This document is a Task Assignment (TA) under Contract Number HW685 between the State of Florida Department of Environmental Protection (FDEP) and Golder Associates USA Inc. The TA, numbered DC033A, was executed on May 26, 2022, with a completion date of January 13, 2023. The assignment pertains to groundwater monitoring activities at the Al Grubers Drycleaners - Former site (ERIC_4562) located at 5161 Beach Boulevard, Jacksonville, Duval County, Florida. The FDEP Project Manager is Ben Grubbs, and the contractor's Project Manager is Matt Crews.

The Task Assignment authorizes Golder to conduct biennial groundwater monitoring services consisting of three subtasks: Project Management ($1,064.29), Biennial Groundwater Monitoring ($7,532.23), and Reporting ($3,284.57), for a total contract value of $11,881.09 on a fixed unit rate basis. The scope includes collecting groundwater samples from 14 monitoring wells, analyzing samples for chlorinated volatile organic compounds using EPA Method 8260B, managing investigation-derived waste (IDW) through Erwin Remediation at $110.00 per drum, and preparing a biennial groundwater monitoring report with GIS updates. Deliverables are scheduled for September 9, 2022 (field documentation and laboratory report), October 21, 2022 (biennial groundwater monitoring report), and completion by January 13, 2023. The contract requires 72 total labor hours and includes vehicle rental ($240.00), laboratory analytical costs ($1,242.00), and field equipment expenses ($1,027.00).

View the file

Other files

File Type Posted
CN-370000-HW685-BF01C.pdf PDF
CN-370000-HW685-BF05ACO2.pdf PDF
CN-370000-HW685-BF05ACO3.pdf PDF
CN-370000-HW685-BF06A.pdf PDF
CN-370000-HW685-BF1ACO1.pdf PDF
CN-370000-HW685-BF6ACO1.pdf PDF
CN-370000-HW685-BIL01C.pdf PDF
CN-370000-HW685-BIL01CO1.pdf PDF
CN-370000-HW685-BIL03A.pdf PDF
CN-370000-HW685-BIL2ACO1.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf.crdownload CRDOWNLOAD file
CN-370000-HW685-DC001A.pdf PDF
CN-370000-HW685-DC002G.pdf PDF
CN-370000-HW685-DC003A.pdf PDF
CN-370000-HW685-DC005C.pdf PDF
CN-370000-HW685-DC006B.pdf PDF
CN-370000-HW685-DC006C.pdf PDF
CN-370000-HW685-DC007C.pdf PDF
CN-370000-HW685-DC008A.pdf PDF
CN-370000-HW685-DC009B.pdf PDF
CN-370000-HW685-DC010A.pdf PDF
CN-370000-HW685-DC011A.pdf PDF
CN-370000-HW685-DC012C.pdf PDF
CN-370000-HW685-DC013A.pdf PDF
CN-370000-HW685-DC013C.pdf PDF
CN-370000-HW685-DC015B.pdf PDF
CN-370000-HW685-DC015C.pdf PDF
CN-370000-HW685-DC016A.pdf PDF
CN-370000-HW685-DC018A.pdf PDF
CN-370000-HW685-DC019B.pdf PDF
CN-370000-HW685-DC01ACO6.pdf PDF
CN-370000-HW685-DC01ACO8.pdf PDF
CN-370000-HW685-DC01ACO9.pdf PDF
CN-370000-HW685-DC020B.pdf PDF
CN-370000-HW685-DC022A.pdf PDF
CN-370000-HW685-DC022B.pdf PDF
CN-370000-HW685-DC022D.pdf PDF
CN-370000-HW685-DC023B.pdf PDF
CN-370000-HW685-DC023C.pdf PDF
CN-370000-HW685-DC027B.pdf PDF
CN-370000-HW685-DC027C.pdf PDF
CN-370000-HW685-DC029B.pdf PDF
CN-370000-HW685-DC029C.pdf PDF
CN-370000-HW685-DC02CCO1.pdf PDF
CN-370000-HW685-DC02FCO1.pdf PDF
CN-370000-HW685-DC031A.pdf PDF
CN-370000-HW685-DC031C.pdf PDF
CN-370000-HW685-DC032B.pdf PDF
CN-370000-HW685-DC035A.pdf PDF
CN-370000-HW685-DC037A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC033A Completion January 13, 2023

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the May 25, 2022, Scope of Work, Cost Estimate, and Bid Documentation.

