This is a Task Assignment (TA) document executed between the State of Florida Department of Environmental Protection (FDEP) and Golder Associates USA Inc. for groundwater monitoring activities at the Former Coin Laundry Equipment of Jacksonville site located at 1692 Hammond Boulevard, Jacksonville, Duval County, Florida. The task assignment is issued under Contract Number HW685 with TA Number DC039A and is effective through May 30, 2023. The FDEP Project Manager is Ginger Shirah, and the Contractor's Project Manager is Matt Crews.

The scope of work, authorized by the September 28, 2022 Scope of Work, Cost Estimate, and Bid Documentation, is divided into three subtasks: (1) Project Management overseen by experienced personnel responsible for schedule, budget, invoicing, and communications; (2) Biennial Groundwater Monitoring including collection of groundwater samples from nine monitoring wells using low-flow sampling methods, analysis for chlorinated volatile organic compounds via EPA Method 8260, and investigation-derived waste disposal; and (3) Reporting of findings in a comprehensive biennial groundwater monitoring report. The total task assignment value is $10,807.40 on a fixed unit rate basis, with deliverables and invoicing requirements as follows: Subtask 2 (Field Documentation and Laboratory Report; IDW Disposal Documentation) due January 31, 2023 for $6,448.85, and Subtasks 1 and 3 (Biennial Groundwater Monitoring Report and Project Management) due March 13, 2023 for $4,358.55. The cost estimate reflects 67 total labor hours at various staff levels with overhead calculated at 172.50 percent, plus direct expenses for travel ($120.00), laboratory analysis ($987.00), field equipment ($613.00), subcontractor services for IDW disposal ($121.00), and a completion fee.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01DCO1.pdf PDF
CN-370000-HW685-BF02B.pdf PDF
CN-370000-HW685-BF04A.pdf PDF
CN-370000-HW685-BIL01A.pdf PDF
CN-370000-HW685-BIL1ACO1.pdf PDF
CN-370000-HW685-BIL1ACO2.pdf PDF
CN-370000-HW685-BIL1ACO3.pdf PDF
CN-370000-HW685-BIL1BCO1.pdf PDF
CN-370000-HW685-DC001F.pdf PDF
CN-370000-HW685-DC001b.pdf PDF
CN-370000-HW685-DC002A.pdf PDF
CN-370000-HW685-DC002D.pdf PDF
CN-370000-HW685-DC002H.pdf PDF
CN-370000-HW685-DC003B.pdf PDF
CN-370000-HW685-DC004B.pdf PDF
CN-370000-HW685-DC008C.pdf PDF
CN-370000-HW685-DC009C.pdf PDF
CN-370000-HW685-DC010D.pdf PDF
CN-370000-HW685-DC014A.pdf PDF
CN-370000-HW685-DC015A.pdf PDF
CN-370000-HW685-DC016B.pdf PDF
CN-370000-HW685-DC016C.pdf PDF
CN-370000-HW685-DC018C.pdf PDF
CN-370000-HW685-DC01ACO3.pdf PDF
CN-370000-HW685-DC01ACO5.pdf PDF
CN-370000-HW685-DC021D.pdf PDF
CN-370000-HW685-DC024A.pdf PDF
CN-370000-HW685-DC024B.pdf PDF
CN-370000-HW685-DC024D.pdf PDF
CN-370000-HW685-DC026A.pdf PDF
CN-370000-HW685-DC026D.pdf PDF
CN-370000-HW685-DC028B.pdf PDF
CN-370000-HW685-DC028E.pdf PDF
CN-370000-HW685-DC02DCO1.pdf PDF
CN-370000-HW685-DC02ECO1.pdf PDF
CN-370000-HW685-DC02GCO1.pdf PDF
CN-370000-HW685-DC030A.pdf PDF
CN-370000-HW685-DC031B.pdf PDF
CN-370000-HW685-DC033B.pdf PDF
CN-370000-HW685-DC034C.pdf PDF
CN-370000-HW685-DC034D.pdf PDF
CN-370000-HW685-DC036A.pdf PDF
CN-370000-HW685-DC038A.pdf PDF
CN-370000-HW685-DC038D.pdf PDF
CN-370000-HW685-DC03ACO1.pdf PDF
CN-370000-HW685-DC03BCO1.pdf PDF
CN-370000-HW685-DC041A.pdf PDF
CN-370000-HW685-DC042C.pdf PDF
CN-370000-HW685-DC051B.pdf PDF
CN-370000-HW685-DC052D.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC039A Completion May 30, 2023

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the September 28, 2022, Scope of Work, Cost Estimate, and Bid Documentation.

