This Task Assignment (TA) is a contract modification executed between the State of Florida Department of Environmental Protection (FDEP) and WSP USA Inc. for environmental remediation services. The document establishes authorization for WSP to perform decommissioning activities at the Dry Cleaning Depot site located at 1320 West Sunrise Boulevard in Fort Lauderdale, Broward County, Florida (ERIC_4158). The contract is issued under the indefinite delivery vehicle Contract Number HW685, with TA Number DC026E effective March 30, 2026, and completion targeted for August 28, 2026. The Department Project Manager is Patrick McGrane (850-245-8899), and WSP's Project Manager is Matt Crews (904-363-3430).
The scope of work includes complete decommissioning of a trailer-mounted Soil Vapor Extraction (SVE) system, including removal of approximately 70 linear feet of fencing, vegetation clearing, equipment ID number removal and marking as scrap, transfer of two 55-gallon drums of spent carbon media into new drums for non-hazardous disposal, and repair of the SVE PVC manifold system. The total Task Assignment value is $17,232.47, calculated as a fixed unit rate with payment contingent upon submittal and FDEP approval of field documentation, photo logs, waste manifests, construction and demolition weigh tickets, and completed DEP Surplus Property Disposal documentation. The deliverable is due June 26, 2026, with the primary invoice amount of $17,232.47 due upon approval. Cost was negotiated down from an originally proposed total of $18,570.16, and the work encompasses 59 total labor hours distributed across project management and system decommissioning activities performed by qualified environmental engineers and scientists.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev.
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW685
DC026E Completion August 28, 2026
This Task Assignment authorizes WSP to decommission the SVE System at Dry Cleaning Depot in accordance with the March 23, 2026 Scope of Work, Cost Estimate, and Bid Documentation.
Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor
Contractor Matt Crews Contractor 904-363-3430
ERIC_4158
1320 West Sunrise Boulevard, Fort Lauderdale, Broward County
Dry Cleaning Depot
Contractor Contractor
✔ $ 17,232.47
$ 17,232.47
Scope of Work
WSP USA Inc.
Contractor Matthew Crews
Environmental Engineer
3/30/2026
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2026.03.30 16:07:12 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.03.30 09:49:28 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
BWC TAFORM
HW685
DC026E
Subtasks 1 & 2 - Project Management; SVE System Decommissioning Activities 06/26/2026
Subtasks 1 & 2 - Submittal and FDEP approval of email summary containing field documentation, photo log, waste manifests, C&D weigh ticket, and completed DEP Surplus Property Disposal documentation
$ 17,232.47
$ 17,232.47
Memorandum TO: Negotiation File
Dry Cleaning Depot Fort Lauderdale, Broward County
ERIC_4158
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment DC026E (HW685)
DATE: , 2026
This Task Assignment authorizes WSP USA Inc. (WSP) to scrap the Soil Vapor Extraction (SVE) system located at the Dry Cleaning Depot site.
Following confirmation of system/trailer water damage and an initiative to remove aging
Department equipment, it was agreed to scrap the existing SVE system onsite. Once field work is complete, completed and signed copies of DEP 55-407 and the attached memorandum are to be submitted with an email deliverable.
The total cost for this project is $1 , . with total labor hours.
All work is to be completed in accordance with the 2 , 2026, Scope of Work, Cost Estimate, and Bid Documentation.
WSP may invoice according to the included schedule.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
In c.
D at e:
3/
/2
Ta sk
D C
6E
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
S ub Ta sk
S V
E S ys te m D ec om m is si on in g
A ct iv iti es S ub Ta sk
A ct iv ity
/P ha se
O
M
Ta sk
S ub Ta sk
P ro je ct
M an ag er
P at ric k M cG ra ne
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $4
9.
PP
ro je ct
M an ag er
(J S
5.
$0
.0
P ro gr am
L ea de r -
X -1
$0
.0
P ra ct ic e Le ad er
X
-1
$0 .0
S en io r C on su lta nt
X -1
$4
9.
