Summary

This is a Task Assignment (TA) under Contract Number HW685 between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. for groundwater monitoring services at the Dawn Laundry facility (ERIC_4188) located at 6890 Miramar Parkway, Miramar, Broward County, Florida. The TA is numbered DC013B with a completion date of July 12, 2024, and is entered pursuant to an underlying indefinite delivery contract. Patrick McGrane serves as the FDEP Project Manager, while Matt Crews is the contractor's project manager.

The contract authorizes WSP to conduct quarterly groundwater sampling of monitoring well MW024 in accordance with the November 10, 2023 Scope of Work, Cost Estimate, and Bid Documentation. The total TA value is $12,425.87 on a fixed unit rate basis, consisting of three subtasks: Subtask 1 (Project Management) at $1,116.32, Subtask 2 (November 2023 Quarterly Sampling & IDW Management) at $5,462.67 with deliverables due December 29, 2023, and Subtask 3 (February 2024 Quarterly Sampling & IDW Management) at $5,846.88 with deliverables due March 29, 2024. The scope includes groundwater sampling using EPA Method 8260B for chlorinated volatile organic compounds, field documentation, laboratory analysis, management of investigation derived waste in 55-gallon drums, and preparation of conclusions and recommendations. The project comprises 76 total labor hours across various staff categories with associated travel, laboratory, equipment, and subcontractor costs for waste disposal.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01DCO1.pdf PDF
CN-370000-HW685-BF02B.pdf PDF
CN-370000-HW685-BF04A.pdf PDF
CN-370000-HW685-BIL01A.pdf PDF
CN-370000-HW685-BIL1ACO1.pdf PDF
CN-370000-HW685-BIL1ACO2.pdf PDF
CN-370000-HW685-BIL1ACO3.pdf PDF
CN-370000-HW685-BIL1BCO1.pdf PDF
CN-370000-HW685-DC001F.pdf PDF
CN-370000-HW685-DC001b.pdf PDF
CN-370000-HW685-DC002A.pdf PDF
CN-370000-HW685-DC002D.pdf PDF
CN-370000-HW685-DC002H.pdf PDF
CN-370000-HW685-DC003B.pdf PDF
CN-370000-HW685-DC004B.pdf PDF
CN-370000-HW685-DC008C.pdf PDF
CN-370000-HW685-DC009C.pdf PDF
CN-370000-HW685-DC010D.pdf PDF
CN-370000-HW685-DC014A.pdf PDF
CN-370000-HW685-DC015A.pdf PDF
CN-370000-HW685-DC016B.pdf PDF
CN-370000-HW685-DC016C.pdf PDF
CN-370000-HW685-DC018C.pdf PDF
CN-370000-HW685-DC01ACO3.pdf PDF
CN-370000-HW685-DC01ACO5.pdf PDF
CN-370000-HW685-DC021D.pdf PDF
CN-370000-HW685-DC024A.pdf PDF
CN-370000-HW685-DC024B.pdf PDF
CN-370000-HW685-DC024D.pdf PDF
CN-370000-HW685-DC026A.pdf PDF
CN-370000-HW685-DC026D.pdf PDF
CN-370000-HW685-DC028B.pdf PDF
CN-370000-HW685-DC028E.pdf PDF
CN-370000-HW685-DC02DCO1.pdf PDF
CN-370000-HW685-DC02ECO1.pdf PDF
CN-370000-HW685-DC02GCO1.pdf PDF
CN-370000-HW685-DC030A.pdf PDF
CN-370000-HW685-DC031B.pdf PDF
CN-370000-HW685-DC033B.pdf PDF
CN-370000-HW685-DC034C.pdf PDF
CN-370000-HW685-DC034D.pdf PDF
CN-370000-HW685-DC036A.pdf PDF
CN-370000-HW685-DC038A.pdf PDF
CN-370000-HW685-DC038D.pdf PDF
CN-370000-HW685-DC03ACO1.pdf PDF
CN-370000-HW685-DC03BCO1.pdf PDF
CN-370000-HW685-DC041A.pdf PDF
CN-370000-HW685-DC042C.pdf PDF
CN-370000-HW685-DC051B.pdf PDF
CN-370000-HW685-DC052D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC013B Completion July 12, 2024

This Task Assignment authorizes WSP to conduct quarterly Groundwater Sampling at Dawn Laundry in accordance with the November 10, 2023 Scope of Work, Cost Estimate, and Bid Documentation.

