This document package comprises a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Golder Associates USA Inc. for groundwater monitoring services at the former Jays Professional Dry Cleaners and Laundry site in Jacksonville, Duval County, Florida (Facility ID: ERIC_4521). The TA is identified as HW685 DC006A and is part of the Drycleaning Solvent Cleanup Program under the indefinite delivery contract structure. The project involves coordination between the FDEP's Division of Waste Management, the contracting consultant Golder, and various subcontractors for waste disposal and laboratory analysis.

The TA authorizes Golder to conduct quarterly groundwater monitoring activities and annual reporting over a twelve-month period from March 2022 through April 2023. Services include four quarterly sampling events (April, July, and October 2022, and January 2023), groundwater sample collection from multiple monitoring wells, laboratory analysis for chlorinated volatile organic compounds (VOCs), total recoverable petroleum hydrocarbons (TRPH), and dissolved gases, investigation-derived waste (IDW) characterization and disposal, and preparation of an annual groundwater monitoring report with GIS updates. The total fixed unit rate for the TA is $18,271.31, representing a reduction from the original proposal of $20,579.87 following cost negotiations. This amount covers 97 labor hours distributed across six subtasks: project management ($4,936.44), four quarterly monitoring events ($3,273.54, $3,053.54, $3,053.54, and $3,954.25 respectively), and annual reporting ($3,486.90). Subcontractor services include IDW disposal through Erwin Remediation at $100 per drum for non-hazardous waste and laboratory analysis services. The contract provides for monthly invoicing upon FDEP approval of deliverables, with work completion scheduled for April 28, 2023.

View the file

Other files

File Type Posted
CN-370000-HW685-BF01C.pdf PDF
CN-370000-HW685-BF05ACO2.pdf PDF
CN-370000-HW685-BF05ACO3.pdf PDF
CN-370000-HW685-BF06A.pdf PDF
CN-370000-HW685-BF1ACO1.pdf PDF
CN-370000-HW685-BF6ACO1.pdf PDF
CN-370000-HW685-BIL01C.pdf PDF
CN-370000-HW685-BIL01CO1.pdf PDF
CN-370000-HW685-BIL03A.pdf PDF
CN-370000-HW685-BIL2ACO1.pdf PDF
CN-370000-HW685-BIL2CCO1.pdf.crdownload CRDOWNLOAD file
CN-370000-HW685-DC001A.pdf PDF
CN-370000-HW685-DC002G.pdf PDF
CN-370000-HW685-DC003A.pdf PDF
CN-370000-HW685-DC005C.pdf PDF
CN-370000-HW685-DC006B.pdf PDF
CN-370000-HW685-DC006C.pdf PDF
CN-370000-HW685-DC007C.pdf PDF
CN-370000-HW685-DC008A.pdf PDF
CN-370000-HW685-DC009B.pdf PDF
CN-370000-HW685-DC010A.pdf PDF
CN-370000-HW685-DC011A.pdf PDF
CN-370000-HW685-DC012C.pdf PDF
CN-370000-HW685-DC013A.pdf PDF
CN-370000-HW685-DC013C.pdf PDF
CN-370000-HW685-DC015B.pdf PDF
CN-370000-HW685-DC015C.pdf PDF
CN-370000-HW685-DC016A.pdf PDF
CN-370000-HW685-DC018A.pdf PDF
CN-370000-HW685-DC019B.pdf PDF
CN-370000-HW685-DC01ACO6.pdf PDF
CN-370000-HW685-DC01ACO8.pdf PDF
CN-370000-HW685-DC01ACO9.pdf PDF
CN-370000-HW685-DC020B.pdf PDF
CN-370000-HW685-DC022A.pdf PDF
CN-370000-HW685-DC022B.pdf PDF
CN-370000-HW685-DC022D.pdf PDF
CN-370000-HW685-DC023B.pdf PDF
CN-370000-HW685-DC023C.pdf PDF
CN-370000-HW685-DC027B.pdf PDF
CN-370000-HW685-DC027C.pdf PDF
CN-370000-HW685-DC029B.pdf PDF
CN-370000-HW685-DC029C.pdf PDF
CN-370000-HW685-DC02CCO1.pdf PDF
CN-370000-HW685-DC02FCO1.pdf PDF
CN-370000-HW685-DC031A.pdf PDF
CN-370000-HW685-DC031C.pdf PDF
CN-370000-HW685-DC032B.pdf PDF
CN-370000-HW685-DC035A.pdf PDF
CN-370000-HW685-DC037A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW685

DC006A Completion April 28, 2023

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the March 15, 2022, Scope of Work, Cost Estimate, and Bid Documentation.

Ben Grubbs 850-245-8992 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Golder Associates USA Inc.

Golder Associates USA Inc.