S en io r S ci /E ng
X -1
(J
S
$0 .0
S en io r S ci
/E ng
X
-1
$0 .0
S en io r P ro je ct
S ci
/E ng
P
-1
$0 .0
S en io r P ro je ct
S ci
/E ng
P
-1
$4 0.
P ro je ct S ci /E ng
P -9
(J W
$3
1.
S ta ff S ci /E ng
P -8
(D J)
.0
$0
.0
S ta ff S ci /E ng
P -8
$0 .0
S ci /E ng /A dm in
P
-7
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al H ou rs
5.
.0 0.
D ire ct L ab or
$2
,1
.3
$2
.4
$1 ,9
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
2.
$3
,7
.2
$4
.4
$3 ,3
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or
$5
,9
.5
$6
.9
$5 ,2
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ry
C le an in g D ep ot
RE
V:
2/
CE
F
GO
LD
ER
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
W S
P U
S A
In c.
at e:
3/
/2
Ta sk
D C
6E
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
S ub Ta sk
S V
E S ys te m D ec om m is si on in g
A ct iv iti es S ub Ta sk
A ct iv ity
/P ha se
O
M
Ta sk
S ub Ta sk
P ro je ct
M an ag er
P at ric k M cG ra ne
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
D ry
C le an in g D ep ot
T ra ve l
V eh ic le
R en ta l
$3
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ea ls
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $3
.0
$3
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(E qu ip m en t P ro cu re m en t)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P ro cu re m en t F ee
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m en t) ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $2
.0
$2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ct io n E nv iro nm en ta l
$9 ,0
.0
$9
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$9 ,2
.0
$9
,2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $9
.0
$9
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$1 0, 5.
$1
0, 5.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P er so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g R el at ed
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
F ie ld E xp en se s
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $1
6, 4.
$6
.9
$1 5, 6.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e $5
.9
$6
8.
$5
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al E st im at ed
C os t $1
7, 2.
$7
.6
$1 6, 5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
GO
LD
ER
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dry Cleaning Depot SUBTASK 2: SVE System Decommissioning Activities
DATE: 3/23/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (J. Spengler) 14
Staff Sci/Eng (D. Johnson) 40
TOTAL LABOR 54.0
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Per Day 3 $360.00
TOTAL VEHICLE $360.00
MEALS STAFF RATE UNIT USEAGE
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USEAGE
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Action Environmental SVE System Decommission $9,000.00 Each 1 $9,000.00
Erwin IDW (Spent carbon media) $125.00 Per Drum 2 $250.00
TOTAL $9,250.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 3 $120.00
TOTAL EQUIPMENT $120.00
Verification of property ownership with property access forms prior to mobilization (1 hour).
Prepare Surplus Property Disposal Certification/Receipt documentation (3 hours). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Discuss and review SVE manifold repairs with contractor on site (2 hours). Prepare and submit email summary with field documentation, receipts, weigh ticket, photo log, and non-hazardous waste manifest (6 hours).
Field event preparation (1 hour). Round trip travel from Palm Beach to Fort Lauderdale (3 hours per day x 3 days = 9 hours). SVE system decommissioning activities (3 days x 10 hours per day = 30 hours).
FINAL --7/24/96
WSP USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida 32256 USA
T: +1 904 363-3430 F: +1 904 363-3445 wsp.com
March 23, 2026 Proposal No. 2025US437343.R2
Mr. Patrick McGrane Florida Department of Environmental Protection Division of Waste Management Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR SVE SYSTEM DECOMMISSIONING
DRY CLEANING DEPOT
1320 WEST SUNRISE BOULEVARD
FORT LAUDERDALE, BROWARD COUNTY, FLORIDA
FACILITY IDENTIFICATION NUMBER: ERIC_4158
PROPOSED TASK ASSIGNMENT: HW685_DC026E
Dear Mr. McGrane:
WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal to complete soil vapor extraction system (SVE) decommissioning activities at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with the DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Site Cleanup Section requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – SVE SYSTEM DECOMMISSIONING ACTIVITIES
SVE System Decommissioning In March 2023, WSP assessed the condition of the SVE system (DEP Property #140983). Based on the reported water damage inside the trailer, including damage to the blower motor, WSP recommended scrapping the SVE system. The DEP approved the recommendation via e-mail in April 2023. The SVE system has not operated since 2017 and is currently located south of the site, as shown on the attached Figure 2.
