This document is a Task Assignment (TA) CSS2A issued by the State of Florida Department of Environmental Protection (DEP) to WSP USA Inc. for preliminary assessment and sampling activities at the Former Clark Pest Control site (ERIC_14705) in Jacksonville, Duval County, Florida. The work is being conducted under Contract Number HW685 using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement administered by DEP on behalf of the U.S. Environmental Protection Agency. The Task Assignment was effective June 26, 2025, with a completion deadline of December 1, 2025.

WSP USA Inc. will conduct four primary subtasks totaling $15,318.93: Subtask 1 (Project Management, $1,544.40), Subtask 2 (Field Sampling Plan/Quality Assurance Project Plan and Health and Safety Plan, $3,304.86), Subtask 3 (Preliminary Assessment Activities including soil, groundwater, sediment, and surface water sampling with quality assurance/quality control samples, $6,256.38), and Subtask 4 (Preliminary Assessment with Sampling Report, $4,213.29). The contract includes soil boring at five locations to depths of 2 feet, groundwater sampling from five monitoring wells, sediment and surface water sampling from Hogan's Creek, and laboratory analysis of samples for RCRA metals, organochlorine pesticides, chlordane, and toxaphene using EPA methods. Deliverables include field documentation, laboratory reports, waste manifests, a Field Sampling Plan/HASP due July 11, 2025, and a final PAWS Report due by September 15, 2025. Subcontractor costs include utility location ($700.00), non-hazardous waste disposal ($125.00), and field equipment ($747.00), with invoicing tied to FDEP approval of specific deliverables.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01A.pdf PDF
CN-370000-HW685-BF01CCO1.pdf PDF
CN-370000-HW685-BF02A.pdf PDF
CN-370000-HW685-BF05A.pdf PDF
CN-370000-HW685-BF05ACO1.pdf PDF
CN-370000-HW685-BF1BCO1.pdf PDF
CN-370000-HW685-BIL02C.pdf PDF
CN-370000-HW685-BIL1ACO4.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf PDF
CN-370000-HW685-BIL3ACO1.pdf PDF
CN-370000-HW685-CSS01.pdf PDF
CN-370000-HW685-CSS2ACO2.pdf PDF
CN-370000-HW685-DC001C.pdf PDF
CN-370000-HW685-DC001E.pdf PDF
CN-370000-HW685-DC002B.pdf PDF
CN-370000-HW685-DC002C.pdf PDF
CN-370000-HW685-DC002E.pdf PDF
CN-370000-HW685-DC003C.pdf PDF
CN-370000-HW685-DC004A.pdf PDF
CN-370000-HW685-DC007A.pdf PDF
CN-370000-HW685-DC007B.pdf PDF
CN-370000-HW685-DC008B.pdf PDF
CN-370000-HW685-DC008D.pdf PDF
CN-370000-HW685-DC009A.pdf PDF
CN-370000-HW685-DC009D.pdf PDF
CN-370000-HW685-DC009E.pdf PDF
CN-370000-HW685-DC010C.pdf PDF
CN-370000-HW685-DC012A.pdf PDF
CN-370000-HW685-DC012D.pdf PDF
CN-370000-HW685-DC014B.pdf PDF
CN-370000-HW685-DC016D.pdf PDF
CN-370000-HW685-DC017A.pdf PDF
CN-370000-HW685-DC017B.pdf PDF
CN-370000-HW685-DC018B.pdf PDF
CN-370000-HW685-DC019A.pdf PDF
CN-370000-HW685-DC019C.pdf PDF
CN-370000-HW685-DC01ACO1.pdf PDF
CN-370000-HW685-DC01ECO1.pdf PDF
CN-370000-HW685-DC021A.pdf PDF
CN-370000-HW685-DC021B.pdf PDF
CN-370000-HW685-DC021C.pdf PDF
CN-370000-HW685-DC021E.pdf PDF
CN-370000-HW685-DC022C.pdf PDF
CN-370000-HW685-DC023A.pdf PDF
CN-370000-HW685-DC023D.pdf PDF
CN-370000-HW685-DC024C.pdf PDF
CN-370000-HW685-DC025A.pdf PDF
CN-370000-HW685-DC027D.pdf PDF
CN-370000-HW685-DC028A.pdf PDF
CN-370000-HW685-DC028D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW685

CSS2A December 1, 2025

WSP USA, Inc. will prepare a Field Sampling Plan/HASP, conduct a CERCLA Site Screening event, and generate a Preliminary Assessment with Sampling (PAWS) Report in accordance with the Cost Proposal/Level of Effort (CP/LOE) submitted on DATE.