Ben Grubbs 850-245-8992 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Golder Associates USA Inc.

Golder Associates USA Inc.

Matt Crews 904-363-3430

ERIC_4562

5161 Beach Boulevard, Jacksonville, Duval County

Al Grubers Drycleaners - Former

✔ $ 11,881.09

$ 11,881.09

Scope of Work

Robert M. Wojcik, PG Digitally signed by Robert M. Wojcik, PG Date: 2022.05.26 10:46:10 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.05.26 10:11:15 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Groundwater Monitoring Field Documentation and Laboratory Report;

IDW Disposal Documentation 09/09/2022

Subtasks 1 & 3: Biennial Groundwater Monitoring Report; ADaPT/GIS Update;

Project Management 10/21/2022

Subtask 2: Submittal and FDEP approval of the Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 7,532.23

Subtasks 1 & 3: Submittal and FDEP approval of the Biennial Groundwater Monitoring Report; ADaPT/GIS Update; Project Management $ 4,348.86

$ 11,881.09

HW685

DC033A

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW685 Contract Negotiation File Al Grubers Drycleaners - Former Jacksonville, Duval County

ERIC_4562

From: Ben Grubbs, Project Manager Date: May 26, 2022 Subject: Negotiation Summary

HW685 DC033A

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the May 25, 2022, Scope of Work, Cost Estimate, and Bid Documentation.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Biennial Groundwater Monitoring Golder will collect groundwater samples from fourteen monitoring wells (MW001, MW005 – MW008, MW010 – MW015, MW018, MW021, and OW-7R). Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste, and M & D Industrial Services. Erwin was selected as the lowest responsive and responsible bidder.

Subtask 3: Reporting Golder will submit the Biennial Groundwater Monitoring Report and ADaPT and GIS deliverables to FDEP.

Golder and the FDEP confirmed on May 25, 2022, that an Access Agreement with the current real property owner of the Al Grubers Drycleaners - Former (ERIC_4562) site has been executed.

This groundwater sampling event is a part of long-term monitoring to determine when the site will be eligible for closure.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $11,881.09 with 72 labor hours.

MEMORANDUM

Al Grubers Drycleaners - Former May 26, 2022 Page Two

Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 5/25/2022

Task #: DC033A SubTask 1 Project Management SubTask 6

Site: SubTask 2 Biennial GW Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 Reporting SubTask 8

Project Manager: Ben Grubbs SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$51.23 Project Manager (RM) 7 6.9 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$63.65 Practice Leader - X-13 (JB) 3 0 3 0 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0

$51.23 Senior Sci/Eng - X-11 (RM) 18 6 12 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 3 0 3 0 0 0 0 0 0 0 $44.15 Project Sci/Eng - P-10 (JT) 2 0 2.0 0 0 0 0 0 0 0 $38.61 Staff Sci/Eng - P-8 (LS) 18 18 0 0 0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 19 19 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 2 0 2 0 0 0 0 0 0 0

$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 72 6.9 43.0 22.0 0 0 0 0 0 0 0

Direct Labor $3,086.27 $355.06 $1,635.44 $1,095.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $5,323.81 $612.48 $2,821.13 $1,890.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,410.08 $967.54 $4,456.57 $2,985.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Al Grubers Drycleaners - Former

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTIMATEContractor: Golder Associates USA Inc.

