This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Golder Associates USA Inc. for groundwater monitoring services at the Clotheshanger Cleaners site in Tallahassee, Leon County, Florida. The Task Assignment is executed under Contract Number HW685 and is designated as TA DC005A. The project involves environmental remediation activities under Florida's Drycleaning Solvent Cleanup Program, with Ben Grubbs serving as the FDEP Project Manager and Matt Crews as the Contractor's Project Manager.
The scope of work consists of three subtasks: project management, annual groundwater monitoring of nine monitoring wells with chemical analysis for chlorinated volatile organic compounds, and preparation of a groundwater monitoring report with GIS data updates. The contract uses a fixed unit rate pricing structure with a total Task Assignment value of $8,821.91, broken into two invoicing milestones: $5,332.32 upon submittal and FDEP approval of field documentation and laboratory reports by May 23, 2022, and $3,489.59 upon submittal and FDEP approval of the annual groundwater monitoring report and GIS updates by June 30, 2022. The work encompasses 54 total labor hours across multiple staff categories, direct costs for laboratory analysis ($877.00), field equipment ($882.00), vehicle rental ($120.00), and investigation-derived waste disposal ($100.00 to Erwin Remediation). The original proposal cost of $9,037.50 was negotiated down to the final amount of $8,821.91, with all work scheduled for completion by August 31, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW685
DC005A Completion August 31, 2022
This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the March 18, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Ben Grubbs 850-245-8992 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Golder Associates USA Inc.
Golder Associates USA Inc.
Matt Crews 904-363-3430
ERIC_4874
1818 North Monroe Street, Tallahassee, Leon County
Clotheshanger Cleaners
✔ $ 8,821.91
$ 8,821.91
Scope of Work
Donald Miller
Principal
Donald Miller Digitally signed by Donald Miller Date: 2022.03.25 08:00:36 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.03.24 13:53:01 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Groundwater Monitoring Field Documentation and Laboratory Report;
IDW Disposal Documentation 05/23/2022
Subtasks 1 & 3: Annual Groundwater Monitoring Report; ADaPT/GIS Update; Project Management 06/30/2022
Subtask 2: Submittal and FDEP approval of the Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 5,332.32
Subtasks 1 & 3: Submittal and FDEP approval of the Annual Groundwater Monitoring Report; ADaPT/GIS Update; Project Management $ 3,489.59
$ 8,821.91
HW685
DC005A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW685 Contract Negotiation File Clotheshanger Cleaners Tallahassee, Leon County
ERIC_4874
From: Ben Grubbs, Project Manager Date: March 24, 2022 Subject: Negotiation Summary
HW685 DC005A
This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the March 18, 2022, Scope of Work, Cost Estimate, and Bid Documentation.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Annual Groundwater Monitoring Golder will collect groundwater samples from monitoring wells MW004, MW006, MW015, MW017 – MW019, MW058, RW002, and RW012. Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste, and M & D Industrial Services. Erwin was selected as the lowest responsive and responsible bidder.
Subtask 3: Reporting Golder will submit the Annual Groundwater Monitoring Report and ADaPT and GIS deliverables to FDEP.
Golder and the FDEP confirmed on March 18, 2022, that an Access Agreement with the current real property owner of the Clotheshanger Cleaners (ERIC_4874) site has been executed.
The original Task Assignment totaled $9,037.50 with 55 labor hours but after negotiations and corrections with contractor costs are reflected as below:
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $8,821.91 with 54 labor hours.