Ginger Shirah 850-245-8899 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Golder Associates USA Inc.

Golder Associates USA Inc.

Matt Crews 904-363-3430

ERIC_4627

1692 Hammond Boulevard, Jacksonville, Duval County

Former Coin Laundry Equipment of Jacksonville

✔ $ 10,807.40

$ 10,807.40

Scope of Work

Matthew Crews

Senior Lead Consultant, Environmental Engineer

11/3/2022

Matthew C. Crews Digitally signed by Matthew C. Crews Date: 2022.11.03 08:24:02 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.11.02 12:39:42 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Groundwater Monitoring Field Documentation and Laboratory Report;

IDW Disposal Documentation 01/31/2023

Subtasks 1 & 3: Biennial Groundwater Monitoring Report; Project Management 03/13/2023

Subtask 2: Submittal and FDEP approval of the Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 6,448.85

Subtasks 1 & 3: Submittal and FDEP approval of the Biennial Groundwater Monitoring Report; Project Management $ 4,358.55

$ 10,807.40

HW685

DC039A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To:

From:

Date:

HW685 Contract Negotiation File Former Coin Laundry Equipment of Jacksonville Jacksonville, Duval County

ERIC_4627

Ginger Shirah, Project Manager October 3, 2022

Subject: Negotiation Summary

HW685 DC039A

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the September 28, 2022, Scope of Work, Cost Estimate, and Bid Documentation, and the follow up email on September 29, 2022 adjusting the project schedule.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Biennial Groundwater Monitoring Golder will obtain a signed site access agreement from the new property owner and collect groundwater samples from monitoring wells MW001I, MW001D, MW006I, MW007I, MW012I, MW013I, MW014I, MW015I, and MW016I. Prior to sampling, depth-to-water will be measured in the above mentioned wells and in existing monitoring wells MW002I, MW008I, and MW009I. The wells will then be purged, and field parameters will be recorded.

The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs) via EPA Method 8260. Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste, and M&D Industries. Clark was selected as the lowest responsive and responsible bidder.

Subtask 3: Reporting Golder will submit the Biennial Groundwater Monitoring Report deliverable to FDEP.

Obtaining a signed site access agreement from the new property owner is part of this Task Assignment.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $10,807.40 with 67 labor hours.

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 10/3/2022

Task #: DC039A SubTask 1 Project Management SubTask 6

Site: SubTask 2 Biennial GW Monitoring SubTask 7

Activity/Phase: Assessment SubTask 3 Reporting SubTask 8

Project Manager: Ginger Shirah SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$51.23 Project Manager (RFM) 7 6.7 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$63.65 Practice Leader - X-13 (JB) 3 0 3 0 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0

$51.23 Senior Sci/Eng - X-11 (RFM) 25 11 14 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 3 0 3 0 0 0 0 0 0 0 $44.15 Project Sci/Eng - P-10 (JT) 0 0 0.0 0 0 0 0 0 0 0 $38.61 Staff Sci/Eng - P-8 (LS) 14 14.0 0 0 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 13 13.0 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 2 0 2 0 0 0 0 0 0 0

$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 67 6.7 38.0 22.0 0 0 0 0 0 0 0

Direct Labor $2,991.29 $344.13 $1,537.23 $1,109.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $5,159.97 $593.62 $2,651.72 $1,914.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,151.26 $937.75 $4,188.95 $3,024.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Coin Laundry and Equipment of Jacksonville

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 10/3/2022

Task #: DC039A SubTask 1 Project Management SubTask 6

Site: SubTask 2 Biennial GW Monitoring SubTask 7

Activity/Phase: Assessment SubTask 3 Reporting SubTask 8

Project Manager: Ginger Shirah SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Coin Laundry and Equipment of Jacksonville

Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $767.00 $767.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $987.00 $987.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $473.00 $473.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $613.00 $613.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $9,992.26 $937.75 $6,029.95 $3,024.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $815.14 $93.78 $418.90 $302.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $10,807.40 $1,031.53 $6,448.85 $3,327.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Coin Laundry and Equipment of Jacksonville SUBTASK 2: Biennial GW Monitoring

DATE: 10/3/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R Mongillo) 11

Staff Sci/Eng L. Swindle) 14

Staff Sci/Eng (J. Spengler) 13

TOTAL LABOR 38

VEHICLE TYPE RATE UNIT USEAGE

Truck (GW sampling $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem Staff Sci/Eng (J. Spengler) $36.00 Per Day 0 $0.00 Per Diem Project Sci/Eng (L. Swindle) $36.00 Per Day 0 $0.00

Hotel Staff Sci/Eng (J. Spengler) $89.00 Per Day 0 $0.00 Hotel Project Sci/Eng (L. Swindle) $89.00 Per Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW T&D - Liquids $110.00 Per Drum 1 $110.00

TOTAL $110.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B

Total VOHs EPA Method 8260B $73.00 9 $657.00 Total VOCs EPA Method 8260B $110.00 1 $110.00

Sample Shipping Small $110.00 2 $220.00

TOTAL LAB $987.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 520 $156.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 9 $27.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $613.00

Round trip travel (1.0 hour). Field event preparation (1 hour). Instrument calibration, groundwater measure water levels (3 additional wells), measure field parameters, sample nine wells (MW001I, MW006I, MW007I, MW012I, MW013I, MW014I, MW015I, MW016I, and MW001D) analyze for chlorinated VOCs by EPA Method 8260B (12 hours). .

Communication with RPO, verification of property ownership, and offsite access properties prior to site access (2 hr), update Source site agreement for new owner (4 hours), prepare and submit field notes, sample forms, laboratory report in an email deliverable to the DEP (3 hours), characterization and waste profile for transportation and disposal of IDW drum(s) (2 hr).

Round trip travel (0.5 hour). Instrument calibration, groundwater measure water levels (2 additional wells), measure field parameters, sample eight wells (AMW004, GMW001S, GMW002S, GMW003S, GMW004S, GMW005S, GMW006S, and GMW007S analyze for chlorinated VOCs by EPA Method 8260B (10 hours).

Groundwater sampling scope: sample 9 wells: (Intermediate zone wells MW001I, MW006I, MW007I, MW012I, MW013I, MW014I, MW015I, MW016I, and deep zone well MW001D) with field parameters and water levels. Depth to water measurements will be collected from the 8 intermediate zone wells that will be sampled and additional intermediate zone wells MW002I, MW008I, and MW009I. Groundwater will be analyzed for chlorinated VOCs by EPA Method 8260.

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Coin Laundry and Equipment of Jacksonville SUBTASK 3: Reporting

DATE: 10/3/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 3

Senior Sci/Eng (R Mongillo) 14

Senior Project Sci/Eng (B. Lucero) 3

Staff Sci/Eng (A. Strayer) 2

TOTAL LABOR 22

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Reporting: Updating tables document production, binding and shipping. Create pdf for OCULUS.

Develop conclusions and recommendations and prepare final Annual Monitoring Report.

Data entry, prepare tables and figures, and draft Annual Monitoring Report

CADD Update Figures (one groundwater flow and one CVOC detections)

FINAL --7/24/96

Golder Associates USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256

T: +1 904 363-3430 F: +1 904 363-3445 golder.com

September 28, 2022 Proposal No. 202208346

Ms. Ginger Shirah Florida Department of Environmental Protection 2600 Blair Stone Road, MS4520 Tallahassee, FL 32399-2400

RE: PROPOSAL FOR 2023 BIENNIAL GROUNDWATER MONITORING

FORMER COIN LAUNDRY EQUIPMENT OF JACKSONVILLE

1692 HAMMOND BOULEVARD

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FACILITY IDENTIFICATION NUMBER: ERIC_4627

PROPOSE TASK ASSIGNMENT: DC039A

Dear Ms. Shirah:

Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for biennial groundwater monitoring at the former Coin Laundry Equipment of Jacksonville (Coin Laundry) site, located in Jacksonville, Duval County, Florida. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services. This scope of work is subdivided into three separate subtasks, as described below.