Mr. Patrick McGrane Proposal No. 2025US437343.R2
Florida Department of Environmental Protection March 23, 2026
Following authorization to proceed, WSP will use the Broward County Property Appraiser’s website to verify that the current property owner has an executed Permission to Enter Property agreement with the DEP. WSP will then coordinate with the real property owner and tenant (if applicable) for access to complete the scope of work.
WSP will then mobilize to the site to oversee the decommissioning of the trailer-mounted SVE system by Action Environmental. The SVE system compound fence (approximately 70 linear feet) will be removed, along with overgrown vegetation within the SVE system compound and any unnecessary aboveground piping, hoses, and fittings associated with the SVE system. These items will be transported offsite for disposal as construction and demolition debris (C&D). Based on the results of the March 2023 soil vapor sampling event, WSP will leave the existing SVE wells, underground conveyance piping, and passive ventilation system in place, pending any future consideration of active SVE at the site.
During the May 2025 annual groundwater monitoring event, WSP observed that the power to the system was disconnected and the electrical wires and conduits had been removed. For cost estimating purposes, WSP has assumed that an electrician will not be required for SVE system decommissioning activities.
Action Environmental will remove DEP Equipment ID numbers from the trailer and related equipment using an engraving tool and mark each of the equipment items as “Scrap”. Action Environmental will transport the trailer-mounted SVE system to American Scrap Metal Alloy at 824 NW 9th Avenue, Fort Lauderdale, Florida. WSP will prepare the appropriate DEP Surplus Property Disposal Certification/Receipt documentation and obtain a ticket/receipt from the scrap yard identifying the trailer and equipment as scrap.
Waste Transportation and Disposal During the May 2025 groundwater sampling event, WSP collected a sample from the two 55-gallon vapor-phase carbon drums located within the SVE trailer for waste characterization purposes. The sample was analyzed by a laboratory for volatile organic compounds using the Toxicity Characteristic Leaching Procedure (Method 1311/8260D), Flashpoint (Method 1010B), and pH (Method 9040C). Due to existing damage to the two carbon media drums, WSP proposes to transfer the carbon media into two new 55-gallon steel drums. Based on the sample results, WSP recommends that the vapor-phase carbon (two 55-gallon drums) be disposed of as non-hazardous waste. WSP will subcontract a licensed waste hauler to transport and dispose of the waste at an approved facility.
WSP will provide the DEP with copies of the disposal manifests.
Deliverable WSP will submit an email field report deliverable. The document will include field documentation; a photographic log, including photos of the equipment ID number removal and subsequent marking as “Scrap”; the DEP Surplus Property Disposal Certification/Receipt form; the receipt from the scrap yard; C&D weigh ticket; and waste manifest.
HEALTH AND SAFETY
WSP will update the existing site-specific Health and Safety Plan for the fieldwork. The work will be completed in accordance with WSP’s safety policies and procedures. At a minimum, WSP will wear safety glasses, high-visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed scope of work is $17,232.47. WSP anticipates the SVE system decommissioning activities event will take place in April 2026. The level of effort sheets and cost estimate form are
Mr. Patrick McGrane Proposal No. 2025US437343.R2
Florida Department of Environmental Protection March 23, 2026 included in Attachment A. The subcontractor quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $ 756.69 June 26, 2026
Subtask 2 – SVE System Decommissioning Activities
$ 16,475.78 June 5, 2026 (Field documentation, Photo Log, Waste Manifest, C&D Weigh Ticket, and DEP Surplus Property Disposal Certification/Receipt;
Scrap Yard Receipt via E-mail Deliverable)
Total/Completion Date $ 17,232.47 July 31, 2026
WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarification, please contact us at (904) 363-3430.