MEMORANDUM
Clotheshanger Cleaners March 24, 2022 Page Two
Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 3/23/2022
Task #: DC005A SubTask 1 Project Management SubTask 6
Site: Clotheshanger Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Assessment SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.23 Project Manager (RFM) 5 5.1 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0
$63.65 Practice Leader - X-13 (JCB) 2 0 2 0 0 0 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0
$51.23 Senior Sci/Eng - X-11 (RFM) 5 5 0 0 0 0 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 3 0 3 0 0 0 0 0 0 0 $44.15 Project Sci/Eng - P-10 (JT) 2 0 2.0 0 0 0 0 0 0 0 $40.38 Staff Sci/Eng - P-9 (LC) 24 12 12 0 0 0 0 0 0 0 $34.06 Staff Sci/Eng - P-8 (EO) 11 11 0 0 0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 2 0 2 0 0 0 0 0 0 0
$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 54 5.1 28.0 21.0 0 0 0 0 0 0 0
Direct Labor $2,279.54 $262.25 $1,115.37 $901.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $3,932.20 $452.38 $1,924.01 $1,555.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,211.74 $714.63 $3,039.38 $2,457.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: Golder Associates USA Inc.
Date: 3/23/2022
Task #: DC005A SubTask 1 Project Management SubTask 6
Site: Clotheshanger Cleaners SubTask 2 Annual GW Monitoring SubTask 7
Activity/Phase: Assessment SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $767.00 $767.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $877.00 $877.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $742.00 $742.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $882.00 $882.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $8,200.74 $714.63 $5,028.38 $2,457.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $621.17 $71.46 $303.94 $245.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $8,821.91 $786.09 $5,332.32 $2,703.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Clotheshanger Cleaners SUBTASK 2: Annual GW Monitoring
DATE: 3/23/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R Mongillo) 5
Staff Sci/Eng (L. Chappell) 12
Project Sci/Eng (E. Oien) 11
TOTAL LABOR 28
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling) $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B Total VOHs EPA Method 8260B $73.00 9 $657.00 Total VOCs EPA Method 8260B - IDW $110.00 1 $110.00 Sample Shipping Small $110.00 1 $110.00
TOTAL LAB $877.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Deep Groundwater Sampling Kit $415.00 Per Day 1 $415.00 Tubing, Poly HDPE $0.30 Per Foot 1000 $300.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 9 $27.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $882.00
Mobilization 1 hour per day 1 day (1.0 hr). Field event preparation (1 hour). Measurement of water levels, instrument calibration, and sampling 9 wells (MW004, MW006, MW015, MW017, MW018, MW019, MW058, RW002, and RW012) and IDW management (10 hours).
Communication with RPO and verification of property ownership prior to site access, prepare and submit field notes, sample forms, laboratory report in an email deliverable to the DEP, and characterization and waste profile for transportation and disposal of IDW drum(s) (5 hours).
Mobilization 1 hour per day x 1 day (1.0 hr). Measurement of water levels, instrument calibration, and sampling sampling 9 wells (MW004, MW006, MW015, MW017, MW018, MW019, MW058, RW002, and RW012) and IDW management (10 hours).
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Clotheshanger Cleaners SUBTASK 3: Reporting
DATE: 3/23/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 2 Senior Sci/Eng (L Chappell) 12
Senior Project Sci/Eng (J. Thomas) 2
Senior Project Sci/Eng (B. Lucero) 3
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 21
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Reporting: Updating tables, document production, binding and shipping. Create pdf for
OCULUS.
Develop conclusions and recommendations and prepare final Annual Monitoring Report.
Data entry, prepare tables and figures, and draft Annual Monitoring Report Update FDEP GIS Tables, run data checker, create and edit error report, and annotate error report (9 data points x 8 min/point = 72 minutes). Submit DEPGIS tables; submit ADaPT
( )CADD Update Figures (one groundwater flow and two CVOC detections) .
FINAL --7/24/96
Golder Associates USA Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445 golder.com
March 18, 2022 Proposal No. 202208346
Mr. Ben Grubbs Florida Department of Environmental Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR CLOTHESHANGER CLEANERS
ANNUAL GROUNDWATER MONIORING
1816 NORTH MONROE STREET
TALLAHASSEE, LEON COUNTY, FLORIDA
FACILITY ID NUMBER: ERIC_4874
PROPOSED TASK ASSIGNMENT: HW685_DC005A
Dear Mr. Grubbs:
Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for groundwater monitoring at the Clotheshanger Cleaners site, located in Tallahassee, Leon County, Florida. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services. The scope of work is based on the recommendations accepted by the DEP in the July 21, 2021 electronic mail correspondence to Golder. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.
