CN-370000-HW685-DC026B.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|HW685|184b9800bda47b032a54413957b4b38d
Contract number
HW685
Issued by
Florida

About this file

Document Summary

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to WSP USA, Inc. (formerly Golder Associates USA Inc.) for remediation activities at the Dry Cleaning Depot site located at 1320 West Sunrise Boulevard, Fort Lauderdale, Broward County, Florida. The task assignment is identified as DC026B under Contract Number HW685, with a completion date of June 23, 2023. The project is managed by Ginger Shirah for FDEP and Matt Crews for WSP USA, Inc.

The contract authorizes WSP to conduct soil vapor and groundwater sampling activities followed by preparation of a Remedial Action Plan (RAP) Modification totaling $28,308.43. Subtask 1 (Project Management) is valued at $2,068.43 with deliverables due May 19, 2023. Subtask 2 (Soil Vapor and Groundwater Sampling) is valued at $18,685.13 with field documentation, laboratory reports, and investigation-derived waste manifest due March 17, 2023. Subtask 3 (RAP Modification) is valued at $7,554.87 with deliverables due April 14, 2023. The work includes assessment of a soil vapor extraction system, collection of samples from 15 SVE wells and 10 monitoring wells, laboratory analysis for volatile organic compounds and dissolved gases, microbial analysis through Microbial Insights, and preparation of a RAP Modification incorporating bioaugmentation recommendations. The contract is structured on a fixed unit rate basis with 126 total labor hours allocated across all subtasks.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01A.pdf PDF
CN-370000-HW685-BF01CCO1.pdf PDF
CN-370000-HW685-BF02A.pdf PDF
CN-370000-HW685-BF05A.pdf PDF
CN-370000-HW685-BF05ACO1.pdf PDF
CN-370000-HW685-BF1BCO1.pdf PDF
CN-370000-HW685-BIL02C.pdf PDF
CN-370000-HW685-BIL1ACO4.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf PDF
CN-370000-HW685-BIL3ACO1.pdf PDF
CN-370000-HW685-CSS01.pdf PDF
CN-370000-HW685-CSS2ACO2.pdf PDF
CN-370000-HW685-DC001C.pdf PDF
CN-370000-HW685-DC001E.pdf PDF
CN-370000-HW685-DC002B.pdf PDF
CN-370000-HW685-DC002C.pdf PDF
CN-370000-HW685-DC002E.pdf PDF
CN-370000-HW685-DC003C.pdf PDF
CN-370000-HW685-DC004A.pdf PDF
CN-370000-HW685-DC007A.pdf PDF
CN-370000-HW685-DC007B.pdf PDF
CN-370000-HW685-DC008B.pdf PDF
CN-370000-HW685-DC008D.pdf PDF
CN-370000-HW685-DC009A.pdf PDF
CN-370000-HW685-DC009D.pdf PDF
CN-370000-HW685-DC009E.pdf PDF
CN-370000-HW685-DC010C.pdf PDF
CN-370000-HW685-DC012A.pdf PDF
CN-370000-HW685-DC012D.pdf PDF
CN-370000-HW685-DC014B.pdf PDF
CN-370000-HW685-DC016D.pdf PDF
CN-370000-HW685-DC017A.pdf PDF
CN-370000-HW685-DC017B.pdf PDF
CN-370000-HW685-DC018B.pdf PDF
CN-370000-HW685-DC019A.pdf PDF
CN-370000-HW685-DC019C.pdf PDF
CN-370000-HW685-DC01ACO1.pdf PDF
CN-370000-HW685-DC01ECO1.pdf PDF
CN-370000-HW685-DC021A.pdf PDF
CN-370000-HW685-DC021B.pdf PDF
CN-370000-HW685-DC021C.pdf PDF
CN-370000-HW685-DC021E.pdf PDF
CN-370000-HW685-DC022C.pdf PDF
CN-370000-HW685-DC023A.pdf PDF
CN-370000-HW685-DC023D.pdf PDF
CN-370000-HW685-DC024C.pdf PDF
CN-370000-HW685-DC025A.pdf PDF
CN-370000-HW685-DC027D.pdf PDF
CN-370000-HW685-DC028A.pdf PDF
CN-370000-HW685-DC028D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC026B Completion June 23, 2023

This Task Assignment authorizes WSP to conduct RAPMOD activities in accordance with the Scope of Work and Cost Proposal submitted on January 18, 2023.

Ginger Shirah 850-245-8899 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

WSP USA, Inc.

WSP USA, Inc.

Matt Crews 904-363-3430

ERIC_4158

1320 WEST SUNRISE BOULEVARD, FORT LAUDERDALE, BROWARD COUNTY

DRY CLEANING DEPOT

✔ $ 28,308.43

$ 28,308.43

Scope of Work

Matthew Crews, PE

Environmental Engineer

1/20/2023

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2023.01.20 15:08:06 -05'00' Kelly Crain Digitally signed by Kelly Crain

Date: 2023.01.20 13:55:54 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Field Documentation, Laboratory Report, IDW Manifest via e-mail deliverable 03/17/2023

Subtasks 1 & 3: RAP Modification; Project Management 04/14/2023

Subtask 2: Field Documentation, Laboratory Report, IDW Manifest via e-mail deliverable $ 18,685.13

Subtasks 1 & 3: RAP Modification; Project Management $ 9,623.30

$ 28,308.43

HW685

DC026B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To:

From:

Date:

HW685 Contract Negotiation File Dry Cleaning Depot Fort Lauderdale, Broward County

ERIC_ 4158

Ginger Shirah, Project Manager January 19, 2023

Subject: Negotiation Summary

HW685 DC026B

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the January 18, 2022, Scope of Work, Cost Estimate, and Bid Documentation.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Soil Vapor and Groundwater Sampling Activities This subtask includes labor, vehicle, travel, lab, equipment and subcontractor costs for soil vapor and groundwater sampling activities. First, WSP will assess the condition of the SVE system and collect soil vapor samples from each of the 15 individual SVE wells (SVE-1 through SVE-15). WSP proposes to collect groundwater samples from the following 10 wells: MW001R, MW040, MW010R,MW011R, MW014, MW015R, MW038, MW041, MW042, and MW044 which will be analyzed for volatile organic compounds (VOCs) via EPA method 8260B. Monitoring wells MW001R, MW011R, MW038, MW041, MW042, & MW044 will be analyzed for dissolved gases via EPA Method RSK 175.