Sincerely, WSP USA Inc.
Justin W. Spengler Matthew C. Crews, PE Senior Consultant, Environmental Engineer Assistant Vice President, Environmental Engineer
JWS/MCC/as
Attachments: Figure 2 – Site Plan
Attachment A – Level of Effort Sheets and Cost Estimate Form Attachment B – Subcontractor Quotes
G:\Projects\DEP-WSCS\Projects\Fort Lauderdale\Dry Cleaning Depot (ERIC_4158) - Ft Lauderdale\DC026E - SVE Decommission\Proposal\Final - Revision 2\DC026E - DC Depot SVE System Decommission Proposal (ERIC_4158).Rev2.docx
WSP Dry Cleaning Depot Project | 1
Sent electronic mail to: justin.spengler@wsp.com February 23, 2026
Attention: Justin Spengler, WSP, Senior Consultant, Environmental Engineering
Subject: Request for Proposal for Dry Cleaning Depot project located at 1320 W Sunrise Blvd, FT.
Lauderdale, FL 33311
Action Environmental (Action) is pleased to provide this proposal for providing labor and equipment for the removal and disposal of the trailer and repairing of the air-sparging vent system at the above-mentioned site.
Presented below is Action’s understanding of the project’s proposed scope of services.
1.0 PROJECT UNDERSTANDING
Based on an email the scope of work includes the following:
Provide labor and equipment for removal and disposal of the enclosure wooden fence, Provide labor and equipment for cutting and disposal of the trees and bushes along the wooden fence which prevent the trailer removal. Any noninvasive vegetation removed will be replaced as part of the work and efforts to support growth until the plant has taken will be included.
Provide labor and material for the repacking of the spent carbon on the site into new open top steel drums.
Provide labor and equipment for removal and disposal of the trailer, the electric panels and the broken PVC pipes. All DEP Equipment ID numbers from the trailer and related equipment will be removed using an engraving tool and each of the equipment items will be marked “Scrap”.
Purchase all the SCH 80 PVC fittings needed for the repair of the vent system on the site.
Provide labor and equipment for repairing the vent system present on the site.
2.0 PROJECT COST
This project is estimated to be completed in three 10-hour workdays. All variations from the estimates and changes in quantities will be documented and written notices will be provided upon discovery. Action will work with WSP to fully document and develop a comprehensive invoice detailing all work performed.
The cost of this will be $9,000.00.
3.0 AUTHORIZATION
This proposal outlines the Scope of Work, pricing for this project and any job specific assumptions or conditions listed within this document. Any change in this scope of work will be executed in writing and signed by all parties.
WSP Dry Cleaning Depot Project | 2
4.0 PROJECT SCHEDULE
Action will proceed with scheduling in accordance with our existing MSA/contract with WSP and authorization to proceed.
Action Environmental would like to thank you for the opportunity to submit this proposal. Please contact us at (305) 345-1184 if you have any questions or need clarification on this proposal. This cost estimate is only valid for 30 days.
Respectfully submitted, Action Environmental
Marc Syracuse Senior Project Manager
Action Environmental
Marc Syracuse
3520 NW 43RD STREET| GAINESVILLE, FL 32606 | TEL. 352-514.0604
Justin Spengler Senior Consultant
WSP
Justin.spengler@wsp.com
DRY CLEANING DEPOT – FORT LAUDERDALE
February 17, 2026
Dear Justin, Green Rock Strategies, LLC (“Green Rock”) is an environmental services company specializing in strategic, sustainable waste management solutions and logistics. We are committed to helping our clients achieve their environmental and operational goals through customized, cost-effective, and innovative approaches.