Matt Crews 904-363-3430

ERIC_4521

10025 San Jose Boulevard, Jacksonville, Duval County

Jays Professional Dry Cleaners & Laundry

✔ $ 18,271.31

$ 18,271.31

Scope of Work

Donald Miller

Principal

Donald Miller Digitally signed by Donald Miller Date: 2022.03.28 08:36:17 -04'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.03.25 15:30:55 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Quarter 1 Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation 04/29/2022

Subtask 3: Quarter 2 Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation 07/29/2022

Subtask 4: Quarter 3 Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation 10/31/2022

Subtask 5: Quarter 4 Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation 01/31/2023

Subtasks 1 & 6: Annual Groundwater Monitoring Report; ADaPT/GIS Update; Project Management 02/28/2023

Subtask 2: Submittal and FDEP approval of the Quarter 1 Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 3,273.54

Subtask 3: Submittal and FDEP approval of the Quarter 2 Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 3,053.54

Subtask 4: Submittal and FDEP approval of the Quarter 3 Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 3,053.54

Subtask 5: Submittal and FDEP approval of the Quarter 4 Groundwater Monitoring Field Documentation and Laboratory Report; IDW Disposal Documentation $ 3,954.25

Subtasks 1 & 6: Submittal and FDEP approval of the Annual Groundwater Monitoring Report; ADaPT/GIS Update; Project Management $ 4,936.44

$ 18,271.31

HW685

DC006A

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW685 Contract Negotiation File Jays Professional Dry Cleaners & Laundry Jacksonville, Duval County

ERIC_4521

From: Ben Grubbs, Project Manager Date: March 25, 2022 Subject: Negotiation Summary

HW685 DC006A

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the March 15, 2022, Scope of Work, Cost Estimate, and Bid Documentation.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtasks 2 – 5: Quarterly Groundwater Monitoring In Quarters 1 – 3, Golder will collect groundwater samples from monitoring wells MW001, MW003, and MW007. In Quarter 4, Golder will collect groundwater samples from monitoring wells MW001, MW003, MW007 – MW009, and MW012. Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for methane, ethane, ethene, and total recoverable petroleum hydrocarbons in Quarters 1 – 4, with chlorinated volatile organic compounds (VOCs) also being analyzed in Quarter 4. Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum. Golder requested bids for IDW drum treatment and disposal from Clark, Erwin, Whatever Waste, and M & D Industrial Services. Erwin was selected as the lowest responsive and responsible bidder.

Subtask 6: Reporting Golder will submit the Annual Groundwater Monitoring Report and ADaPT and GIS deliverables to FDEP.

Golder and the FDEP confirmed on March 15, 2022, that an Access Agreement with the current real property owner of the Jays Professional Dry Cleaners & Laundry (ERIC_4521) site has been executed.

The original Task Assignment totaled $20,579.87 with 107 labor hours but after negotiations and corrections with contractor costs are reflected as below:

MEMORANDUM

Jays Professional Dry Cleaners & Laundry March 25, 2022 Page Two

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $18,271.31 with 97 labor hours.

Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTI MATEContractor: Golder Associates USA Inc.

Date: 3/23/2022

Task #: DC006A SubTask 1 Project Management SubTask 6 Reporting

Site: Former Jays Cleaners SubTask 2 First Qtr UIC and Performance Monitoring SubTask 7

Activity/Phase: Assessment SubTask 3 Second Qtr UIC and Performance Monitoring SubTask 8

Project Manager: Ben Grubbs SubTask 4 Third Qtr UIC and Performance Monitoring SubTask 9

SubTask 5 Fourth Qtr UIC and Performance Monitoring SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$51.23 Project Manager (RFM) 9 9.4 $0.00 Program Leader - X-14 0 0 0 0 0 0 0 0 0 0

$63.65 Practice Leader - X-13 (JB) 3 0 0 0 0.0 3 0 0 0 0 $0.00 Senior Consultant - X-12 0 0 0 0 0 0 0 0 0 0

$51.23 Senior Sci/Eng - X-11 (RFM) 28 4 4 4 4.0 12 0 0 0 0 $45.42 Senior Project Sci/Eng - P-10 (BL) 4 0 0 0 0.0 4 0 0 0 0 $44.15 Project Sci/Eng - P-10 (JT) 3 0 0.0 0 0.0 2.5 0 0 0 0 $38.61 Staff Sci/Eng - P-8 (LS) 26 6 6 6 8.0 0 0 0 0 0 $33.32 Staff Sci/Eng - P-8 (JS) 22 5 5 5 7.0 0 0 0 0 0 $32.75 Staff Sci/Eng - P-8 (AS) 2 0 0 0 0 2 0 0 0 0

$0.00 Sci/Eng/Admin - P-7 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 97 9.4 15.0 15.0 15 19 23.5 0 0 0 0

Direct Labor $4,203.43 $483.58 $603.18 $603.18 $603.18 $747.04 $1,163.27 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $7,250.93 $834.18 $1,040.49 $1,040.49 $1,040.49 $1,288.64 $2,006.64 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $11,454.36 $1,317.76 $1,643.67 $1,643.67 $1,643.67 $2,035.68 $3,169.91 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 1

FDEP COST ESTI MATEContractor: Golder Associates USA Inc.