Monitoring wells MW001R, MW038, & MW041will be analyzed for CENSUS-DNA by Microbial Insights, a specialty laboratory in Knoxville, TN. WSP requested bids for the IDW disposal; Erwin was chosen with the lowest bids

Subtask 3: RAP Modification This subtask includes labor hours associated with preparing a RAP Modification, which will include proposed injection well information, recommended injection procedures, UIC Notice, updated figures and the quarterly Groundwater Monitoring Plan.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $28,308.43 with 126 labor hours. A site access agreement has been executed for this source property as verified on 1/19/23.

Printed on recycled paper.

FDEP COST ESTIMATE

Contractor: Golder Associates USA Inc./WSP USA Inc.

Date: 1/18/2023

Task #: DC026B SubTask 1 Project Management SubTask 6

Site: SubTask 2 Soil Vapor and Groundwater Sampling SubTask 7

Activity/Phase: Remediation SubTask 3 RAP Modification SubTask 8

Project Manager: Ginger Shirah SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$64.39 Project Manager (MC) 10.7

$0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$68.75 Practice Leader - X-13 (JB) 3 0 3 0 0 0 0 0 0 0

$64.39 Senior Consultant - X-12 (MC) 38 8 30 0 0 0 0 0 0 0

$0.00 Senior Sci/Eng - X-11 0 0 0 0 0 0 0 0 0 0

$0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0

$42.00 Senior Project Sci/Eng - P-10 (BL) 4 0 4 0 0 0 0 0 0 0

$0.00 Senior Project Sci/Eng - P-10 0 0 0 0 0 0 0 0 0 0

$40.37 Project Sci/Eng - P-9 (DM) 34 34 0 0 0 0 0 0 0 0

$36.66 Staff Sci/Eng - P-8 (JS) 4 0 4 0 0 0 0 0 0 0

$33.90 Staff Sci/Eng - P-8 (AS) 2 0 2 0 0 0 0 0 0 0

$30.00 Sci/Eng/Admin - P-7 (TT) 30 30 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 126 10.7 72.0 43.0 0 0 0 0 0 0 0

Direct Labor $5,998.14 $690.05 $2,787.70 $2,520.39 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $10,346.79 $1,190.34 $4,808.78 $4,347.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $16,344.93 $1,880.39 $7,596.48 $6,868.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Dry Cleaning Depot

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTIMATEContractor: Golder Associates USA Inc./WSP USA Inc.

Date: 1/18/2023

Task #: DC026B SubTask 1 Project Management SubTask 6

Site: SubTask 2 Soil Vapor and Groundwater Sampling SubTask 7

Activity/Phase: Remediation SubTask 3 RAP Modification SubTask 8

Project Manager: Ginger Shirah SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Dry Cleaning Depot

Travel

Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $572.00 $572.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $932.00 $932.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Microbial Insights $1,260.00 $1,260.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $1,370.00 $1,370.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $137.00 $137.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $1,507.00 $1,507.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $4,920.00 $4,920.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $600.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $5,520.00 $5,520.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $2,150.00 $2,150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $2,370.00 $2,370.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $26,673.93 $1,880.39 $17,925.48 $6,868.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $1,634.50 $188.04 $759.65 $686.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $28,308.43 $2,068.43 $18,685.13 $7,554.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dry Cleaning Depot SUBTASK 2: Soil Vapor and Groundwater Sampling

DATE: 1/18/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Consultant (M. Crews) 8

Project Sci/Eng (D. McDaniels) 34

Sci/Eng/Admin (T. Tassimbedo) 30

TOTAL LABOR 72.0

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Per Day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem D. McDaniels $36.00 Per Day 3 $108.00 Hotel D. McDaniels $89.00 Per Day 2 $178.00

Per Diem T. Tassimbedo $36.00 Per Day 3 $108.00 Hotel T. Tassimbedo $89.00 Per Day 2 $178.00

TOTAL PER DIEM $572.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Microbial Insights CENSUS-DNA $420.00 Per Sample 3 $1,260.00 Erwin IDW T&D - Liquids $110.00 Per Drum 1 $110.00

TOTAL $1,370.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Groundwater Samples Halocarbons 8260 $73.00 10 $730.00 Methane/ethane/ethene RSK175 $180.00 6 $1,080.00 Total VOCs (IDW) PID/Hall Series $110.00 1 $110.00 Sample Shipping Large $150.00 2 $300.00

Soil Vapor Samples VOC Soil Vapor-Full Scan TO-15 $200.00 15 $3,000.00 Sample Shipping Large $150.00 2 $300.00

TOTAL LAB $5,520.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 3 $120.00 Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00

MAGS Investigation Kit $500.00 Per Day 2 $1,000.00 Tedlar Bag $20.00 Per Bag 12 $240.00

Tubing, Poly HDPE $0.30 Per Foot 1,000 $300.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per foot 10 $30.00

Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $2,370.00

Verification of property ownership for site and offsite property owners for access (2 hours).