Claire Field 850-245-8970 WSP USA Inc.

Jonathan Whipple 904-363-3430

ERIC_14705

Former Clark Pest Control

$ 15,318.93

$ 15,318.93

Scope of Work

WSP USA Inc.

Matthew Crews, P.E.

Environmental Engineer

6/26/2025

Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2025.06.26 13:50:06 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.06.26 13:16:45 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum

TO: WSP USA Inc., HW685 Contract File

FROM: Claire Field, Contract Manager

SUBJECT: June 24, 2025

DATE: Negotiation Summary – Task Assignment (TA) CSS2A Former Clark Pest Control - Site ID # ERIC_14705 Site Inspection Activities

This Task Assignment (TA) is intended for conducting a site visit to locate potential sampling locations, the preparation of a Field Sampling Plan/Health and Safety Plan, a CERCLA Site Screening event including field work and preliminary assessment activities, and a Preliminary Assessment with Sampling Activities (PAWS) Report for the Former Clark Pest Control site. The services are being conducted using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement that is administered by DEP on behalf of EPA.

Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general, administrative, and fringe. The agreed upon cost of this subtask is $1,544.40

Subtask 2: Field Sampling Plan/Quality Assurance Project Plan and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Field Sampling Plan (FSP), and a Health and Safety Plan (HASP). A site visit to area within the parcels locating existing wells at the site, prior to completion of the FSP Workplan. The FSP Workplan will provide a brief summary of the scope of work and tables and figures showing the proposed sample locations. The agreed upon cost of this subtask is $3,304.86 www.FloridaDEP.gov

Negotiation Summary – Task Assignment (TA) CSS2A Former Clark Pest Control ERIC_14705, Jacksonville, Duval County Preliminary Assessment and Sampling and Report June 24, 2025

Subtask 3: Preliminary Assessment Activities This subtask includes pre- and post- preliminary assessment meetings, labor hours, travel, equipment costs, and subcontractor costs associated with the soil, surface water, and groundwater sampling. Deliverables of this subtask include field documentation (field data sheets, equipment calibration forms, and field notes), laboratory analytical reports, the non-hazardous waste manifest (IDW management), site photographs, chain of custody documentation, and subcontractor receipts from PAWS activities. The agreed upon cost of this subtask is $6,256.38.

Subtask 4: Preliminary Assessment with Sampling Report This subtask includes labor hours associated with the preparation of Data Summary Tables/Figures and the PAWS Report. The deliverable will document field and laboratory findings to include soil and groundwater sampling forms, and soil and groundwater analytical results (tabulated and figures). Deliverables of this subtask will include both the Data Summary Tables/Figures and the Report. The agreed upon cost of this subtask is $4,213.29.

Summary DEP’s CSS Project Manager and WSP’s Project Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $15,318.93. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by WSP USA Inc. on June 19, 2025, as well as the Task Assignment Form for CSS2A prepared by DEP. The final deliverable must be received by DEP no later than September 1 , 2025.

www.FloridaDEP.gov

SITE : Former Clark Pest Control SUBTASK 2: Field Sampling Plan/QAPP and HASP

DATE: 6/18/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (A. McCarthy) 3

Project Sci/Eng (J. Whipple) 19

Senior Sci/Eng (B. Lucero) 2

Staff Sci/Eng (A. Strayer) 2

TOTAL LABOR 26

VEHICLE TYPE RATE UNIT USAGE

Truck $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00

TOTAL EQUIPMENT $40.00

Prepare final Field Sampling Plan/Quality Assurance Project Plan and Health and Safety Plan (3 hours).

Prepare draft Field Sampling Plan/Quality Assurance Project Plan and Health and Safety Plan (16 hours). Conduct site visit to assess site conditions (3 hours).

CADD - prepare figures for Field Sampling Plan/QAPP.