Date: 3/23/2022

Task #: DC006A SubTask 1 Project Management SubTask 6 Reporting

Site: Former Jays Cleaners SubTask 2 First Qtr UIC and Performance Monitoring SubTask 7

Activity/Phase: Assessment SubTask 3 Second Qtr UIC and Performance Monitoring SubTask 8

Project Manager: Ben Grubbs SubTask 4 Third Qtr UIC and Performance Monitoring SubTask 9

SubTask 5 Fourth Qtr UIC and Performance Monitoring SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $480.00 $120.00 $120.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $120.00 $120.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $400.00 $100.00 $100.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $400.00 $100.00 $100.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $40.00 $10.00 $10.00 $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $440.00 $110.00 $110.00 $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $2,324.00 $554.00 $444.00 $444.00 $882.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $550.00 $220.00 $110.00 $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,874.00 $774.00 $554.00 $554.00 $992.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $40.00 $40.00 $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,317.50 $321.50 $321.50 $321.50 $353.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $400.00 $100.00 $100.00 $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,877.50 $461.50 $461.50 $461.50 $493.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $17,125.86 $1,317.76 $3,109.17 $2,889.17 $2,889.17 $3,750.68 $3,169.91 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,145.45 $131.78 $164.37 $164.37 $164.37 $203.57 $316.99 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $18,271.31 $1,449.54 $3,273.54 $3,053.54 $3,053.54 $3,954.25 $3,486.90 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GOLDER Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Jays Cleaners SUBTASK 2: First Qtr UIC and Performance Monitoring

DATE: 3/23/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R Mongillo) 4

Staff Sci/Eng L. Swindle) 6

Staff Sci/Eng (J. Spengler) 5

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Truck (GW sampling $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00

TOTAL $100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TRPH FL PRO $88.00 3 $264.00

MEE RSK174 $180.00 1 $180.00

Total VOCs IDW EPA Method 8260B $110.00 1 $110.00 Sample Shipping Small sample/IDW $110.00 2 $220.00

TOTAL LAB $774.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 75 $22.50 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 3 $9.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $461.50

Contact property owner and DEP scheduling field work, collect groundwater samples from three monitoring wells for UIC parameter FL PRO analysis and MEE (for MW007 only), IDW characterization and waste profile for transportation and disposal, and prepare an email deliverable for submittal to the DEP.

Round trip travel (1 hour). Field event preparation (1 hr). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for VOC, TRPH FL PRO. A sample for methne, ethane and ethene will be collected from MW007, depth to water measurements, field parameters will be measured for all three wells (4 hours). .

Communication with RPO and verification of the property ownership prior to site access, prepare and submit field notes, sample forms, and laboratory report in an email deliverable to the DEP, and characterization and waste profile for transportation and disposal of IDW drum(s) (4 hours).

Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for VOCs and TRPH FL PRO. A sample for methne, ethane and ethene will be collected from MW007, depth to water measurements, field parameters parameters will be measured for all three wells (4 hours).

FINAL --7/24/96

SUBTASK 3: Second Qtr UIC and Performance Monitoring

DATE: 3/23/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R Mongillo) 4

Staff Sci/Eng L. Swindle) 6

Staff Sci/Eng (J. Spengler) 5

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Truck (GW sampling $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00

TOTAL $100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Total VOHs TRPH FL PRO $88.00 3 $264.00

MEE RSK174 $180.00 1 $180.00

Sample Shipping Small $110.00 1 $110.00

TOTAL LAB $554.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 75 $22.50 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 3 $9.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $461.50

Contact property owner and DEP scheduling field work, collect groundwater samples from three monitoring wells for UIC parameter FL PRO analysis and MEE (for MW007 only), IDW characterization and waste profile for transportation and disposal, and prepare an email deliverable for submittal to the DEP.

Communication with RPO prior to site access, prepare and submit field notes, sample forms, and laboratory report in an email deliverable to the DEP, and characterization and waste profile for transportation and disposal of IDW drum(s) (4 hours).

Round trip travel (1 hour). Field event preparation (1 hr). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for TRPH FL PRO. A sample for methne, ethane and ethene will be collected from MW007, depth to water measurements, field parameters will be measured for all three wells (4 hours). .

Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for TRPH FL PRO. A sample for methne, ethane and ethene will be collected from MW007, depth to water measurements, field parameters will be measured for all three wells (4 hours).

SUBTASK 4: Third Qtr UIC and Performance Monitoring

DATE: 3/23/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R Mongillo) 4

Staff Sci/Eng L. Swindle) 6

Staff Sci/Eng (J. Spengler) 5

TOTAL LABOR 15

VEHICLE TYPE RATE UNIT USEAGE

Truck (GW sampling $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00

TOTAL $100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Total VOHs TRPH FL PRO $88.00 3 $264.00

MEE RSK174 $180.00 1 $180.00

Sample Shipping Small $110.00 1 $110.00

TOTAL LAB $554.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 75 $22.50 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 3 $9.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $461.50

Contact property owner and DEP scheduling field work, collect groundwater samples from three monitoring wells for UIC parameter FL PRO analysis and MEE (for MW007 only), IDW characterization and waste profile for transportation and disposal, prepare an email deliverable for submittal to the DEP.

Communication with RPO for site access, prepare and submit field notes, sample forms, and laboratory report in an email deliverable to the DEP, and characterization and waste profile for transportation and disposal of IDW drum(s) (4 hours).