Prepare and submit field documentation, laboratory report and non-hazardous waste manifest in an email deliverable to the DEP (4 hours). Characterization and waste profile for transportation and disposal of IDW drum (2 hours).

Round trip travel (10 hours). Development of Health and Safety Plan (3 hours). Field event preparation (1 hour). Collect soil vapor samples from 15 SVE wells (SVE-1 through SVE-15).

Collect groundwater samples from 10 monitoring wells: MW001R in the shallow zone of the surficial aquifer; MW040 in the intermediate zone of the surficial aquifer; and MW010R, MW011R, MW014, MW015R, MW038, MW041, MW042, and MW044 in the deep zone of the surficial aquifer. Water levels, instrument calibration, and sampling (10 hours per day x 2 days = 20 hours).

Round trip travel (10 hours). Collect soil vapor samples from 15 SVE wells (SVE-1 through SVE- 15). Collect groundwater samples from 10 monitoring wells: MW001R in the shallow zone of the surficial aquifer; MW040 in the intermediate zone of the surficial aquifer; and MW010R, MW011R, MW014, MW015R, MW038, MW041, MW042, and MW044 in the deep zone of the surficial aquifer. Water levels, instrument calibration, and sampling (10 hours per day x 2 days = 20 hours).

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Dry Cleaning Depot SUBTASK 3: RAP Modification

DATE: 1/18/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 3

Senior Consultant (M. Crews) 30

Staff Sci/Eng (J. Spengler) 4

Staff Sci/Eng (A. Strayer) 2

Senior Project Sci/Eng (B. Lucero) 4

TOTAL LABOR 43

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Reporting: Formatting tables, document production. Create pdf for OCULUS.

Develop final injection volume and amendment concentrations. Prepare final RAP Modification.

Prepare draft RAP Modification.

Update figures with 2023 groundwater monitoring data and prepare CADD Figures for RAP Modification.

Prepare report tables with 2023 groundwater data and soil vapor analytical results.

FINAL --7/24/96

10515 Research Drive

Knoxville, TN 37932

Phone: (865) 573-8188

Fax: (865) 573-8133

Client: Phone:

Golder Associates USA Inc.

Matt Crews

9428 Baymeadows Road

Cost Proposal

Suite 400 Fax:Jacksonville, FL 32256

Branch: WSP - Jacksonville FL Project: Dry Cleaning Depot

Quote ID: Q202319.0002 Date Quoted: 01/09/2023

WSP Special Pricing

NOTICE: This cost proposal is intended only for the addressee shown above and may contain confidential or privileged information. If the recipient of this material is not the intended recipient or if you have received this in error, please notify

Microbial Insights, Inc. immediately. Thank you for your cooperation.

Client:

Contact: Date Quoted:

Quote ID:

Cost Proposal

Golder Associates USA Inc. Q202319.0002

01/09/2023Matt Crews

Qty.

Sampling Event:

Analysis Per Sample Cost (USD) Extended

Following is a table detailing the per sample cost based on the objectives for this study.

1 Water

CENSUS-DNA (Dehalococcoides--DHC) $330

CENSUS-DNA ( BAV1 Vinyl Chloride Reductase--BVC) $90

CENSUS-DNA ( tceA Reductase--TCE) $0

CENSUS-DNA ( Vinyl Chloride Reductase--VCR) $0

Sub-Total $420.00$420.00

1 Water

QuantArray (QuantArray-Chlor (DNA)) $900

Sub-Total $900.00$900.00

Total of Items $1,320.00

Discount-15% -15% $-198.00

Total After Discounts 1,122.00

Total Event Cost (USD): $1122.00

Notes:

*For all CENSUS (qPCR) analysis the 1st target is at the higher price than each additional target thereafter.

USMC700671

Highlight

USMC700671

Highlight

Important Information

Sample Cancellation Policy

We understand that on rare occasions our clients may want to cancel an order or analysis of individual samples. However, because samples are processed promptly upon receipt, the following cancellation surcharges apply. If cancellation is within 24 hours of sample receipt there will be no charge. If cancellation is between 24 hours up to 3 working days, there will be a 50% surcharge to cover our processing to that point. After 3 working days the full charge will apply. There is a

$25/sample processing fee if samples are submitted on hold and are later canceled.

Sampling Supplies

We will gladly provide upon request at no additional charge the Bio-Flo filters (Laboratory Preferred for groundwater if using a pump), poly bottles or Whirl-Pak bags for soil along with instructions, COC forms (w/duplicate copies) and sampling labels for your convenience and quality assurance.

Any sample collection supplies will be shipped FedEx ground unless expedited shipping is requested.

MI does not cover any international shipping charges. For expedited (2nd day or Overnight) or international shipping, we require client’s FedEx account number prior to shipping.

It is the client’s responsibility to ship samples back to laboratory. MI does not cover any return shipping costs.

Report format and EDD

This quote is for the standard MI report and standard MI EDD (when applicable). Any deviation from the standard report will result in a surcharge.

Requests for a MI Level III data package will entail an additional 15% surcharge. Allow an additional 1 - 2 weeks after the

Standard Report is completed for the Level III data package to be sent.

Requests for a MI Level IV data package will entail an additional 25% surcharge. Allow an additional 1 - 2 weeks after the

Standard Report is completed for the Level IV data package to be sent.

EDD formats different from the standard MI EDD will entail a 5% surcharge. Please inquire to find out the availability of the EDD being requested.

If you need an example of these formats, please contact an MI representative.

Expiration

This quote expires in 60 days from the quote date. Please contact an MI Representative for the updated pricing.

Payment Terms

Standard Payment terms are Net 30.

