Task Assignment Change Order Summary
This document is a Task Assignment Change Order (TACO #2) issued by the State of Florida Department of Environmental Protection (FDEP) for Contract HW685, Project ERIC_4521. The parties involved are the State of Florida Department of Environmental Protection and WSP USA Inc., a private environmental consulting contractor. The project concerns groundwater monitoring and assessment activities at the Former Jay's Professional Dry Cleaners and Laundry facility located in Jacksonville, Duval County, Florida.
The work encompasses quarterly groundwater sampling, monitoring well installation and maintenance, laboratory analysis, field documentation, and comprehensive reporting related to Underground Injection Control (UIC) parameters and chlorinated volatile organic compounds (CVOCs) monitoring. This change order authorizes a cost reduction from $22,103.91 to $21,963.51, reflecting a decrease of $140.40 due to changes in WSP labor assignments for Subtask 3 field work. The original task assignment completion date was extended from October 31, 2024, to January 16, 2025 (77 days) under TACO #1. The deliverables include quarterly monitoring reports with FDEP approval, due on specified dates through November 22, 2024, with corresponding invoice amounts ranging from $3,261.26 to $5,626.18 for individual subtasks. Project management costs are automatically calculated as a percentage of total labor in accordance with Contract HW685.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department) Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC006B 2 HW685
Patrick McGrane 850-245-8899 WSP USA Inc.
Matt Crews 904-363-3430
ERIC_4521
Jays Professional Dry Cleaners & Laundry
$ 21,963.51 $ 22,103.91
$ 21,963.51 $ 22,103.91
01/16/2025 01/16/2025 0
1 1 2
WSP USA Inc.
Matthew Crews
Environmental Engineer
5/15/2024
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.05.15 15:36:41 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.05.14 16:19:40 -04'00'
N/A
This Task Assignment Change Order authorizes a cost reduction due to changes in WSP labor completing
Subtask 3 field work.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton
Secretary
Memorandum
TO: Negotiation File Jays Professional Dry Cleaners and Laundry Jacksonville, Duval County
ERIC_4521
FROM: Patrick McGrane, Project Manager
SUBJECT: Negotiation Summary Task Assignment Change Order DC006B-2 (HW685)
DATE: April 30, 2024
This Change Order authorizes a total cost decrease due to a change in WSP Labor conducting Subtask 3.
Further information is found in the April 30, 2024, change order email with Richard McCann of WSP.
The previous cost total was $22,103.91. Total costs decreased by $140.40 resulting in a new final cost total of $21,963.51. There is a $0.01 rounding error associated with the final Cost Estimate form.
WSP may invoice according to the included schedule.
Specific negotiated subtasks are as follows:
Subtask 1:
Project Management is automatically calculated as a percentage of total labor in accordance with
Contract HW685.
Subtask 3:
A change in WSP labor conducting field work in Subtask 3 reduced costs by $124.25.
