This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (DEP) to Golder Associates USA Inc. for interim source removal activities at the Former Slick's Garage site located at 904 4th Street West, Palmetto, Manatee County, Florida. The TA is entered under Contract Number HW685 and is designated as Task Assignment BF01D. The project is managed under the State & Tribal Response Program (SRP), a cooperative agreement administered by DEP on behalf of the U.S. Environmental Protection Agency (EPA). The Department Project Manager is Megan Johnson, and the contractor's project manager is Matt Crews, P.E., Senior Lead Consultant, Environmental Engineer at Golder Associates USA Inc.

The Task Assignment authorizes Golder Associates USA Inc. to conduct second phase interim source removal activities, including excavation of polynuclear aromatic hydrocarbon and arsenic-impacted soils and disposal to a licensed facility, with backfill and site restoration. The total TA value is $94,694.40, structured as fixed unit rate compensation divided into three subtasks: Subtask 1 (Project Management) at $3,793.27, Subtask 2 (Interim Source Removal) at $85,723.88, and Subtask 3 (ISR Report) at $5,177.25. The work is estimated to remove approximately 1,241 tons of contaminated soil through excavation of multiple depth intervals and transport to Heart of Florida Landfill. Deliverables include field documentation and daily reports due January 20, 2023, and the final Interim Source Removal Report due February 24, 2023, with overall TA completion by April 21, 2023. The estimated total scope cost was $185,411.18; however, the TA is capped at the remaining DEP remediation budget of $94,694.40, with the property owner, Palmetto Community Redevelopment Agency (CRA), responsible for the additional completion costs through a separate contract with Action Environmental.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01A.pdf PDF
CN-370000-HW685-BF01CCO1.pdf PDF
CN-370000-HW685-BF02A.pdf PDF
CN-370000-HW685-BF05A.pdf PDF
CN-370000-HW685-BF05ACO1.pdf PDF
CN-370000-HW685-BF1BCO1.pdf PDF
CN-370000-HW685-BIL02C.pdf PDF
CN-370000-HW685-BIL1ACO4.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf PDF
CN-370000-HW685-BIL3ACO1.pdf PDF
CN-370000-HW685-CSS01.pdf PDF
CN-370000-HW685-CSS2ACO2.pdf PDF
CN-370000-HW685-DC001C.pdf PDF
CN-370000-HW685-DC001E.pdf PDF
CN-370000-HW685-DC002B.pdf PDF
CN-370000-HW685-DC002C.pdf PDF
CN-370000-HW685-DC002E.pdf PDF
CN-370000-HW685-DC003C.pdf PDF
CN-370000-HW685-DC004A.pdf PDF
CN-370000-HW685-DC007A.pdf PDF
CN-370000-HW685-DC007B.pdf PDF
CN-370000-HW685-DC008B.pdf PDF
CN-370000-HW685-DC008D.pdf PDF
CN-370000-HW685-DC009A.pdf PDF
CN-370000-HW685-DC009D.pdf PDF
CN-370000-HW685-DC009E.pdf PDF
CN-370000-HW685-DC010C.pdf PDF
CN-370000-HW685-DC012A.pdf PDF
CN-370000-HW685-DC012D.pdf PDF
CN-370000-HW685-DC014B.pdf PDF
CN-370000-HW685-DC016D.pdf PDF
CN-370000-HW685-DC017A.pdf PDF
CN-370000-HW685-DC017B.pdf PDF
CN-370000-HW685-DC018B.pdf PDF
CN-370000-HW685-DC019A.pdf PDF
CN-370000-HW685-DC019C.pdf PDF
CN-370000-HW685-DC01ACO1.pdf PDF
CN-370000-HW685-DC01ECO1.pdf PDF
CN-370000-HW685-DC021A.pdf PDF
CN-370000-HW685-DC021B.pdf PDF
CN-370000-HW685-DC021C.pdf PDF
CN-370000-HW685-DC021E.pdf PDF
CN-370000-HW685-DC022C.pdf PDF
CN-370000-HW685-DC023A.pdf PDF
CN-370000-HW685-DC023D.pdf PDF
CN-370000-HW685-DC024C.pdf PDF
CN-370000-HW685-DC025A.pdf PDF
CN-370000-HW685-DC027D.pdf PDF
CN-370000-HW685-DC028A.pdf PDF
CN-370000-HW685-DC028D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

BF01D Completion April 21, 2023

The Department approves this Task Assignment (TA) based upon the Cost Proposal and Level of Effort (CP/LOE) to conduct phase two Interim Source Removal (ISR) activities at the below project site, submitted to the Department on December 6, 2022 by Golder Associates USA Inc. The ISR activities includes excavation of polynuclear aromatic hydrocarbon and arsenic impacted soils and disposal of those soils to a licensed disposal facility and backfill and site restoration.

Megan Johnson (850) 245-8994 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Golder Associates USA Inc.

Golder Associates USA Inc.

Matt Crews (904) 363-3430

ERIC_7517

904 4th Street West, Palmetto, Manatee County

Former Slick's Garage

✔ $ 94,694.40

$ 94,694.40

Scope of Work

Matt Crews, P.E.

Senior Lead Consultant, Environmental Engineer

12/8/2022

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2022.12.08 08:15:18 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.12.07 15:16:50 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Field documentation, weigh tickets, daily reports via email 01/20/2023

Interim Source Removal Report; Project Management 02/24/2023

Department approval of field documentation, weigh tickets, and daily reports (Subtask 2) $ 85,723.88

Department approval of Project Management and Interim Source Removal Report (Subtasks 1 and 3) $ 8,970.52

$ 94,694.40

HW685

BF01D

www.FloridaDEP.gov

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Golder Associates USA Inc., HW685 Contract File

FROM: Megan Johnson, Contract Manager

DATE: December 7, 2022

SUBJECT: Negotiation Summary – SRP18 Task Assignment (TA) BF01D

Former Slick’s Garage – Site ID # ERIC_7517 Interim Source Removal (Second Phase)

This TA is intended for conducting second phase interim source removal activities at the Former Slick’s Garage site, located at 904 4th Street West, Palmetto, Manatee County.