From: Mongillo, Ralph To: Mongillo, Ralph Subject: RE: IDW soil and groundwater drum pick up at the Capitol Cleaners at 3813 North Monroe Street in Tallahassee, FL

Date: Tuesday, May 24, 2022 9:10:22 AM

From: Erwin Remediation <erwinremediation@gmail.com> Sent: Monday, May 23, 2022 4:14 PM To: Mongillo, Ralph <ralph.mongillo@wsp.com> Subject: Re: IDW soil and groundwater drum pick up at the Capitol Cleaners at 3813 North Monroe Street in Tallahassee, FL

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Ralph, I have this on schedule, but we recently had to increase our drum rate by $10.00.

Unfortunately the cost of fuel and disposal has forced our hand on this.

Thank you, Jonathan Erwin Erwin Remediation, Inc.

Office: (850) 292-6511|Email: ErwinRemediation@Gmail.com Erwin Remediation, Inc.|408 Ditmar Street Pensacola, FL 32503 lTWfa4Hgs7pbKl-BT-P365-c108p227-DayTwo-Disclaimer mailto:ralph.mongillo@wsp.com mailto:ralph.mongillo@wsp.com tel:%28850%29%20292-6511 mailto:ErwinRemediation@gmail.com

From: Craig Burns To: Crews, Matt; Morelli, Gene; Neal, Scott; Mongillo, Ralph Subject: Golder Drum Rates update from CLARK Date: Tuesday, May 10, 2022 12:56:33 PM Attachments: image001.png

Golder Drum Rates - 2022.pdf

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Gents- See the new line item reflecting a 10% FSC to the drum total invoice. CLARK started to implement April 15.

Call with questions, also always…thank you for your business.

Craig

Please note: a 10% “cost of services surcharge” will be added to the bottom line of all invoices effective April 15, 2022.

Think CLARK!

Craig Burns | Sales / Project Manager | Clark Environmental Inc.

cburns@clarkenv.com | È:863.327.6289 mailto:cburns@clarkenvironmental.com mailto:matt.crews@wsp.com mailto:gene.morelli@wsp.com mailto:scott.neal@wsp.com mailto:ralph.mongillo@wsp.com https://urldefense.proofpoint.com/v2/url?u=https-3A__eur03.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.clarkenvironmental.com-252F-26data-3D04-257C01-257C-257Ccbc1f417ff8c4337355508d9512e2412-257Cef8a53ea1a1c4189b792c832dcaea568-257C0-257C0-257C637630080879080169-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Do50wIW3MIyw-252FGoKyrlvbxMIbbP-252BO9gB5TtQqcXHi-252BR0-253D-26reserved-3D0&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=Nk5c7G1FQ88ZgxtZwQzwAlNlpfGMEJLPerLkIs92lL0&s=IkqjklDtDzZYWA58IMoE8gCdmyvcKTVe3L1scUIICLc&e= mailto:cburns@clarkenv.com

5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2

Quote Number: 19536

QUOTE

QUOTED TO:

QUOTE DATE: 1/1/2022

COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns

863.327.6289 - cburns@clarkenv.com

Name (print) Title quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2

Quote Number: 19536

QUOTE

QUOTED TO:

QUOTE DATE: 1/1/2022

COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns

863.327.6289 - cburns@clarkenv.com

Name (print) Title quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png

AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Ralph

We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.

Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790

Sent from Mail for Windows

From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com

WSP USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256

T: +1 904 363-3430 F: +1 904 363-3445 wsp.com

January 18, 2023 Proposal No. 202208346

Ms. Ginger Shirah Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR DRY CLEANING DEPOT

RAP MODIFICATION ACTIVITIES

1320 WEST SUNRISE BOULEVARD

FORT LAUDERDALE, BROWARD COUNTY, FLORIDA

FACILITY IDENTIFICATION NUMBER: ERIC_4158

PROPOSED TASK ASSIGNMENT: HW685_HW026B

Dear Ms. Shirah:

WSP USA Inc. (WSP) formally Golder Associates USA Inc. is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal to complete additional sampling activities and prepare a Remedial Action Plan (RAP) Modification for the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

Ms. Ginger Shirah Proposal No. 202208346

Florida Department of Environmental Protection January 18, 2023

SUBTASK 2 – SOIL VAPOR AND GROUNDWATER SAMPLING

Soil Vapor Sampling AECOM operated a soil vapor extraction (SVE) system at the site from June 2011 to January 2017. Based on the data presented in AECOM’s Year Six Q1&2 Semi-Annual Operation and Maintenance Report, dated March 10, 2017, the SVE system removed approximately 18 pounds of volatile organic compounds (VOCs) during operation. Based on a review of available files in the DEP’s OCULUS database, soil confirmation sampling was not completed at the site following SVE system operation. In addition, soil vapor samples were not collected for laboratory analysis from the individual SVE wells during system operation. The SVE system is still onsite.

WSP proposes to assess the condition of the SVE system and collect soil vapor samples from each of the 15 individual SVE wells (SVE-1 through SVE-15). Before sample collection, WSP will use existing valves and fittings to isolate each SVE well at the system manifold. WSP will then, one at a time, connect each SVE well to Modified Active Gas Sampling (MAGS) equipment to extract and monitor soil vapor from vadose zone soil. The MAGS blower (Fuji Electric Model VFC508P-2T, 2.5 hp, single phase) will be capable of a flow rate of 154 standard cubic feet per minute at a vacuum of 80 inches of water (inches H20) under ideal conditions. A portable generator will supply power to the blower. The connection between the SVE wells and the blower will be made using 2-inch diameter vacuum-rated flexible PVC tubing and Schedule 40 PVC pipe. Vacuum gauges, a flowmeter, a filter, and sample ports will be installed in line.