Patrick McGrane 850-245-8899 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

WSP USA Inc.

WSP USA Inc.

Matt Crews 904-363-3430

ERIC_4188

6890 Miramar Parkway, Miramar, Broward County

Dawn Laundry

✔ $ 12,425.87

$ 12,425.87

Scope of Work

Matthew Crews

Environmental Engineer

11/28/2023

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2023.11.28 08:55:46 -05'00' Kelly Crain Digitally signed by Kelly Crain

Date: 2023.11.27 10:51:58 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Groundwater Sampling field documentation; updated Table and figure;

laboratory analytical report; conclusions and recommendations; and IDW disposal documentation

12/29/2023

Subtask 3: Groundwater Sampling field documentation; updated Table and figure;

laboratory analytical report; conclusions and recommendations; and IDW disposal documentation

03/29/2024

Subtask 1: Project Management 05/31/2024

Subtask 2: Submittal and FDEP approval of Groundwater Sampling field documentation; updated Table and figure; laboratory analytical report; conclusions and recommendations

$ 5,462.67

Subtask 3: Submittal and FDEP approval of Groundwater Sampling field documentation; updated Table and figure; laboratory analytical report; conclusions and recommendations; and IDW disposal manifest

$ 5,846.88

Subtask 1: Project Management $ 1,116.32

$ 12,425.87

HW685

DC013B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: ERIC_4188

Dawn Laundry

FROM: Patrick McGrane, Project Manager

SUBJECT: Negotiation Summary

HW685 DC013B

DATE: Nov 14, 2023

This Task Assignment authorizes WSP to conduct quarterly groundwater monitoring activities in accordance with the Nov 10,2023, Scope of Work, Cost Estimate, and Bid Documentation. The final cost of this Task Assignment is $12,425.87 with 76 labor hours.

Subtask 1: Project Management

An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Offsite Monitor Well Sampling and IDW Management WSP will collect a groundwater sample from offsite monitoring well MW024. Prior to sampling, MW024 will be purged, and field parameters will be monitored. All groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP- 001/01), dated January 2017. The groundwater sample will be delivered to Florida Department of Health and National Environmental Laboratory Accreditation Program for analysis of chlorinated volatile organic compounds using EPA Method 8260B. WSP will containerize IDW purge water and decontamination water in a 55-gallon drum that will be stored on the property.

Subtask 3: Offsite Monitor Well Sampling and IDW Management

WSP will perform the scope of work described in Subtask 2 approximately 3 months following the samples taken in ST 2. Sampling parameters, deliverables and IDW management will be the same.

Following the completion of the sampling WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260. Once waste characterization is determined, the IDW transport and disposal subcontractor will collect and dispose of the drum. The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment.

FDEP COST ESTI MATEContractor: WSP USA Inc

Date: 11/10/2023

Task #: DC013B SubTask 1 Project Management SubTask 6

Site: Dawn Laundry SubTask 2 Nov 2023 Quarterly Sampling & IDW Management SubTask 7

Activity/Phase: Monitoring SubTask 3 Feb 2024 Quarterly Sampling & IDW Management SubTask 8

Project Manager: Patrick McGrane SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$53.28 Project Manager (RFM) 7 7.0 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$68.75 Practice Leader - X-13 (JB) 2 1 1 0 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0

$53.28 Senior Sci/Eng - X-11 (RFM) 11 5 6 0 0 0 0 0 0 0 $48.00 Senior Project Sci/Eng - P-10 (BL) 2 1 1 0 0 0 0 0 0 0 $36.66 Project Sci/Eng - P-9 (JS) 26 13 13 0 0 0 0 0 0 0 $39.00 Staff Sci/Eng - P-8 (LS) 28 14 14 0 0 0 0 0 0 0

$0.00 Staff Sci/Eng - P-8 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Sci/Eng - P-8 0 0 0 0 0 0 0 0 0 0 $0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 76 7.0 34.0 35.0 0 0 0 0 0 0 0

Direct Labor $3,237.16 $372.42 $1,405.73 $1,459.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $5,584.09 $642.42 $2,424.88 $2,516.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,821.25 $1,014.84 $3,830.61 $3,975.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTI MATEContractor: WSP USA Inc

Date: 11/10/2023

Task #: DC013B SubTask 1 Project Management SubTask 6

Site: Dawn Laundry SubTask 2 Nov 2023 Quarterly Sampling & IDW Management SubTask 7