The services under this task are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).

Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, and fringe. The agreed upon cost of this subtask is $3,793.27.

Subtask 2: Interim Source Removal Under this subtask, prior to excavation activities, Golder will coordinate utility location at the proposed excavation areas and excavation boundaries will be staked or flagged. The limits of excavation were approximated based on soil analytical data; an approximate 727 square-foot area will be excavated to a depth of 2 feet below ground surface (bgs), an approximate 203 square-foot area will be excavated to a depth of 4 feet bgs, and an approximate 3,239 square-foot area will be excavated to a depth of 6 feet bgs. The estimated total volume of impacted soil is approximately 804 cubic yards in-place, totaling an estimated 1,241 tons.

Excavated soils will be direct loaded into the transport trucks with the trucks placed atop plastic sheeting. Excavated soil may be temporarily stockpiled atop plastic sheeting and covered with plastic sheeting when not in use and at the end of each day. The excavated soil will be transported for disposal at Heart of Florida Landfill in Lake Panasoffkee, Florida.

The excavation areas will be backfilled with clean fill and the surface will be restored to its original condition. The agreed upon cost of this subtask is $85,723.88.

Subtask 3: Interim Source Removal Report This subtask is for the completion of an ISR Report following the completion of the second phase of ISR activities. The agreed upon cost of this subtask is $5,177.25.

http://www.floridadep.gov/

Negotiation Summary – Task Assignment BF01D Former Slick’s Garage – Site ID # ERIC_7517 December 7, 2022 www.FloridaDEP.gov

Summary The estimated cost to complete the scope of work is $185,411.18; however, per the EPA under SRP, the Department is only authorized to spend up to a certain amount on remediation at any given site. Remediation costs have already been expended for this site during first phase interim source removal. Therefore, this TA will be capped at the remaining remediation budget. The additional cost to complete the scope of work will be the responsibility of the property owner, the Palmetto Community Redevelopment Agency (CRA). The Palmetto CRA will contract directly with the remedial contractor, Action Environmental, to settle the remaining cost.

The Department’s SRP Contract Manager and Golder’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $94,694.40. Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by Golder on December 6, 2022, and the TA Form for BF01D prepared by the Department. The final deliverable for this TA must be received by the Department no later than February 24, 2023.

http://www.floridadep.gov/

Golder Associates USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256

T: +1 904 363-3430 F: +1 904 363-3445

Golder and the G logo are trademarks of Golder Associates Corporation golder.com

December 6, 2022 Proposal No. 202208350

Ms. Megan Johnson Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR INTERIM SOURCE REMOVAL (SECOND PHASE)

FORMER SLICK’S GARAGE

904 4TH STREET WEST

PALMETTO, MANATEE COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_7517

BROWNFIELDS SITE ID: BF411201004

Dear Ms. Johnson:

Golder Associates USA Inc. (Golder) is providing the Florida Department of Environmental Protection (DEP) with this cost proposal to implement Interim Source Removal (ISR) activities for the above-referenced site. ISR activities will be completed in accordance with Golder’s June 2022 ISR Work Plan. Based on the previous DEP fiscal year budget allotment, the DEP requested that Golder complete ISR activities in two phases. The first phase was completed in June 2022 (previous DEP fiscal year) and consisted of partial ISR Work Plan implementation in Area 2 and Area 3. The second phase will be completed during the current DEP fiscal year and will consist of ISR Work Plan implementation in Area 1 and the remaining ISR activities in Area 2 and Area 3 that were not completed during the first phase. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

Ms. Megan Johnson Proposal No. 202208350

Florida Department of Environmental Protection December 6, 2022

SUBTASK 2 – INTERIM SOURCE REMOVAL

Golder recommends excavation of the soil with polynuclear aromatic hydrocarbon (PAH) and arsenic concentrations above the applicable DEP Soil Cleanup Target Levels. Golder used the existing soil analytical data to define the design excavation areas and depths. ISR soil disposal and backfill calculations are shown in Table 5. The proposed excavation areas and depths are shown on Figure 4.

Site Preparation Activities Site Access, Utility Clearance, and Permits

Following authorization to proceed, Golder will coordinate with the real property owner for access to complete the scope of work. Golder will obtain the applicable local, county, and state-required permits prior to implementing the proposed scope of work. The location of underground utilities will be identified and marked. Sunshine State One Call, a utility location service provider, will be contacted at least three working days (72 hours) before any subsurface work begins. Given that work will be conducted on private property, Sunshine State One Call might not be able to provide details regarding specific utilities in the area where site restoration activities will be conducted. Therefore, Golder will use a private utility location company to locate and map shallow subsurface anomalies present within the proposed site restoration areas.

Anomalies will be marked with paint on the ground surface and a scaled drawing will be developed for reference during site restoration activities. The remedial contractor will then, if applicable, uncover sections of the utilities prior to site restoration activities to verify the locations, depth, and direction. Golder or its remedial contractor will contact appropriate companies to have the identified utilities decommissioned prior to site restoration activities, if necessary.

Utilities will be restored or repaired after the completion of the site restoration activities, as necessary.

Kick-Off Meeting

Before initiation of soil excavation activities, Golder will conduct a kick-off meeting with the appropriate contractor representatives, the DEP representatives, and the property owner. The purpose of the kick-off meeting will be to:

▪ Review and confirm the health and safety procedures.

▪ Establish lines of communication.

▪ Document preconstruction site conditions by taking photographs and videos of relevant site features.

▪ Plan workflow and scheduling details.

▪ Establish work zones (exclusion zone, contaminant reduction zone, and support zone).

▪ Review any concerns on the conduct of the work.