Round trip travel (1 hour). Field event preparation (1 hr). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for TRPH FL PRO. A sample for methne, ethane and ethene will be collected from MW007, depth to water measurements, field parameters will be measured for all three wells (4 hours). .

Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for TRPH FL PRO. A sample for methne, ethane and ethene will be collected from MW007, depth to water measurements, field parameters parameters will be measured for all three wells (4 hours).

SUBTASK 5: Fourth Qtr UIC and Performance Monitoring

DATE: 3/23/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R Mongillo) 4

Staff Sci/Eng L. Swindle) 8

Staff Sci/Eng (J. Spengler) 7

TOTAL LABOR 19

VEHICLE TYPE RATE UNIT USEAGE

Truck (GW sampling $120.00 Per Day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW T&D - Liquids $100.00 Per Drum 1 $100.00

TOTAL $100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Chlorinated VOCs - EPA Method 8260B CVOCs $73.00 6 $438.00

TRPH FL PRO $88.00 3 $264.00

MEE RSK174 $180.00 1 $180.00

Sample Shipping Small $110.00 1 $110.00

TOTAL LAB $992.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $40.00 Per Day 1 $40.00 Shallow Groundwater Sampling Kit $290.00 Per Day 1 $290.00 Tubing, Poly HDPE $0.30 Per Foot 150 $45.00 Tubing, Silicon 3/16 x 3/8 $3.00 Per Foot 6 $18.00 Drum, 55-gallon $100.00 Per Drum 1 $100.00

TOTAL EQUIPMENT $493.00

Contact property owner and DEP scheduling field work, collect groundwater samples from three monitoring wells MW001, MW003, MW007 for UIC parameter FL PRO analysis and MEE (for MW007 only), and chlorinated VOCs for these three wells and MW008, MW009, and MW012, IDW characterization and waste profile for transportation and disposal, and prepare an email deliverable for submittal to the DEP.

Communication with RPO prior to site access, prepare and submit field notes, sample forms, and laboratory report in an email deliverable to the DEP, and characterization and waste profile for transportation and disposal of IDW drum(s) (4 hours).

Round trip travel (1 hour). Field event preparation (1 hr). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for TRPH FL PRO. A sample for methne, ethane and ethene will be collected from MW007, depth to water measurements, field parameters will be measured for all three wells (6 hours). .

Round trip travel (1 hour). Including instrument calibration and sample 3 wells MW001, MW003, and MW007 for TRPH FL PRO. A sample for methne, ethane and ethene will be collected from MW007, depth to water measurements, field parameters parameters will be measured for all three wells (6 hours).

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK 6: Reporting

DATE: 3/23/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Practice Leader (J. Brown) 3 Senior Sci/Eng (R Mongillo) 12

Senior Project Sci/Eng (J. Thomas) 2.5

Senior Project Sci/Eng (B. Lucero) 4

Staff Sci/Eng (A. Strayer) 2

TOTAL LABOR 23.5

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Reporting: Updating tables, document production, binding and shipping. Create pdf for

OCULUS.

Develop conclusions and recommendations and prepare a final Annual Monitoring Report Data entry, prepare tables and figures and draft Annual Monitoring Report Update FDEP GIS Tables, run data checker, create and edit error report, annotate error report (15 data points x 8 min/point = 42 minutes). Submit FDEPGIS tables; submit ADaPT deliverable ( )CADD Update Figures (two groundwater flow and two figures CVOC and UCI detections).

FINAL --7/24/96

Golder Associates USA Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256

T: +1 904 363-3430 F: +1 904 363-3445 golder.com

March 15, 2022 Proposal No. 202208346

Mr. Ben Grubbs Florida Department of Environmental Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR FORMER JAY’S PROFESSIONAL DRY CLEANERS AND LAUNDRY

QUARTERLY UIC AND ANNUAL GROUNDWATER MONITORING

10025 SAN JOSE BOULEVARD

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FACILITY ID NUMBER: ERIC_4521

PROPOSED TASK ASSIGNMENT: HW685_DC006A

Dear Mr. Grubbs:

Golder Associates USA Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for groundwater monitoring at the former Jays Professional Dry Cleaners and Laundry site, located in Jacksonville, Duval County, Florida. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services. The proposed scope of services is described below. The scope of work is based on the recommendations accepted by the DEP in the December 8, 2021 electronic mail correspondence to Golder.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASKS 2 THROUGH 5 – QUARTERLY GROUNDWATER MONITORING

Golder removed and disposed of 200 tons of impacted soil and 5,334 gallons of groundwater and rainwater collected from the excavation area during Interim Source Removal activities. Golder applied a food-grade and enriched emulsified vegetable oil, EOSPRO manufactured by EOS Remediation to the base of the excavation prior to

