGHTED VALUE INDICATES CONCENTRATION

IS ABOVE THE FDEP NATURAL ATTENUATION DEFAULT

CONCENTRATION (NADC).

6. FT-BGS = FEET BELOW GROUND SURFACE

0 40 80

NOTE(S)

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

WELL ID (SCREEN INTERVAL DEPTH IN FT-BGS)

DATE SAMPLED

TETRACHLOROETHYLENE CONCENTRATION

TRICHLOROETHYLENE CONCENTRATION

CIS-1,2-DICHLOROETHYLENE CONCENTRATION

VINYL CHLORIDE CONCENTRATION

SW-00 (3.6-13.6)

APR 2017

3 300

3 300

70 700

1 100

FDEP NATURAL ATTENUATION

DEFAULT CONCENTRATION (NADC)

FDEP GROUNDWATER CLEANUP

TARGET LEVEL (GCTL)

SW-1 (3.6-13.6)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

SW-3 (3.8-13.8)

Feb 2016 < 0.50 < 0.50 14.2

< 0.50

SW-6 (3.7-13.7)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

SW-14 (3.5-13.5)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

SW-21 (3.6-13.6)

Feb 2016

<0.50 <0.50 <0.50 <0.50

SW-9 (3.8-13.8)

Feb 2016 Jun 2023 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50

SW-16 (3.6-13.6)

Feb 2016 Jun 2018 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50

SW-19 (3.5-13.5)

Feb 2016 Apr 2017 Jun 2018 < 0.50 < 0.22 < 0.50 < 0.50 < 0.36 < 0.50 < 0.50 < 0.36 < 0.50 < 0.50 < 0.36 < 0.50

SW-4 (4.1-14.1)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

1.3 0.36 U 0.36 U 0.36 U 0.36 U 230 68.2 177 253 2.7

51.7 62.1 87.4 106 0.91 I

SW-10 (3.8-13.8)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.54 I 0.36 U 0.63 I 0.36 U 0.88 I

1,390 704 382 673 582 452 256 165 307 406

SW-13 (4-14)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

3.7 3.6 3.8 3.3 2.9

56.8 53.4 67.8 66.6 96.2

4.1 4.6 11.5 9.1 8.6

SW-15 (3.4-13.4)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.36 U 0.36 U 0.36 U 0.36 U 0.36 U

591 466 197 13.0 12.0 274 164 161 61.0 116

SW-17 (3.6-13.6)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.36 U 0.36 U 0.36 U 0.36 U 0.36 U

2.2 0.27 U 0.27 U 0.27 U 0.55 I

0.39 U 0.39 U 0.39 U 0.39 U 0.39 U

E

N U

E

HOME DEPOT ENTRANCE

CONCRETE

POWER POLE

POWER POLE

CONCRETE

FIRE HYDRANT

BACK OF WALK

GRASS ISLAND

TELEPHONE

WIRE

AREA OF

EXCAVATION

CONCRETE

POWER POLE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

UES TMW-2UES TMW-1

IW-7

IW-9

IW-8

IW-11

IW-12

IW-2

IW-1

DW-1

IW-3

IW-6IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19

SW-20

SW-14

SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

MW-25

MW-15

MW-23

MW-17R

MW-24

MW-7MW-21MW-18MW-19

MW-5R

MW-6R

MW-12R

MW-8R

MW-22

MW-26

MW-27

FORMER

BUILDING

FOOTPRINT

INFERRED EXTENT OF

CHLORINATED HYDROCARBONS

(EXCEEDING THE FDEP

GROUNDWATER CLEANUP

TARGET LEVELS)

INFERRED EXTENT OF

CHLORINATED

HYDROCARBONS

EXCEEDING THE FDEP

NADCs

DICK ENVIRONMENTAL SERVICES WELL

SHALLOW MONITORING WELL LOCATION

TEMPORARY MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

DEEP MONITORING WELL LOCATION

CHITIN COLUMNS

in

31404452.4619 Control No.

4619-DC028B-006

FIGURE

2023-03-07

BCL

RFM

RFM

MCC

GRACE PROPERTY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMENTAL PROTECTION

CHLORINATED HYDROCARBON CONCENTRATIONS IN THE

INTERMEDIATE ZONE OF THE SURFICIAL AQUIFER

(FEBRUARY 2023)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\Projects\FDEP\FDEP-DC\31404452\31404452_4619_Music_Man\DC028B\Active Drawings\ | File Name: 4619-DC028B-006.dwg

LEGEND

0 40 80

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

1. ALL UNITS REPORTED IN MICROGRAMS PER LITER (μg/L).

2. < = BELOW THE LABORATORY REPORTED METHOD

DETECTION LIMIT.

3. I - REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND LABORATORY PRACTICAL

QUANTITATION LIMIT.

4. BOLD/YELLOW HIGHLIGHTED VALUE INDICATES

CONCENTRATION IS ABOVE THE FDEP GROUNDWATER

CLEANUP TARGET LEVEL (GCTL).

5. BOLD/BLUE HIGHLIGHTED VALUE INDICATES

CONCENTRATION IS ABOVE THE FDEP NATURAL

ATTENUATION DEFAULT CONCENTRATION (NADC).