WSP will run the blower at the highest achievable wellhead vacuum without entraining water for up to 30 minutes at each location. One soil vapor sample will be collected from each well using a Summa Canister (Tedlar bags if Summa Canisters are not available) and submitted to a fixed-base laboratory for VOC analysis using EPA Method

TO-15.

Groundwater Sampling Since the last groundwater injection event in July 2017, tetrachloroethene (PCE) does not appear to have rebounded significantly in the shallow, source area, based on recent groundwater monitoring results at monitoring well MW001R1; however, trichloroethene (TCE), cis-1,2-dichloroethene (cis-1,2-DCE), and vinyl chloride have continued to increase. PCE and TCE concentrations have rebounded significantly in deep, source area monitoring wells MW038 and MW041, indicating that source material is still present. Based on the lithology reported during site assessment activities, these deep zone wells are screened within a sand layer atop the thick layer of hard, vuggy limestone (low permeability) that appears to limit any further vertical migration of contaminants. WSP recommends further enhanced bioremediation injections in the shallow and deep zones in the source area, followed by quarterly groundwater performance monitoring.

Before the injections though, WSP proposes to collect groundwater samples from the following 10 wells: MW001R in the shallow zone of the surficial aquifer; MW040 in the intermediate zone of the surficial aquifer; and MW010R, MW011R, MW014, MW015R, MW038, MW041, MW042, and MW044 in the deep zone of the surficial aquifer. The attached figures (Figures 2, 3, 7, 8, and 9) from the November 2022 Annual Groundwater Monitoring Report, show the monitoring well locations and chlorinated VOC results for the shallow, intermediate, and deep zones of the surficial aquifer.

Before groundwater sampling, the depth to groundwater will be measured at accessible monitoring well using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.

Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 (effective April 16, 2018). Before collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures. The samples will be analyzed as follows:

Sample ID Chlorinated VOCs (Method 8260B)

Dissolved Gases (Method RSK 175)

CENSUS-DNA*

(Microbial Insights)

Shallow Zone

MW001R X X X

Intermediate Zone

MW040 X

Deep Zone

MW010R X

MW011R X X

MW014 X

MW015R X

MW038 X X X

MW041 X X X

MW042 X X

MW044 X X

IDW Total VOCs

*CENSUS-DNA analysis includes Dehalococcoides microbial species and BAV1 Vinyl Chloride Reductase, tceA Reductase, and Vinyl Chloride Reductase functional genes

The groundwater samples to be analyzed for chlorinated VOCs and dissolved gases will be delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified, fixed-base laboratory. The groundwater samples to be analyzed for microbial species and functional genes will be shipped to Microbial Insights in Knoxville, Tennessee. Upon receipt of the laboratory analytical results, WSP will evaluate the constituent concentrations to determine if off-site notification is required.

Investigation Derived Waste WSP will temporarily store the investigation-derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.

Interim Deliverable Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, laboratory chain-of-custody documentation, and non-hazardous waste manifest.

SUBTASK 3 – RAP MODIFICATION

To address the chlorinated VOCs present in groundwater at concentrations above DEP Natural Attenuation Default Concentrations (NADCs), as given in Table 5 of Chapter 62-777 of the FAC, AECOM submitted a Groundwater RAP to DEP in September 2014. The selected remedy was enhanced bioremediation using direct injection wells and EOS® Pro as the carbon source. The DEP approved the Groundwater RAP in January 2015. AECOM completed two injection events as part of the approved RAP (July 2015 and July 2017).

If WSP and DEP agree that bioaugmentation would be beneficial to groundwater remediation, WSP will prepare a Groundwater RAP Modification for the inclusion of bioaugmentation into the injection program. Since there is not a shallow injection well upgradient (based on historical groundwater flow direction) of monitoring well MW001R1, WSP also recommends installing a shallow injection well as part of the IW-J cluster. The RAP Modification will include the following:

▪ A brief discussion of recent site activities.

▪ Proposed injection well construction details for new shallow injection well.

▪ Proposed injection locations and depths.

▪ Recommended dosage concentrations and volumes of carbon source and bioaugmentation amendment.

▪ Amendment injection procedures.

▪ Underground Injection Control Notice.

▪ Proposed injectant and a table summarizing injectant concentrations, volumes, locations/depths.

▪ Figure depicting approximate injection locations.

▪ Quarterly groundwater monitoring plan.

HEALTH AND SAFETY

WSP will prepare a site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high-visibility safety vests, and steel-toed boots. A safety job briefing will be conducted before the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the RAP Modification activities is $28,308.43. WSP will tentatively schedule the soil vapor and groundwater sampling event for February 2023. The LOE/CEF cost sheets are included in Attachment A.

The subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 2,068.43 May 19, 2023

Subtask 2 – Soil Vapor and Groundwater Sampling

$18,685.13 March 17, 2023 (Field Documentation, Laboratory Report, IDW Manifest via e-mail deliverable)

Subtask 3 – RAP Modification $ 7,554.87 April 14, 2023 (RAP Modification)

Total/Completion Date $28,308.43 June 23, 2023

Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.

WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, Golder Associates USA Inc.

Matthew C. Crews, PE Jesse C. Brown, PE Senior Lead Consultant, Environmental Engineer Director, Environmental Engineer

MCC/JCB/as

Attachments: Figure 2 – Site Plan

Figure 3 – Site Layout Figure 7 – Groundwater Analytical Results in the Shallow Surficial Aquifer (June 2022) Figure 8 – Groundwater Analytical Results in the Intermediate Surficial Aquifer (June 2022) Figure 9 – Groundwater Analytical Results in the Deep Surficial Aquifer (June 2022)

Attachment A – Level of Effort Sheets / Cost Estimate Form Attachment B – Subcontractor Quotes

G:\Projects\DEP-Drycleaning\Projects\Fort Lauderdale\Dry Cleaning Depot (ERIC_4158) - Ft Lauderdale\DC026B - RAPMOD\Proposal\DC026B - Dry Cleaning Depot RAPMOD Proposal.docx

BCMW004

BCMW005

BCMW006

BCMW007

N W

3t h

TE

R R

AC

E

W SUNRISE BLVD.