Activity/Phase: Monitoring SubTask 3 Feb 2024 Quarterly Sampling & IDW Management SubTask 8

Project Manager: Patrick McGrane SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $480.00 $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $744.00 $372.00 $372.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,224.00 $612.00 $612.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $195.00 $0.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $195.00 $0.00 $195.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $19.50 $0.00 $19.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $214.50 $0.00 $214.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $256.00 $73.00 $183.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $476.00 $183.00 $293.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $628.00 $314.00 $314.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $808.00 $454.00 $354.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $11,543.75 $1,014.84 $5,079.61 $5,449.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $882.12 $101.48 $383.06 $397.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $12,425.87 $1,116.32 $5,462.67 $5,846.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dawn Laundry SUBTASK 2: Nov 2023 Quarterly Sampling & IDW Management

DATE: 11/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 1

Senior Sci/Eng (R. Mongillo) 5

Staff Sci/Eng (L. Swindle) 14

Project Sci/Eng (J. Spengler) 13

Senior Project Sci/Eng (B. Lucero) 1

TOTAL LABOR 34

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem Project Sci/Eng (L. Swindle) $36.00 Per Day 1 $36.00 Per Diem Project Sci/Eng (J. Spengler) $36.00 Per Day 1 $36.00

Hotel Project Sci/Eng (L. Swindle) $150.00 Per Day 1 $150.00 Hotel Project Sci/Eng (J. Spengler) $150.00 Per Day 1 $150.00

TOTAL PER DIEM $372.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Halocarbons EPA Method 8260 $73.00 1 0 $73.00 PID/Hall Series EPA Method 8021 (Total VOCs) $110.00 0 0 $0.00

Sample Shipping Small CVOC/IDW Characterization $110.00 1 $110.00

TOTAL LAB $183.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 70 $21.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 1 $3.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $454.00

Field event preparation (1 hour). Round trip travel (10 hours). Gauge water level and calibrate instrumentation, collect sample from MW024, and manage IDW drum for placement on source property, finish field notes and forms (3 hours).

Verification of property ownership with property access forms prior to groundwater sampling (1 hour). Prepare and submit email deliverable with field notes and forms, updated analytical table and figure, certified laboratory report, and conclusions and recommendations (4 hours).

CADD figure with CVOC analytical results

Round trip travel (10 hours). Gauge water level and calibrate instrumentation, collect sample from MW024, and manage IDW drum for placement on source property, finish field notes and forms (3 hours).

Develop conclusions and recommendations for interim Deliverable to DEP

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dawn Laundry SUBTASK 3: Feb 2024 Quarterly Sampling & IDW Management

DATE: 11/10/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 1

Senior Sci/Eng (R. Mongillo) 6

Staff Sci/Eng (L. Swindle) 14

Project Sci/Eng (J. Spengler) 13

Senior Project Sci/Eng (B. Lucero) 1

TOTAL LABOR 35

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem Project Sci/Eng (L. Swindle) $36.00 Per Day 1 $36.00 Per Diem Project Sci/Eng (J. Spengler) $36.00 Per Day 1 $36.00

Hotel Project Sci/Eng (L. Swindle) $150.00 Per Day 1 $150.00 Hotel Project Sci/Eng (J. Spengler) $150.00 Per Day 1 $150.00

TOTAL PER DIEM $372.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW Disposal - CVOC and PFAS Liquid $195.00 Per Drum 1 $195.00

TOTAL $195.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Halocarbons EPA Method 8260 $73.00 1 0 $73.00 PID/Hall Series EPA Method 8021 (Total VOCs) $110.00 1 0 $110.00

Sample Shipping Small CVOC/IDW Characterization $110.00 1 $110.00

TOTAL LAB $293.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 70 $21.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 1 $3.00

TOTAL EQUIPMENT $354.00

CADD figure with CVOC analytical results

Develop conclusions and recommendations for interim Deliverable to DEP

Prepare and submit email deliverable with field notes and forms, updated analytical table and figure, certified laboratory report, and conclusions and recommendations (4 hours). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours).

Field event preparation (1 hour). Round trip travel (10 hours). Gauge water level and calibrate instrumentation, collect sample from MW024, and manage IDW drum for placement on source property, finish field notes and forms (3 hours).