We appreciate the opportunity to present this proposal and look forward to working together to support your team and achieve your objectives.
Jobsite: Dry Cleaning Depot, 1320 W Sunrise Blvd, Fort Lauderdale, FL
PROJECT PRICING:
Decommissioning of the SVE system at the Dry Cleaning Depot site to include the following:
Mobilization Brush clearing to make path for trailer Purchase and replacement of shrubs damaged in trailer removal Removal of approximately 70 liner feet of 6-foot tall fence Removal of DEP Equipment ID numbers from the trailer and related equipment, marking items as “Scrap” Transfer two 55-gallon drums of spent carbon media into competent drums for non-hazardous disposal (Disposal not included) Removal of trailer Repair the SVE PVC manifold based on current condition, pending any future consideration of active SVE at the site. This cost includes repairing Sch 80 PVC pipe, Sch 80 4” true union threaded Tees, Sch 40 PVC fittings, brass gate valves, and fernco couplings as depicted in photograph provided showing original condition.
*Power disconnect not included **Estimated to take 5 work days to complete
Total Estimate $17,500.00
Optional estimate with PVC ball valves and sch 40 pvc fitting $15,200.00
CONTRACT: WSP – DRY CLEANING DEPOT
DATE: 2/17/2026
PAGE: 2 OF 3
3520 NW 43RD STREET| GAINESVILLE, FL 32606 | TEL. 352-514.0604
TERMS AND CONDITIONS:
Payment Terms: C.O.D 1% 10 Days NET 30 Other: __________ Payments not made by due date will be subject to 1.5% monthly late fee.
This proposal may be withdrawn if not accepted within 30 days.
All terms and conditions contained in this proposal shall supersede any prior agreements, contracts, or understandings, whether written or oral, unless otherwise agreed upon in writing by both parties.
SITE CONDITIONS: Green Rock will have free and clear access to the site and where applicable. Work to be performed in accordance with all local, state and federal regulations.
TAXES: All applicable Federal, State, or Local taxes and/or surcharges will be included at time of invoice. Tax-exempt entities must provide proof of tax-exempt status prior to execution of the proposed work.
TARIFFS: Should any project costs arise due to applicable tariffs, such increases shall be borne by the client.
CHANGE ORDERS: Any deviation from the agreed-upon specifications will be undertaken only upon receipt of written authorization. Such deviations may result in additional charges.
Furthermore, if, during the course of the project, the actual volumes exceed those outlined in the original Scope of Work, there may be a need for a formal Change Order Request to accommodate the increased scope and associated costs.
WASTE DISPOSAL: Disposal pricing is based upon generator information, waste analysis, profile approval and sample (if requested). Surcharges from disposal facilities based on “as received” waste characteristics are in addition to quoted rates.
TRANSPORTATION:
o Minimum Load Charges - a minimum charge for transportation services will be assessed:
���� Projects priced “by the ton” - Tandems (17-tons), Triaxles (18-tons), Quad Axles (20-tons), End-
Dump Trailers (22-tons), Vac/Straight Tankers (5k gallons), Vac Trucks (3k gallons).
���� Projects priced “by the hour” – 4-hour minimum ��� Projects priced “by the load” – no minimum unless specified in the scope of work.
o Demurrage Charges – demurrage fees will apply under the following conditions ���� Loading & Unloading – First 30 minutes are included; demurrage is assessed at $125 per hour thereafter.
���� Charges will be calculated at 15-minute increments beyond the free time allowed.
o Standard Workday ���� Pricing is based on a standard 10-hour working day. (8-hour working day for union sites). Any work required beyond the standard window may be subject to overtime or additional charges, as specified in the project agreement.
o Same Day Cancellations are subject to the following non-refundable fees per truck scheduled:
���� Non-Hazardous Waste Projects: $500 per truck ��� Hazardous Waste Projects: $1,500 per truck ���� Fees cover logistical planning, resource allocation, and administrative costs incurred due to short-notice cancellations.