Excavation Area Demarcation and Horizontal Control

Golder will mark the excavation areas with pin flags or wooden stakes and marking paint using the GPS coordinates (northings and eastings) of the cut-line soil sampling locations established from the soil sampling activities. The topographic elevations will be surveyed by Golder personnel prior to excavation activities and again following completion of backfilling activities to verify the ground surface is returned to its approximate pre-excavation elevation.

Site Security

Temporary fencing along with orange safety fence will be used to secure open excavation areas on residential properties during non-working hours. The temporary fencing will be placed around the front and sides of the property boundary during ISR activities to minimize public access to the excavation areas as needed. Warning signs will also be posted during ISR activities. The remedial contractor will be responsible for providing security for their equipment and roll-off containers, which may include onsite security or transportation to a local storage yard daily.

Erosion and Stormwater Controls

The remedial contractor will be responsible for setting up and maintaining stormwater controls, which may include installing silt fencing, wattle, or hay bales around the perimeter of the proposed excavations areas, as necessary.

The approximate area for the source removal is less than one acre and, therefore, will not require a Stormwater Pollution Prevention Plan and a Notice of Intent to Use Generic Permit for Stormwater Discharge from Large and Small Construction Activities.

Proposed Soil Excavation The second phase of the ISR implementation will consist of excavation of impacted soil from the following areas:

▪ Area 1 – the proposed 2 feet below ground surface (bgs) area (green shading); the proposed 4 feet bgs areas (yellow shading); and the proposed 6 feet bgs area (orange shading), as shown on Figure 4.

▪ Areas 2 and 3 – the proposed 6 feet bgs area (orange shading), as shown on Figure 4.

Based on the soil analytical results, an approximately 727 square-foot area will be excavated to a depth of 2 feet bgs; an approximately 203 square-foot area will be excavated to a depth of 4 feet bgs; and an approximately 3,239 square-foot area will be excavated to a depth of 6 feet bgs. The estimated total volume of impacted soil is approximately 804 cubic yards in-place. Using a conversion factor of 1.4 tons per cubic yard and a 10 percent contingency factor, the estimated disposal mass is 1,238 tons; however, Golder rounded-up the estimated disposal mass (to the nearest ton) at each depth interval, which resulted in a design estimated disposal mass of 1,241 tons.

The estimated disposal tonnage calculations are shown in Table 5. The proposed excavation areas and depths for each area are shown on Figure 4. Note: the ISR calculations presented in Table 5 assume a water table depth of 6 feet bgs. The observed water table depth during the November 2022 soil sampling event was 5 feet bgs. Golder proposes to use 6 feet bgs for cost estimating purposes; however, the actual excavation depth will be to the top of the water table at the time of the excavation.

The anticipated list of significant equipment to be used during ISR activities is as follows: excavator (CAT 320 or similar), compact track loader (CAT 249 or similar), wheel loader (CAT 930 or similar), bulldozer (CAT D5 or similar), vibratory drum roller (44-inch diameter), trailer-mounted water wagon for dust control, support truck with a fuel cell, support trailer, and an equipment trailer. The exclusion zone, contaminant reduction zone, and support zone will be marked prior to the initiation of excavation activities.

Excavated soils will be direct loaded into the transport trucks. The trucks will be loaded atop plastic sheeting to prevent excavated soil from coming in contact with the surface. Excavated soil may also be temporarily stockpiled atop plastic sheeting and covered with plastic sheeting when not in use and at the end of each day. Transport truck tires will be visually inspected for the presence of excavated soil prior to departure. If observed, the excavated soil present on the tires will be removed from the plastic sheeting and transferred back to a stockpile.

Excavation work will be conducted in accordance with the Florida Trench Safety Act, Sections 533.60 – 533.64, Florida Statutes and Underground Facility Damage Prevention and Safety Act, Sections 556.101 – 556.111.

Proposed Soil Disposal The results of soil sampling analyses confirmed that the impacted soils are suitable for transportation and disposal as non-hazardous waste at an approved facility. Once loaded, the soils will be transported to Heart of Florida Landfill in Lake Panasoffkee, Florida. The remedial contractor will provide weigh tickets from a local scale along with weigh tickets from the landfill. Waste handling, storage, transportation, and disposal will be performed in accordance with Chapter 62-730, FAC (Updated Investigation Derived Wastes Best Management Practices).

Traffic controls will be in place along 4th Street West during ISR activities and will include appropriate signage and safety cones or barricades. Trucks traveling on city streets will not exceed the posted speed limits and may reduce speeds if dust is observed.

Backfill and Site Restoration The excavation areas will be backfilled with clean fill and the surface will be restored to its original condition. Prior to site mobilization, Golder or the remedial contractor will collect a sample of the proposed backfill. One soil sample will be collected from the fill source (borrow pit) and analyzed in accordance with Rob Cowdery’s memo dated

June 4, 2009. The representative backfill sample will be collected and analyzed for the presence of volatile organics, base/neutral compounds, acid extractables, RCRA metals, pesticides, and total recoverable petroleum hydrocarbons. The results of the backfill analysis will be submitted to the DEP for approval prior to use.

Once approved, the backfill will be placed in one-foot lifts. Golder will test the backfill material to verify that the compaction was completed to at least 95 percent of the modified Proctor maximum dry density. The frequency of the testing will be at least three tests per 5,000 square feet, which will result in approximately three testing locations.

For safety purposes, compaction testing will start at four feet bgs in the areas excavated below four feet. Golder anticipates that the backfill will be directly loaded into the excavation areas upon arrival and will not be stockpiled onsite. If a stockpile area is required, Golder will notify the DEP and agree on an appropriate location.

Once the compaction requirements have been met, the excavation area will be seeded, unless otherwise directed by the DEP.