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Jays Cleaners SUBTASK 2: First Qtr UICParameters
DATE: 2/29/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R Mongillo) 5
Staff Sci/Eng L. Swindle) 6
Staff Sci/Eng L. Swindle) -6
Staff Sci/Eng (J. Spengler) 6
Project Sci/Eng (S. Neal) 5
Project Sci/Eng (S. Neal) -5
Sci/Eng/Admin (J. Whipple) 5
Staff Sci/Eng (D. Burton) 3
Staff Sci/Eng (D. Burton) -3
Staff Sci/Eng L. Swindle) 6
Staff Sci/Eng L. Swindle) -6
Sci/Eng/Admin (T. Tassimbedo) 6
Project Sci/Eng (S. Neal) 5
Project Sci/Eng (S. Neal) -5
Sci/Eng/Admin (J. Whipple) 5
TOTAL LABOR 27
VEHICLE TYPE RATE UNIT USEAGE
Truck (Well Inst and GW sampling) $120.00 Per Day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Monitoring Well Materials
Atlantic Drilling 1"X5' dia 0.010" slot screen $80.00 per 5 foot 1 $80.00 Supply 1" Riser - for adjustments $15.35 per 5 foot 1 $15.35
Water tight sealable 1" cap $5.50 per cap 1 $5.50 20/30 sand $6.80 per bag 1 $6.80
6" Steel Manhole $27.00 per manhole 1 $27.00
Portland cement $9.15 per 47 lb bag 1 $9.15
7.5% sales Tax $10.79 LS 1 $10.79
Subtotal $154.59
Duval County Well Permit $150.00 per well 1 $150.00
Duval County Well Permit $150.00 per well -1 ($150.00)
Blood Hound $505.00 per mobe 1 $505.00
Blood Hound $505.00 per mobe -1 ($505.00)
Erwin Profile Fee $350.00 LS 0 $0.00 Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00
TOTAL $349.59
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
TRPH FL PRO MW001, MW003, and MW0 $88.00 3 $264.00
MEE RSK174 (MW007R) $180.00 1 $180.00
CVOCs EPA Method 8260B (MW007R) $73.00 1 $73.00 Total VOCs IDW EPA Method 8260B $110.00 1 $110.00 Sample Shipping Small sample/IDW $110.00 1 $110.00
TOTAL LAB $737.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 2 $80.00 Soil Sampling Kit (through Concrete) $235.00 Per Day 1 $235.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 75 $22.50 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 3 $9.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00 Duval County Well Permit $150.00 per permit 1 $150.00 Duval County Well Permit $150.00 per permit -1 ($150.00)
TOTAL EQUIPMENT $736.50
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH using the FL PRO Method. A sample for methane, ethane and ethene (MEE) and chlorinated VOHs will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH using the FL PRO Method. A sample for methane, ethane and ethene (MEE) and chlorinated VOHs will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Contact property owner and DEP scheduling field work, Install replacement well MW007R inside building, collect groundwater samples from three monitoring wells (MW001, MW003, and MW007R) for UIC parameter FL PRO analysis and for MEE at MW007R only, IDW characterization and waste profile for transportation and disposal, and prepare an email deliverable for submittal to the DEP.
Round trip travel (1 hour). Field event preparation (1 hr.). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH using the FL PRO Method. A sample for methane, ethane and ethene (MEE) and chlorinated VOHs will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Verification of property ownership with property access forms and notify DEP prior to beginning field work (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (2 hours). Prepare and submit email summary with field documentation of groundwater and certified laboratory report (2 hours).
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH using the FL PRO Method. A sample for methane, ethane and ethene (MEE) and chlorinated VOHs will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Round trip travel (1 hour). Field event preparation (1 hr.). Installing a shallow zone replacement monitoring well (MW007R) inside the former dry cleaner location using a stainless steel hand auger and set a 1-Inch diameter, 5-foot long using a pre-packed PVC screen, well development, and associated surface completion with clean up at current active restaurant facility (4 hours). .
Round trip travel (1 hour). Installing a shallow zone replacement monitoring well (MW007R) inside the former dry cleaner location using a stainless steel hand auger and set a 1-Inch diameter, 5-foot long using a pre-packed PVC screen, well development, and associated surface completion with clean up at current active restaurant facility (4 hours).
Procure well permit before and submittal of data after installation from Duval County and sign the Permit using the Professional Drilling License.
Round trip travel (1 hour). Field event preparation (1 hr.). Installing a shallow zone replacement monitoring well (MW007R) inside the former dry cleaner location using a stainless steel hand auger and set a 1-Inch diameter, 5-foot long using a pre-packed PVC screen, well development, and associated surface completion with clean up at current active restaurant facility (4 hours)
Round trip travel (1 hour). Field event preparation (1 hr.). Installing a shallow zone replacement monitoring well (MW007R) inside the former dry cleaner location using a stainless steel hand auger and set a 1-Inch diameter, 5-foot long using a pre-packed PVC screen, well development, and associated surface completion with clean up at current active restaurant facility (4 hours).