CONTRACT: WSP – DRY CLEANING DEPOT
DATE: 2/17/2026
PAGE: 3 OF 3
3520 NW 43RD STREET| GAINESVILLE, FL 32606 | TEL. 352-514.0604
BACKFILL/AGGREGATES - Green Rock Strategies, LLC - does not guarantee that any backfill, and/or aggregate material provided will meet specific engineering, environmental, or other technical specifications. It is the sole responsibility of the client to perform all necessary testing, analysis, and inspection of the backfill and/or aggregate material to ensure its suitability for the intended use, unless otherwise explicitly agreed upon in writing by both parties.
MEASUREMENT AND INVOICING OF BACKFILL
Backfill material quoted by the cubic yard shall be invoiced based on truck loose yards, not compacted volume.
o All pricing reflects the volume of material as loaded and transported in a loose, uncompacted state.
o Any estimates or discussions regarding compacted volume are for informational purposes only and do not affect the invoiced quantity.
o It is the client’s responsibility to account for potential volume reduction due to compaction during placement and use.
FUEL SURCHARGE - Pricing as quoted above includes current Fuel Surcharge based upon U.S. Average diesel prices as of the date of this proposal using the following website: http://www.eia.gov/petroleum/gasdiesel. An additional 0.5% may apply to the base transportation rate for each $0.10/gallon increase in the price of diesel fuel above the base rate.
To authorize the performance of this proposal, please execute the “Proposal Acceptance” below and return to my attention.
If you have any questions regarding this quotation or would like further information on our services, please feel free to call me at 352-514-0604.
Sincerely, Brandt Frenchman Senior Business Manager
PROPOSAL ACCEPTANCE:
CUSTOMER: The above prices and conditions are satisfactory and are hereby accepted. GREEN ROCK is authorized to perform the work as proposed. The person signing below is doing so as a duly authorized Representative of Customer.
Signature: _____________________________ Name: _______________________________
Date: _____________________________ Title: _______________________________
PO Number _____________________________
This proposal when executed represents a legal and binding Contract.
Brandt Frenchman
Er w in U
S Ec ol og y* H
EP
AC
O T&
D N on H az S oi l -
C
VO
C s, P et ro le um , M et al s pe r d ru m
$1
.0
$0 .0
T&
D N on H az M ud /w at er
C
VO
C s, P et ro le um
, M et al s pe r d ru m
$1
.0
$1
.0
Fa ls e
M ob ili za tio n
(n o dr um fo un d)
$8 5.
$0
.0
PF
AS
P ro fil e
Fe e
(1 p er s ite
$3
.0
$0
.0
T& D
N on
H az
S oi l - P
FA
S/
PF
O
S pe r d ru m
$1
.0
$0 .0
T&
D N on H az M ud /w at er
-P
FA
S/
PF
O S pe r d ru m
$1
.0
$0
.0
D is po sa l N on
H az
S oi l - V
O C s pe r d ru m
$1
.0
$0 .0
D is po sa l N on H az M ud /w at er
VO
C s pe r d ru m
$1
.0
$1
.0
Pr of ile
F ee
(1 p er s ite
$9
5.
$9 5.
D is po sa l N on H az S oi l -
P
FA
S/
PF
O S
$6
.0
$0
.0
D is po sa l N on H az M ud /w at er
-P
FA
S/
PF
O S
$6
.0
$0
.0
Ap pr ov al
F ee
(p er s ite
$7
.0
$0 .0
N on H az S ol ifi ca tio n W as te
P ro fil e fe e
$5
0.