Health and Safety The site activities will create health and safety concerns for both site workers and the general public. Measures will be implemented to address exposure risks and health and safety hazards for both groups. In general, the threats to the health and safety of the general public will be addressed by controlling access to the site, preventing public vehicular and pedestrian access to the work area, and controlling dust. Golder will provide a health and safety specialist on-site during the excavation to monitor the safety procedures and dust levels.

Site work will be completed in accordance with Golder’s safety rules and procedures and applicable local, state, and federal regulations, including the Occupational Safety and Health Administration (OSHA) and the US Department of Transportation regulatory requirements. Engineering controls, personal protective equipment, and personal monitoring will be used to control risk to site worker health and safety. In accordance with OSHA’s 29 CFR 1910.120 regulations, a site-specific Health and Safety Plan will be prepared for the soil excavation work. The HASP will include Chemical Safety Data Sheets; maps and directions to the nearest hospital; project personnel and emergency contact information; general safety procedures; and control measures for the potential physical, chemical, and biological hazards at the site.

During construction or maintenance operations, the maximum sound level during daytime hours at the property lines will be 75 decibels. Hearing protection may be required in the vicinity of the work areas.

Personnel working in potentially impacted areas will have completed 40 hours of Hazardous Site Health and Safety Training as required by OSHA 29 CFR 1919.120 (f) regulations, and annual eight-hour refresher training within one year prior to working at the site. Golder anticipates the field activities can be completed in Level D personal protective equipment.

Site contractors will be provided a copy of the HASP for information and guidance. The excavation contractor will be responsible for preparing its own project-specific HASP; complying with all applicable safety rules, procedures, and regulations; and providing for the safety of its employees and any other party retained by the contractor. Spill kits and fire extinguishers will be kept on-site throughout the duration of the project.

Site workers will attend daily job safety briefings at the beginning of each field day to discuss upcoming site activities.

Additional job safety briefings will be completed as required by changes in site conditions and/or activities. Qualified personnel will be provided to coordinate traffic control and workplace logistics throughout the completion of the project.

Dust Control Golder personnel will monitor dust levels in the work area and along the property boundary throughout the ISR activities. Work may be suspended if conditions of high dust generation cannot be controlled. A TSI DustTrak DRX Aerosol Monitor, or equivalent will be used to measure dust levels at a minimum of one upwind and one downwind location. The meters will be mounted on the surveyor’s tripods approximately 5 feet above the ground surface. Dust meters will collect real-time data, which will be downloaded via USB daily. The location of the monitors will be determined by site conditions and Golder. The locations can be adjusted throughout the day based on wind direction data. The action level for the project will be based on a 4 milligrams per cubic meter differential between upwind and downwind monitoring stations. If the action level is exceeded for a period greater than 30 minutes, work operations will cease until adequate dust mitigation measures can be implemented. During dry periods, a water truck may be used to minimize dust generation.

COST AND SCHEDULE

The estimated cost to complete the scope of work is $185,411.18; however, the remaining DEP remediation budget for the site is $94,848.00. As discussed with the DEP, Golder proposes that the additional cost to complete the scope of work be the responsibility of the property owner, the Palmetto Community Redevelopment Agency (CRA).

Golder has recommended that the Palmetto CRA contract directly with the remedial contractor, Action Environmental.

Golder has scheduled the second phase of ISR activities for December 12, 2022, through December 23, 2022 (10 working days). Golder proposes to submit an interim deliverable following the completion of the second phase.

The interim deliverable will include, at a minimum, field documentation, daily reports, weigh tickets and disposal manifests, backfill tickets, and compaction test results. The ISR Report will be submitted following the completion of the second phase of ISR activities. The level of effort sheets and cost estimate form are included in Attachment A.

Subcontractor bids are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 Project Management

$ 3,793.27 March 24, 2023

Subtask 2 Interim Source Removal

$85,723.88 January 20, 2023 (Field documentation, weigh tickets, daily reports via e-mail deliverable)

Subtask 3 Interim Source Removal Report

$ 5,177.25 February 24, 2023 (ISR Report)

Total/Completion Date $94,694.40 April 21, 2023

Golder appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, Golder Associates USA Inc.

Matthew C. Crews, PE Jesse C. Brown, PE Senior Lead Consultant, Environmental Engineer Director, Environmental Engineer

MCCJCB/as

Attachments: Table 5 Soil Volume Calculations

Figure 4 Proposed Soil Sampling Locations and Excavation Areas Attachment A Level of Effort Sheets and Cost Estimate Form Attachment B Subcontractor Bids

G:\Projects\DEP - Brownfields\Slick's Garage\BF01D - Slick's Garage ISR\Proposal\BF01D - Slick's Garage Phase II ISR Proposal.docx

TABLE 5

December 2022 31404452.7517.BF01D cubic feet cubic yards

2 727 1,454 54 76

4 203 812 30 43

6 1,786 10,716 397 556

Subtotal 2,716 12,982 481 675 cubic feet cubic yards

6 1,453 8,718 323 453

Subtotal 1,453 8,718 323 453

1,241

Total Excavation Volume (cubic yards in place)

20% Contingency

Factor (cubic yards)

Expansion Factor

Estimated Backfill Volume

(cubic yards)B

Estimated Number of

TrucksB

804 161 1.4 1,368 76

Application Area (square feet)

20% Contingency

Factor 4,169 834

Notes:

bgs - below ground surface

*Assume water table depth of 6 feet bgs AAssume 1.4 tons per cubic yard, rounded up to the nearest ton BAssume 18 cubic yards per truck, rounded up to nearest truckload

Seed and Water Calculations

Estimated Total Application Area (square feet)

5,003

Areas 2 and 3

10% Contingency Factor

Total

Backfill Calculations

Total Estimated Soil Disposal Mass

Estimated

MassA

(tons)

Soil Disposal Calculations

Excavation Depth* (feet bgs)

Surface Area (square feet)

Volume Estimated

MassA

(tons)

Area 1

10% Contingency Factor

Total

Excavation Depth* (feet bgs)