Round trip travel (1 hour). Installing a shallow zone replacement monitoring well (MW007R) inside the former dry cleaner location using a stainless steel hand auger and set a 1-Inch diameter, 5-foot long using a pre-packed PVC screen, well development, and associated surface completion with clean up at current active restaurant facility (4 hours).
Round trip travel (1 hour). Installing a shallow zone replacement monitoring well (MW007R) inside the former dry cleaner location using a stainless steel hand auger and set a 1-Inch diameter, 5-foot long using a pre-packed PVC screen, well development, and associated surface completion with clean up at current active restaurant facility (4 hours).
Procure well permit before and submittal of data after installation from Duval County and sign the Permit using the Professional Drilling License.
Round trip travel (1 hour). Field event preparation (1 hr.). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH using the FL PRO Method. A sample for methane, ethane and ethene (MEE) and chlorinated VOHs will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Round trip travel (1 hour). Field event preparation (1 hr.). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH using the FL PRO Method. A sample for methane, ethane and ethene (MEE) and chlorinated VOHs will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
FINAL --7/24/96
SUBTASK 3: Second Qtr UIC Parameters
DATE: 2/29/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R Mongillo) 4.0
Staff Sci/Eng (L. Swindle) 6.0
Project Sci/Eng (S. Neal) 5.0
Project Sci/Eng (S. Neal) -5.0
Staff Sci/Eng (J. Whipple) 5.0
TOTAL LABOR 15.0
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Profile Fee $350.00 LS 0 $0.00 Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
TRPH FL PRO MW001, MW003, and MW0 $88.00 3 $264.00
MEE RSK174 (MW007R) $180.00 1 $180.00
CVOCs EPA Method 8260B (MW007R) $73.00 0 $0.00 Total VOCs IDW EPA Method 8260B $110.00 0 Use 1st qtr results for IDW $0.00 Sample Shipping Small sample/IDW $110.00 1 $110.00
TOTAL LAB $554.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 75 $22.50 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 3 $9.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $461.50
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH by FL-PRO. A sample for methane, ethane and ethene will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Contact property owner and DEP scheduling field work, collect groundwater samples from three monitoring wells for UIC parameter FL PRO analysis and MEE (for MW007 only), IDW characterization and waste profile for transportation and disposal, and prepare an email deliverable for submittal to the DEP.
Verification of property ownership with property access forms and notify DEP prior to beginning field work (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (1 hours).
Prepare and submit email summary with field documentation of groundwater and certified laboratory report (2 hours).
Round trip travel (1 hour). Field event preparation (1 hr.). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH by FL-PRO. A sample for methane, ethane and ethene will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH by FL-PRO. A sample for methane, ethane and ethene will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH by FL-PRO. A sample for methane, ethane and ethene will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
SUBTASK 4: Third Qtr UIC Parameters
DATE: 2/29/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R Mongillo) 4
Staff Sci/Eng L. Swindle) 6
Project Sci/Eng (S. Neal) 5
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Profile Fee $350.00 LS 0 $0.00 Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
TRPH FL PRO MW001, MW003, and MW0 $88.00 3 $264.00
MEE RSK174 (MW007R) $180.00 1 $180.00
CVOCs EPA Method 8260B (MW007R) $73.00 0 $0.00 Total VOCs IDW EPA Method 8260B $110.00 0 Use 1st qtr results for IDW $0.00 Sample Shipping Small sample/IDW $110.00 1 $110.00
TOTAL LAB $554.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 75 $22.50 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 3 $9.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $461.50
Contact property owner and DEP scheduling field work, collect groundwater samples from three monitoring wells for UIC parameter FL PRO analysis and MEE (for MW007 only), IDW characterization and waste profile for transportation and disposal, prepare an email deliverable for submittal to the DEP.
Verification of property ownership with property access forms and notify DEP prior to beginning field work (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (1 hours). Prepare and submit email summary with field documentation of groundwater and certified laboratory report (2 hours).