SUBTASK 2 – ANNUAL GROUNDWATER MONITORING
Golder will collect nine groundwater monitoring well samples (MW004, MW006, MW015, MW017, MW018, MW019, MW058, RW002, and RW012) and one waste characterization sample. The attached figures from the June 2021 annual groundwater monitoring report are showing the monitoring well locations, potentiometric map for in the
Mr. Ben Grubbs Proposal No. 202208346
Florida Department of Environmental Protection March 18, 2022 shallow surficial aquifer zone, PCE isoconcentration contour map, and source zone map for chlorinated volatile organic compound (VOC) results.
Prior to groundwater sampling, the depth to groundwater will be measured at accessible monitoring well locations (MW004, MW006, MW015, MW017, MW018, MW019, MW058, RW002, and RW012) using an electronic water level indicator to determine groundwater elevations and flow direction. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary. Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method 8260B.
Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.
Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.
SUBTASK 3 – REPORTING
The annual groundwater monitoring report will include a description of sampling procedures, evaluation of analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will update the DEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the DEP data checker on the completed tables;
and submit the updated tables and error report. Additionally, Golder will forward Automated Data Processing Tool (ADaPT) data deliverables provided by the laboratory for each groundwater sampling event.
HEALTH AND SAFETY
Golder will update the site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
Mr. Ben Grubbs Proposal No. 202208346
Florida Department of Environmental Protection March 18, 2022
COST AND SCHEDULE
The estimated cost to complete the monitoring is $9,037.50. Golder will tentatively schedule the annual sampling event for late March or middle April 2022. The LOE/CEF cost sheets and subcontractor bids are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $810.89 July 31, 2022
Subtask 2 – Annual Groundwater Monitoring
$5,523.11 May 23, 2022 (Field Documentation and Laboratory Report)
Subtask 3 – Reporting $2,703.50 June 30, 2022 (Groundwater Monitoring Report, GIS Tables, ADaPT Deliverables)
Total/Completion Date $9,037.50 August 31, 2022
Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.
Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, Golder Associates USA Inc.
Logan Chappell, PE Jesse C. Brown, PE Consultant Director, Environmental Engineer
LC/JCB/as
Attachments: Figure 3 Potentiometric Map (April 12, 2021)
Figure 4 Groundwater Analytical Results (April 2021) Figure 5 Source Area Groundwater Chlorinated VOC Analytical Results (April 2021)
Attachment A Level of Effort Sheets / Cost Estimate Form and Subcontractor Bids
G:\Projects\DEP-Drycleaning\Projects\Tallahassee\Clotheshanger - HW685\Proposal\HW685 Annual Groundwater Monioring Proposal - ERIC_4874.docx
MW004
MW014
MW015
MW016
MW017
MW018
MW020 MW019
RW004
RW002
RW005
RW006
RW007
RW008RW009RW010
RW012
RW001
VEW003
VEW002
VEW001
MW003
VEW005S
VEW007S
VEW010S
VEW006S
VEW004S
VEW005D
VEW007D
VEW010D
VEW006D
VEW004D
VEW003S
VEW003D
VEW009S
VEW009D
VEW008S
VEW008D
(154.92)
(155.86)
(155.65)
(148.00)
(159.74)
(168.55)
(152.99)
RW003
LEGEND
REFERENCE(S)
in
FDEP-DC021
Control No.
FDEP-DC021-K003
FIGURE
2021-04-19
BCL
JWS
RFM
JCB
CLOTHESHANGER DRYCLEANERS
TALLAHASSEE, LEON COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMENTAL PROTECTION
POTENTIOMETRIC MAP
(APRIL 13, 2021)
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F
D
EP
\F D
EP
-D
C \D
C N o
C lo th es ha ng er
\K
A nn ua l G
W R pt \A ct iv e D ra w in gs
Fi le
N am e:
F
D
EP
-D C
1-
K0
.d w g
SCALE
0 10 20
FEET
1. SITE PLAN DEVELOPED FROM SITE PLAN BY HARDING ESE,
DATED OCTOBER 2002.