Surface Area (square feet)

Volume

Facility ID No. ERIC_7517

TABLE 5

SOIL VOLUME CALCULATIONS

AREA 1, 2, AND 3

Former Slick's Garage Palmetto, Manatee County, Florida

Table 5 - ISR Calculations Page 1 of 1

FIGURE 4

9TH

AVEN

U E W

10TH

AVEN

U E W

9TH

AVEN

U

E WAREA 1

PROPOSED EXCAVATION AREA TO 2 FT-BGS 727 SF

PROPOSED EXCAVATION AREA TO 4 FT-BGS 203 SF

PROPOSED EXCAVATION AREA TO 6 FT-BGS 1,786 SF

AREA 2 AND 3

COMPLETED EXCAVATION AREA TO 2 FT-BGS 3,744 SF

COMPLETED EXCAVATION AREA TO 4 FT-BGS 1,451 SF

PROPOSED EXCAVATION AREA TO 6 FT-BGS 1,453 SF

MW-1

MW-2

MW-3

MW-4

MW-5

MW-6

MW-7

MW-8

MW-9

MW-10

MW-11

MW-12

MW-13

SB-1

SB-2NN

SB-2NW SB-2NE

SB-2N

SB-2S

SB-2W

SB-2 SB-2E

SB-3

SB-3N

SB-3S

SB-3W SB-3E

SB-4

SB-4N

SB-4NE

SB-4W

SB-4E

SB-4EE

SB-4SE

SB-4S

SB-9

SB-9N SB-9NE

SB-9W

SB-9E SB-9EE

SB-9S

SB-9SE

SB-6

SB-6N

SB-6S

SB-6W SB-6E

SB-10NW

SB-10N SB-10NE SB-13

SB-10W

SB-10

SB-10E SB11NE

SB-10SW

SB-10S

SB-10SE

SB-11

SB-11E

SB-12

SB-11SW

SB-11S

SB-11SE

SB-11SE/10E

SB-11SE/10S

SB-5SB-7WW

SB-7W SB-7

SB-7S

SB-7SS

SB-7E

SB-7EE

SB-8

SB-14

SB-15

SB-16

SB-17

SB-18

SB-19

SB-20

SB-21

SB-22

SB-23

SB-7N/SB-24

SB-48

SB-49

SB-36

SB-34

SB-33

SB-32

SB-31

SB-30

SB-29

SB-28

SB-27

SB-26

SB-25

SB-37

SB-39

SB-38 SB-40

SB-41

SB-42

SB-43

SB-44

SB-45

SB-46

SB-47

SB-56

SB-55

SB-54

SITE BOUNDARY

SB-1

in

31404452 Control No.

31404452-B004

FIGURE

2022-11-28

BCL

SJRS

MCC

JCB

FORMER SLICK'S GARAGE

904 4th ST WEST, PALMETTO

MANATEE COUNTY, FL

FL. DEPT. OF ENVIRONMENTAL PROTECTION

PROPOSED EXCAVATION AREAS

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th go ld er

.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

Sl ic ks _G ar ag e\

Ph

_B F0

1A _J un e2

2\

Ac tiv e D ra w in gs

F ile

N am e:

-B

4.

dw g

REFERENCE(S)

SCALE

0 20 40

FEET

1. BASEMAP SOURCE: CARDNO, DATED APRIL 2022.

2. AERIAL IMAGERY SOURCE: GOOGLE EARTH© PRO 2010, IMAGE DATED

MAY 2022. IMAGE GEOREFERENCED BY GOLDER AND INTENDED FOR

INDICATIVE PURPOSES ONLY.

MW-1 SHALLOW MONITOR WELL

SOIL BORING

LEGEND

NO EXCEEDANCE OF SCTL (IF ANALYZED)

CONCENTRATION ABOVE RESIDENTIAL OR INDUSTRIAL

DIRECT EXPOSURE SCTL FOR As OR PAHs (0-0.5 FT-BGS)

CONCENTRATION ABOVE RESIDENTIAL OR INDUSTRIAL

DIRECT EXPOSURE SCTL FOR As OR PAHs (0.5-2.0 FT-BGS)

CONCENTRATION ABOVE RESIDENTIAL OR INDUSTRIAL

DIRECT EXPOSURE SCTL FOR As OR PAHs (2-4 FT-BGS)

CONCENTRATION ABOVE RESIDENTIAL OR INDUSTRIAL

DIRECT EXPOSURE SCTL FOR As OR PAHs (4-6 FT-BGS)

NOTE(S)

1. SCTL - SOIL CLEANUP TARGET LEVEL, PER TABLE II, CHAPTER 62-777,

FAC

2. As - ARSENIC

3. PAHs - POLYNUCLEAR AROMATIC HYDROCARBONS

4. FT-BGS - FEET BELOW GROUND SURFACE

5. SF - SQUARE FEET

6. PAH AND As CONCENTRATIONS IN SOIL ARE PRESENTED IN TABLE 1 AND

TABLE 4, RESPECTIVELY.