Round trip travel (1 hour). Field event preparation (1 hr.). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH FL PRO. A sample for methane, ethane and ethene will be collected from MW007, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for TRPH FL PRO. A sample for methane, ethane and ethene will be collected from MW007r, depth to water measurements, field parameters will be measured for all three wells (4 hours).
SUBTASK 5: Fourth Qtr UIC and Performance Monitoring
DATE: 2/29/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (R Mongillo) 4
Staff Sci/Eng L. Swindle) 10
Project Sci/Eng (S. Neal) 9
TOTAL LABOR 23
VEHICLE TYPE RATE UNIT USEAGE
Truck (GW sampling $120.00 Per Day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Profile Fee $350.00 LS 0 $0.00 Erwin T&D - Non-Haz PFOS/PFAS Water $195.00 per drum 1 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
TRPH FL PRO MW001, MW003, and MW0 $88.00 3 $264.00
MEE RSK174 (MW007R) $180.00 1 $180.00
CVOCs EPA Method 8260B $73.00 7 $511.00 Total VOCs IDW EPA Method 8260B $110.00 1 $110.00 Sample Shipping Small sample/IDW $110.00 2 $220.00
TOTAL LAB $1,285.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 200 $60.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 7 $21.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00
TOTAL EQUIPMENT $511.00
Contact property owner and DEP scheduling field work, collect groundwater samples from three monitoring wells MW001, MW003, MW007R for UIC parameter FL PRO analysis and MEE (for MW007R only), and chlorinated VOCs for these three wells and MW004, MW008, MW009, and MW012, dept to water measurements from the seven wells that will be sampled and MW002, MW005, and MW011, IDW characterization and waste profile for transportation and disposal, and prepare an email deliverable for submittal to the DEP.
Verification of property ownership with property access forms and notify DEP prior to beginning field work (1 hour). Characterize IDW and prepare waste profile for transportation and disposal of IDW (1 hours). Prepare and submit email summary with field documentation of groundwater and certified laboratory report (2 hours).
Round trip travel (1 hour). Field event preparation (1 hr.). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH FL PRO. A sample for methane, ethane and ethene will be collected from MW007R, samples from the three previously mentioned wells along with MW004, MW008, MW009, and MW012 for analysis of chlorinated VOCs, depth to water measurements in the seven wells sampled along with MW002, MW005, and MW011, field parameters will be measured for all seven wells (8 hours).
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH FL PRO. A sample for methane, ethane and ethene will be collected from MW007R, samples from the three previously mentioned wells, along with MW004, MW008, MW009, and MW012 for analysis of chlorinated VOCs, depth to water measurements in the seven wells sampled along with MW002, MW005, and MW011, field parameters will be measured for all seven wells (8 hours).
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 6: Reporting
DATE: 2/29/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Practice Leader (J. Brown) 3
Senior Sci/Eng (R Mongillo) 16
Senior Project Sci/Eng (B. Lucero) 4
Staff Sci/Eng (A. Strayer) 2
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Reporting: Updating tables, document production, binding and shipping. Create pdf for
OCULUS.
Develop conclusions and recommendations and prepare final Quarterly UIC and Annual Monitoring Report
Preparation of draft Quarterly UIC and Annual Monitoring Report
CADD Update Figures (two groundwater flow and three figures for CVOCs and one figure for UIC detections).
FINAL --7/24/96
SUBTASK 3: Second Qtr UIC Parameters
DATE: 2/29/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Sci/Eng (S. Neal) 0.0
Project Sci/Eng (S. Neal) -5.0
Staff Sci/Eng (J. Whipple) 5.0
TOTAL LABOR 0.0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Chlorinated VOCs - EPA Method 8260B
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Contact property owner and DEP scheduling field work, collect groundwater samples from three monitoring wells for UIC parameter FL PRO analysis and MEE (for MW007 only), IDW characterization and waste profile for transportation and disposal, and prepare an email deliverable for submittal to the DEP.