MONITORING WELL LOCATION
SOIL VAPOR WELL LOCATION
EXISTING RECOVERY WELL LOCATION
BUILDING
FORMER CLOTHESHANGER CLEANERS
VEW002
MW014
RW001
PROPERTY BOUNDARY
(159.37) GROUNDWATER ELEVATION - MARCH 2017
GROUNDWATER CONTOUR INTERVAL
(DASHED WHERE INFERRED)
ESTIMATED GROUNDWATER FLOW DIRECTION
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
SPORTS & IMPORTS (USED CARS)
AutoCAD SHX Text
PAPA JOHN'S FORMERLY CLOTHESHANGER CLEANERS
AutoCAD SHX Text
SAN MIGUEL RESTAURANT
AutoCAD SHX Text
OPEN COURTYARD (DINING AREA)
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text
SEWER CLEANOUTS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ASPHALT PARKING AREA
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT PARKING AREA
AutoCAD SHX Text
ESTIMATED SEWER LATERAL LOCATION
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
25" WOOD RETAINING WALL
AutoCAD SHX Text
CURB
AutoCAD SHX Text
NORTH MONROE STREET
AutoCAD SHX Text
HYDRAULIC LIFT
AutoCAD SHX Text
5/8" CITY OF TALLAHASSEE MPE DISCHARGE FLOW METER IN 12" ROUND VAULT
AutoCAD SHX Text
4" SEWER CLEANOUT
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text
FORMER SVE EQUIPMENT COMPOUND
AutoCAD SHX Text V
VEW001
MW-U
MW017
MW019
MW006
MW022
MW007
MW012
MW015
MW020
PMW008
MW004
MW018
MW008
RW002
RW003
RW008
RW009
RW012
MW058
MW009
RW001
MW021
RW006
LEGEND
in
FDEP-DC021
Control No.
FDEP-DC021-K004
FIGURE
2021-04-27
BCL
JWS
RFM
JCB
GROUNDWATER PCE ANALYTICAL RESULTS
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F
D
EP
\F D
EP
-D
C \D
C N o
C lo th es ha ng er
\K
A nn ua l G
W R pt \A ct iv e D ra w in gs
Fi le
N am e:
F
D
EP
-D C
1-
K0
.d
0 100 200
FEET
1. SITE PLAN DEVELOPED FROM SITE PLAN BY HARDING ESE, DATED OCTOBER
2002.
MONITORING WELL LOCATION
SOIL VAPOR WELL LOCATION
EXISTING RECOVERY WELL LOCATION
BUILDING
VEW002
MW014
RW001
DATE SAMPLED
MW004
4/26/2012 3 4/9/2013 300
1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2.) U - INDICATES THE COMPOUND WAS ANALYZED FOR BUT NOT DETECTED. THE
VALUE SHOWN IS THE METHOD DETECTION LIMIT.
3.) i - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD DETECTION
LIMIT AND THE LABORATORY PRACTICAL QUANTITATION LIMIT.
4.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER CHAPTER 62-777, TABLE I, OF
THE FLORIDA ADMINISTRATIVE CODE (FAC).
5.) NADC - NATURAL ATTENUATION DEFAULT CONCENTRATION PER CHAPTER 62-777,
TABLE V, OF THE FAC.
6.) BOLD/SHADED CONCENTRATIONS EXCEEDS GROUNDWATER CLEANUP TARGET
LEVEL (GCTL).
7.) ISOCONCENTRATION CONTOURS DASHED WHERE INFERRED.
8.) V - INDICATES ANALYTE WAS DETECTED IN BOTH THE SAMPLE AND ASSOCIATED
METHOD BLANK.
9.) BDL - BELOW LABORATORY METHOD DETECTION LIMIT.