Date: 5/25/2022

Task #: DC033A SubTask 1 Project Management SubTask 6

Site: SubTask 2 Biennial GW Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 Reporting SubTask 8

Project Manager: Ben Grubbs SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Al Grubers Drycleaners - Former

Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,132.00 $1,132.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,242.00 $1,242.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $847.00 $847.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,027.00 $1,027.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $11,040.08 $967.54 $7,086.57 $2,985.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $841.01 $96.75 $445.66 $298.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $11,881.09 $1,064.29 $7,532.23 $3,284.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Al Grubers Drycleaners - Former SUBTASK 2: Biennial GW Monitoring

DATE: 5/25/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R Mongillo) 6

Staff Sci/Eng (J. Spengler) 19

Staff Sci/Eng (L. Swindle) 18

TOTAL LABOR 43

VEHICLE TYPE RATE UNIT USEAGE

Truck (GW sampling $120.00 Per Day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW T&D - Liquids $110.00 Per Drum 1 $110.00

TOTAL $110.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B Halocarbons EPA Method 8260 $73.00 14 $1,022.00 PID/Hall-series EPA Method 8021 $110.00 1 $110.00 Sample Shipping Small $110.00 1 $110.00

TOTAL LAB $1,242.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Per Day 2 $580.00 Tubing, Poly HDPE $0.30 Per Foot 750 $225.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 14 $42.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $1,027.00

Field event preparation (1 hour). Round trip travel (1 hour). Water levels (29 wells), instrument calibration, and sample 14 MWs (8 hours per day x 2 days = 16 hours). IDW management (1 hour).

Communication with RPO and verification of property ownership (1 hour). Prepare and submit field notes, sample forms, laboratory report in an email deliverable (3 hours), characterization and waste profile for transportation and disposal of IDW drum(s) (2 hours).

Round trip travel (1 hour). Water levels (29 wells), instrument calibration, and sample 14 MWs (8 hours per day x 2 days = 16 hours). IDW management (1 hour).

Contact property owner and DEP to schedule field work; collect depth to water measurements at accessible wells; collect groundwater samples from 14 existing monitoring wells for chlorinated VOC analysis; and IDW characterization and waste profile for transportation and disposal.

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Al Grubers Drycleaners - Former SUBTASK 3: Reporting

DATE: 5/25/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 3

Senior Sci/Eng (R Mongillo) 12

Senior Project Sci/Eng (J. Thomas) 2

Senior Project Sci/Eng (B. Lucero) 3

Staff Sci/Eng (A. Strayer) 2

TOTAL LABOR 22

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Reporting: Updating tables document production, binding and shipping. Create pdf for OCULUS.

Develop conclusions and recommendations and prepare final Biennial Monitoring Report.

Data entry, prepare tables and figures, and draft Biennial Monitoring Report

Update FDEP GIS Tables, run data checker, create and edit error report, and annotate error report. Submit FDEPGIS tables; submit ADaPT deliverable.

CADD Update Figures

FINAL --7/24/96

Golder Associates USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256

T: +1 904 363-3430 F: +1 904 363-3445 golder.com

May 25, 2022 Proposal No. 202208346

Mr. Ben Grubbs Florida Department of Environmental Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR BIENNIAL GROUNDWATER MONITORING

AL GRUBERS DRYCLEANERS - FORMER

5161 BEACH BOULEVARD

JACKSONVILLE, DUVAL COUNTY, FLORIDA

DEP FACILITY ID NUMBER: ERIC_4562

PROPOSED TASK ASSIGNMENT: HW685_DC033A

Dear Mr. Grubbs:

Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for biennial groundwater monitoring at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – BIENNIAL GROUNDWATER MONITORING

Golder will collect groundwater samples from the following 14 monitoring wells: six shallow zone monitoring wells (MW001, MW005, MW008, MW010, MW012, and MW014); one shallow zone observation well (OW-7R); and seven intermediate zone monitoring wells (MW006, MW007, MW011, MW013, MW015, MW018, and MW021).

Chlorinated volatile organic compounds (VOC) analytical results from the previous groundwater monitoring report are shown on the attached Figures 6 and 7.