SUBTASK 1: PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, the project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation such that the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will be responsible for the work being conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2: ANNUAL GROUNDWATER SAMPLING AND IDW TREATMENT

Golder will collect groundwater samples from nine monitoring wells (MW001I, MW001D, MW006I, MW007I, MW012I, MW013I, MW014I, MW015I, and MW016I). Figures 2, 3, and 4 from the 2021 biennial monitoring report, which show the potentiometric contours for the intermediate zone of the surficial aquifer and the volatile organic compound (VOC) results for the intermediate, and deep zones of the surficial aquifer, are attached.

Ms. Ginger Shirah Proposal No. 202208346

Florida Department of Environmental Protection September 28, 2022

Prior to groundwater sampling, depth-to-water measurements will be collected at the nine previously mentioned monitoring wells and existing monitoring wells MW002I, MW008I, and MW009I using an electronic water level indicator to determine groundwater depth. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.

Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B. Upon receipt of the laboratory analytical results, Golder will evaluate the constituent concentrations to determine if off-site notification is required.

Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.

Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.

SUBTASK 3: REPORTING

The biennial groundwater monitoring report will include a description of the sampling procedures, evaluation of the analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will forward the Automated Data Processing Tool (ADaPT) data deliverables for the groundwater sampling event provided by the laboratory.

HEALTH AND SAFETY

Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the proposed work is $10,113.29. Golder will tentatively schedule the sampling event to be conducted in March 2023. The groundwater sampling event is estimated to require one day on site with two field personnel. The LOE/CEF cost sheets are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule:

Table 1: Proposed Costs and Deliverable Schedule

Task Proposed Cost Proposed Schedule

Subtask 1: Project Management $ 951.68 June 26, 2023

Subtask 2: Annual Groundwater Sampling and IDW Treatment

$ 5,834.59 April 23, 2023 (Field Documentation and Laboratory Report)

Subtask 3: Reporting $ 3,327.02 May 21, 2023 (annual Monitoring report)

Total/Completion Date $10,113.29 July 31, 2023

Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.

Golder appreciates the opportunity to provide services under the Dry Cleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at 904 363-3430.

Sincerely, Golder Associates USA Inc.

Ralph F. Mongillo, Jr., PG Jesse C. Brown, PE Senior Geologist / Lead Consultant Director, Environmental Engineer

RFM/JCB/as

Attachments: Figure 1 Site Location Map

Figure 2 Potentiometric Map of the Intermediate Zone of the Surficial Aquifer Figure 3 CVOC Contaminants Detected in the Intermediate Zone of the Surficial Aquifer (Screened Interval 20 – 25 feet bgs)

Attachment A Level of Effort Sheets and Cost Estimate Form Attachment B Subcontractor Quotes

G:\Projects\DEP-Drycleaning\Projects\Jax\Coin Laundry\HW685\DC039A\Proposal\DC039A 2023 Biennial Monitoring Proposal.docx

FIGURES

in

FDEP-DC003

Control No.

FDEP-DC003-J001

FIGURE

2021-03-30

BCL

RFM

RFM

JCB 1

2021 BI-ANNUAL GROUNDWATER MONITORING REPORT

COIN LAUNDRY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMETAL PROTECTION

SITE LOCATION MAP

TITLE

PROJECT NO. REV.

PROJECTCLIENT

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

A

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

Pa th

: C :\U se rs

\b lu ce ro

\A pp

D at a\ R oa m in g\

G C

D S_ us er

\T em p- D w g\

Ac Pu bl is h_

Fi le N am e:

F D

EP

-D

C

3- J0

.d w g

SITE

County

DUVAL

FLORIDA

SCALE

0 1200 2400

FEET

1. USGS TOPOGRAPHIC MAP, 7.5 MIN. QUADRANGLE MAP SERIES:

MARIETTA QUADRANGLE, DUVAL COUNTY, FLORIDA.