10.) PCE - TETRACHLOROETHENE.
ESTIMATED EXTENT OF VOLATILE ORGANIC COMPOUNDS
(VOCs) EXCEEDING GCTLs
ESTIMATED EXTENT OF VOLATILE ORGANIC COMPOUNDS
EXCEEDING NADCs
PMW008
5/12/2005 1.7 6/3/2009 5.1 4/26/2010 0.42 i 4/28/2011 0.56 i 3/25/2014 0.75 i 3/12/2015 0.74 U
RW003
1/21/2003 2,040 8/13/2003 48 3/31/2004 940
MW020
2/13/2001 1,930 2/20/2001 1,190 5/12/2005 1,600 2/5/2008 3,100
RW008
4/2/2004 46
9/24/2004 70 3/17/2005 20 3/28/2006 30 3/12/2015 53 3/28/2017 30
RW009
1/21/2003 69.2 9/16/2003 48 4/2/2004 13
MW004
3/1/2000 1,360
5/12/2005 1.0 3/13/2015 49 3/31/2016 25 3/28/2017 13 4/12/2018 4.9 4/17/2019 28 4/2/2020 30 4/13/2021 45
RW012
4/2/2004 88
3/17/2005 1,800 3/28/2006 250
10/27/2006 380 V 3/28/2017 270 4/12/2018 500 4/17/2019 650 4/2/2020 650 4/13/2021 730
VEW001
10/8/2002 575 1/21/2003 2,150 3/17/2005 4,700 3/28/2006 3,400 3/12/2015 370
MW007
5/6/1997 1 U 3/1/2000 1 U
1/30/2002 1 U 5/12/2005 0.18 U
MW012
5/6/1997 1 U
5/12/2005 0.18 U
MW015
4/26/2010 230 4/28/2011 53 4/26/2012 5.9 4/9/2013 9.6
3/25/2014 7.9 3/12/2015 6.0 3/31/2016 11 3/28/2017 6.9 4/12/2018 9.9 4/17/2019 9.2 4/2/2020 8.4 4/13/2021 13
RW001
4/2/2004 1,100
3/17/2005 3,400 3/28/2006 790
10/27/20061,100 V 3/12/2015 820
RW002
9/24/2004 860 3/28/2006 1,100
10/27/2006 800 V 2/5/2008 1,200
3/12/2015 1,100 3/31/2016 870 3/28/2017 700 4/13/2018 870 4/17/2019 890 4/2/2020 870 4/13/2021 740
MW018
4/26/2010 1,500 4/28/2011 1,500 4/26/2012 1,200 4/9/2013 1,400
3/25/2014 840 3/12/2015 1,800 3/31/2016 260 3/28/2017 790 4/13/2018 910 4/17/2019 2,600 4/2/2020 2,300 4/13/2021 1,600
MW009
6/3/2009 15 4/28/2011 7.4 4/26/2012 13 5/8/2013 5.8 3/25/2014 15 3/13/2015 0.74 U 3/31/2016 6.5
MW006
4/30/1997 1 U 3/1/2000 1 U
5/12/2005 0.18 U 2/6/2008 2.4
3/31/2016 1.7 3/28/2017 2.9 4/12/2018 0.89 I 4/17/2019 210 4/2/2020 1.9
4/13/2021 0.90 I
MW022
8/27/2000 BDL
5/12/2005 0.18 UMW-U
4/26/2012 1.1 4/9/2013 2.0
MW017
3/12/2015 710 3/31/2016 840 3/28/2017 1,200 4/13/2018 800 4/17/2019 1,300 4/2/2020 1,400 4/13/2021 1,400
MW019
3/12/2015 1,300 4/13/2018 2,000 4/17/2019 1,600 4/2/2020 2,400 4/13/2021 2,300
NOTE(S)
REFERENCE(S)
MW058
3/28/2017 0.50 U 4/12/2018 7.3 4/17/2019 5.8 4/2/2020 2.3 4/13/2021 6.6
ABANDONED WELLS
TETRACHLOROETHENE (PCE)
CONCENTRATION (µg/L) AND GCTL
PCE CONCENTRATION (µg/L) AND NADC
WELL ID
RW006
4/17/2019 99
AutoCAD SHX Text Retaining wall
AutoCAD SHX Text KAYO Station
AutoCAD SHX Text Former
AutoCAD SHX Text Wok'n Roll
AutoCAD SHX Text Restaurant
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
SPORTS & IMPORTS (USED CARS)
AutoCAD SHX Text
PAPA JOHN'S FORMERLY CLOTHESHANGER CLEANERS
AutoCAD SHX Text