Mr. Ben Grubbs Proposal No. 202208346

Florida Department of Environmental Protection May 25, 2022

Prior to groundwater sampling, depth-to-water measurements will be collected from accessible wells using an electronic water level indicator. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced, as necessary.

Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B. Upon receipt of the laboratory analytical results, Golder will evaluate the constituent concentrations to determine if off-site notification is required.

Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.

Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.

SUBTASK 3 – REPORTING

The biennial groundwater monitoring report will include a description of the sampling procedures, evaluation of the analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will also update the DEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the DEP data checker on the completed tables; and submit the updated tables and error reports under this subtask. Additionally, Golder will forward the Automated Data Processing Tool (ADaPT) data deliverables for the groundwater sampling event provided by the laboratory.

HEALTH AND SAFETY

Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

Mr. Ben Grubbs Proposal No. 202208346

Florida Department of Environmental Protection May 25, 2022

COST AND SCHEDULE

The estimated cost to complete the proposed scope of work is $11,881.09. Golder anticipates the monitoring event will take place in July 2022. The LOE/CEF sheets and Disposal subcontractor IDW quotes are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $ 1,064.29 November 25, 2022

Subtask 2 – Biennial Groundwater Monitoring

$ 7,532.23 September 9, 2022 (Field documentation and laboratory analytical report via E-mail)

Subtask 3 – Reporting $ 3,284.57 October 21, 2022 (Biennial Groundwater Monitoring Report)

Total/Completion Date $11,881.09 December 30, 2022

Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.

Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, Golder Associates USA Inc.

Matthew C. Crews, PE Robert M. Wojcik, PG Senior Lead Consultant, Environmental Engineer Director, Hydrogeologist

MCC/RMW/as

Attachments: Figure 6 – Groundwater Analytical Results – Shallow Zone of the Surficial Aquifer Figure 7 – Groundwater Analytical Results – Intermediate Zone of the Surficial Aquifer

Attachment A – Level of Effort Sheets and Cost Estimate Form and Subcontractor Quotes

G:\Projects\DEP-Drycleaning\Projects\Jax\Al Gruber's - HW685\DC033A - Biennial GW Mon\Proposal\HW685_DC033A - Al Grubers Biennial Mon Proposal.docx

MW014

MW010

MW008

MW012

MW005 MW001

MW003

MW002

OW-08

OW-10

OW-7R

OBSERVATION WELL LOCATION

SHALLOW MONITORING WELL LOCATION

BUILDING

ESTIMATED EXTENT OF VOLATILE ORGANIC

COMPOUNDS EXCEEDING GCTLs

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER

(ug/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER

62-777, TABLE 1, OF THE FLORIDA ADMINISTRATIVE CODE.

3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF

THE APPLICABLE GCTL.

4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT

NOT DETECTED. THE VALUE SHOWN IS THE METHOD

DETECTION LIMIT.

5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL

QUANTITATION LIMIT.

6.) MW012 WAS SAMPLED INSTEAD OF OW-08 BECAUSE OW-08 WAS

COVERED BY ASPHALT.