Reporting: Formatting tables, document production. Create pdf for OCULUS.

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 3: Preliminary Assessment Activities

DATE: 6/18/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Sci/Eng (J. Whipple) 11

Senior Project Sci/Eng (D. McDaniels) 14

Staff Sci/Eng (L. Kamikazi) 13

TOTAL LABOR 38

VEHICLE TYPE RATE UNIT USAGE

Truck $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

GPRS Utility Locate $700 LS 1 $700.00

Erwin T&D - Non-Haz OCPs/Metals Water $125.00 per drum 1 $125.00

TOTAL $825.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00

Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00

Tubing, Poly HDPE $0.30 Per Foot 270 $81.00

Tubing, Silicon 1/4 x 7/16 $3.00 Per Foot 7 $21.00

Soil Assessment Kit $175.00 Per Day 1 $175.00

Drum (55-gallon) $100.00 Each 1 $100.00

TOTAL EQUIPMENT $707.00

Verification of property ownership for site access (2 hours). Complete forms to arrange for sample bottle order delivery and shipment from DEP Central Laboratory (2 hours). Characterize IDW and prepare waste profile for transportation and disposal of IDW (3 hours). Prepare and submit email summary with field documentation and certified laboratory reports (4 hours).

Field event preparation (1 hour). Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours).

Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).

Round trip travel (1 hour). Utility locate, soil sampling, sediment and surface water sampling (3 hours). Instrument calibration, groundwater measure water levels, measure field parameters, collect samples from five monitoring wells; sample and stage IDW (7 hours). Package and deliver samples to shipping point for DEP Central Laboratory (2 hours).

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 4: Reporting

DATE: 6/18/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (A. McCarthy) 3

Project Sci/Eng (J. Whipple) 24

Senior Sci/Eng (B. Lucero) 5

Staff Sci/Eng (A. Strayer) 2

TOTAL LABOR 34

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

Develop conclusions and recommendations and prepare final Preliminary Assessment with Sampling (PAWS) Report

Review site history; data entry, prepare tables and figures for new site, and draft PAWS Report

Prepare figures for report using CAD.

Reporting: Formatting tables, document production. Create pdf for OCULUS.

C o n tr a ct r:

W

S P

U S

A In c.

D a te

/1

8/

T as k

S

A u b T as k

P ro je ct M a n a ge m e nt S u b

T a sk

S ite

F or m er

C la rk P e st

C on tr l b T as k

F ie ld

S am p lin g P la n

/Q A

P P a n d H

A S

P S u b

T as k

A ct iv ity

/P ha se

P re lim in ar y S ite A ss e ss m e nt

S u b T as k

P re lim in ar y A ss e ss m en t

A ct iv iti es S u b

T as k

P ro je ct

M a n a ge la ir e F ie ld b

T as k

R e p o rt in g S u b

T as k

S u b T as k

S u b

T as k

T o ta ls

L ab o r

R a te C a te g o ry

8.

P ro je c t

M a n a g e r (J

W

.4

.0

P ro g ra m L e a d e r

X -1

2.

P ra ct ic e

L e a d e r

X

-1

M

C

.0

S e n io r C on su lta nt

X

-1

5.

S e n io r

S ci

/E n g

X -1

A M

4.

S e n io r

S ci

/E n g

X -1

B L)

5.

S e n io r

P ro je ct

S ci

/E ng

P

-1

D

M

8.

P ro je ct S ci /E n g

P

-9

JW

4.

S ta ff

S ci

/E n g

P -8

L

K

6.

S ta ff

S ci

/E n g

P -8

A

S

.0

S ci

/E n g/ A dm in

-7

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

T o ta l H o u rs

.4

.0

.0

.0

D ir e ct

L a b o r

,4

.5

.2

1, .1

1, .5

1, .6

0.

0.

0.

0.

0.

$0 .0

O ve rh e a d

2.

,7

.4

.7

1, .8

2, .2

2, .6

0.

0.

0.

$0

.0

$0 .0

$0

.0

G e n

A d m in

.0

.0

.0

.0

.0

0.

0.

0.

0.

0.

0.

0.

F rin g e

.0

.0

.0

.0

0.

0.

0.

0.

0.

0.

0.

0.