SAN MIGUEL RESTAURANT
AutoCAD SHX Text
OPEN COURTYARD (DINING AREA)
AutoCAD SHX Text
SEWER CLEANOUTS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ASPHALT PARKING AREA
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT PARKING AREA
AutoCAD SHX Text
ESTIMATED SEWER LATERAL LOCATION
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
MPE EQUIPMENT COMPOUND
AutoCAD SHX Text
25" WOOD RETAINING WALL
AutoCAD SHX Text
CURB
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
NORTH MONROE STREET
AutoCAD SHX Text
HYDRAULIC LIFT
AutoCAD SHX Text V
MW004
MW014
MW015
MW016
MW017
MW018
MW020 MW019
RW004
RW002
RW005
RW003
RW006
RW007
RW008RW009RW010
RW012
VEW003
VEW002
VEW001
VEW003
VEW001
VEW003
VEW001
VEW005S
VEW007S
VEW010S
VEW006S
VEW004S
VEW005D
VEW007D
VEW010D
VEW006D
VEW004D
VEW003S
VEW003D
VEW009S
VEW009D
VEW008S
VEW008D
RW001
DRY
in
FDEP-DC021
Control No.
FDEP-DC021-K005
FIGURE
2021-04-27
BCL
JWS
RFM
JCB
SOURCE AREA GROUNDWATER CHLORINATED VOC
ANALYTICAL RESULTS
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
IF
T
H
IS
M
EA
SU
R
EM
EN
T D
O
ES
N O
T M
AT
C
H W
H
AT
IS
S
H O
W N
, T H
E
SH
EE
T
SI
ZE
H
AS
B
EE
N M
O D
IF
IE
D F
R O
M : A
N
SI
B
Pa th
\g ol de r.g ds
\c om pl ex da ta
\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F
D
EP
\F D
EP
-D
C \D
C N o
C lo th es ha ng er
\K
A nn ua l G
W R pt \A ct iv e D ra w in gs
Fi le
N am e:
F
D
EP
-D C
1-
K0
.d
0 10 20
FEET
MONITORING WELL LOCATION
SOIL VAPOR WELL LOCATION
EXISTING RECOVERY WELL LOCATION
BUILDING
FORMER CLOTHESHANGER CLEANERS
VEW002
MW014
RW001
PROPERTY BOUNDARY
TETRACHLOROETHENE (PCE)
TRICHLOROETHENE (TCE)
cis-1,2-DICHLOROETHENE
VINYL CHLORIDE
SAMPLE DATE
WELL ID
MW015
4/12/18 4/17/19 4/2/20 4/13/21
9.9 9.2 8.4 13
0.61 U 0.61 U 0.61 U 0.25 U
0.32 U 0.32 U 0.32 U 0.50 U
0.26 U 0.26 U 0.26 U 0.25 U
MW018
4/13/18 4/17/19 4/2/20 4/13/21
910 2,600 2,300 1,600
3.1 U 6.1 U 0.76 I 5.0 U
1.6 U 3.2 U 0.24 U 10 U
1.3 U 2.6 U 0.20 U 5.0 U
RW002
4/13/18 4/17/19 4/2/20 4/13/21
870 890 870 740
3.1 U 1.2 U 0.89 I 2.5 U
3.7 I 9.6 7.5 31
1.3 U 0.51 U 0.20 U 2.5 U
RW001
3/28/06 10/27/06 3/12/15 790 1,100 V 820
0.30 I 3.3 U 4.8 U
0.18 U 4.5 U 4.1 U
0.29 U 2.8 U 5.0 U
RW012
4/12/18 4/17/19 4/2/20 4/13/21 500 650 650 730
1.2 U 1.2 U 0.45 I 2.5 U
0.65 U 0.65 U 0.24 U 5.0 U
0.51 U 0.51 U 0.20 U 2.5 U
VEW001
3/28/06 3/12/15 3,400 370
11 U 2.4 U 18 U 2.1 U 29 U 2.5 U
RW008
3/28/06 3/12/15 3/28/17
30 53 30
0.34 I 0.48 U 0.61 U
0.18 U 0.41 U 0.65 U
0.29 U 0.50 U 0.71 U
MW020
5/12/05 2/5/08 1,600 3,100
BDL 2.6 U
BDL 9.0 U
BDL 2.9 U
MW004
4/9/13
GCTLs
1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER (µg/L).