Round trip travel (10 hours). Gauge water level and calibrate instrumentation, collect sample from MW024, and manage IDW drum for placement on source property, finish field notes and forms (3 hours).

FINAL --7/24/96

WSP USA Inc.

9428 Baymeadows Road Suite 400 Jacksonville, Florida 32256

T: +1 904-363-3430 F: +1 904 363-3445 wsp.com

November 10, 2023 Proposal No. 202208346

Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR QUARTERLY GROUNDWATER MONITORING

DAWN LAUNDRY

6890 MIRAMAR PARKWAY

MIRAMAR, BROWARD COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_4188

PROPOSED TASK ASSIGNMENT: DC013B

Dear Mr. McGrane:

WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for completing quarterly groundwater sampling of monitoring well MW024 at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services.

RECENT SITE HISTORY

WSP recommended collecting a groundwater sample from monitoring well MW024 on a quarterly basis in the January 2023 Annual Groundwater Monitoring Report. If chlorinated VOC concentrations in MW024 were below GCTLs after the two consecutive sampling events, WSP would recommend No Further Action using Risk Management Option Level I, as defined in Chapter 62-780.680(1), FAC, as far as chlorinated solvents are concerned. However, based on the ongoing perfluoroalkyl and polyfluoroalkyl substances (PFAS) assessment at the site, WSP will not recommend the abandonment of the monitoring wells.

An offsite property owner representative, Jonny Gil, an engineer for the City of Miramar, contacted the DEP on July 6, 2023, indicating that monitoring well MW024 was in the way of a proposed paved road scheduled to be constructed in late spring/early summer of 2024. The DEP requested completing at least three quarterly sampling events (August 2023, November 2023, and February 2024) prior to needing to abandon the monitoring well. WSP will keep in contact with the City of Miramar and continue sampling MW024 past February 2024 (May 2024 and August 2024) if construction delays occur; however, WSP will be prepared to submit a work change directive to DEP to abandon the well if the City of Miramar indicates that construction will begin before subsequent sampling events.

Mr. Patrick McGrane Proposal No. 202208346

Florida Department of Environmental Protection November 10, 2023

The first quarterly sampling event for monitoring well MW024 occurred on August 23, 2023, when vinyl chloride was detected at 6.1 micrograms per liter (ug/L), which was higher than the November 2022 result of 3.4 ug/L, and still above the Groundwater Cleanup Target Level (GCTL) of 1.0 ug/L for vinyl chloride.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – NOVEMBER 2023 QUARTERLY SAMPLING AND IDW MANAGEMENT

WSP will collect a groundwater sample from offsite monitoring well MW024. The well location and previous analytical results are shown on the attached Figure 4 with the August 2023 analytical results.

Prior to groundwater sampling, depth-to-water measurements will be measured using an electronic water level indicator. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary. Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

The groundwater sample will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified, fixed-base laboratory for analysis of chlorinated volatile organic compounds (VOCs) using EPA Method 8260B.

WSP will submit an e-mail deliverable upon receipt of the certified laboratory analytical report that will include field notes and forms, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; laboratory analytical report; and conclusions and recommendations.

SUBTASK 3 – FEBRUARY 2024 QUARTERLY SAMPLING AND IDW MANAGEMENT

The scope of work described above in Subtask 2 will be completed for Subtask 3 in February 2024.

Investigation Derived Waste WSP will containerize the investigation derived waste (IDW) purge water and decontamination water in a 55-gallon drum and store the drum on the source property. WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260 after the sampling event is completed for Subtask 3. The drum will be temporarily staged onsite, pending waste characterization. WSP has assumed that the IDW can be transported and disposed as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates one drum of IDW purge water and decontamination water will be generated during groundwater sampling activities. Given that PFAS were detected in groundwater samples collected during the 2023 PFAS screening event, disposal rates will be reflective of PFAS-impacted media.

HEALTH AND SAFETY

WSP will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $12,425.87. WSP anticipates the monitoring events will take place in late November 2023 and late February 2024. WSP will include this work, if possible, with other south Florida field projects to reduce the mobilization costs. The level of effort sheets and cost estimate form are included in Attachment A. The IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 1,116.32 May 31, 2024

Subtask 2 – November 2023 Quarterly Sampling

$ 5,462.67 December 29, 2023 (E-mail summary with updated Table and figure; field documentation;

certified laboratory analytical report;

conclusions; and recommendations)

Subtask 3 – February 2024 Quarterly Sampling

$ 5,846.88 March 29, 2024 (E-mail summary with updated Table and figure; field documentation; certified laboratory analytical report; conclusions and recommendations; and IDW manifest)

Total/Completion Date $ 12,425.87 June 28, 2024

WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, WSP USA Inc.

