CN-370000-HW685-DC01ACO7.pdf
PDF 1 MB Posted
- Contract number
- HW685
- Issued by
- Florida
About this file
Summary
This is a Task Assignment Change Order (TACO #7) issued by the State of Florida Department of Environmental Protection (FDEP) to WSP USA Inc. under Contract HW685. The change order amends the existing task assignment DC001A and authorizes a cost increase to reconcile work completed under Work Change Directives (WCDs) #8 through #13. The document includes supporting work change directives, a level of effort worksheet, an invoice schedule, and a negotiation summary memorandum dated August 8, 2024.
The change order increases the total task assignment value from $21,693.88 to $30,754.42, representing a cost increase of $9,060.54. The work encompasses two primary subtasks: Subtask 1 involves project management calculated as a percentage of total labor in accordance with Contract HW685, while Subtask 2 covers reconciliation of site-wide visionary (SVE) fencing repairs (WCDs #8, #9, and #10), groundwater sampling at the Big B Cleaners #31 site (WCD #11), and site visits with updated property owner information and photographs at the Fairfax North site (WCDs #12 and #13). The work involves 55 total labor hours across multiple staff positions, vehicle equipment costs totaling $600, subcontractor costs of $125 for waste transport and disposal, laboratory analysis costs of $183, and miscellaneous equipment and expendables totaling $855. WSP may invoice according to the included schedule, with deliverables requiring documentation of completed site activities due by November 27, 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department) Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC001A 7 HW685
Patrick McGrane 850-245-8899 WSP USA Inc.
Matt Crews 904-363-3430 Multiple
Multiple
$ 30,754.42 $ 21,693.88
$ 30,754.42 $ 21,693.88
12/27/2026 12/27/2026 0
1 1 7
WSP USA Inc.
Matthew Crews
Environmental Engineer
8/13/2024
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.08.13 09:58:24 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.08.13 08:46:46 -04'00'
N/A
This Change Order authorizes a cost increase to reconcile costs associated with WCD #8 - WCD #13.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment Change Order DC001A-7 (HW685)
DATE: August 8, 2024
This Change Order authorizes a total cost increase to reconcile Work Change Directives #8 through #13.
Specific costs can be found in the included Subtask 2 Scope of Work.
The previous cost total was $21,693.88. Total costs were increased by $9,060.54 resulting in a new final cost total of $30,754.42. WSP may invoice according to the included schedule.
Specific negotiated subtasks are as follows:
Subtask 1:
Project Management is automatically calculated as a percentage of total labor in accordance with
Contract HW685.
Subtask 2:
Costs contained in this Subtask are for the reconciliation of SVE fencing repairs (WCD #8, WCD #9, and
WCD #10), groundwater sampling (WCD #11), and site visits with updated property owner information and pictures (WCD #12 and WCD #13). A breakdown of labor hours and equipment can be found in the
Subtask 2 LOE. .
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Multiple SUBTASK 2: Multiple
DATE: 8/7/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Project Sci/Eng (L. Chappell) 1
Sci/Eng/Admin (T. Dawalt) 5
Project Sci/Eng (E. Oien) 7
Project Sci/Eng (E. Oien)
Senior Project Sci/Eng (L. Chappell)
Senior Project Sci/Eng (L. Chappell) 6
Staff Sci/Eng (Z. Lawson) 7
Sci/Eng/Admin (D. Johnson) 6
Senior Project Sci/Eng (B. Lucero) 1
Senior Consultant (M. Crews) 1
Senior Project Sci/Eng (S. Sider) 4
Senior Consultant (M. Crews) 4
Sci/Eng/Admin (B. Coppersmith) 6
TOTAL LABOR 55
VEHICLE TYPE RATE UNIT USEAGE
Equipment Van (WCD #8) $120.00 Per day 1 $120.00
Equipment Van (WCD #9) $120.00 Per day 1 $120.00
Equipment Van (WCD #10) $120.00 Per day 1 $120.00
Equipment Van (WCD #11) $120.00 Per day 1 $120.00 Truck (WCD #13) $120.00 Per Day 1 $120.00
TOTAL VEHICLE $600.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin - WCD #11 T&D - Non-Haz Water $125.00 per drum 1 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Total VOHs EPA Method 8260B WCD #11 $73.00 1 $73.00 Total VOCs EPA Method 8021 - IDWWCD #11 $110.00 1 $110.00
TOTAL LAB $183.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables (WCD #8) $40.00 Per Day 1 $40.00
Miscellaneous Expendables (WCD #9) $40.00 Per Day 1 $40.00
Miscellaneous Expendables (WCD #10) $40.00 Per Day 1 $40.00
Miscellaneous Expendables (WCD #11) $40.00 Per Day 1 $40.00 Miscellaneous Expendables (WCD #13) $40.00 Per Day 1 $40.00
PPE- Level D (WCD #8) $35.00 Per Man Day 1 $35.00 Construction/O&M Supplies (WCD #10) $75.00 Per Day 1 $75.00
Deep Groundwater Sampling Kit (WCD #11) $415.00 Per Day 1 $415.00 Tubing, Poly HDPE (WCD #11) $0.30 Per Foot 90 $27.00
Tubing, Silicon 3/16 x 3/8 (WCD #11) $3.00 Per Foot 1 $3.00 Drum, 55-gallon (WCD #11) $100.00 Per Each 1 $100.00
TOTAL EQUIPMENT $855.00
WCD #13 - Fairfax North site visit to take updated site photos and determine number of parcels with crawl spaces (3 hours). Update property owner information table and prepare photo log (3 hours).