2.) U - INDICATES THE COMPOUND WAS ANALYZED FOR BUT NOT DETECTED.
THE VALUE SHOWN IS THE METHOD DETECTION LIMIT.
3.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY METHOD
DETECTION LIMIT AND THE LABORATORY PRACTICAL QUANTITATION LIMIT.
4.) V - INDICATES ANALYTE WAS DETECTED IN BOTH THE SAMPLE AND
ASSOCIATED METHOD BLANK.
5.) BOLD/SHADED CONCENTRATIONS EXCEEDS GROUNDWATER CLEANUP
TARGET LEVEL (GCTL).
6.) VOC - VOLATILE ORGANIC COMPOUNDS.
MW004
4/12/18 4/17/19 4/2/20 4/13/21
4.9 28 30 45
0.61 U 0.61 U 0.29 U 0.25 U
0.95 I 1.1 0.54 I 0.50 U
0.26 U 0.26 U 0.20 U 0.25 U
MW017
4/13/18 4/17/19 4/2/20 4/13/21
800 1,300 1,400 1,400
1.2 U 3.1 U 0.86 I 2.5 U
0.65 U 9.3 0.43 I 5.0 U
0.51 U 1.3 U 0.20 U 2.5 U
MW019
4/13/18 4/17/19 4/2/20 4/13/21 2,0001,6002,400 2,300
6.1 U 6.1 U 0.56 I 5.0 U
3.2 U 14 0.24 U 10 U
2.6 U 2.6 U 0.20 U 5.0 U
NOTE(S)
LEGEND
REFERENCE(S)
1. SITE PLAN DEVELOPED FROM SITE PLAN BY HARDING ESE, DATED
OCTOBER 2002.
RW001 ABANDONED WELL
RW006
4/17/19
0.61 U
0.32 U
0.26 U
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
SPORTS & IMPORTS (USED CARS)
AutoCAD SHX Text
PAPA JOHN'S FORMERLY CLOTHESHANGER CLEANERS
AutoCAD SHX Text
SAN MIGUEL RESTAURANT
AutoCAD SHX Text
OPEN COURTYARD (DINING AREA)
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text
SEWER CLEANOUTS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ASPHALT PARKING AREA
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT PARKING AREA
AutoCAD SHX Text
ESTIMATED SEWER LATERAL LOCATION
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
25" WOOD RETAINING WALL
AutoCAD SHX Text
CURB
AutoCAD SHX Text
NORTH MONROE STREET
AutoCAD SHX Text
HYDRAULIC LIFT
AutoCAD SHX Text
5/8" CITY OF TALLAHASSEE MPE DISCHARGE FLOW METER IN 12" ROUND VAULT
AutoCAD SHX Text
4" SEWER CLEANOUT
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text
FORMER SVE EQUIPMENT COMPOUND
From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png
AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png
EXTERNAL EMAIL
EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.
Ralph
We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.
Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790
Sent from Mail for Windows
From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com
File details come from the government source that posted it. Updated .