7. SAMPLE LOCATIONS AND EXCAVATION AREAS ARE APPROXIMATE.

PROPOSED EXCAVATION AREA TO 2 FT-BGS (4,471 SF)

COMPLETED EXCAVATION AREA TO 2 FT-BGS (3,744 SF)

PROPOSED EXCAVATION AREA TO 4 FT-BGS (1,654 SF)

COMPLETED EXCAVATION AREA TO 4 FT-BGS (1,451 SF)

PROPOSED EXCAVATION AREA TO 6 FT-BGS (3,239 SF)

AREA 1

AREA 2 AND 3

COMPLETED EXCAVATION AREA

PROPOSED EXCAVATION AREA

ATTACHMENT A

Level of Effort Sheets and Cost Estimate Form

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Slick's Garage SUBTASK 2: Interim Source Removal

DATE: 12/6/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 21

Senior Sci/Eng (G. O'Neal) 5

Project Sci/Eng (S. Sider) 112

Staff Sci/Eng (A. Morales) 102

TOTAL LABOR 240

VEHICLE TYPE RATE UNIT USEAGE

Truck (Field Staff 1 ISR) $480.00 Per Week 2 $960.00 Truck (Field Staff 2 ISR) $480.00 Per Week 2 $960.00 Car (Site Visit) $80.00 Per Day 1 $80.00 Car (Kick-off meeting) $80.00 Per Day 1 $80.00

TOTAL VEHICLE $2,080.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem S. Sider $36.00 Per Day 9 $324.00 Hotel S. Sider $93.50 Per Day 8 $748.00

TOTAL PER DIEM $1,072.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Action Environmental ISR $47,500.00 LS 1 $47,500.00 GPRS Utility Locate $700.00 LS 1 $700.00

TOTAL $48,200.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 10 $400.00 Total GPS Station $175.00 Per Day 2 $350.00 Construction/O&M/Pilot Test Kit $1,440.00 Per Week 2 $2,880.00 Respiration Dust Monitor (2 total) $480.00 Per Week 4 $1,920.00

TOTAL EQUIPMENT $5,550.00

ISR Activities estimated to take 10 days over a two-week period. Daily reports will be prepared for each day of ISR activities.

Subcontractor oversight, waste management, site control, health and safety, site restoration (10 hours per day x 10 days = 100 hours). Round trip travel (2 hours).

Round trip travel (8 hours). Project kick-off meeting (3 hours). Daily report of ISR activities (10 hours).

Field event preparation (4 hours). Subcontractor oversight, waste management, site control, health and safety, site restoration (10 hours per day x 10 days = 100 hours). Round trip travel (8 hours).

Round trip travel for site visit (2 hours). Construction oversight during site visit (3 hours).

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Slick's Garage SUBTASK 3: ISR Report

DATE: 12/6/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 2

Senior Consultant (M. Crews) 24

Senior Project Sci/Eng (B. Lucero) 3

Staff Sci/Eng (A.Strayer) 1

TOTAL LABOR 30

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Reporting-document production, binding and shipping

Prepare conclusions and recommendations for ISR Report. Finalize report.

Develop draft ISR Report and as-built drawings

Develop figures for ISR Report.

FINAL --7/24/96

FDEP COST ESTIMATE

Contractor: Golder Associates USA Inc.

Date: 12/6/2022

Task #: BF01D SubTask 1 Project Management SubTask 6

Site: Former Slick's Garage SubTask 2 Interim Source Removal SubTask 7

Activity/Phase: ISR SubTask 3 ISR Report SubTask 8

Project Manager: Megan Johnson SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$59.62 Project Manager (MC) 21 21.2

$0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$63.65 Practice Leader - X-13 (JB) 2 0.0 2 0 0 0 0 0 0 0

$59.62 Senior Consultant - X-12 (MC) 45 21 24 0 0 0 0 0 0 0

$53.74 Senior Sci/Eng - X-11 (GO) 5 5 0 0 0 0 0 0 0 0

$45.42 Senior Project Sci/Eng - P-10 (BL) 3 0 3 0 0 0 0 0 0 0

$33.19 Project Sci/Eng - P-9 (SS) 112 112 0 0 0 0 0 0 0 0

$0.00 Project Sci/Eng - P-9 0 0 0 0 0 0 0 0 0 0

$27.15 Staff Sci/Eng - P-8 (AM) 102 102 0 0 0 0 0 0 0 0

$32.75 Staff Sci/Eng - P-8 (AS) 1 0 1 0 0 0 0 0 0 0

$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 291 21.2 240.0 30 0 0 0 0 0 0 0

Direct Labor $10,999.97 $1,265.48 $8,007.30 $1,727.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $18,974.94 $2,182.95 $13,812.59 $2,979.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $29,974.91 $3,448.43 $21,819.89 $4,706.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 12/6/2022

Task #: BF01D SubTask 1 Project Management SubTask 6

Site: Former Slick's Garage SubTask 2 Interim Source Removal SubTask 7

Activity/Phase: ISR SubTask 3 ISR Report SubTask 8

Project Manager: Megan Johnson SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Travel

Vehicle Rental $2,080.00 $2,080.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $1,072.00 $1,072.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $3,152.00 $3,152.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utility Location $700.00 $700.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Action Environmental $47,500.00 $47,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $48,200.00 $48,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $4,820.00 $4,820.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $53,020.00 $53,020.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $400.00 $400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $5,150.00 $5,150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $5,550.00 $5,550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $91,696.91 $3,448.43 $83,541.89 $4,706.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $2,997.49 $344.84 $2,181.99 $470.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $94,694.40 $3,793.27 $85,723.88 $5,177.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

ATTACHMENT B

Subcontractor Bids

3007 N.50th St. Tampa, Fl 33619 P a g e | 1

December 1, 2022

Matt Crews, P.E.

WSP Golder 9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256

Re: Former Slick’s Garage Interim Source Removal (ISR)

Dear Mr. Crews:

In accordance with your request for accost estimate, Action Environmental is pleased to provide the following proposal for the removal of arsenic-impacted soils at the Former Slicks’ Garage site in Palmetto, Florida.

Based on your email on November 29th, 2022, we understand the scope of work to include the following:

SCOPE OF SERVICES:

Call in public utility location services (WSP Golder to conduct private utility location survey).

Mobilize personnel and equipment to the site to excavate soils as shown on Figure 4 - Proposed ISR

Activities as Area 1 and the 6-foot deep area of Area 2 and 3.

Site preparation including 6’ temporary construction fencing around excavation area and erosion control around excavations.

Excavated, load, transport and dispose of arsenic impacted soils.

Backfill in 1’ lifts and compact to 95% modified proctor (Action to provide proctor results of backfill material – WSP Golder to conduct density testing in the field).