T o ta l L a b o r

2, .0

,4

.0

,8

.9

,1

.8

3, .2

0.

0.

0.

0.

0.

0.

n tr a ct

W

P

U S

A In c.

D a te

/1

8/

T as k

S b T as k

P ro je ct M a n a ge m e nt S u b

T a sk

S ite

F or m er

C la rk P e st

C on tr l b T as k

F ie ld

S am p lin g P la n

/Q A

P P a n d H

A S

P S u b

T as k

A ct iv ity

/P ha re lim in ar y S ite A ss e ss m e nt b

T as k

P re lim in ar y

A ss e ss m en t A ct iv iti es

S u b T as k

P ro je ct

M a n a ge la ir e F ie ld b

T as k

R e p o rt in g S u b

T as k

S u b T as k

S u b

T as k

T o ta ls

T ra v el

V e h ic le R e n ta l

.0

.0

.0

.0

.0

0.

0.

0.

0.

0.

M ile ag e

C o st s

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

A ir

F ar e

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

P e r d ie m

H o te l

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

T ot a l T ra ve l

.0

.0

.0

.0

.0

0.

0.

0.

0.

0.

S u b c o n tr a c to r (E q u ip m e n t P ro c u re m e n t)

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

S u b co n tr a ct o r

S ub to ta l

.0

.0

.0

0.

0.

0.

0.

0.

0.

0.

P ro cu re m en t F ee

.0

.0

.0

.0

0.

0.

0.

0.

0.

0.

T o ta l S u b c o n tr a ct o r

C o st

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

S u b c o n tr a c to r (S e rv ic e s P ro cu re m en t)

D ri lli n g

C o n ve n tio n a l)

0.

.0

.0

.0

.0

.0

.0

0.

0.

0.

D ri lli n g

N o n -c on ve n tio na l)

0.

.0

.0

.0

.0

.0

.0

0.

0.

0.

M ob ile L a b or a to ry

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

S u rv e yi n g

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

ID

W

.0

.0

.0

.0

.0

.0

0.

0.

0.

0.

U til iti e s

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

U til ity L o ca tio n

.0

.0

.0

.0

.0

.0

0.

0.

0.

0.

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

S u b co n tr a ct o r

S ub to ta l

.0

.0

.0

0.

0.

0.

0.

0.

0.

0.

H a n d lin g

F e e

2.

.0

.5

0.

0.

0.

0.

0.

0.

0.

T o ta l S u b c o n tr a ct o r

C o st

.5

.0

.5

.0

.0

.0

0.

0.

0.

0.

L ab o ra to ry n a ly tic a l C o st s

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

F as t T ur n a ro u n d C ha rg es

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

S a m p le S h ip p in g

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

T o ta l L a b o ra to ry

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

F ie ld E x p e n s e rs o na l P ro te ct io n

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

E xp e n d ab le s

0.

0.

0.

.0

.0

.0

0.

0.

0.

0.

E q u ip m e n t

(D ril lin g r e la te d

0.

.0

.0

.0

.0

.0

.0

0.

0.

0.

E q u ip m en t (A n a ly tic al r e la te d

.0

.0

.0

.0

.0

.0

0.

0.

0.

0.

E q u ip m en t (I

D W r e la te d)

.0

.0

.0

.0

.0

.0

0.

0.

0.

0.

E q u ip m en t (O th e r)

.0

.0

.0

.0

.0

.0

.0

0.

0.

0.

T o ta l F ie ld

E x p en s e s

.0

0.

.0

.0

.0

0.

0.

0.

0.

0.

S u b to ta l

4, .5

,4

.0

,0

.9

5, .3

3, .2

0.

0.

0.

0.

0.

0.

C o m p le ti o n

F e e

,2

.4

.4

.9

.0

.0

0.

0.

0.

0.

0.

0.

T o ta l E st im a te d C o s t

5, .9

,5

.4

,3

.8

6, .3

4, .2

0.

0.

0.

0.

0.

0.

WSP USA Inc.