MW002

2/20/08

0.24 U

0.13 U

0.18 U

0.058 U

MW001

3/24/15

GCTLs

MW003

9/11/00

1.0 U

1.0 U

1.0 U

1.0 U

OW-10

10/12/00 7/27/16 6/14/17 7/11/18

2.1 1.9 2.8 1.6

1.0 U 0.36 U 0.36 U 0.36 U

1.0 U 0.36 U 0.36 U 0.36 U

1.0 U 0.36 U 0.36 U 0.36 U

MW005

2/20/08 6/18/20

9.7 2.4

1.1 1.4

8.2 1.3

0.39 I 0.36 U

MW012

2/20/08 6/18/20

0.48 I 1.7

0.38 I 0.36 U

32 0.36 U

0.98 I 0.36 U

OW-08

10/12/00

1.0 U

1.0 U

MW014

9/30/16 6/14/17 7/12/18 6/18/20

0.22 U 0.22 U 0.22 U 0.22 U

5.6 5.9 5.9 6.8 81 64 58 72

6.3 5.7 5.3 5.3

MW010

7/27/16 6/15/17 7/11/18 6/18/20

0.53 I 0.22 U 0.22 U 0.22 U

14 0.66 I 2.4 2.5

76 12 120 110

4.3 0.45 I 3.3 0.80 I

MW008

2/19/08 6/18/20

0.24 U 0.22 U

1.3 0.36 U

5.9 0.68 I

0.058 U 0.36 U

MW001

3/24/15 7/27/16 6/14/17 6/18/20

7.4 4 4.5 6.8

0.54 I 0.36 U 0.36 U 0.36 U

0.36 U 1.5 0.72 I 0.36 U

0.36 U 0.36 U 0.36 U 0.36 U

MW001

OW-10

1.) SITE MAP BY HARDING ESE, DATED JUNE 2002.

in

FDEP-DC009

Phase

FDEP-DC009-H006

FIGURE

2020-06-30

BCL

RFM

RFM

JCB

AL GRUBERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL DEPT OF ENVIRONMENTAL PROTECTION

GROUNDWATER ANALYTICAL RESULTS

SHALLOW ZONE OF THE SURFICIAL AQUIFER

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

: E :\G ol de r_ Pr oj ec ts \F

D

EP

\D C

N o

A l G ru be rs \H

Ju n2

An nu al

M on

R pt

\A ct iv e

D ra w in gs

Fi le N am e:

F D

EP

-D

C

9- H

6.

dw g

SCALE

0 50 100

FEET

LEGEND

NOTE(S)

REFERENCE(S)

OW-7R

7/27/16 6/15/17 7/11/18

0.22 U 0.41 I 0.22 U

0.36 U 0.36 U 0.36 U

0.36 U 0.36 U 0.36 U

0.36 U 0.36 U 0.36 U

MONITORING WELL I.D.

SAMPLE DATE

TETRACHLOROETHENE (PCE)

TRICHLOROETHENE (TCE)

cis-1,2-DICHLOROETHENE

VINYL CHLORIDE

WELL COVERED BY ASPHALT OR CONCRETE

AutoCAD SHX Text

BEACH BOULEVARD

AutoCAD SHX Text

EMERSON EXPRESSWAY

AutoCAD SHX Text

FAIRMONT STREET

AutoCAD SHX Text

ART MUSEUM DRIVE

AutoCAD SHX Text

AL GRUBER'S DRY CLEANERS

MW015

MW021

MW018

MW013

MW011

MW007

MW006

MW004

MW009

MW026

MW024

MW027

MW025

MW029

OW-13

OW-09

MW030

OBSERVATION WELL LOCATION

INTERMEDIATE MONITORING WELL LOCATION

BUILDING

1.) SITE MAP BY HARDING ESE, DATED JUNE 2002.

ESTIMATED EXTENT OF VOLATILE ORGANIC

COMPOUNDS EXCEEDING GCTLs

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (ug/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777, TABLE 1,

OF THE FLORIDA ADMINISTRATIVE CODE.

3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF THE APPLICABLE

GCTL.

4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT NOT DETECTED.

THE VALUE SHOWN IS THE METHOD DETECTION LIMIT.

5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD DETECTION

LIMIT AND THE LABORATORY PRACTICAL QUANTITATION LIMIT.

6.) * - RESULTS DETERMINED NOT TO EXCEED THE GCTL BASED ON MEMORANDUM

"ROUNDING THE ANALYTICAL DATA FOR SITE REHABILITATION COMPLETION",

DATED NOVEMBER 17, 2011.

7.) MW006 WAS SAMPLED INSTEAD OF MW029 BECAUSE MW029 WAS COVERED BY

ASPHALT.