N W

3t h

AV

EN

U

E

MW001

MW001R

MW002

MW003

MW004

MW005

MW006

MW012MW009MW010MW011

MW017MW018MW016

MW026

MW001R1

MW007MW008

MW009R

MW010R

MW011R

MW012R

MW013

MW014

MW015R

MW019

MW020

MW021

MW022

MW023

MW025 MW027

MW028

MW029

MW030

MW031

MW032

MW033

MW035MW036

MW037

MW038

MW039

MW040

MW041

MW042

MW043

MW044

MW045

BCMW001

BCMW002

SVE TRAILER

in

31404452.4158 Control No.

31404452-4158A-002a

FIGURE

2022-04-27

BCL

JWS

MCC

JCB

DRY CLEANING DEPOT

1320 WEST SUNRISE BOULEVARD, FT. LAUDERDALE

BROWARD COUNTY, FL

FL. DEPT. OF ENVIRONMENTAL PROTECTION

SITE PLAN

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

8_ D

C _D ep ot

_F tL au de rd al e\

\A ct iv e D ra w in gs

Fi le

N am e:

2-

A-

2a .d w g

SCALE

0 30 60

FEET

LEGEND

1. AERIAL IMAGE TAKEN FROM FLORIDA DEPARTMENT OF

TRANSPORTATION, DATED JANUARY 2021.

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF

REVENUE.

REFERENCE(S)

FORMER DRY CLEANING DEPOT BUILDING

PARCEL BOUNDARY

BROWARD COUNTY WELLS

MONITORING WELL LOCATION

N W

3t h

TE

R R

AC

E

W SUNRISE BLVD.

N W

3t h

AV

EN

U

E

IRR001

IRR002

MW001

MW001R

MW002

MW003

MW004

MW005

MW006

MW012

MW009 MW010

MW011

MW017MW018MW016

MW001R1

MW007

MW008

MW009R

MW010R

MW011R

MW012R

MW021

MW022

MW023

MW036

MW037 MW038

MW039

MW040

MW041

MW042

MW043

MW044

MW045

MW035

SVE-1

SVE-2

SVE-3

SVE-4

SVE-5

SVE-6

SVE-7

SVE-8

SVE-9

SVE-10

SVE-11

SVE-12

SVE-13

SVE-14

SVE-15

IW-A 30

IW-A 55

IW-A 80

IW-B 30

IW-B 55

IW-B 80

IW-C 30

IW-C 55

IW-C 80

IW-D 30

IW-D 55IW-D 80

IW-E 55

IW-E 80

IW-F 55

IW-F 80

IW-G 55

IW-G 80 IW-H 55

IW-H 80

IW-I 55

IW-I 80

IW-J 55

IW-J 80

IW-K 30

IW-K 55

IW-K 80

BCMW001

BCMW002

PIPING TO

SVE TRAILER

in

31404452.4158 Control No.

31404452-4158A-002

FIGURE

2022-04-27

BCL

JWS

MCC

JCB

DRY CLEANING DEPOT

1320 WEST SUNRISE BOULEVARD, FT. LAUDERDALE

SITE LAYOUT

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

8_ D

C _D ep ot

_F tL au de rd al e\

\A ct iv e D ra w in gs

Fi le

N am e:

2-

A-

2.

dw

0 10 20

FEET

LEGEND

1. AERIAL IMAGE TAKEN FROM FLORIDA DEPARTMENT OF

TRANSPORTATION, DATED JANUARY 2021.

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF

REVENUE.

REFERENCE(S)

SOIL VAPOR EXTRACTION WELL

UNDERGROUND REMEDIATION SYSTEM PIPING

FORMER DRY CLEANING DEPOT BUILDING

PARCEL BOUNDARY

ABANDONED MONITORING WELL

IRRIGATION WELLS

INJECTION WELL POINT

MONITORING WELL LOCATION

2009 SOURCE REMOVAL 6' AND 25' BGS

(617.4 TONS HAZARDOUS)

(957.4 TONS NON-HAZARDOUS)

6 FT-BGS

25 FT-BGS

3t h

TE

R R

AC

E

W SUNRISE BLVD.

MW001R1

MW007

MW031

MW035MW036

SVE TRAILER

in

31404452.4158 Control No.

31404452-4158A-004

FIGURE

2022-04-27

BCL

JWS

MCC

JCB

DRY CLEANING DEPOT

1320 WEST SUNRISE BOULEVARD, FT. LAUDERDALE

GROUNDWATER ANALYTICAL RESULTS IN THE SHALLOW

SURFICIAL AQUIFER

(JUNE 2022)

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

8_ D

C _D ep ot

_F tL au de rd al e\

\A ct iv e D ra w in gs

Fi le

N am e:

2-

A-

4.

0 20 40

FEET

LEGEND

1. AERIAL IMAGE TAKEN FROM FLORIDA DEPARTMENT OF TRANSPORTATION,

DATED JANUARY 2021.

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

3. PROPERTY BOUNDARY TAKEN FROM FLORIDA DEPARTMENT OF REVENUE.

REFERENCE(S)

SHALLOW MONITORING WELL LOCATION

FORMER DRY CLEANING DEPOT BUILDING

NOTE(S)

MW007 Sample ID 2 - 12 Sample Interval (ft-bgs)

6/20/22 Date Sampled

3 300 Tetrachloroethene (PCE)

3 300 Trichloroethene (TCE)

70 700 Cis-1,2-Dichloroethene (DCE)

100 1,000 Trans-1,2-Dichloroethene (DCE)

1 100 Vinyl Chloride (VC)

7 70 1,1-Dichloroethene

NADCsGCTLs

1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).

2. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT

DETECTED

3. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD DETECTION

LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT

4. NA - NOT ANALYZED

5. NS - NOT SAMPLED

6. D - INDICATES SAMPLE WAS DILUTED DURING LAB ANALYSIS

7. BOLD FONT AND YELLOW SHADED CELL INDICATES AN EXCEEDANCE OF

THE APPLICABLE GCTL.

8. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE OF THE

APPLICABLE NADC.

9. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,

TABLE I OF THE FLORIDA ADMINISTRATIVE CODE (FAC).

10. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER

CHAPTER 62-777, TABLE V OF THE FLORIDA ADMINISTRATIVE CODE (FAC)

11. ft-bgs = FEET BELOW GROUND SURFACE

MW007

2 - 12

07/24/18 05/03/21

0.76 U 0.2 U

0.89 U 0.2 U

0.84 I 0.2 U

0.73 U 0.2 U

0.71 U 0.2 U

0.94 U 0.2 U

MW001R1

5 - 15

07/24/18 05/03/21 06/20/22

0.76 U 7.5 3.5

0.89 U 11 276

120 310 D 1,200

0.73 U 2.8 6.3

110 160 D 250

1.6 15 27.8

MW031

15-20

08/29/07

0.34 U

0.42 U

0.26 U

0.38 U

0.31 U

MW035

5-15

07/23/18 05/03/21 06/21/22

0.76 U 0.59 I 2.6

0.89 U 0.2 U 0.44 I

5.8 0.51 I 0.83 U

0.73 U 0.2 U 0.23 U

0.71 U 0.2 U 0.88 U

0.94 U 0.2 U 0.59 U

MW036

25-30

07/23/18 05/03/21

0.76 U 0.2 U

0.89 U 0.2 U

1.8 0.63 I

0.73 U 0.2 U

1.3 0.31 I

0.94 U 0.2 U

GCTL EXCEEDANCE CONTOUR

NADC EXCEEDANCE CONTOUR

3t h

TE

R R

AC

E

W SUNRISE BLVD.

N W

3t h

AV

EN

U

E

MW008

MW009R

MW013

MW021

MW025

MW027

MW028

MW032

MW037

MW040

in

31404452.4158 Control No.

31404452-4158A-004

FIGURE

2022-04-27

BCL

JWS

MCC

JCB

DRY CLEANING DEPOT

1320 WEST SUNRISE BOULEVARD, FT. LAUDERDALE

GROUNDWATER ANALYTICAL RESULTS IN THE INTERMEDIATE

(JUNE 2022)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

8_ D

C _D ep ot

_F tL au de rd al e\

\A ct iv e D ra w in gs

Fi le

N am e:

2-

A-

4.

FEET

LEGEND

1. AERIAL IMAGE TAKEN FROM FLORIDA DEPARTMENT OF

TRANSPORTATION, DATED JANUARY 2021.

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

REFERENCE(S)

INTERMEDIATE MONITORING WELL LOCATION

FORMER DRY CLEANING DEPOT BUILDING

NOTE(S)

1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).

2. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT

DETECTED

3. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD DETECTION

LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT

4. NA - NOT ANALYZED

5. NS - NOT SAMPLED

6. BOLD FONT AND YELLOW SHADED CELL INDICATES AN EXCEEDANCE OF

THE APPLICABLE GCTL.

7. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE OF THE

APPLICABLE NADC.

8. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,

TABLE I OF THE FLORIDA ADMINISTRATIVE CODE (FAC).

9. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER CHAPTER

62-777, TABLE V OF THE FLORIDA ADMINISTRATIVE CODE (FAC)

10. ft-bgs = FEET BELOW GROUND SURFACE

NADCsGCTLs

MW013 Sample ID 45 - 50 Sample Interval (ft-bgs)

6/20/22 Date Sampled

3 300 Tetrachloroethene (PCE)

3 300 Trichloroethene (TCE)

70 700 Cis-1,2-Dichloroethene (DCE)

100 1,000 Trans-1,2-Dichloroethene (DCE)

1 100 Vinyl Chloride (VC)

7 70 1,1-Dichloroethene

MW025

45-50

07/24/18

0.76 U

0.89 U

0.53 U

0.73 U

0.71 U

0.94 U

MW013

35-40

06/07/16

0.76 U

0.89 U

0.53 U

0.73 U

0.71 U

0.94 U

MW028

35-40

08/29/07

0.34 U

0.42 U

0.26 U

0.38 U

0.31 U

NM

MW027

45-50

07/24/18 05/04/21

0.76 U 0.2 U

0.89 U 0.2 U

0.53 U 0.2 U

0.73 U 0.2 U

1.1 0.2 U

0.94 U 0.2 U

MW032

35-40

08/29/07

0.34 U

0.42 U

0.26 U

0.38 U

0.31 U

NM

MW021

35-40

07/24/18

0.76 U

0.89 U

0.53 U

0.73 U

0.71 U

0.94 U

MW037

45-50

07/23/18 05/03/21 06/21/22

0.76 U 0.2 U 0.38 U

0.89 U 0.2 U 0.36 U

0.92 I 0.2 U 0.83 U

0.73 U 0.2 U 0.23 U

1.5 1.5 0.88 U

0.94 U 0.2 U 0.59 U

MW040

50-55

03/21/16 06/21/22

0.76 U 0.38 U

0.89 U 0.36 U

0.97 I 7.3

0.73 U 0.23 U

21 2.0

0.94 U 0.59 U

MW009R

35-40

07/23/18 05/03/21

0.76 U 0.2 U

0.89 U 0.2 U

0.53 U 0.2 U

0.73 U 0.2 U

0.71 U 0.2 U

0.94 U 0.2 U

MW008

45-50

07/23/18 05/03/21 06/21/22

0.76 U 0.2 U 0.38 U

0.89 U 0.2 U 0.36 U

1.1 0.2 U 0.83 U

0.73 U 0.2 U 0.23 U

1.8 0.2 U 0.88 U

0.94 U 0.2 U 0.59 U

3t h

TE

R R

AC

E

W SUNRISE BLVD.