9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256

T: 1 904 363-3430 wsp.com

June 18, 2025 Proposal No. 2025US423223

Ms. Claire Field

Florida Department of Environmental Protection

Waste Cleanup Program

Brownfields and CERCLA Site Screening Section

2600 Blair Stone Road, MS 4520

Tallahassee, FL 32399-2400

E-mail: claire.field@floridadep.gov

RE: COST PROPOSAL FOR PRELIMINARY ASSESSMENT

WITH SAMPLING ACTIVITIES

FORMER CLARK PEST CONTROL

JACKSONVILLE, DUVAL COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_14705

PROPOSED TASK ASSIGNMENT: CSS2A

Dear Ms. Field:

WSP USA Inc. (WSP) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal to conduct Preliminary Assessment with Sampling (PAWS) activities at the above-referenced site.

This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate table that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Waste Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

Ms. Claire Field Proposal No. 2025US423223

Florida Department of Environmental Protection June 18, 2025

SUBTASK 2 FIELD SAMPLING PLAN/QUALITY ASSURANCE PROJECT PLAN AND

HEALTH AND SAFETY PLAN

This subtask will include a review of historical site files; a site visit to assess current site conditions, including evaluating the integrity of the existing site monitoring wells; and participation in teleconferences with DEP to discuss the site and scope of the PAWS activities. WSP will then prepare and submit a Field Sampling Plan/Quality

Assurance Project Plan (QAPP) and Health and Safety Plan (HASP), which will include the following:

Site location and project planning elements

Project personnel

Brief site background and history

Project description

Proposed groundwater, soil, sediment, and surface water locations, depths, and analyses

Proposed sample location figures

Data quality objectives

Data generation and acquisition methods

Per OSHA 1910.120 requirements, WSP will also prepare a site-specific HASP for the fieldwork. The work will be high visibility safety vests, and steel-toed boots.

SUBTASK 3 PRELIMINARY ASSESSMENT ACTIVITIES

Site Access and Utility Locate

Following authorization to proceed, WSP will use the Duval current property owner and relevant offsite property owners have an executed Permission to Enter Property agreement with the DEP. WSP will then coordinate with the real property owner, tenant (if applicable), and offsite property owners for access to complete the scope of work. WSP or the DEP will attempt to obtain new or updated

Permission to Enter Property forms from relevant property owners prior to and/or during mobilization to the site, as needed.

WSP will obtain the applicable local, county, and State-required permits prior to implementing the proposed scope of work. Before the initiation of fieldwork, WSP will contact Sunshine 811 for underground utility clearance and marking. Given that work will be conducted on private property, Sunshine State One Call might not be able to provide details regarding specific utilities in the area where site restoration activities will be conducted. Therefore, WSP will use a private utility location company to locate and map shallow subsurface anomalies present within the proposed site restoration areas.

Soil Sampling

Soil sampling activities will be completed in accordance with DEP SOPs for Field Activities (DEP SOP-001/01

[FS 3000]), dated January 2017 (effective April 16, 2018). WSP will advance a total of five soil borings to determine potential soil impacts and collect representative soil samples for laboratory analysis. At each of the soil boring locations, WSP will use a decontaminated stainless-steel hand auger to collect discrete soil samples from the ground surface to a total depth of 2 feet below ground surface (bgs). WSP will collect soil samples for laboratory analysis from the bottom of the following depth intervals: 0 to 1.0 feet bgs and 1.0 to 2.0 feet bgs. The proposed soil boring locations are shown on the figure included in Attachment A.

The samples will be placed in the laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of 4° Celsius, and delivered to the DEP Central Laboratory in Tallahassee, Florida, along with the completed chain-of-custody documentation. The coolers and sample containers (including any pre-preserved sample containers) will be provided by the DEP Central Laboratory. The soil samples will be analyzed for the presence of the eight Resource Conservation and Recovery Act (RCRA) metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver) using EPA Method 6010/7470; organochlorine pesticides (OCPs) using EPA Method 8270E; and chlordane and toxaphene using EPA Method 8276.

Groundwater Sampling

WSP will collect groundwater samples from the following five monitoring wells: MEDW-4, MW-12, MW-14, MW-22, and MW-10D. The attached Figure 1 shows the monitoring well locations.

Prior to groundwater sampling, the depth-to-groundwater will be measured at each of the five well locations using an electronic water level indicator to determine groundwater elevations. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.

Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures

(SOPs) for Field Activities (DEP SOP-001/01 [FS 2200]), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater samples, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be

Groundwater samples will be collected using low-flow sampling methods.

WSP will submit the samples to the DEP Central Laboratory, along with the completed chain-of-custody documentation. The groundwater samples will be analyzed for the presence of the eight RCRA metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver) using EPA Method 6010/7470; OCPs using EPA

Method 8270E; and chlordane and toxaphene using EPA Method 8276.

Sediment and Surface Water Sampling

, which borders the site. The proposed sediment and surface water sampling locations are shown on the figure included in

Attachment A.

WSP assumes that the sediment sample can be collected with a decontaminated stainless-steel hand auger within the top 6 inches of sediment. Before collecting the surface water sample, WSP will purge approximately three equipment volumes with a peristaltic pump and record field parameters, including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the

WSP will submit the samples to the DEP Central Laboratory, along with the completed chain-of-custody documentation. The groundwater samples will be analyzed for the presence of the eight RCRA metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver) using EPA Method 6010/7470; OCPs using EPA

Method 8270E; and chlordane and toxaphene using EPA Method 8276.

Quality Assurance/Quality Control

WSP will submit the following quality assurance/quality control (QA/QC) samples during the sampling event:

Duplicate Samples (Soil): WSP will collect two field duplicate samples immediately after the collection of the primary field sample. The label for the duplicate sample will be consistent with the primary sample and include historical soil analytical results, WSP proposes to collect the duplicate soil samples from the easternmost proposed sample location

(see figure included in Attachment A).

Duplicate Samples (Groundwater): WSP will collect one field duplicate sample immediately after the collection of the primary field sample. The label for the duplicate sample will be consistent with the primary sample and ed on the historical groundwater analytical results, WSP proposes to collect the duplicate groundwater sample from well MW-12.

Equipment Blanks (Soil): WSP will collect one equipment blank for soil samples. WSP will collect the equipment blank by pouring distilled water over the decontaminated soil sampling equipment (hand auger extension and bucket) and collecting the water into a sample container.

Equipment Blanks (Groundwater): WSP will collect one equipment blank for groundwater samples. WSP will collect the equipment blank by pumping distilled water through silicon and/or HDPE tubing and collecting the water into a sample container.

Matrix Spike and Matrix Spike Duplicate (MS/MSD) Samples (Soil): WSP will collect one MS/MSD sample in the same manner and at the same time and location as a primary sample (i.e., additional sample volume), preferably in an area known to have little to no contamination. If the samples do not appear visually similar, WSP will choose another location for the collection of the MS/MSD sample. The MS/MSD sample will be labeled with the same sample name and time as the primary sample and denoted as an MS/MSD sample on the chain-of-custody and sample label. Based on the historical soil analytical results, WSP proposes to collect the

MS/MSD sample from the southernmost proposed sample location, adjacent to monitoring well MW-22 (see figure included in Attachment A).

MS/MSD Samples (Groundwater): WSP will collect one MS/MSD sample in the same manner and at the same time and location as a primary sample (i.e., additional sample volume), preferably in an area known to have little to no contamination. If the samples do not appear visually similar , WSP will choose another location for the collection of the MS/MSD sample. The MS/MSD sample will be labeled with the same sample name and time as the primary sample and denoted as an MS/MSD sample on the chain-of-custody and sample label. Based on the historical groundwater analytical results, WSP proposes to collect the MS/MSD sample from well MW-22.

Each QA/QC sample will be analyzed for the presence of the eight RCRA metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver) using EPA Method 6010/7470; OCPs using EPA Method 8270E;

and chlordane and toxaphene using EPA Method 8276.

Investigation-Derived Waste

WSP will containerize the investigation-derived waste (IDW) purge water and decontamination water in a 55-gallon drum. WSP will collect waste characterization samples from the drum for laboratory analysis using the Toxicity

Characteristic Leaching Procedure for the eight RCRA metals using Method 1311/6010/7470; OCPs using

Method 1311/8270E; and chlordane and toxaphene using Method 1311/8276. The drum will be temporarily staged onsite, in a secure location, pending waste characterization. For cost-estimating purposes, WSP has assumed that the IDW can be transported and disposed of as non-hazardous waste at an approved facility. The IDW transportation and disposal subcontractor will provide WSP with a non-hazardous waste manifest upon delivery to the disposal facility. WSP estimates one drum of IDW purge water will be generated during the field activities.

Interim Deliverable

Upon completion of Subtask 3, WSP will submit an e-mail deliverable that will include field documentation (field data sheets, equipment calibration forms, and field notes), laboratory analytical reports, the non-hazardous waste manifest, and site photographs.

SUBTASK 4 REPORTING

WSP will prepare a Preliminary Assessment With Sampling Activities (PAWS) Report deliverable that will include a description of the site history, pathway targets, field activities and sampling procedures, evaluation of the analytical results; comparison of the results to State Chapter 62-777, FAC Cleanup Target Level (CTLs); a tabulated summary of the analytical data; a site map showing the soil, groundwater, sediment, and surface water analytical results exceeding CTLs; water level elevation information in tables and figures; laboratory analytical data; and conclusions and recommendations.

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $15,318.93. WSP anticipates the sampling activities will take place in July or August 2025. The level of effort sheets and cost estimate form are included in Attachment B.

Subcontractor quotes are included in Attachment C. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost

Proposed Schedule/Deliverables

Subtask 1 Project Management $ 1,544.40 November 14, 2025

Subtask 2 Field Sampling Plan/Quality Assurance Project Plan and HASP

$3,304.86 July 11, 2025 (Field Sampling Plan/QAPP and

HASP)

Subtask 3 Preliminary Assessment Activities

$6,256.38 September 26, 2025 - (E-mail summary with field documentation, certified laboratory analytical reports, and non-hazardous waste manifest for IDW)

Subtask 4 Reporting $4,213.29 October 17, 2025 (PAWS Report)

Total/Completion Date $15,318.93 December 19, 2025

WSP appreciates the opportunity to provide services to the DEP. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, WSP USA Inc.

Jonathan L. Whipple, GIT Matthew C. Crews, PE

Consultant, Geologist Assistant Vice President, Environmental Engineer

JLW/MCC/as

CC: Scott Sweeney, DEP

Attachments: Figure 1 Sampling Event

Attachment A Sample Location Map Attachment B Level of Effort Sheets and Cost Estimate Form Attachment C Subcontractor Quotes

G:\Projects\DEP - Brownfields\Clark Pest Control\CSS2A - Preliminary Assessment\Proposal\CSS2A - Former Clark Pest Control Proposal (ERIC_14705).docx

FIGURE

ATTACHMENT A

Sample Location Map

ATTACHMENT C

Subcontractor Quotes

U

E c o lo g y*

H E

P A

C O

T

D N o n

H a z S o il

V

O C s p e r d ru m

.0

.0

T

D N o n

H a z M u d

/w a te r

V

O C s p e r d ru m

.0

.0

F a ls e

M o b ili za tio n n o d ru m f o u n d

.0

.0

P F

A S

P ro fil e

F e e p e r si te

.0

.0

T

D N o n

H a z S o il

P

F A

S /P

F O

S p e r d ru m

.0

.0

T

D N o n

H a z M u d

/w a te r

-P F

A S

/P F

O S p e r d ru m

.0

.0

D is p o sa l N o n

H a z S o il

V

O C s p e r d ru m

.0

.0

D is p o sa l N o n

H a z M u d

/w a te r

V

O C s p e r d ru m

.0

.0

P F

A S

P ro fil e

F e e p e r si te

.0

.0

D is p o sa l N o n

H a z S o il

P

F A

S /P

F O

S

.0

.0

D is p o sa l

N o n H a z

M u d /w a te r -P

F A

S /P

F O

S

.0

.0

A p p ro va l F e e p e r si te

.0

.0

N o n H a z

S o lif ic a tio n W a st e P ro fil e f e e

.0

.0

N o n H a z

S o lid s

D is p o sa l

(p e r d ru m

.0

.0

N o n H a z

S lu d g e D is p o sa l

.0

.0

P F

A S

W a st e g a l d ru m e m e lle A

L

.0

.0

T ru ck w ith li ft g a te a n d d ri ve r

.0

.0 n o n h a z liq u id s d is p o sa l ( p e r d ru m

.7

.0 g a llo n r e co n d iti o n e d d ru m

.6

.0

L T

L f e e s (l e ss t h a n d ru m s

.0

.0

E n e rg y se cu ri ty r e co ve ry f e e

.0

.0

T o ta l C o st

.0

,4

.0

,7

.0

N o te s*

T ra n sp o rt a tio n c o st s w ill b e c a lc u la te d b a se d o n p ic ku p s a t va ri o u s si te s a n d w a st e s tr e a m v o lu m e

E rw in

ESTIMATE

Blood Hound 6500 Technology Center Dr.