MW004

3/24/15

GCTLs

MW004

9/11/00

1.0 U

1.0 U

1.0 U

1.0 U

OW-09

10/12/00 6/15/17 7/11/18

7.8 0.58 I 0.57 I

1.0 U 0.36 U 0.36 U

1.0 U 0.36 U 0.36 U

1.0 U 0.36 U 0.36 U

OW-13

10/12/00 7/27/16 6/15/17 7/11/18

185 1.1 1.1 1.9

18.7 0.36 I 0.53 I 0.41 I

225 0.36 U 0.36 U 0.36 U

1.0 U 0.36 U 0.36 U 0.36 U

MW004

OW-09

MW027

2/20/08

0.24 U

0.17 I

1.1

0.058 U

MW024

9/26/01

1.0 U

1.8

1.0 U

1.0 U

MW025

2/18/08

0.48 I

1.0 8.9

0.058 U

MW026

10/1/04

0.17 U

0.47 I

1.2

0.25 U

MW029

2/19/08

0.51 I

0.13 U

0.18 U

0.058 U

MW006

2/20/08 6/18/20

0.33 I 0.22 U

0.73 I 0.36 U

0.57 I 0.36 U

0.058 U 0.36 U

MW007

7/27/16 6/15/17 7/12/18 6/18/20

0.22 U 0.22 U 0.22 U 0.22 U

9.3 3.4* 3.3* 0.89 I

330 460 200 460

0.36 U 0.76 I 0.36 U 0.36 U

MW009

2/18/08

0.41 I

0.27 I

0.53 I

0.058 U

MW018

7/27/16 6/14/17 7/12/18 6/18/20

11 9.8 17 9.1 I 15 14 24 14 310 310 270 270

3.0 3.2 2.2 0.36 U

MW021

7/27/16 6/15/17 7/11/18 6/18/20

0.22 U 0.22 U 0.22 U 0.22 U

0.36 U 0.36 U 0.36 U 0.36 U

0.36 U 0.36 U 6.8 39

0.36 U 0.36 U 0.36 U 0.87 I

MW011

7/27/16 6/15/17 7/11/18 6/18/20

0.22 U 0.22 U 0.22 U 0.22 U

5.3 3.4* 5.0 2.6

0.51 I 110 170 95

3.8 2.4 3.0 1.1

MW013

7/27/16 6/14/17 7/12/18 6/18/20

3.2* 2.4 2.7 1.4

6.5 7.4 4.3 4.3 170 240 140 130

8.0 12 9 9.3

MW015

7/27/16 6/14/17 7/12/18 6/18/20

0.22 U 0.22 U 0.22 U 0.22 U

1.3 2.9 3.9 5.3 34 54 44 56

5.9 9.0 6.9 6.2 in

FDEP-DC009

Phase

FDEP-DC009-H007

FIGURE

2020-06-30

BCL

RFM

RFM

JCB

AL GRUBERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FL DEPT OF ENVIRONMENTAL PROTECTION

GROUNDWATER ANALYTICAL RESULTS

INTERMEDIATE ZONE OF THE SURFICIAL AQUIFER

TITLE

PROJECT NO. REV.

PROJECT

CLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

: E :\G ol de r_ Pr oj ec ts \F

D

EP

\D C

N o

A l G ru be rs \H

Ju n2

An nu al

M on

R pt

\A ct iv e

D ra w in gs

Fi le N am e:

F D

EP

-D

C

9- H

7.

dw g

SCALE

0 60 120

FEET

LEGEND

NOTE(S)

REFERENCE(S)

MW030

7/26/16 6/14/17 7/12/18

0.22 U 0.22 U 0.22 U

0.36 U 0.36 U 0.36 U

0.48 I 0.54 I 0.36 U

0.36 U 0.36 U 0.36 U

MONITORING WELL I.D.