WCD #8: Mobilization to Big B Cleaners #31 site (1 hour). Assess property damage to system/fence, make repairs, maintain plant growth, dispose of yard waste, scan and upload notes/photos (4 hours).
WCD #13 - Fairfax North site visit to take updated site photos and determine number of parcels with crawl spaces (3 hours). Prepare and submit e-mail deliverable with final Fairfax North property owner information table (1 hour).
WCD #8: Prepare e-mail deliverable following Big B Cleaners #31 site visit (1 hour).
WCD #9 - Field Preparation (2 hours). Mobilization to Big B Cleaners # 31 site (1 hour). Assess property damage to system/fence, make repairs, maintain plant growth, dispose of yard waste, scan and upload notes/photos (4 hours).
WCD #10 -Field Preparation (1 hour), Mobilize to Big B Cleaners #31 (1 hour). Pickup fence repair materials and complete repair (3 hours). Upload note/photos (1 hour).
WCD #11 - Big B Cleaners #31: Verification of property ownership with property access forms prior to mobilization (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit email summary with, field documentation, laboratory chain-of-custody, and certified laboratory report (2 hours). Deliver Samples to Lab (1 hour).
WCD #11 - Big B Cleaners #31: Field event preparation (1 hour). Groundwater Sampling:
Instrument calibration, measure water levels, measure field parameters, collect samples from 1 well for chlorinated VOC analysis, including IDW sampling and staging (5 hours). Update data tables (1 hour).
WCD #11 - Big B Cleaners #31: Field event preparation (1 hour). Groundwater Sampling:
Instrument calibration, measure water levels, measure field parameters, collect samples from 1 well for chlorinated VOC analysis, including IDW sampling and staging (5 hours).
WCD #11 - Big B Cleaners #31: Update figure with new analytical data (1 hour).
WCD #12 - Prepare and submit e-mail deliverable with final Fairfax North property owner information table.
WCD #12 - Prepare draft Fairfax North property owner information table.
WCD #10: Prepare e-mail deliverable following Big B Cleaners #31 site visit; covers work done under WCD #9 and 10 (1 hour).
FINAL --7/24/96
Contract No. HW685
Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Work Change DirectiveForm
ATTACHMENT 6
Site Name: Site ID #:
Contract #:
Task Assignment #:
Contractor:
Work Change Directive #:
� Reason for Work Change Directive :
� Description of Work Change Directive :
� Attachments (if applicable, listdocuments supportingchange):
� Costs (if negotiated unitcosts, provide information below):
Maximum Estimated Increase in Task Amount:
Authorized ContractorSignature:
Authorized FDEPSignature:
FDEP SupervisorApproval:
(if applicable)
Big B #031 Cleaners ERIC_4822
HW685 WSP USA Inc.
DC001A 8
Property owner called and said that the system compound fence was damaged, and has been set to side of property.
WSP recommends a site visit to assess the damage to fence/system.
1-hr Mobilization 3-hr onsite to take pictures, measurements of fence, inspect system, clear yard waste 1-hr to haul waste to Marpan recycling and unload
$ 900.00
Digitally signed by Logan.Chappell @wsp.com DN: cn=Logan.Chappell@wsp.com Date: 2024.01.09 17:23:01 -05'00'
Logan.Chappell @wsp.com
Patrick McGrane Digitally signed by Patrick McGrane Date: 2024.01.10 08:33:12 -05'00'
Aaron Cohen Digitally signed by Aaron Cohen Date: 2024.01.11 14:07:42 -05'00'
Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Work Change DirectiveForm
ATTACHMENT 6
Site Name: Site ID #:
Contract #:
Task Assignment #:
Contractor:
Work Change Directive #:
� Reason for Work Change Directive :
� Description of Work Change Directive :
� Attachments (if applicable, listdocuments supportingchange):
� Costs (if negotiated unitcosts, provide information below):
Maximum Estimated Increase in Task Amount:
Authorized ContractorSignature:
Authorized FDEPSignature:
FDEP SupervisorApproval:
(if applicable)
Multiple Multiple
HW685 WSP USA Inc.
DC001A 9
Property owner called and said that the system compound fence was damaged, and has been set to side of property.
WSP recommends a site visit to assess the damage to fence/system.
2-hr Field Prep at warehouse 1-hr Mobilization 3-hr onsite to take pictures, measurements of fence, inspect system, clear yard waste 1-hr to dispose of yard waste.
1-hr Compile Email Deliverable
$ 1,500.00
Digitally signed by Chappell, Logan (USLC 689471) DN: cn=Chappell, Logan (USLC689471), ou =Active, email=Logan.Chappell@wsp.com Date: 2024.06.03 09:52:39 -04'00'
Chappell, Logan
(USLC689471)
Patrick McGrane Digitally signed by Patrick McGrane Date: 2024.06.03 10:34:39 -04'00'
Mubeen Darji, P.E.
Digitally signed by Mubeen Darji, P.E.
Date: 2024.06.03 12:46:27 -04'00'
Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Work Change DirectiveForm
ATTACHMENT 6
Site Name: Site ID #:
Contract #:
Task Assignment #:
Contractor:
Work Change Directive #:
� Reason for Work Change Directive :
� Description of Work Change Directive :
� Attachments (if applicable, listdocuments supportingchange):
� Costs (if negotiated unitcosts, provide information below):
Maximum Estimated Increase in Task Amount:
Authorized ContractorSignature:
Authorized FDEPSignature:
FDEP SupervisorApproval:
(if applicable)
Multiple Multiple
HW685 WSP USA Inc.
DC001A 10
Upon arriving on site following tornado, the fence was damaged, and in need of repair. The fence was not able to be salvaged based on materials which remained onsite. WSO requests costs to mobilize to site and repair fence.
WSP would pickup fence repair materials, mobilize to site, and install repair section.
Mobilize to site; Pickup repair materials , Make Repair, Upload documents, Repair material costs
$ 1,200.00
Digitally signed by Chappell, Logan (USLC 689471) DN: cn=Chappell, Logan (USLC689471), ou =Active, email=Logan.Chappell@wsp.com Date: 2024.06.10 16:21:00 -04'00'
Chappell, Logan
(USLC689471)
Patrick McGrane Digitally signed by Patrick McGrane Date: 2024.06.10 16:28:16 -04'00'
Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Work Change DirectiveForm
ATTACHMENT 6
Site Name: Site ID #:
Contract #:
Task Assignment #:
Contractor:
Work Change Directive #:
� Reason for Work Change Directive :
� Description of Work Change Directive :
� Attachments (if applicable, listdocuments supportingchange):
� Costs (if negotiated unitcosts, provide information below):
Maximum Estimated Increase in Task Amount:
Authorized ContractorSignature:
Authorized FDEPSignature:
FDEP SupervisorApproval:
(if applicable)
Multiple Multiple
HW685 WSP USA Inc.
DC001A 11
WSP is requesting approval of this work change directive to cover costs associated with sampling two offsite monitoring wells associated with the Big B Cleaners #31 site (ERIC_4822). The property owner contacted DEP indicating that the wells were scheduled to be abandoned on 6/25/2024.
WSP will mobilize to the property and collect groundwater samples from two wells (BBMW007 and BBMW010). WSP will stage IDW on the Big B #31 Cleaners site for subsequent T&D.
None
5 hours for Senior Consultant (MC) - verify property ownership; waste characterization; email deliverable (2 staff) 8 hours each for Staff Sci/Eng - field prep; sampling; update data tables, deliver samples to Lab 1 hour for Senior Proj Sci/Eng - update CAD figures Vehicle, equipment, and lab costs using HW685 rates
$ 4,500.00
Digitally signed by Chappell, Logan
(USLC689471)
DN: cn=Chappell, Logan (USLC689471), ou=Active, email=Logan.Chappell@wsp.com Date: 2024.06.24 10:20:00 -04'00'
Chappell, Logan
(USLC689471)
Patrick McGrane Digitally signed by Patrick McGrane Date: 2024.06.24 10:24:26 -04'00'
Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Work Change DirectiveForm
ATTACHMENT 6
Site Name: Site ID #:
Contract #:
Task Assignment #:
Contractor:
Work Change Directive #:
� Reason for Work Change Directive :
� Description of Work Change Directive :
� Attachments (if applicable, listdocuments supportingchange):
� Costs (if negotiated unitcosts, provide information below):
Maximum Estimated Increase in Task Amount:
Authorized ContractorSignature:
Authorized FDEPSignature:
FDEP SupervisorApproval:
(if applicable)
Multiple Multiple
HW685 WSP USA Inc.
DC001A 12
WSP is requesting approval of this work change directive to cover costs associated with updating the property owner information table for the Fairfax North site, per DEP e-mail request dated 7/22/2024.
WSP labor hours using HW685 rates. WSP will use the Duval County Property Appraiser's website to update property information table for 45 parcels and one City of Jacksonville right-of-way.
1 hour for Senior Consultant (MC) using HW685 rates 4 hours for Senior Project Sci/Eng (SS) using HW685 rates
$ 900.00
Crews, Matt
(USMC700671)
Digitally signed by Crews, Matt
(USMC700671)
Date: 2024.07.23 10:08:16 -04'00'
Patrick McGrane Digitally signed by Patrick McGrane Date: 2024.07.23 10:20:50 -04'00'
Mubeen Darji, P.E.
Digitally signed by Mubeen Darji, P.E.
Date: 2024.07.23 10:25:30
Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Work Change DirectiveForm
ATTACHMENT 6
Site Name: Site ID #:
Contract #:
Task Assignment #:
Contractor:
Work Change Directive #:
� Reason for Work Change Directive :
� Description of Work Change Directive :
� Attachments (if applicable, listdocuments supportingchange):
� Costs (if negotiated unitcosts, provide information below):
Maximum Estimated Increase in Task Amount:
Authorized ContractorSignature:
Authorized FDEPSignature:
FDEP SupervisorApproval:
(if applicable)
Multiple Multiple
HW685 WSP USA Inc.
DC001A 13
WSP is requesting approval of this work change directive to complete a site visit at the Fairfax North site, per DEP e-mail correspondence dated 8/1/2024. WSP will take updated site photos and evaluate the presence of crawl spaces at each parcel. WSP will update the property information table and prepare a photo log.
WSP labor hours, vehicle, and expendables using HW685 rates.
4 hour for Senior Consultant (MC) using HW685 rates 6 hours for Sci/Eng/Admin (SS) using HW685 rates
$ 1,700.00
Crews, Matt
(USMC700671)
Digitally signed by Crews, Matt
(USMC700671)
Date: 2024.08.02 08:43:28 -04'00'
Patrick McGrane Digitally signed by Patrick McGrane Date: 2024.08.02 08:57:40 -04'00'
Mubeen Darji, P.E.
Digitally signed by Mubeen Darji, P.E.
Date: 2024.08.02 09:11:41
McGrane, Patrick
From: Crews, Matt <matt.crews@wsp.com> Sent: Thursday, August 8, 2024 3:52 PM To: McGrane, Patrick Cc: Chappell, Logan Subject: DC001A (TACO #7) - Critical Response for Big B Cleaners #31 and Fairfax North Attachments: DC001A (Delta #7) -Critical Response LOECEF.xlsx; HW685 DC001A -Critical Response WCD#8-signed.pdf; HW685 DC001A -Critical Response WCD#9-signed.pdf; HW685 DC001A -Critical Response WCD#10-signed.pdf; HW685 DC001A -Critical Response WCD#11-signed.pdf; HW685 DC001A -Critical Response WCD#12-signed.pdf; HW685 DC001A -Critical Response WCD#13-signed.pdf
Follow Up Flag: Follow up Flag Status: Flagged
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Patrick, WSP has attached the les necessary to complete TACO #7 for TA DC001A, which will rectify work change directives WCD #8 through WCD #13. WSP completed site activities at the Big B Cleaners #31 site and the Fairfax North site under the Critical Response TA.
Please review and let us know if you have any questions or comments.
Thanks, Matt
Matthew Crews, P.E.
Assistant Vice President, Environmental Engineer
T+ 1 904-363-3430 M+ 1 904-327-8420
WSP USA Inc.
9428 Baymeadows Road, Suite 400 Jacksonville, Florida, USA 32256 wsp.com
NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department�s Project Manager: Department�s Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC001A 6 HW685
This Task Assignment Change Order authorizes an increase in costs to reconcile Work Change Directive (WCD) #7 and complete TACO #6
Opeyemi Kehinde 850-245-8887 Contractor WSP USA Inc. Contractor
Contractor Matt Crews Contractor 904-363-3430 Multiple
Multiple
$ 21,693.88 $ 19,658.94
$ 21,693.88 $ 19,658.94
Completion Completion 0
1 1 6
Contractor
Matthew Crews
Environmental Engineer
10/16/2023
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2023.10.16 10:40:42 -04'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.10.12 12:32:09 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date Documentation of Completed Site Activities
Documentation of Completed Site Activities
Documentation of Completed Site Activities
Documentation of Completed Site Activities
Documentation of Completed Site Activities
Documentation of Completed Site Activities
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced Documentation of Completed Site Activities
$2,500.00
Documentation of Completed Site Activities $1,351.30
Documentation of Completed Site Activities $1,094.44
Documentation of Completed Site Activities $962.44
Documentation of Completed Site Activities $2,964.97
Documentation of Completed Site Activities $10,785.79
Documentation of Completed Site Activities $2,034.94
TOTAL COST $21,693.88