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH FL PRO. A sample for methane, ethane and ethene will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007R for TRPH FL PRO. A sample for methane, ethane and ethene will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for TRPH FL PRO. A sample for methane, ethane and ethene will be collected from MW007R, depth to water measurements, field parameters will be measured for all three wells (4 hours).
From: McCann, Rick To: McGrane, Patrick Cc: Crews, Matt Subject: DC006B (TACO#2) - Jay"s Cleaners Quarterly Monitoring - ERIC_4521 Date: Tuesday, April 30, 2024 10:25:19 AM Attachments: RE DC006B (TACO#2) - Jay"s Cleaners Quarterly Monitoring - ERIC_4521.msg
HW685_DC006B-signed.pdf DC006B (TACO #1) - Jays Cleaners Quarterly Mon Report LOECEF.rev1.xlsx HW685_DC006B-1-signed.pdf DC006B (Delta #1) - Jays Cleaners Quarterly Mon Report LOECEF.rev1.xlsx DC006B (Delta #2) - Jays Cleaners Quarterly Mon LOECEF.xlsx DC006B (TACO #2) - Jays Cleaners Quarterly Mon LOECEF.xlsx
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Sorry sir, network gymnastics this morning.
WSP provides supporting documentation for TACO #2 which should show reductions in personnel costs incurred during the Q2 GW sampling recently completed (Subtask 3). TACO #2 attached shows a reduction of -$140.41.
Please contact me with any questions.
Thank you!
Respectfully, Rick
Richard D. "Rick" McCann, PG
Vice President / Geology (US) richard.mccann@wsp.com
T: 904.363.3430
M: 904.460.6179
WSP USA Inc.
9428 Baymeadows Road / Suite 400
Jacksonville, FL 32256 wsp.com
NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.
-LAEmHhHzdJzBlTWfa4Hgs7pbKl
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department) Department�s Project Manager: Department�s Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC006B 1 HW685
Patrick McGrane 850-245-8899 Contractor WSP USA Inc. Contractor
Contractor Matt Crews Contractor 904-363-3430
ERIC_4521
Former Jay's Professional Dry Cleaners and Landry
$ 22,103.91 $ 23,802.55
$ 22,103.91 $ 23,802.55
Completion Completion 10/31/2024 01/16/2025 77
1 1 1
WSP USA Inc.
Contractor
Matthew Crews
Environmental Engineer
3/6/2024
Crews, Matt (USMC700671) Digitally signed by Crews, Matt (USMC700671) Date: 2024.03.06 08:46:37 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.03.05 15:42:58 -05'00'
N/A
This Task Assignment Change Order authorizes a cost decrease and a time extension for all deliverable due dates and the Task Completion date to compensate for subcontractor scheduling issues and costs.
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW685
DC006B
$ 22,103.91
Subtask 2 � MW007R install and First Quarter of UIC Monitoring
Subtask 3 � Second Quarterly of UIC Monitoring
Subtask 4 � Third Quarter of UIC Monitoring
Subtask 5 � Fourth Quarterly of UIC and Annual CVOC Monitoring
Subtask 1 & 6 � Project Management; Reporting
Subtask 2: Submittal and FDEP approval of Email summary with the Field Documentation and Laboratory Report of MW007R install and First Quarter of UIC Monitoring
Subtask 4: Submittal and FDEP approval of Email summary with the Field Documentation and Laboratory Report of Third Quarter of UIC Monitoring
Subtask 5: Submittal and FDEP approval of Email summary with the Field Documentation and Laboratory Report of fourth Quarter of UIC Monitoring and Annual CVOC Monitoring
Subtask 1 & 6: Submittal and FDEP approval of the Groundwater Monitoring Report
Subtask 3: Submittal and FDEP approval of Email summary with the Field Documentation and Laboratory Report of Second Quarter of UIC Monitoring
01/26/2024
04/26/2024
07/26/2024
10/25/2024
11/22/2024
$ 3,261.26
$ 4,989.02
$ 3,261.26
$ 4,966.19
$ 5,626.18
File details come from the government source that posted it. Updated .