REFERENCE(S)

(68.26)

(68.47)

(68.59)

(68.26)

(68.88)

(68.88)

(69.05)

(69.18)

(NM)

(68.61)

(NM)

68.20

68.40

68.60

68.80

69.00

69.00

68.80

68.60

68.40

68.20

BURIED GAS LINE

PROPERTY BOUNDARY

OVER HEAD ELECTRICAL LINES

INTERMEDIATE SURFICIAL AQUIFER

MONITORING WELL LOCATION

(SCREEN INTERVAL 20-25 FT BGS)

BURIED SEWER AND WATER LINES

UPPER SURFICIAL GROUNDWATER

ELEVATION (FT - NGVD)

GROUNDWATER CONTOUR INTERVAL

ESTIMATED GROUNDWATER FLOW DIRECTION

(DASHED WHERE INFERRED)

1. UST = UNDERGROUND STORAGE TANK

2. NM = NOT MEASURED

3. LIL CHAMP MONITORING WELLS WERE ABANDONED PRIOR TO

AUGUST 2005.

4. MW009I WAS DESTROYED WHEN USTs/DISPENSERS WERE

REMOVED FROM THE PROPERTY SOMETIME BETWEEN APRIL

2009 AND APRIL 2010.

5. GROUNDWATER MEASUREMENT FROM MW013I IS ANOMALOUS;

THEREFORE, WAS NOT USED ON THE POTENTIOMETRIC MAP.

6. * - AN ANOMALOUS DEPTH TO WATER MEASUREMENT WAS

COLLECTED AT MW012I AND WAS NOT USED FOR THIS FIGURE.

in

FDEP-DC003

Control No.

FDEP-DC003-J002

FIGURE

2021-03-30

BCL

RFM

RFM

.JCB

2021 BI-ANNUAL GROUNDWATER MONITORING REPORT

COIN LAUNDRY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMETAL PROTECTION

POTENTIOMETRIC MAP OF THE INTERMEDIATE ZONE OF THE

SURFICIAL AQUIFER

(SCREENED INTERVAL 20-25 FEET BGS) - MARCH 15, 2021

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F

D

EP

\F D

EP

-D

C \D

C N o

C oi n

La un dr y\

J

- 2

Bi -a nn ua l G W

M R

\A ct iv e

D ra w in gs

Fi le N am e:

F D

EP

-D

C

3- J0

.d w g

SCALE

0 20 40

FEET

LEGEND

NOTE(S)

(67.29)

A

B

C

D in

FDEP-DC003

Control No.

FDEP-DC003-J003

FIGURE

2021-03-30

BCL

RFM

RFM

JCB

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F

D

EP

\F D

EP

-D

C \D

C N o

C oi n

La un dr y\

J

- 2

Bi -a nn ua l G W

M R

\A ct iv e

D ra w in gs

Fi le N am e:

F D

EP

-D

C

3- J0

.d w g

OVER HEAD ELECTRICAL LINES

PROPERTY BOUNDARY

ASPHALT CUTS

BURIED GAS LINE

BURIED SEWER AND WATER LINE

MONITORING WELL LOCATION

INTERMEDIATE SURFICIAL AQUIFER

PCE 3.0 ug/L ISOCONCENTRATION

CONTOUR

(SCREENED INTERVAL 20-25 FT. BGS)