6. * = RESULT DETERMINED NOT TO EXCEED THE GCTL BASED

ON THE FDEP MEMORANDUM "ROUNDING ANALYTICAL DATA

FOR THE SITE REHABILITATION COMPLETION", DATED

NOVEMBER 17, 2011.

7. FT-BGS = FEET BELOW GROUND SURFACE

NOTE(S)

DATE SAMPLED

TETRACHLOROETHYLENE CONCENTRATION

TRICHLOROETHYLENE CONCENTRATION

CIS-1,2-DICHLOROETHYLENE CONCENTRATION

VINYL CHLORIDE CONCENTRATION

IW-00 (15.2-20.2)

APR 2017

3 300 3 300

70 700

1 100

FDEP NATURAL ATTENUATION

DEFAULT CONCENTRATION (NADC)

FDEP GROUNDWATER CLEANUP

TARGET LEVEL (GCTL)

WELL ID (SCREEN INTERVAL DEPTH IN FT-BGS)IW-3 (25.8-30.8)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

IW-6 (16.5-21.5)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

IW-14 (15.5-20.5)

Feb 2016 < 0.50 < 0.50 < 0.50 < 0.50

IW-16 (14.4-19.4)

Feb 2016 Jun 2018 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50

IW-19 (15.5-20.5)

Feb 2016 Apr 2017 Jun 2018 < 0.50 < 0.22 < 0.50 < 0.50 < 0.36 < 0.50

50.1 38 37.2

3.9 1.1* 0.72 I

IW-21 (15.5-20.5)

Feb 2016 Jun 2018 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50 < 0.50

IW-1 (14.3-19.3)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.36 U 0.36 U 0.36 U 0.36 U 0.36 U

232 149 669 651 332 136 121 231 182 164

IW-9 (16-21)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.36 U 0.36 U 0.36 U 0.36 U 0.36 U

153 23 683 936 404 115 16.7 497 488 469

IW-15 (15.6-20.6)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.36 U 0.36 U 0.36 U 0.36 U 0.36 U

410 273 154 83.5 43.9 136 99.4 109 60.9 59.3

IW-17 (14.6-19.6)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.50 I 0.36 U 0.36 U 0.36 U 0.36 U

11.6 5 1.5 0.54 I 0.86 I

0.48 I 0.39 U 0.39 U 0.39 U 0.39 U

IW-10 (15.2-20.2)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.44 I 0.36 U 0.36 U 0.36 U 0.36 U

383 179 169 30.6 26.5 136 110 162 107 130

IW-4 (16.7-21.7)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.36 U 0.36 U 0.36 U 0.36 U 0.36 U

75 69.3 77.2 60.5 525

0.88 I 0.70 I 0.49 I 0.39 U 143

IW-13 (17-22)

Jun 2019 Jun 2020 Jul 2021 Aug 2022 Feb 2023

0.38 U 0.38 U 0.38 U 0.38 U 0.38 U

0.47 I 0.65 I 0.36 U 0.36 U 0.36 U

102 89.5 106 85.8 85.9

4.4 5.5 5.9 10.6 8.3

E

N U

E

HOME DEPOT ENTRANCE

CONCRETE

POWER POLE

POWER POLE

CONCRETE

FIRE HYDRANT

BACK OF WALK

GRASS ISLAND

TELEPHONE

WIRE

AREA OF

EXCAVATION

CONCRETE

POWER POLE

R A M O N A B O U L E V A R D

PICCADILLY

CAFETERIA

MUSIC

DEPOT

BONO'S

BAR B QUE

O F F I C E D E P O T

IW-7

IW-9

IW-8

IW-11

IW-12

IW-2

IW-1

IW-3

IW-6IW-10

IW-4

IW-5

IW-13

IW-14 IW-15

IW-16

IW-20

IW-19

IW-18

IW-21

SW-18

SW-21

SW-19

SW-20

SW-14

SW-15

SW-16

SW-5

SW-13

SW-4

SW-10

SW-7

SW-9

SW-8

SW-2

SW-1

SW-3

SW-6

IW-17

SW-17

FORMER

BUILDING

FOOTPRINT

SHALLOW MONITORING WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

in

FDEP-DC025

Control No.

FDEP-DC025-L007

FIGURE

2021-08-05

BCL

RFM

RFM

JCB

FL. DEPT. OF ENVIRONMENTAL PROTECTION

PFOA AND PFOS CONCENTRATIONS IN THE SHALLOW AND

INTERMEDIATE SURFICIAL AQUIFER

(JULY 2021)

TITLE

PROJECT NO. REV.

PROJECT

PROPERTY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

CLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Path: \\golder.gds\complexdata\Office\Jacksonville\drafting\File\FDEP\FDEP-DC\DC No 025 Grace Properties\L - 2021_AGWMR\Active Drawings\ | File Name: FDEP-DC025-L007.dwg

LEGEND

0 40 80

1. BASE MAP OBTAINED FROM GANNETT FLEMING, TITLED "SITE

DRAWING GRACE PROPERTIES, INC JACKSONVILLE FLORIDA

FEBRUARY 2005", DATED 3/21/05.