Suite 200 Indianapolis, IN 46278

Email: BHI@bhug.com bhug.com Website:

Phone #: 888-858-9830 888-858-9829 Fax #:

6500 Technology Center Dr.

Suite 200

Payment is due at the time of service, unless you already have an account with us. If you do have an account with us, payment terms are Net 30 days, unless otherwise stated in a pre-approved contract. To learn more, please call the office at 888-858-9830.

PRICE MAY VARY BASED ON ACTUAL TIME ON SITE. The above pricing is based only on the information supplied by the customer.

If a site walk through has not been conducted, this may affect the price.

Blood Hound will use electromagnetic (EM) and ground-penetrating-radar (GPR) equipment to locate private underground utilities at site indicated by client. All findings will be marked according to APWA standard. Customer is responsible for calling 811 for locates of any public utilities. If the scope of work should change or is different than that listed on estimate, please call our office for a revised estimate.

Unless expressly noted, Vacuum Excavation estimates do not include any of the following services: Permitting, Traffic Control, Restoration, Special Restoration, Special Backfill or Waste Disposal. If you need any of those services please call our office for a revised estimate.

Blood Hound is not responsible for the condition of the pipes or structures before or after jetting/clearing service is performed. Unsatisfactory conditions could be present within the structure and any services may bring those deficiencies to light.

In the event of inclement weather, if the client still requests for crew to arrive on site, then the client will be responsible for minimum charges even if no work is performed.

6500 Technology Center Dr.

Suite 200

By signing this Estimate the client acknowledges that they accept the scope of work listed on the estimate, as well as the service rates provided and are providing Blood Hound with a Notice To Proceed (NTP) for the listed Project. If the scope of work should change while the work is in progress, any changes will be documented on the technician’s field notes and signed off on by the client. Signing this estimate also acknowledges that the client agrees to the terms and conditions as they relate to payment for services rendered.

Signature: ______________________________________________________________________________________

Printed Name: ___________________________________________________________________________________

Date Signed: ____________________________________________________________________________________

If this is a prevailing wage job, please contact our office for a revised quote as this pricing does not reflect prevailing wage rates. If at some later date a project is determined to be a prevailing wage job, then any extra expense incurred by Blood Hound will be billed to the client.

The project estimate outlined in this specific proposal is valid for 90 days from the date of the proposal. Blood Hound reserves the right to review and adjust this estimate if client does not approve of the proposal within 90 days.

Please send all POs / Contracts to .BHUGContracts@bhug.com

We look forward to working with you.

GeoTek Services, LLC

28 May 2025

To: Jonathan Whipple

Golder Associates USA, Inc.

9428 Baymeadows Road, Suite 400 Jacksonville, Florida 32256

From: GeoTek Services, LLC 4060 Sparrow Hawk Road

Melbourne, Florida 32934

RE: Utility Locating Services Former Clark Pest Control, Jacksonville, Florida

Mr. Whipple, GeoTek Services is pleased to respond to your request for Utility Locating services at the Former Clark Pest Control site located in Jacksonville, Florida. We will scan a

5 proposed bore locations with the goal of locating underground utilities. We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as landscaping, fencing, buildings. We will scan as close as reasonably possible to fixed objects such as walls, landscaping, fences, etc.

Our deliverable will be marking paint and/or flags indicating the location of potential

We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.

We request access to any as-built site plans of the scan areas prior to rendering services. Our fixed price quote for this effort is $750.00. No out-of-pocket expenses are expected for this project. This quote is valid for sixty days.

Best Regards, Martin (Bud) Connor GeoTek Services, LLC

4060 Sparrow Hawk Road Melbourne, FL 32934-8525 info@GeoTekServices.com 321.473.7498