$0 .0
N on H az S ol id s D is po sa l
(p er d ru m
$1
.0
$0
.0
N on
H az
S lu dg e
D is po sa l
$1
.0
$0 .0
PF
AS
W as te ga l d ru m e m el le
A L
$8
.0
$0
.0
Tr uc k w ith li ft ga te a nd d riv er
$1
.0
$5
.0 no n ha z liq ui ds d is po sa l ( pe r d ru m
$1
.7
$1
.7 g al lo n re co nd iti on ed d ru m
$1
.6
$0
.0
LT
L fe es
(l es s th an dr um s
$1
.0
$1
.0
En er gy s ec ur ity re co ve ry fe e
$1
.7
$1
.7
To ta l C os t p er
D ru m $1
.0
$2
.0
$1 ,0
.5
N ot es
* T ra ns po rta tio n co st s w ill b e ca lc ul at ed b as ed o n pi ck up s at v ar io us s ite s an d w as te s tre am v ol um e
ID
W
S U
B C
O N
TR
AC
TO
R
C O
ST
E
ST
IM
AT
ES
F O
R C
H
LO
R
IN
AT
ED
V O
C S, P
ET
R O
LE
U
M C
O M
PO
U
N D
S, A
N D
M
ET
AL
S
Su m m ar y of
ID
W
S ub co nt ra ct or s
C os ts
3_
6_
C
VO
C -P et ro
-M et al s
Pa ge o f 1
408 Ditmar Street Pensacola, FL 32503
To: Mr. Ralph Mongillo
WSP
9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256
June 16, 2023
Re: Non-Hazardous Disposal of PFOS/PFAS Impacted Materials
Mr. Mongillo:
The price for the transportation and disposal (T&D) of non-hazardous soil, mud, and water is listed below:
For Non-Hazardous Chlorinated Solvent Impacted Materials:
Description Rate Unit T&D - Non-Haz Chlorinated Solvents Impacted Soil $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Mud/Water $ 125.00 Per Drum T&D - Non-Haz Chlorinated Solvents Impacted Water $ 95.00 Per Bucket
For Non-Hazardous PFAS/PFOS Impacted Materials:
Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Water (5-gallon bucket) $ 95.00 Per Bucket T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com p y
Memorandum TO: WSCS Inventory FROM: WSCS – Patrick McGrane SUBJECT: Dry Cleaning Depot (ERIC_4158) Surplus Property Scrapping
DATE: 2/2/2026
This document confirms that WSP has properly disposed of Surplus Property units in accordance with “Procedures for Policy ADM 320”. WSP is authorized to execute Task Assignments through the HW685 Contract with FDEP.
The Property Numbers of the indicated units are as follows:
001409
FDEP Signature:
FDEP Signature:
WSP Signature:
Florida Department of Environmental Protection
DEP 55-407 Surplus Property Disposal Certification/Receipt
Required Signatures: Original Ink
NOTE: Scrap disposal must be attested to by the person disposing of the property and one witness. Reminder:
Items will not be removed from your inventory until this form is completed and returned.
SUBMIT TO: Records_Inventory@dep.state.fl.us
The surplus property listed below was released or disposed of as follows: (Indicate method of disposal and print name and agency/company of person to whom released, if applicable. If property was in scrap condition or disposal method is “OTHER”, include a brief description of disposal procedure.)
__ SOLD; __ DONATED; __ TRANSFERRED; __ TRADED; __ SCRAPPED; __ OTHER
AGENCY/COMPANY RELEASED TO: _______________________________________________________
DESCRIPTION OF DISPOSAL PROCEDURE: _________________________________________________
Item # Property # Description Sales Rec’t # Cert. #
TOTAL NUMBER OF ITEMS RELEASED/DISPOSED: ___________________
RELEASED/DISPOSED OF BY: DATE:
BY SIGNING THIS FORM I ACKNOWLEDGE THAT ALL DONATED PROPERTY RECEIVED IS FOR
THE USE OF THE RECEIVING AGENCY.
RECEIVED BY:
(Person receiving property, if applicable)
WITNESSED BY:
BGS - DEP 55-407 (Effective 10-23-2013)
DATE:
DATE:
RELEASED/DISPOSED OF BY:
RECEIVED BY:
WITNESSED BY:
00140983 SVE Treatment System - Trailer Mounted
File details come from the government source that posted it. Updated .