Hydroseed backfilled and disturbed areas.

Remove temporary fencing and demobilize equipment and crew from the site.

CONDITIONS and ASSUMPTIONS:

No interfering utilities.

Excludes permitting.

Assumes no waiting on confirmation sample results in the field.

Excludes backfill analytical (assumes the analytic from phase I is acceptable) Unit Rates are based on the assumption that the confirmation lab results are “clean” and no additional excavating is required.

Profile is still open/active at Heart of Florida so no profiling will be required.

Provide OSHA 40hr trained equipment operators and labor.

Excludes density testing (WSP Golder to conduct) Excludes dewatering.

Proposal is based on 10 working days with a 3-4 man crew working up to 8-hour days (8 hours onsite plus 2 hour drive time each day).

Assumes backfilling operations can begin while excavation activities are ongoing.

Excludes construction of stone or other entrances – tires to be dry brushed if warranted.

Erosion controls to be removed when vegetation has been established as determined by Golder.

Assumes site is accessible for tractor trailers for hauling contaminated soil to landfill Action will hydroseed the disturbed areas. Hydroseed is applied with water and that will be considered the initial watering event. Subsequent watering is not included in our cost proposal.

Assumes water source onsite is available for dust control if needed.

This cost estimate is valid for up to 30 days.

ESTIMATED COSTS:

Please find the following attachment to this proposal following the Acceptance Page:

3007 N.50th St. Tampa, Fl 33619 P a g e | 2

Bid Summary Area 1 and Area 2

Thank you for the opportunity to provide this cost estimate.

Respectfully Submitted, Action Environmental

Jason Marberry Project Manager

Item Quantity Units Unit Cost Cost Comments

Mobilization 1 LS $10,500.00 $10,500.00 Site Preparation and Stormwater Controls 1 LS $2,900.00 $2,900.00 Site Security (temporary fencing) 300 LF

$6.50 $1,950.00 Temporary 6-foot high chain-link fence to restrict public access to site

Excavation and Non-Hazardous Waste Transport and Disposal 1,241 tons $62.00 $76,942.00

Secondary Weigh Tickets for T&D Trucks 54 per truck $50.00 $2,700.00 Please add number of trucks Backfill Placement and Compaction 1,368 CY $24.00 $32,832.00 Seed and Water Backfill Areas 5,003 SF $0.50 $2,501.50 Demobilization 1 LS $2,500.00 $2,500.00

TOTAL COST $132,825.50

Number of Days to Complete 10

Notes:

LS - lump sum LF- linear feet

SF - square feet CY -cubic yards

BF01D - Slick's Garage Bid Summary Table - Estimated Units

November 2022 31404452.7517.BF01D

INTERIM SOURCE REMOVAL BID SUMMARY NOVEMBER 2022 - AREA 1 AND AREA 2

Former Slick's Garage Palmetto, Manatee County, Florida Facility ID No. ERIC_7517

May 2022 31404452.7517.BF01A

INTERIM SOURCE REMOVAL BID SUMMARY

AREA 2 AND AREA 3

Former Slick's Garage Palmetto, Manatee County, Florida

Facility ID No. ERIC_7517

CAPITOL ENVIRONMENTAL SERVICES

Item Quantity Units Unit Cost Cost Comments

Mobilization 1 LS $4,800.00 $4,800.00

Site Preparation and Stormwater Controls 1 LS $4,500.00 $4,500.00 Golder will subcontract the private utility locator.

Site Security (temporary fencing) 600 LF $10.00 $6,000.00 Temporary 6-foot high chain-link fence to restrict public access to site Excavation and Non-Hazardous Waste Transport and Disposal 1,151 tons $75.32 $86,693.32

Backfill Placement and Compaction 1,368 CY $30.75 $42,066.00 Golder will complete compaction testing. Contractor to provide backfill analytical results and Proctor report prior to placement.

Seed and Water Backfill Areas 5,806 SF $0.65 $3,773.90

Demobilization 1 LS $4,800.00 $4,800.00

TOTAL COST $152,633.22

Number of Days to Complete 7

Notes:

LS - lump sum SF - square feet LF- linear feet CY - cubic yards

Assumptions:

No underground conflict utilities / No asphalt or concrete removal / Backfill to match grade No permitting or dewatering required / No delays due to confirmatory sampling Estimated Daily Production Rate (In/out): 360 CYs/Tons CESI will collect proctor and compliance sampling for import fill CESI can stockpile fill ahead of project commencement

2 - Slick's Garage ISR - Bid Summary Table (Area 2-3) Page 1 of 1 mcrews Text Box

CAPITOL ENVIRONMENTAL SERVICES

(BID FOR PART 1)

JACKSONVILLE, FL (MER) | 251 LEVY ROAD | ATLANTIC BEACH, FL 32233 | TEL. 904-241-2200

CORPORATE OFFICE | 75-D YORK AVENUE | RANDOLPH, MA 02368| TEL. 888-233-5338

CLIENT:

Attn: Matt Crews Company: Golder Associates, Inc.

Street: 9428 Baymeadows Rd. Suite 400 City, St, Zip: Jacksonville, FL 32256 Phone: (904)327-8420 Email: Matt_Crews@golder.com

WORK TO BE PERFORMED AT:

Site: Palmetto Dig Company: Former Slick's Garage

Street: 904 Fouth St W

City, St, Zip: Palmetto, FL 34221

Site Contact: Matt Crews

Phone: (904)327-8420

BID NAME: Palmetto Dig DATE: June 1, 2022

BID NO: 22FLRA0042

Dear Matt, Moran Environmental Recovery, LLC (MER) appreciates this opportunity to be of service. MER is a specialized provider of integrated environmental and industrial services. Below is the scope of work and pricing for the services requested (“Services”).