SAMPLE DATE

TETRACHLOROETHENE (PCE)

TRICHLOROETHENE (TCE)

cis-1,2-DICHLOROETHENE

VINYL CHLORIDE

WELL COVERED BY ASPHALT OR CONCRETE

AutoCAD SHX Text

BEACH BOULEVARD

AutoCAD SHX Text

EMERSON EXPRESSWAY

AutoCAD SHX Text

FAIRMONT STREET

AutoCAD SHX Text

ART MUSEUM DRIVE

AutoCAD SHX Text

AL GRUBER'S DRY CLEANERS

From: Mongillo, Ralph To: Mongillo, Ralph Subject: RE: IDW soil and groundwater drum pick up at the Capitol Cleaners at 3813 North Monroe Street in Tallahassee, FL

Date: Tuesday, May 24, 2022 9:10:22 AM

From: Erwin Remediation <erwinremediation@gmail.com> Sent: Monday, May 23, 2022 4:14 PM To: Mongillo, Ralph <ralph.mongillo@wsp.com> Subject: Re: IDW soil and groundwater drum pick up at the Capitol Cleaners at 3813 North Monroe Street in Tallahassee, FL

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Ralph, I have this on schedule, but we recently had to increase our drum rate by $10.00.

Unfortunately the cost of fuel and disposal has forced our hand on this.

Thank you, Jonathan Erwin Erwin Remediation, Inc.

Office: (850) 292-6511|Email: ErwinRemediation@Gmail.com Erwin Remediation, Inc.|408 Ditmar Street Pensacola, FL 32503 lTWfa4Hgs7pbKl-BT-P365-c108p227-DayTwo-Disclaimer mailto:ralph.mongillo@wsp.com mailto:ralph.mongillo@wsp.com tel:%28850%29%20292-6511 mailto:ErwinRemediation@gmail.com

From: Craig Burns To: Crews, Matt; Morelli, Gene; Neal, Scott; Mongillo, Ralph Subject: Golder Drum Rates update from CLARK Date: Tuesday, May 10, 2022 12:56:33 PM Attachments: image001.png

Golder Drum Rates - 2022.pdf

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Gents- See the new line item reflecting a 10% FSC to the drum total invoice. CLARK started to implement April 15.

Call with questions, also always…thank you for your business.

Craig

Please note: a 10% “cost of services surcharge” will be added to the bottom line of all invoices effective April 15, 2022.

Think CLARK!

Craig Burns | Sales / Project Manager | Clark Environmental Inc.

cburns@clarkenv.com | È:863.327.6289 mailto:cburns@clarkenvironmental.com mailto:matt.crews@wsp.com mailto:gene.morelli@wsp.com mailto:scott.neal@wsp.com mailto:ralph.mongillo@wsp.com https://urldefense.proofpoint.com/v2/url?u=https-3A__eur03.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.clarkenvironmental.com-252F-26data-3D04-257C01-257C-257Ccbc1f417ff8c4337355508d9512e2412-257Cef8a53ea1a1c4189b792c832dcaea568-257C0-257C0-257C637630080879080169-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Do50wIW3MIyw-252FGoKyrlvbxMIbbP-252BO9gB5TtQqcXHi-252BR0-253D-26reserved-3D0&d=DwMFAg&c=euGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM&r=hv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ&m=Nk5c7G1FQ88ZgxtZwQzwAlNlpfGMEJLPerLkIs92lL0&s=IkqjklDtDzZYWA58IMoE8gCdmyvcKTVe3L1scUIICLc&e= mailto:cburns@clarkenv.com

5/10/22, 12:47 PM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2

Quote Number: 19536

QUOTE

QUOTED TO:

QUOTE DATE: 1/1/2022

COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns

863.327.6289 - cburns@clarkenv.com

Name (print) Title quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 1/2

Quote Number: 19536

QUOTE

QUOTED TO:

QUOTE DATE: 1/1/2022

COMPANY NAME: WSP / Golder QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's**PFAS drum rates are the same as the Petro/Drycleaner NonHaz Drums rates T&D.**Haz rates will be quoted case-by-case** Craig Burns

863.327.6289 - cburns@clarkenv.com

Name (print) Title quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19536 2/2

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png

AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Ralph

We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.

Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790

Sent from Mail for Windows

From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com

File details come from the government source that posted it. Updated .