A

B

ROSA JENKINS PROPERTY

M&T TRUST

8832 BRIER WAY SOUTH

8831 NORMANDY BLVD

C FLORIDA DEPARTMENT OF

TRANSPORTATION PROPERTY

D JUSTIN MICHAEL SHAW PROPERTY

8840 BRIER WAY SOUTH

MW014I

DATE PCE TCE

3/24/2011 2.8 0.36 U 3/22/2012 5.9 0.36 U 3/19/2013 1.7 0.66 U 3/13/2014 3.5 0.36 U

10/29/2015 5.2 0.58 U 10/26/2016 12 0.89 I 10/18/2017 18 1.2 3/12/2019 22 1.3 I

10/17/2019 21 1.2 3/15/2021 23 1.1

MW007I

DATE PCE TCE

3/24/2011 76 2.2 3/22/2012 46 1.1 3/19/2013 29 0.66 U 3/13/2014 38 0.54 I

10/29/2015 31 0.85 I 10/26/2016 66 1.8 10/18/2017 120 2.1 3/12/2019 62 1.3 I

10/17/2019 57 1.0 3/15/2021 43 0.89 I

MW006I

DATE PCE TCE

6/5/2006 1.0 U 1.0 U 3/10/2008 1.61 0.324 U 3/20/2013 17 1.1 3/13/2014 25 0.73 I 5/17/2018 23 0.29 U 3/12/2019 17 0.29 U

10/17/2019 24 0.83 I 3/15/2021 17 0.25 U

MW002I

DATE PCE TCE

9/28/2004 2.0 U 2.0 U 8/29/2005 1.0 U 1.0 U 6/5/2006 1.0 U 1.0 U 3/10/2008 0.187 U 0.324 U

MW001I

DATE PCE TCE

3/24/2011 29 0.76 I 3/22/2012 29 0.69 I 3/19/2013 14 0.86 I 3/13/2014 20 2.7

10/29/2015 25 3.4* 10/26/2016 25 6.2 10/18/2017 36 8.6 3/12/2019 18 12 3/15/2021 13 11

MW009I

DATE PCE TCE

9/28/2004 2.0 U 2.0 U 8/30/2005 1.42 1.0 U 6/5/2006 1.0 U 1.0 U

3/11/2008 0.187 U 0.324 U

MW012I

DATE PCE TCE

3/24/2011 6.1 0.36 U 3/22/2012 61 1.6 3/19/2013 16 0.66 U 3/13/2014 16 0.36 U

10/29/2015 6.1 0.29 U 10/26/2016 9.4 0.29 U 10/18/2017 7.8 0.29 U 3/12/2019 31 1.1 I 3/15/2021 37 1.1

LCIW001

DATE PCE TCE

8/25/2004 1.3 <1.0 8/25/2004 1.13 1.0 U

MW008I

DATE PCE TCE

8/30/2005 1.0 U 1.0 U 6/5/2006 1.0 U 1.0 U 3/11/2008 0.187 U 0.324 U 3/19/2013 0.52 U 0.66 U

MW013I

DATE PCE TCE

3/24/2011 0.94 I 0.36 U 3/22/2012 6.6 0.36 U 3/19/2013 0.67 I 0.66 U 3/13/2014 0.36 U 0.36 U

10/29/2015 2.9 0.58 U 10/26/2016 2.6 0.29 U 10/18/2017 2.3 0.29 U 3/12/2019 0.36 U 0.29 U 3/15/2021 0.25 U 0.25 U

MW015I

DATE PCE TCE

3/11/2008 0.187 U 0.324 U 3/19/2013 0.52 U 0.66 U

10/17/2019 0.36 U 0.29 U 3/15/2021 0.25 U 0.25 U

WELL ID

DATE SAMPLED

DP002

DATE PCE TCE

10/26/2016 3 3

GCTLs

MW016I

DATE PCE TCE

10/29/2015 0.72 U 0.58 U 10/26/2016 0.36 U 0.29 U 10/18/2017 0.36 U 0.29 U 3/12/2019 0.36 U 0.29 U

10/17/2019 0.36 U 0.29 U 3/15/2021 0.25 U 0.25 U

1. DATE OF OFFSITE NOTIFICATION 8/29/2006.

2. CVOC - CHLORINATED VOLATILE ORGANIC COMPOUND

3. * RESULT DETERMINED NOT TO EXCEED THE GCTL BASED ON

THE FDEP MEMORANDUM, DATED NOVEMBER 17, 2011.

4. MW009I WAS DESTROYED WHEN USTs/DISPENSERS WERE

REMOVED FROM THE PROPERTY SOMETIME BETWEEN APRIL

2009 AND APRIL 2010.

5. I = THE REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL

QUANTITATION LIMIT.