MW010R

MW011R

MW012R

MW014

MW015R

MW019

MW020

MW022

MW023

MW029

MW038

MW039

MW041

MW042

MW043

MW044

MW045

SVE TRAILER

in

31404452.4158 Control No.

31404452-4158A-004

FIGURE

2022-04-27

BCL

JWS

MCC

JCB

DRY CLEANING DEPOT

1320 WEST SUNRISE BOULEVARD, FT. LAUDERDALE

GROUNDWATER ANALYTICAL RESULTS IN THE DEEP

(JUNE 2022)

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \P ro je ct s\

FD

EP

\F D

EP

-D

C \3

2\

_4

8_ D

C _D ep ot

_F tL au de rd al e\

\A ct iv e D ra w in gs

Fi le

N am e:

2-

A-

4.

FEET

LEGEND

1. AERIAL IMAGE TAKEN FROM FLORIDA DEPARTMENT OF

TRANSPORTATION, DATED JANUARY 2021.

2. WELL LOCATIONS SOURCE: AECOM, DATED MARCH, 2021.

REFERENCE(S)

DEEP MONITORING WELL LOCATION

FORMER DRY CLEANING DEPOT BUILDING

NOTE(S)

1. ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).

2. U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT

DETECTED

3. I- REPORTED VALUE IS BETWEEN THE LABORATORY METHOD DETECTION

LIMIT AND LABORATORY PRACTICAL QUANTITATION LIMIT

4. NA - NOT ANALYZED

5. NS - NOT SAMPLED

6. D - INDICATES SAMPLE WAS DILUTED DURING LAB ANALYSIS

7. BOLD FONT AND YELLOW SHADED CELL INDICATES AN EXCEEDANCE OF

THE APPLICABLE GCTL.

8. BOLD FONT AND BLUE SHADED CELL INDICATES AN EXCEEDANCE OF THE

APPLICABLE NADC.

9. GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777,

TABLE I OF THE FLORIDA ADMINISTRATIVE CODE (FAC).

10. NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER CHAPTER

62-777, TABLE V OF THE FLORIDA ADMINISTRATIVE CODE (FAC)

11. ft-bgs = FEET BELOW GROUND SURFACE

NADCsGCTLs

MW014 Sample ID 65 - 70 Sample Interval (ft-bgs)

6/20/22 Date Sampled

3 300 Tetrachloroethene (PCE)

3 300 Trichloroethene (TCE)

70 700 Cis-1,2-Dichloroethene (DCE)

100 1,000 Trans-1,2-Dichloroethene (DCE)

1 100 Vinyl Chloride (VC)

7 70 1,1-Dichloroethene

MW014

65-70

07/24/18 05/04/21

0.76 U 0.2 U

0.89 U 0.2 U

1.0 0.2 U

0.73 U 0.2 U

4.0 0.81 I

0.94 U 0.2 U

MW015R

75-80

07/24/18 05/04/21

0.76 U 0.2 U

0.89 U 0.2 U

0.53 U 0.26 I

0.73 U 0.2 U

3.1 0.33 I

0.94 U 0.2 U

MW019

65-70

07/24/18 05/04/21

0.76 U 0.2 U

0.89 U 0.2 U

0.53 U 0.2 U

0.73 U 0.2 U

0.71 U 1.4

0.94 U 0.2 U

MW020

75-80

07/24/18 05/04/21 06/20/22

0.76 U 0.2 U 0.38 U

0.89 U 0.2 U 0.36 U

0.53 U 0.2 U 0.83 U

0.73 U 0.2 U 0.23 U

4.2 0.89 I 0.88 U

0.94 U 0.2 U 0.59 U

MW042

75-80

03/04/19 05/03/21 06/21/22

7.6 U 0.2 U 0.38 U

8.9 U 0.2 U 0.36 U

740 0.2 U 0.83 U 62 0.2 U 0.23 U

500 1.2 1.7 15 0.2 U 0.59 U

MW045

75-80

05/03/21 06/21/22

0.2 U 0.38 U

0.2 U 0.36 U

0.2 U 0.83 U

0.2 U 0.23 U

5.2 1.30

0.2 U 0.59 U

MW011R

75-80

07/24/18 05/03/21 06/21/22

0.76 U 0.2 U 38.0 U

0.89 U 0.2 U 36.0 U

1.3 8.3 842

0.73 U 0.2 U 23.0 U

21 100 915

0.94 U 0.2 U 59.0 U

MW010R

65-70

07/23/18 05/03/21 06/21/22

0.76 U 0.2 U 19.0 U

0.89 U 0.43 I 18.0 U

0.53 U 3.4 50.0 I

0.73 U 0.2 U 11.5 U

0.71 U 15 361

0.94 U 0.2 U 29.5 U

MW041

75-80

03/04/19 05/04/21 06/21/22 190 U 2 U,D 2,720 220 U 34 D 3,420 6,600 140 D 10,000 180 U 2 U,D 69.6 I

18,000 3,500 D 7,290 240 U 6.7 I,D 209

MW038

75-80

03/04/19…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .