CN-370000-HW685-DC017C.pdf
PDF 5 MB Posted
- Contract number
- HW685
- Issued by
- Florida
About this file
This Task Assignment (TA) document is issued by the State of Florida Department of Environmental Protection (DEP) under Contract Number HW685. The TA, designated DC017C, authorizes WSP USA Inc., an environmental consulting firm based in Jacksonville, Florida, to conduct groundwater sampling and monitoring activities at the Alan Dry Cleaners site located at 869 Northwest 183rd Street in Miami, Miami-Dade County. The project is managed by Patrick McGrane at DEP and Matt Crews at WSP. The TA is effective June 25, 2025, with a completion date of February 20, 2026.
WSP will perform four subtasks: project management, annual groundwater monitoring activities, PFAS-related costs and investigative derived waste (IDW) transportation and disposal, and annual reporting. The groundwater monitoring includes sampling from nine monitoring wells for chlorinated volatile organic compounds (VOCs) using EPA Method 8260B and per- and polyfluoroalkyl substances (PFAS) analysis. The total TA value is $19,228.99, invoiced on a fixed unit rate basis across four deliverables: Subtask 2 ($8,558.13) due August 29, 2025; Subtask 3 ($4,305.61) due September 26, 2025; Subtask 4 ($4,525.48) due October 24, 2025; and Subtask 1 ($1,839.77) for project management due October 24, 2025. IDW disposal is estimated at $195.00 per drum through Erwin Remediation for non-hazardous PFAS-impacted water. The project is funded under appropriation code N/A with all work completed in accordance with DEP's May 28, 2025, Scope of Work, Cost Estimate, and Bid Documentation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW685
DC017C February 20, 2026
This Task Assignment authorizes WSP to conduct groundwater sampling at Alan
Cleaners in accordance with the May 28, 2025 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 WSP USA Inc.
Matt Crews 904-363-3430
ERIC_4399
869 Northwest 183rd Street, Miami, Miami-Dade County
Alan Dry Cleaners
$ 19,228.99
$ 19,228.99
Scope of Work
WSP USA Inc.
Matthew Crews
Environmental Engineer
6/25/2025
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.06.25 14:08:14 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.06.25 12:55:24 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM 01/18
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Alexis A. Lambert Secretary
Memorandum
TO: Negotiation File Alan Dry Cleaners Miami, Miami-Dade County
ERIC_4399
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC017C (HW685)
DATE: , 2025
This Task Assignment authorizes WSP USA Inc. (WSP) to conduct annual groundwater sampling at the
Alan Dry Cleaners site. Due to the distance from the Jacksonville office, three total days of travel is included in the proposal. The final total cost will be verified via submitted field notes and revised as needed in a change order.
PFAS monitoring will be limited to the four monitoring wells sampled during the 2024 sampling event.
IDW transport and disposal will be handled in Subtask 3 due to disposal costs associated with PFAS impacted waste.
The total cost for this project is $ , . with 11 total labor hours.
All work is to be completed in accordance with the , 2025, Scope of Work, Cost Estimate, and Bid Documentation.
WSP may invoice according to the included schedule.
SITE : Alan Cleaners SUBTASK 2: Groundwater Monitoring
DATE: 6/25/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (S. Sider) 4
Project Sci/Eng (J. Whipple) 24
Project Sci/Eng (M. Triano) 23
TOTAL LABOR 51
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem M. Triano $36.00 Per Day 3 $108.00
Per Diem J. Whipple $36.00 Per Day 3 $108.00
Hotel M. Triano $150.00 Per Day 2 $300.00
Hotel J. Whipple $150.00 Per Day 2 $300.00
TOTAL PER DIEM $816.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
Total VOHs EPA Method 8260B $73.00 8 $584.00
Total VOCs EPA Method 8021 - IDW $110.00 1 $110.00
Sample Shipping Large $150.00 1 $150.00
TOTAL LAB $844.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00
Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00
Tubing, Poly HDPE $0.30 Per Foot 525 $157.50
Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 9 $27.00
TOTAL EQUIPMENT $554.50
Verification of property ownership with property access forms prior to groundwater sampling (1 hour). Prepare and submit email summary with field documentation, laboratory chain-of-custody, and certified laboratory report (3 hours).
Round Trip from Jacksonville to Miami (12 hours). Field event preparation (1 hour). Instrument calibration, measure water levels, measure field parameters, collect samples from 8 wells for chlorinated VOC analysis (see Table in proposal), including IDW sampling and staging (11 hours).
Round Trip from Jacksonville to Miami (12 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from 8 wells for chlorinated VOC analysis (see table in proposal), including IDW sampling and staging (11 hours).
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 3: PFAS Related Costs and IDW T&D
DATE: 6/25/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (S. Sider) 11
Project Sci/Eng (J. Whipple) 7
Project Sci/Eng (M. Triano) 4
Senior Sci/Eng (B. Lucero) 2
TOTAL LABOR 24
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
PFAS DEP SOP: LC001-3 or Similar $0.00 5 1 $0.00
TOTAL LAB
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 40 $12.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 2 $6.00 Drum, 55-gallon $100.00 Per Each 1 $100.00
TOTAL EQUIPMENT $448.00
Complete forms to arrange for PFAS sample bottle order delivery and shipment from DEP Central Laboratory (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (3 hours). Prepare and submit email summary with field documentation and certified laboratory report with PFAS results (3 hours). Prepare PFAS section for the draft annual report (4 hours).
Collect samples from 1 wells for PFAS analysis only; collect samples from 3 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (2 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours). Prepare data tables with PFAS analytical results (3 hours).
Collect samples from 1 wells for PFAS analysis only; collect samples from 3 wells listed in Subtask 2 for PFAS analysis; collect equipment blank for PFAS analysis (2 hours). Package and deliver PFAS samples to shipping point for DEP Central Laboratory (2 hours).
Prepare CADD Figures with PFAS data for Annual Groundwater Monitoring Report.
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 4: Reporting
DATE: 6/25/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Program Leader (M. Crews) 3
Senior Sci/Eng (S. Sider) 18
Senior Sci/Eng (B. Lucero) 3
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 26
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Develop conclusions and recommendations and prepare final Annual Monitoring Report.
Data entry, prepare tables and figures, and draft Annual Monitoring Report
CADD Update Figures
Reporting: Updating tables, document production. Create pdf for OCULUS.
FINAL --7/24/96
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA
T: +1 904 363-3430 F: +1 904 363-3445 wsp.com
June 25, 2025 Proposal No. 2025US414454.R1
Mr. Patrick McGrane
Florida Department of Environmental Protection
Division of Waste Management
Waste Site Cleanup Section
2600 Blair Stone Road, MS 4520
Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR ANNUAL GROUNDWATER MONITORING
ALAN CLEANERS
869 NW 183RD STREET
MIAMI, MIAMI-DADE COUNTY, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4399
PROPOSED TASK ASSIGNMENT: DC017C
Dear Mr. McGrane, WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual chlorinated volatile organic compound (VOC) and continued per- and polyfluoroalkyl substances (PFAS) groundwater monitoring activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the
DEP-approved task assignment.
SUBTASK 2 GROUNDWATER MONITORING ACTIVITIES
Groundwater Monitoring
Following authorization to proceed, WSP will use the Miami-that the current property owner and relevant offsite property owners have an executed Permission to Enter
Property agreement with the DEP. WSP will then coordinate with the real property owner, tenant, and offsite property owners for access to complete the scope of work.
Mr. Patrick McGrane Proposal No. 2025US414454.R1
Florida Department of Environmental Protection June 25, 2025
WSP will collect groundwater samples from 9 monitoring wells. The attached Figures 3 through 11 from the
July 2024 sampling event show the monitoring well locations, groundwater flow direction, chlorinated VOC results for each zone, and PFAS screening results.
Prior to groundwater sampling, the depth-to-groundwater will be measured at accessible monitoring wells using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.
Groundwater sampling activities will be completed in accordance with DEP Standard Operating Procedures
(SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018) and DEP SOPs for
Sampling and Analysis of PFAS, dated August 2020. Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data procedures.
The groundwater samples to be analyzed for chlorinated VOCs will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified, fixed-base laboratory along with the completed chain-of-custody documentation. The selected groundwater samples to be analyzed for PFAS will be shipped to the DEP Central Laboratory in Tallahassee, Florida. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if off-site notification is required.
The samples will be analyzed as follows:
Sample ID Chlorinated VOCs
(EPA Method 8260B)
PFAS
(DEP SOP: LC001-3 or Similar)
Shallow Zone Surficial Aquifer Well
MW002 X
X
(Sampled in July 2024)
MW005 ---
X
(Sampled in July 2024)
MW013 X
X
(Sampled in July 2024)
Intermediate Zone Surficial Aquifer Wells
MW007R X
X
(Sampled in July 2024)
MW017 X
Deep Zone Surficial Aquifer Wells
MW018 X
Lower Deep Zone Surficial Aquifer Wells
MW016 X
MW018D X
MW019D X
Equipment Blank --- X
Investigative Derived Waste
(IDW)
Total VOCs X
Interim Deliverable
Upon completion of Subtask 2, an e-mail deliverable will be submitted, which will include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report or laboratory sample login checklist, and laboratory chain-of-custody documentation.
SUBTASK 3 PFAS-RELATED COSTS AND IDW TRANSPORTATION AND DISPOSAL
WSP will include costs associated with the continued PFAS monitoring activities in this subtask. These activities include completing bottle order requests with the DEP Central Laboratory; waste characterization and waste profiling; packaging and shipping PFAS samples to the DEP Central Laboratory; labor involved in sampling wells associated with PFAS analysis only; and investigation-derived waste (IDW) transportation and disposal.
Quality Assurance/Quality Control
WSP will collect one equipment blank sample during the groundwater sampling event. The equipment blank will be collected by pumping (peristaltic pump) PFAS-free water through silicon and/or HDPE tubing and into laboratory-supplied containers. The equipment blank will be analyzed for PFAS using DEP SOP: LC001-3 (or similar), as shown in the above table.
Investigation Derived Waste
WSP will containerize the IDW purge water and decontamination water in a 55-gallon drum. WSP will collect a waste characterization sample from the drum for analysis of total VOCs using EPA Method 8260 and PFAS using
DEP SOP: LC001-3 (or similar), as shown in the above table. The drum will be temporarily staged onsite, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates one drum of IDW purge water will be generated during the field activities.
Interim Deliverable
Upon completion of Subtask 3, an e-mail deliverable will be submitted for the PFAS samples and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and updated data tables and figures.
SUBTASK 4 REPORTING
WSP will prepare an Annual Groundwater Monitoring Report that will include a description of the sampling procedures, evaluation of the analytical results; comparison of current to historical data; tabulated summary of the current and historical analytical data; a site map showing the groundwater analytical results; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in high-visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $19,228.99. WSP anticipates the monitoring event will take place in July 2025. The level of effort sheets and cost estimate form are included in Attachment A. The
IDW disposal subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 Project Management $ 1,839.77 October 24, 2025
Subtask 2 Groundwater Sampling Activities
$ 8,558.13 August 29, 2025 (E-mail summary with field documentation and certified laboratory analytical report for chlorinated VOCs)
Subtask 3 PFAS Related Costs and IDW Transportation and Disposal
$ 4,305.61 September 26, 2025 (E-mail summary with field documentation and certified laboratory analytical report for PFAS and non-hazardous waste manifest for IDW)
Subtask 4 Reporting $ 4,525.48 October 24, 2025 (Annual Groundwater Monitoring Report)
Total/Completion Date $19,228.99 December 17, 2025
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, WSP USA Inc.
Stephen J.R. Sider, GISP, PG Matthew C. Crews, PE
Senior Consultant, Geology Assistant Vice President, Environmental Engineering
SJRS/MCC/as
Attachments: Figure 3 Potentiometric Map of the Shallow Zone of the Surficial Aquifer (July 15, 2024) Figure 4 Potentiometric Map of the Intermediate Zone of the Surficial Aquifer (July 15, 2024) Figure 5 Potentiometric Map of the Deep Zone of the Surficial Aquifer (July 15, 2024) Figure 6 Potentiometric Map of the Lower Deep Zone of the Surficial Aquifer (July 15, 2024) Figure 7 VOC Analytical Summary of the Shallow Zone of the Surficial Aquifer Figure 8 VOC Analytical Summary of the Intermediate Zone of the Surficial Aquifer Figure 9 VOC Analytical Summary of the Deep Zone of the Surficial Aquifer Figure 10 VOC Analytical Summary of the Lower Deep Zone of the Surficial Aquifer Figure 11 PFAS Analytical Results in Groundwater (July 2024)
Attachment A Level of Effort Sheets and Cost Estimate Form Attachment B Subcontractor Quotes
G:\Projects\DEP-WSCS\Projects\Miami\Alan Dry Cleaners\4 -DC017C - 2025 Annual GW Mon\Proposal\Revised\DC017C - Alan Cleaners Annual GW Mon Proposal (ERIC_4399).docx
File details come from the government source that posted it. Updated .