2. BASE MAP UPDATED FROM CADD FILE PREPARED BY WALTON

F. POPPELL, INC., LAND SURVEYORS, JOB No. 07-061, FIELD

SURVEYED ON 03/15/07 IN RELATION TO THE NATIONAL

GEODETIC VERTICAL DATUM OF 1988 (NAVD 88).

REFERENCE(S)

1. ALL UNITS REPORTED IN NANOGRAMS PER LITER (ng/L).

2. I - REPORTED VALUE IS BETWEEN THE LABORATORY METHOD

DETECTION LIMIT AND LABORATORY PRACTICAL

QUANTITATION LIMIT.

3. BOLD FONT INDICATES CONSTITUENT CONCENTRATION WAS

DETECTED ABOVE THE METHOD DETECTION LIMIT

4. PFOA - PERFLOURIDE-N-OCTANOIC ACID

5. PFOS - PERFLOUROOCTANESULFUNIC ACID

6. FT-BGS - FEET BELOW GROUND SURFACE

NOTE(S)

SW-10

JULY 2021

3.80 - 13.80

WELL NUMBER

DATE SAMPLED

SCREEN INTERVAL DEPTH (FT-BGS)

PFOS CONCENTRATION

PFOA CONCENTRATION

SUM OF PFOS AND PFOA

IW-00

JULY 2021

3.80 - 13.80

IW-1

JULY 2021

14.30 - 19.30

IW-15

JULY 2021

15.61 - 20.61

6.0 I

SW-15

JULY 2021

3.42 - 13.42

SW-1

SW-4

SW-10

SW-13

SW-14

SW-15

SW-16

SW-17

SW-6

SW-5

SW-9

SW-2

IW-1

IW-3

SW-3

IW-4

IW-6IW-10

IW-9

IW-15

IW-13

IW-12

IW-17

IW-5

IW-16

SW-7

IW-7

U

Ec ol og y*

H

EP

AC

O

T& D

N on

H az

S oi l - V

O C s pe r d ru m

$1

.0

$0 .0

T&

D N on H az M ud /w at er

VO

C s pe r d ru m

$1

.0

$0

.0

Fa ls e M ob iliz at io n (n o dr um fo un d)

$8

5.

$0 .0

PF

AS

P ro fil e Fe e (1 p er s ite

$3

.0

$3

.0

T& D

N on

H az

S oi l - P

FA

S/

PF

O

S pe r d ru m

$1

.0

$0 .0

T&

D N on H az M ud /w at er

-P

FA

S/

PF

O S pe r d ru m

$1

.0

$3

.0

D is po sa l N on H az S oi l -

V O

C s pe r d ru m

$1

.0

$0

.0

D is po sa l N on

H az

M ud

/w at er

VO

C s pe r d ru m

$1

.0

$0 .0

PF

AS

P ro fil e Fe e (1 p er s ite

$9 5.

$9

5.

D is po sa l N on

H az

S oi l - P

FA

S/

PF

O

S

$6

.0

$0 .0

D is po sa l

N on

H az

M ud

/w at er -P

FA

S/

PF

O

S

$6

.0

$1 ,3

.0

Ap pr ov al F ee (p er s ite

$7

.0

$7

.0

N on H az S ol ifi ca tio n W as te

P ro fil e fe e

$5

0.

$0 .0

N on H az S ol id s D is po sa l

(p er d ru m

$1

.0

$0

.0

N on

H az

S lu dg e

D is po sa l

$1

.0

$0 .0

PF

AS

W as te ga l d ru m e m el le

A L

$8

.0

$1

,6

.0

Tr uc k w ith li ft ga te a nd d riv er

$1

.0

$1

.0 no n ha z liq ui ds d is po sa l ( pe r d ru m

$1

.7

$0

.0 g al lo n re co nd iti on ed d ru m

$1

.6

$0 .0

LT

L fe es (l es s th an dr um s

$1

.0

$1

.0

En er gy s ec ur ity re co ve ry fe e

$2

.0

$2

.0

To ta l C os t $7

.0

$2

,1

.0

$2

,1

.0

N ot es

* T ra ns po rta tio n co st s w ill be c al cu la te d ba se d on p ic ku ps a t v ar io us s ite s an d w as te s tre am v ol um e

ID

W

S U

B C

O N

TR

AC

TO

R

C O

ST

E

ST

IM

AT

ES

F O

R P

FA

S

M

AT

ER

IA

L

Er w in

Su m m ar y of

ID

W

S ub co nt ra ct or s

C os ts

3_

6_

P

FA

S dr um s Pa ge o f 1

408 Ditmar Street Pensacola, FL 32503

To: Mr. Ralph Mongillo

WSP

9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256

June 16, 2023

Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials

Mr. Mongillo:

The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:

For Non-Hazardous Chlorinated Solvent Impacted Materials:

Description Rate Unit T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket

For Non-Hazardous PFAS/PFOS Impacted Materials:

Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: robert@erwinremediation.com p y

File details come from the government source that posted it. Updated .