2021 BI-ANNUAL GROUNDWATER MONITORING REPORT

COIN LAUNDRY

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL. DEPT. OF ENVIRONMETAL PROTECTION

CVOC CONTAMINANTS DETECTED IN THE INTERMEDIATE

ZONE OF THE SURFICIAL AQUIFER

(SCREENED INTERVAL 20 - 25 FEET BGS)

SCALE

0 20 40

FEET

LEGEND

NOTE(S)

ATTACHMENT B

Subcontractor Quotes

5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2

Quote Number: 19536

QUOTE

QUOTED TO:

QUOTE DATE: 1/1/2022

COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns

863.327.6289 - cburns@clarkenv.com

Name (print) Title mcrews Highlight mcrews Highlight mcrews Highlight mcrews Highlight

5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png

AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Ralph

We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.

Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790

Sent from Mail for Windows

From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com

Shirah, Ginger K

From: Mongillo, Ralph <Ralph_Mongillo@golder.com> Sent: Thursday, September 29, 2022 11:09 AM To: Shirah, Ginger K Cc: Crews, Matt; Brown, Jesse Subject: Revised Schedule for Proposals submitted

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Ginger, Attached are some revised dates for the proposals submitted.

Subtask 1 Subtask 2 Subtask 3 TA AR Pats 3/13/23 1/31/23 3/13/23 5/30/23

Coin Laundry 3/13/23 1/31/23 3/13/23 5/30/23

Swift Cesery 3/13/23 1/31/23 3/13/23 5/30/23

Sages 3/13/23 1/31/23 3/13/23 5/30/23

Music Man 3/31/23 2/20/23 3/31/23 5/30/23

Bert Morsch 3/31/23 2/20/23 3/31/23 5/30/23

Regards

Ralph

Ralph F. Mongillo Jr., PG Senior Geologist/Lead Consultant

T: +1 904 363 3430 D: +1 904 421 4245 C: +904 610 8761

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256 wsp.com | golder.com

WSP and Golder have joined together to form the premier environmental consultancy in the industry. Together we are 14,000 strong, Future Ready©, and delivering innovative solutions to our clients around the globe.

As of October 28, 2021, Golder Associates Inc. is now Golder Associates USA Inc.

DC010B Annual GW Monitoring proposal - ERIC_4553.pdf
Figures 4-8.pdf
Sheets and Views
1 SITE LOCATION MAP
2 POTENTIOMETRIC MAP OF THE INTERMEDIATE ZONE
3 POT MAP OF THE DEEP ZONE OF THE SURFICIAL AQUIFER
4 GW CHARACTERIZATION SHALLOW ZONE SURFICIAL AQUIFER
5 GW CHARACTERIZATION INTERMEDIATE ZONE SURFICIAL AQUIFER
6 GW CHARACTERIZATION DEEP ZONE SURFICIAL AQUIFER
7 GW CHARACTERIZATION ROCK ZONE SURFICIAL AQUIFER
8 GROUNDWATER CHARACTERIZATION TPOC WELLS
PLOT
DC023B Former Sages Cleaners GW Monitoring proposal - ERIC_4596.pdf
Table 1 - 2023 Performance Monitoring Plan.pdf
Table 5
Figures 6-8.pdf
Sheets and Views
1 SITE LOCATION MAP
2 SITE LAYOUT
3 POTENTIONMETRIC MAP OF THE SHALLOW SURFICIAL AQUIFER
4 POT MAP OF THE INTERMEDIATE SURFICIAL AQUIFER
5 POTENTIOMETRIC MAP OF THE DEEP SURFICIAL AQUIFER
6 GW CHARAC IN THE SHALLOW ZONE OF THE SURFICIAL AQUIFER
7 GW CHARAC IN THE INTERMEDIATE ZONE OF THE SURFICIAL AQUIFER
8 GW CHARACTERIZATION IN THE DEEP ZONE OF THE SURFICIAL AQUIFER
DC039A Cost Estimate.pdf
Cost Estimate
DC039A Subtask 2.pdf
Subtask 2
DC039A Subtask 3.pdf
Subtask 3