Mr. Ben Grubbs Proposal No. 202208346

Florida Department of Environmental Protection March 15, 2022 backfilling to stimulate the enhanced bioremediation of any residual chlorinated solvents in the shallow zone of the surficial aquifer. Golder applied three 50-gallon batches of the amendment evenly to the base of the excavation on August 6, 2021 prior to placement of the No. 57 stone backfill. An additional 50-gallon batch was applied to the exterior excavation pits on August 12, 2021. In order to comply with the requirements of the DEP technology acceptance letter for EOSPRO and Underground Injection Control (UIC) monitoring requirements, Golder collected baseline groundwater samples from the following shallow surficial zone monitoring wells: background well MW005, source area monitoring well MW007, and downgradient monitoring wells MW001 and MW003. The UIC and chlorinated volatile organic compound (VOC) samples were collected prior to application of the enhanced bioremediation amendment on February 15, 2021. The groundwater samples were analyzed for total recoverable petroleum hydrocarbons (TRPH) using the FL-PRO Method and chlorinated VOCs using EPA Method 8260. In addition, the groundwater sample from MW007 was also analyzed for dissolved gases (methane, ethane, and ethene) using Method AM20GAX. The UIC and performance monitoring plan is presented in Table 4.

Golder will mobilize to the site on a quarterly basis (April, July, and October 2022, and January 2023) and collect groundwater samples in accordance with the FDEP-approved performance monitoring plan (Table 4) along with chlorinated VOCs. Prior to groundwater sampling during each event, the water level depth will be measured at each well to be sampled to determine purge well volumes. Groundwater samples will be collected from the wells in accordance with FDEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures. During the sampling event, Golder will inspect the locks and well caps for damage or degradation and replaced, as necessary.

Groundwater samples will be collected using low flow sampling methods. The attached figures (Figures 3 through 6) from the September 2021 annual groundwater field event showing the monitoring well locations, potentiometric map for the shallow and intermediate zones of the surficial aquifer and chlorinated VOC results for the shallow and intermediate zones of the surficial aquifer. During the first three quarters groundwater samples will be collected for chlorinated VOCs and the UIC parameters from MW007, MW008, and MW012 for TRPH using the FL-PRO Method and methane, ethene, and ethane (MEE) for a sample collected from MW007 only. Groundwater samples collected during the fourth quarter will be analyzed for the UIC parameters from the three monitoring wells and chlorinated VOCs along with three additional wells MW008, MW009, and MW012 for chlorinated VOCs only. Prior to groundwater sampling, the depth to groundwater will be measured at accessible the six above mentioned monitoring well locations and MW002, MW005, and MW011 using an electronic water level indicator to determine groundwater elevations and flow direction. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed in accordance with the attached Table 4.

Golder will temporarily store the investigation derived waste (IDW) purge water generated from each groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260 during the first quarter sampling event for IDW characterization.

The remaining quarters the chlorinated VOC results will be used for waste characterization. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.

Interim e-mail deliverables (field documentation, lab reports, and brief data evaluation) will be submitted following the completion of Subtasks 2 through 5.

SUBTASK 6 – REPORTING

The annual groundwater monitoring report will include a description of sampling procedures, evaluation of analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will update the FDEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the DEP data checker on the completed tables; and submit the updated tables and error report. Additionally, Golder will forward Automated Data Processing Tool (ADaPT) data deliverables provided by the laboratory for each groundwater sampling event.

HEALTH AND SAFETY

Golder will update the site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the monitoring is $20,579.87. Golder will tentatively schedule the first quarterly sampling event for early to middle April 2022. The LOE/CEF cost sheets and subcontractor bids are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $1,626.89 March 31, 2023

Subtask 2 – First Quarter of UIC Monitoring

$4,087.96 April 29, 2022 (Email Interpretation with Field Documentation and Laboratory Report)

Subtask 3 – Second Quarterly of UIC Monitoring

$3,867.96 July 29, 2022 (Email Interpretation with Field Documentation and Laboratory Report)

Subtask 4 – Third Quarter of UIC Monitoring

$3,867.96 October31, 2022 (Email Interpretation with Field Documentation and Laboratory Report)

Subtask 5 – Fourth Quarterly of UIC and Annual CVOC Monitoring

$4,408.60 January 31, 2023 (Email Interpretation with Field Documentation and Laboratory Report)

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 6 – Reporting $2,720.50 February 28, 2023 (Groundwater Monitoring Report, GIS Tables, ADaPT Deliverables)

Total/Completion Date $20,579.87 April 28, 2023

Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.

Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, Golder Associates USA Inc.

Ralph F. Mongillo, Jr. Jesse C. Brown, PE Lead Consultant / Senior Geologist Director, Environmental Engineer

RFM/JCB/as

Attachments: Table 4 UIC and Performance Monitoring Plan

Figure 3 Potentiometric Map – Shallow Zone of the Surficial Aquifer (September 13, 2021) Figure 4 Potentiometric Map – Intermediate Zone of the Surficial Aquifer (September 13, 2021) Figure 5 Groundwater Analytical Results Shallow Zone of the Surficial Aquifer (September 2021) Figure 6 Groundwater Analytical Results Intermediate Zone of the Surficial Aquifer (September 2021)

Attachment A Level of Effort Sheets / Cost Estimate Form and Subcontractor Bids

G:\Projects\DEP-Drycleaning\Projects\Jax\Jays - HW685\Proposal\HW685 Annual Groundwater Monitoring Proposal ERIC_4521.docx

March 2022 202208346

UIC Parameter Methane, Ethane, Ethene

TRPH Chlorinated VOCs

Field ParametersA

Method AM20GAX FL-PRO Method

8260B

Shallow Surficial Aquifer MW001 Downgradient 9 - 14 X X X MW003 Downgradient 9 - 14 X X X MW007 Source 5 - 10 X X X X MW008 Downgradient 10 - 15 X X MW009 Downgradient 20 - 25 X X MW012 Downgradient 20 - 25 X X

Shallow Surficial Aquifer MW001 Downgradient 9 - 14 X X MW003 Downgradient 9 - 14 X X MW007 Source 5 - 10 X X X

Notes:

X -Parameter measured or analyzed UIC - Underground Injection Control VOCs - Volatile Organic Compounds TRPH - Total recoverable petroleum hydrocarbons

Monitoring plan may be adjusted based on evaluation of prior results.

ANNUAL SAMPLING EVENT

QUARTERLY SAMPLING EVENTS

AField parameters include dissolved oxygen, pH, conductivity, temperature, turbidity, and oxidation-reduction

TABLE 4

UIC AND PERFORMANCE MONITORING PLAN

Jay's Professional Dry Cleaners and Laundry Jacksonville, Duval County, Florida

Facility Identification Number ERIC_4521

Well Identification Location

Screen Interval (feet)

FN: Table 4 UIC Sampling Table Page 1 of 1

X

X

X X X X X X X

X X

XXX

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXX

X

X X

X X

X X

X X

X

JAY'S

DRY CLEANERS

MW001

23.44

MW002

23.57

MW003

23.71

MW005

NM

MW006

NM

MW007

NM MW008

23.93 23.60

23.80

23.60

23.80

BUILDING

in

FDEP-DC008

Control No.

FDEP-DC008-U003

FIGURE

2021-09-30

BCL

RFM

MCC

JCB

JAY'S CLEANERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FACILITY ID#: ERIC-4521

FL. DEPT. OF ENVIRONMENTAL PROTECTION

POTENTIOMETRIC MAP - SHALLOW ZONE OF THE SURFICIAL

AQUIFER

(SEPTEMBER 13, 2021)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F

D

EP

\F D

EP

-D

C \D

C N o

Ja y' s

C le an er s\ U

Se pt

R pt \A ct iv e D ra w in gs

Fi le

N am e:

F

D

EP

-D C

8-

U

3.

dw g

SCALE

0 30 60

FEET

LEGEND

REFERENCE(S)

X X X

23.53

(DASHED WHERE INFERRED)

FENCE

TREELINE

DITCH

PROPERTY BOUNDARY

1.) SITE MAP BY HARDING ESE, MACTEC COMPANY DATED MARCH

2001.

GROUNDWATER ELEVATION

GROUNDWATER CONTOUR INTERVAL

ESTIMATED GROUNDWATER FLOW

DIRECTION

SHALLOW MONITORING WELL LOCATION

NOT MEASUREDNM

AutoCAD SHX Text

MALL

AutoCAD SHX Text

SAN JOSE BOULEVARD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT

AutoCAD SHX Text

CROWN POINT COURT

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

POND

AutoCAD SHX Text

MALL

AutoCAD SHX Text

POND

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

MERCHANT'S WALK

AutoCAD SHX Text

SHOPPING CENTER

AutoCAD SHX Text

CROWN POINT

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

DAY CARE

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

X

X X X X X X X

X X

XXX

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXX

X

X X

X X

X X

X X

X

JAY'S

DRY CLEANERS

MW009

24.12

MW011

24.05

MW012

24.11

24.10

24.05

24.05

24.10

BUILDING

in

FDEP-DC008

Control No.

FDEP-DC008-U004

FIGURE

2021-09-30

BCL

RFM

MCC

JCB

JAY'S CLEANERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

POTENTIOMETRIC MAP - INTERMEDIATE ZONE OF THE

SURFICIAL AQUIFER

(SEPTEMBER 13, 2021)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F

D

EP

\F D

EP

-D

C \D

C N o

Ja y' s

C le an er s\ U

Se pt

R pt \A ct iv e D ra w in gs

Fi le

N am e:

F

D

EP

-D C

8-

U

4.

FEET

LEGEND

REFERENCE(S)

X X X

23.21

(DASHED WHERE INFERRED)

FENCE

TREELINE

DITCH

PROPERTY BOUNDARY

1.) SITE MAP BY HARDING ESE, MACTEC COMPANY DATED MARCH

2001.

GROUNDWATER ELEVATION

GROUNDWATER CONTOUR INTERVAL

ESTIMATED GROUNDWATER FLOW

DIRECTION

INTERMEDIATE MONITORING WELL LOCATION

AutoCAD SHX Text

MALL

AutoCAD SHX Text

SAN JOSE BOULEVARD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT

AutoCAD SHX Text

CROWN POINT COURT

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

POND

AutoCAD SHX Text

MALL

AutoCAD SHX Text

POND

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

MERCHANT'S WALK

AutoCAD SHX Text

SHOPPING CENTER

AutoCAD SHX Text

CROWN POINT

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

DAY CARE

AutoCAD SHX Text

GRASS

X

X X X X X X X

X X

XXX

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXX

X

X X

X X

X X

X X

X

JAY'S

DRY CLEANERS

MW001

MW002

MW003

MW005

MW006

MW007

MW008

BUILDING

in

FDEP-DC008

Control No.

FDEP-DC008-U005

FIGURE

2021-09-30

BCL

RFM

MCC

JCB

JAY'S CLEANERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

GROUNDWATER ANALYTICAL RESULTS

SHALLOW ZONE OF THE SURFICIAL AQUIFER

(SEPTEMBER 2021)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

: C :\U se rs

\b lu ce ro

\A pp

D at a\ R oa m in g\

G C

D S_ us er

\T em p- D w g\

Ac Pu bl is h_

2\

F ile N am e:

F D

EP

-D

C

8- U

5.

FEET

LEGEND

X X X FENCE

DITCH

PROPERTY BOUNDARY

SHALLOW MONITORING WELL LOCATION

ANALYTICAL DATA LEGEND

REFERENCE(S)

1.) SITE MAP BY HARDING ESE, MACTEC

COMPANY DATED MARCH 2001.

MW008

3/25/19 11/12/15 03/13/20 09/13/21

0.22 U 0.36 U 0.22 U 0.38 U

6.5 2.5 2.8 1.6 10 20 10 6.3

0.36 U 0.24 U 0.36 U 0.39 U

MW007

3/25/19 03/13/20 02/15/21 09/13/21 28 27 2.6 0.38 U 13 18 7.� 0.36 U

4.1 6.4 13.2 0.57 I

0.36 U 0.36 0.39 U 0.39 U

MW002

1/31/18 3/25/19 03/13/20 09/13/21

0.44 I 0.22 U 0.22 U 0.38 U

0.54 I 0.36 U 0.38 I 0.36 U

0.54 I 0.36 U 0.36 I 0.27 U

0.36 U 0.36 U 0.36 U 0.39 U

MW001

3/25/19 03/13/20 02/15/21 09/13/21 77 25 1.0 1.6 120 150 5�.3 �2.0 90 95 60.6 38.8

1.8 U 0.99 I 0.54 I 0.39 U

MW003

3/25/19 03/13/20 02/15/21 09/13/21

3.7 0.84 I 0.44 I 0.53 I 26 21 11.3 10.5 33 21 23.5 19.5

0.41 I 0.45 I 0.55 I 0.39 U

MW005

8/24/01 11/12/15 2/15/21

1.0 U 0.36 U 0.38 U

1.0 U 0.29 U 0.36 U

1.0 U 0.24 U 0.27 U

1.0 U 0.24 U 0.39 U

MW006

11/12/15

0.36 U

0.29 U

0.24 U

0.24 U

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER

(µg/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER

CHAPTER 62-777, TABLE I, OF THE FLORIDA ADMINISTRATIVE

CODE.

3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF

THE APPLICABLE GCTL.

4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT

NOT DETECTED.

5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL

QUANTITATION LIMIT.

6.) CVOCs - CHLORINATED VOLATILE ORGANIC COMPOUNDS.

cis-1,2-DICHLOROETHENE (cis-1,2-DCE)

TRICHLOROETHENE (TCE)

TETRACHLOROETHENE (PCE)

MW-007

6/26/14

MONITORING WELL I.D.

SAMPLE DATE

VINYL CHLORIDE (VC)

GCTLs

ESTIMATED EXTENT OF

GROUNDWATER CONCENTRATIONS

OF CVOCs EXCEEDING THE GCTLs

NOTE(S)

AutoCAD SHX Text

MALL

AutoCAD SHX Text

SAN JOSE BOULEVARD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT

AutoCAD SHX Text

CROWN POINT COURT

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

POND

AutoCAD SHX Text

MALL

AutoCAD SHX Text

POND

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

MERCHANT'S WALK

AutoCAD SHX Text

SHOPPING CENTER

AutoCAD SHX Text

CROWN POINT

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

DAY CARE

AutoCAD SHX Text

GRASS

X

X X X X X X X

X X

XXX

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXX

X

X X

X X

X X

X X

X

JAY'S

DRY CLEANERS

MW009

MW011

MW012

BUILDING

in

FDEP-DC008

Control No.

FDEP-DC008-U006

FIGURE

2021-09-30

BCL

RFM

MCC

JCB

JAY'S CLEANERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

GROUNDWATER ANALYTICAL RESULTS

INTERMEDIATE ZONE OF THE SURFICIAL AQUIFER

(SEPTEMBER 2021)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

\g ol de r.g ds

\c om pl ex da ta

\O ffi ce \J ac ks on vi lle \d ra fti ng \F ile \F

D

EP

\F D

EP

-D

C \D

C N o

Ja y' s

C le an er s\ U

Se pt

R pt \A ct iv e D ra w in gs

Fi le

N am e:

F

D

EP

-D C

8-

U

6.

FEET

LEGEND

X X X FENCE

DITCH

PROPERTY BOUNDARY

ANALYTICAL DATA LEGEND

REFERENCE(S)

1.) SITE MAP BY HARDING ESE, MACTEC

COMPANY DATED MARCH 2001.

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER

(µg/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER

CHAPTER 62-777, TABLE I, OF THE FLORIDA ADMINISTRATIVE

CODE.

3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF

THE APPLICABLE GCTL.

4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT

NOT DETECTED.

5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL

QUANTITATION LIMIT.

6.) CVOCs - CHLORINATED VOLATILE ORGANIC COMPOUNDS.

cis-1,2-DICHLOROETHENE (cis-1,2-DCE)

TRICHLOROETHENE (TCE)

TETRACHLOROETHENE (PCE)

MW-007

6/26/14

MONITORING WELL I.D.

SAMPLE DATE

VINYL CHLORIDE (VC)

GCTLs

ESTIMATED EXTENT OF

GROUNDWATER CONCENTRATIONS

OF CVOCs EXCEEDING THE GCTLs

NOTE(S)

INTERMEDIATE MONITORING WELL LOCATION

MW009

1/31/18 3/25/19 03/13/20 09/13/21

5.2 1.3 3.6 0.38 U 22 5.5 41 3.8 34 3.3 130 5.3

0.36 U 0.36 U 0.36 U 0.39 U

MW012

1/31/18 3/25/19 03/13/20 09/13/21

0.22 U 0.22 U 0.22 U 0.38 U

0.84 I 1.2 1.6 0.36 U

8.9 9.8 9.2 5.9

2.7 2.4 3.2 0.41 I

MW011

1/31/18 3/25/19 03/13/20 09/13/21

0.22 U 0.22 U 0.22 0.38 U

0.36 U 0.36 U 0.36 0.36 U

1.2 1.1 2.4 1.4

0.36 U 0.36 U 0.36 U 0.39 U

AutoCAD SHX Text

MALL

AutoCAD SHX Text

SAN JOSE BOULEVARD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT

AutoCAD SHX Text

CROWN POINT COURT

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

POND

AutoCAD SHX Text

MALL

AutoCAD SHX Text

POND

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

MERCHANT'S WALK

AutoCAD SHX Text

SHOPPING CENTER

AutoCAD SHX Text

CROWN POINT

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

DAY CARE

AutoCAD SHX Text

GRASS

From: Fred Portofe To: Mongillo, Ralph Cc: Madison Rogers; Roger Pragle; Crews, Matt Subject: RE: Investigative Derived Waste Drum Costs for Transportation and Disposal at a Regulated Facility Date: Wednesday, March 9, 2022 9:33:38 AM Attachments: F0152F28A2B5418EBC7A4FD870EC8D28.png

AD282F6C3391468088CDA42829B8E703.png A719914B10184314957B0CA910CA8D14.png F1DF3C4322764E8A9076F1ADFF76864A.png 3409DF389C3B4156BA232DDC85C60E09.png

EXTERNAL EMAIL

EXTERNAL EMAIL - We could not verify the authenticity of this message. Please be cautious when clicking on links or opening attachments.

Ralph

We are not going to provide annual Pricing for the Statewide Contract . After reviewing the scope with my partners and the variability with respect to disposal costing and ever changing fuel costs, we feel we can not bid this work given the current uncertainty in the market. We would be please to bid this work on a casa by case basis.

Fred G. Portofe, PG President of Environmental Services (Professional Geologist in FL, GA, AL, MS, TX, SC, NC, TN, IN, LA, WI and AK) M & D Industrial Services, LLC 5896 Azalea Street Port Orange, Florida 32127 Email: Fportofe@mdindustrialservices.com Website: mdindustrialservices.com Cell: 813-951-1012 Emergencies: 888-307-2790

Sent from Mail for Windows

From: Mongillo, Ralph Sent: Tuesday, March 8, 2022 12:46 PM To: Fred Portofe Cc: Madison Rogers; Roger Pragle; Eddy Mendoza; Crews, Matt mailto:fportofe@mdindustrialservices.com mailto:ralph.mongillo@wsp.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:matt.crews@wsp.com mailto:Fportofe@mdindustrialservices.com https://nam10.safelinks.protection.outlook.com/?url=http%3A%2F%2Fmdindustrialservices.com%2F&data=04%7C01%7Cmculbreth%40ectinc.com%7Cbfdc4a6d2ce945e1eaf008d9dcf8eabf%7C911eb1cc54d34d8ca5773bf3ccc8105c%7C0%7C0%7C637783784008834159%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000&sdata=ntkZP1OGe7McYRA722JXtcGwkbgN9EEhQtSgBSKqC3E%3D&reserved=0 https://go.microsoft.com/fwlink/?LinkId=550986 mailto:Ralph_Mongillo@golder.com mailto:fportofe@mdindustrialservices.com mailto:mrogers@mdindustrialservices.com mailto:rpragle@mdindustrialservices.com mailto:emendoza@mdindustrialservices.com mailto:Matt_Crews@golder.com