Ralph F. Mongillo Jr., PG Matthew C. Crews, PE Senior Geologist/Lead Consultant Assistant Vice President, Environmental Engineer

RFM/MCC/as

Attachments: Figure 4 – Groundwater Characterization in the Intermediate Zone of the Surficial Aquifer – August 2023

Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes

G:\Projects\DEP-Drycleaning\Projects\Miami\Dawn Laundry\3 - DC013B - MW024 Quarterly Sampling\Proposal\DC013B - Dawn Laundry Quarterly Monitoring Proposal_ERIC_4188.docx

US Ecology* HEPACO T&D Non Haz Soil - VOCs per drum 0 $125.00 $0.00 T&D Non Haz Mud/water - VOCs per drum 0 $125.00 $0.00 False Mobilization (no drum found) 0 $85.00 $0.00 PFAS Profile Fee (1 per site) 0 $350.00 $0.00 T&D Non Haz Soil - PFAS/PFOS per drum 0 $195.00 $0.00 T&D Non Haz Mud/water -PFAS/PFOS per drum 1 $195.00 $195.00 Disposal Non Haz Soil - VOCs per drum 0 $150.00 $0.00 Disposal Non Haz Mud/water - VOCs per drum 0 $150.00 $0.00 PFAS Profile Fee (1 per site) 1 $95.00 $95.00 Disposal Non Haz Soil - PFAS/PFOS 0 $650.00 $0.00 Disposal Non Haz Mud/water -PFAS/PFOS 1 $650.00 $650.00 Approval Fee (per site) 1 $750.00 $750.00 Non Haz Solification Waste Profile fee 0 $50.00 $0.00 Non Haz Solids Disposal (per drum) 0 $185.00 $0.00 Non Haz Sludge Disposal 0 $185.00 $0.00 PFAS Waste 55 gal drum emelle AL 1 $810.00 $810.00 Truck with lift gate and driver 4 $145.00 $580.00 non haz liquids disposal (per drum) 0 $141.75 $0.00 55 gallon reconditioned drum 0 $134.63 $0.00 LTL fees (less than 15 drums 1 $150.00 $150.00 Energy security recovery fee 15% 1 $231.00 $231.00

Total Cost $195.00 $1,495.00 * $1,771.00

Notes* Transportation costs will be calculated based on pickups at various sites and waste stream volume

IDW SUBCONTRACTOR COST ESTIMATES FOR PFAS MATERIAL

Erwin

Summary of IDW Subcontractors Costs 2023_6_16 PFAS no profile Page 1 of 1

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Ralph Mongillo

WSP

9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256

June 16, 2023

Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials

Mr. Mongillo:

The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:

For Non-Hazardous Chlorinated Solvent Impacted Materials:

Description Rate Unit

T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum

T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum

T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket

For Non-Hazardous PFAS/PFOS Impacted Materials:

Description Rate Unit

Profile Fee (Charged once per site) $ 350.00 Per Site

T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket

T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum

T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: robert@erwinremediation.com

COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf
Table 1 for SAWP
Monitoring Well Locations
Utility Locate Bids_Compiled.pdf
Geosyntec Utility-272_Geotek_1500
Geoview Utility Quote_2000_COT FTF SIS
Tallahassee Fire Training Division_V1_Bloodhound_3700
Drilling Bids_Compiled.pdf
PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic)
Direct Push
City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email
Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844
GW Protection_Geosyntec (T) 1022060 S.pdf
Invoice
Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf
Sheet1
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf
Subtask 1 – Project Management
Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling
Subtask 3 –Monitoring Well Installation
Right-of-Way Permitting
Utility Locate and Drilling Subcontractors
Monitoring Well Installation
Subtask 4 – Monitoring Well Sampling and Surveying
Laboratory Analysis
Trip Report
Subtask 5 – Investigation Derived Waste
Trip Report
Subtask 6 – Supplemental Site Assessment Report
Invoice and Deliverable Schedule:
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
ATTACHMENT F
Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf
Cost Estimate
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Subtask 6
2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf
Table 1 for SAWP
Monitoring Well Locations