SCOPE OF WORK:

MER to complete interim source removal activities at the Former Slick's Garage site, which is located at 904 4th Street West in Palmetto, Manatee County, Florida (Facility ID: ERIC_7517). The site is managed by FDEP's Waste Cleanup Program, Brownfields Section. The excavation will be completed in two phases. Areas 2 & 3 will be completed first in June 2022 (fast turn around). Area 1 will be completed next Brownfields fiscal year (likely October 2022). Soil is contaminated with arsenic and PAHs.

PROJECT PRICING:

• Please see the attached bid sheet for Areas 1,2 & 3 to be performed during the same mobilization

• Please see the attached bid sheet for Area 2 & 3 to be performed during the same mobilization.

Clarifications:

- This bid is only good for 30 days. Due to the volitility of the fuel market, MER may need to revise this pricing if the fuel market makes a substatial shift.

- Golder to perform all density testing.

- Assumes no dewatering is needed on the site. Any removal of water will be at an additional expense and will be submitted in writing and approved if requested.

- Any delays beyond the control of MER will be charged $4,885 per day for labor and equipment standby.

- Pricing for fencing is lump sum and can’t be adjusted per foot as the fence will need to be order in sufficient time before the start of the job. Price is good for up to 6 month rental although the job is only expected to take two weeks.

- Golder to provide private locate.

- Hydroseed will be a blend of Proganics Soil Media, Bahia Seed and 16-04-08 fertilizer.

CONTRACT: 22FLRA0042

PRINTED: 6/1/2022

PAGE: 2 OF 3

COMMERCIAL TERMS AND CONDITIONS:

Payment Terms: C.O.D 1% 10 Days NET 30 Other:__________ Payments not made by due date will be subject to 1.5% monthly late fee.

This proposal may be withdrawn if not accepted within 30 days.

• SITE CONDITIONS: MER must have free and clear access to the site and where applicable, Client will supply a constant and sufficient source of running water, electricity, and other utilities necessary for MER to perform services.

• MINIMUM CHARGE: All services performed by MER are subject to a $1,000 Minimum Charge.

• ATTORNEY-IN-FACT (HANDLING OF SUBSTANCES): By executing this proposal or authorizing MER to proceed, Client authorizes MER to act on its behalf (or the generator’s behalf) and appoints MER (or its subcontractors of any tier) as its attorney-in-fact for purposes of completing and executing any documentation related to or necessary for transportation and disposal of any waste, substance, or material handled in connection with the performance of Services.

• TAXES: All applicable Federal, State, or Local taxes and/or surcharges will be included at time of invoice. Tax-exempt entities must provide proof of tax-exempt status prior to execution of the proposed work.

• CHANGE ORDERS: Any deviation from the Services specified within the Scope of Work or applicable specifications or drawings referenced herein may be subject to a change order (additional rates charges or change in schedule). MER, at its election, may choose not to proceed with such deviation until a Client and MER agree upon and mutually execute a change order.

• WASTE DISPOSAL: Disposal pricing is based upon generator information, off specification charges may apply if upon receipt at the disposal facility the material to be disposed of differs from what has been quoted. If applicable, federal, state, or local waste disposal taxes and/or surcharges will be added to the invoice.

• GENERAL TERMS AND CONDITIONS: The attached general terms and conditions shall be applicable to and govern the Services and Client’s acceptance of the general terms and conditions shall occur the earlier of: (i) Client’s execution of the proposal acceptance; (ii) Client’s written or verbal authorization to proceed; or (iii) MER’s commencement of Services (including mobilization). Any additional of different terms, conditions, or instructions proposed by Client in any form are rejected unless expressly agreed to by MER in writing.

To authorize the performance of this proposal, please execute the proposal acceptance below and return to the attention of Ryan Harris. If you have any questions regarding this quotation or would like further information on our services, please feel free to call me at 904-219-6341. In the event that I cannot be reached, please contact our office at 904-241- 2200 and ask for assistance.

Sincerely, Ryan Harris Business Manager

PROPOSAL ACCEPTANCE:

By signing below, the individual below warrants his/her authority to bind Client to the terms and conditions of this Proposal and to authorize MER to proceed with the Services.

CLIENT:

Signature: _____________________________ Name: _______________________________

Date: _____________________________ Title: _______________________________

PO Number _____________________________

CONTRACT: 22FLRA0042

PRINTED: 6/1/2022

PAGE: 3 OF 3

GENERAL TERMS AND CONDITIONS

1. Performance. Moran Environmental Recovery, LLC (“MER”) agrees to perform the services identified on its proposal (the

“Services”) in accordance with these general terms and conditions and those within the proposal (the “Agreement”). MER will perform the services at the general direction of Client, in conformance with applicable local, state, federal, and industry standards. Unless stated otherwise, the Services do not include any utility locate, design, engineering, or any similar technical services, and to the extent such services are needed in connection with the Services, it shall be the responsibility of Client or third parties engaged by Client.

2. Suspension or Termination by MER. MER may terminate this Agreement and cancel the Services at any time for convenience, if MER determines in its reasonable opinion the Services cannot be performed without posing an unreasonable risk to property, the environment, or health of any personnel, or in the event Client: (i) fails to pay any amounts due; (ii) materially breaches any term or condition of this Agreement; or (iii) fails to provide reasonable assurances to MER of its ability to pay for the Services.

3. Warranties. MER warrants that it will perform the Services in a professional and workmanlike manner consistent with sound industry practices. EXCEPT AS EXPRESSLY PROVIDED HEREIN, MER MAKES NO AND EXPRESSLY DISCLAIMS ANY GUARANTEES, REPRESENTATIONS, OR WARRANTIES AS TO THE PERFORMANCE OR SUITABILITY OF THE SERVICES AND ANY ASSOCIATED PERSONNEL, LABOR, EQUIPMENT, OR MATERIALS PROVIDED BY MER, INCLUDING BUT NOT LIMITED TO ANY WARRANTY OR REPRESENTATIONS AS TO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .