Attachment 2 - Drawings.pdf

PDF 657 KB Posted

Attached to
Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Solicitation number
FA461326R0003
Issued by

About this file

This is an architectural floor plan drawing for Building 65 at F.E. Warren Air Force Base. The document depicts a First Floor Remodel Plan for the Telephone Office area, prepared by the 90th Civil Engineer Squadron (90th CES) under project number GHLN26-7290 with work request number WRN-B-985. The plan is drawn at a scale of 1/8" = 1'-0" and was issued on March 25, 2026, with the file dated the same day.

The plan shows the renovation layout of the telephone office space with various room designations, including corridors, offices, and equipment areas marked with room numbers. Red lines indicate construction elements and modifications, while hatched areas denote specific flooring or finishes. The drawing includes general notes and flag notes addressing construction requirements, material specifications, lighting fixtures, electrical systems, and other installation details. Two blue-outlined stairwells are visible on the plan. The document specifies the use of 2' x 4' LED ceiling light fixtures as indicated in the legend. This working design drawing is one component of the design documentation package for the Building 65 telephone office renovation project at F.E. Warren AFB in Cheyenne, Wyoming, managed by the Civil Engineer Squadron's Engineering and Maintenance division.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA OF WORK

PR

O

JE

C

T N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

D

AT

E

W O

R K

R

EQ

U

ES

T N

O

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

AN

SI

D th

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

F.

E.

W

AR

R

EN

A

FB

G

LO

BA

L

ST

R

IK

E th

C

ES

C

EN

M

E

VE

SL

E

D R

C

H

EY

EN

N

E W

Y

OF

FI

LE

N

AM

E:

PLAN NORTH

TN

TN = TRUE NORTH

T:

\7

0-

C

EN

\7

0-

PR

O

JE

C

TS

\F Y2

6\

G H

LN

-7

Bl dg . 6

- R en ov at e

Te le ph on e O ffi ce a re a\ 2.

D es ig n\

2.

W or ki ng

D es ig n\

Bl dg

.6

- F irs t F lo or R em od el P la n.

dw g

Bl dg

.6

- F irs t F lo or R em od el P la n.

dw g

PL

O

T D

AT

E:

/2

5/

:2 9:

P

M

W R

N

B

- 9

G H

LN

-7

-2

5-

C D

R

C D

R

C D

R

AX1

BLDG. 65

1 1

0 8'4' 16'SCALE: 1/8" = 1'-0"

FIRST FLOOR REMODEL PLAN

AutoCAD SHX Text up

AutoCAD SHX Text up

AutoCAD SHX Text dn

AutoCAD SHX Text up

AutoCAD SHX Text up

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text D.F.

AutoCAD SHX Text 5H

AutoCAD SHX Text 129 s.f.

AutoCAD SHX Text 5D

AutoCAD SHX Text 67 s.f.

AutoCAD SHX Text 5I

AutoCAD SHX Text 130 s.f.

AutoCAD SHX Text 5G

AutoCAD SHX Text 51 s.f.

AutoCAD SHX Text 5F

AutoCAD SHX Text 254 s.f.

AutoCAD SHX Text 5E

AutoCAD SHX Text 670 s.f.

AutoCAD SHX Text 5B

AutoCAD SHX Text 245 s.f.

AutoCAD SHX Text 5A

AutoCAD SHX Text 413 s.f.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 39 s.f.

AutoCAD SHX Text 107 s.f.

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 105 s.f.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FLAG NOTES

AutoCAD SHX Text

1. DEMOLISH EXISTING GLUE DOWN CARPETING AND 4" HIGH VINYL BASE. DEMOLISH EXISTING GLUE DOWN CARPETING AND 4" HIGH VINYL BASE. PREP. WOOD SUBFLOOR TO RECEIVE NEW CARPET TILE FLOORING. ALSO, PROVIDE 4" HIGH RUBBER COVE BASE. TYP. IN HATCHED AREAS. 2. DEMOLISH EXISTING VCT FLOORING. PREP. WOOD SUBFLOOR TO RECEIVE DEMOLISH EXISTING VCT FLOORING. PREP. WOOD SUBFLOOR TO RECEIVE NEW CARPET TILE. ALSO, PROVIDE 4" HIGH RUBBER COVE BASE. TYP. IN HATCHED AREA. 3. DEMOLISH ENTIRE GYP. BD. PARTITION. DEMOLISH ENTIRE GYP. BD. PARTITION. 4. PATCH EXISTING WALL TO MATCH ADJACENT CONSTRUCTION UPON PATCH EXISTING WALL TO MATCH ADJACENT CONSTRUCTION UPON COMPLETION OF DEMO. WORK. 5. PATCH WALL TO FILL IN EXISTING DOOR OPENING. MATCH EXISTING PATCH WALL TO FILL IN EXISTING DOOR OPENING. MATCH EXISTING ADJACENT CONSTRUCTION. MATCH ADJACENT WALL TEXTURE. PRIME AND 2 COATS OF PAINT ON ENTIRE WALL. 6. PAINT ENTIRE H.M. DOOR AND FRAME. PAINT ENTIRE H.M. DOOR AND FRAME. 7. REMOVE WOOD PANEL WAINSCOT AND VINYL WALL COVERING FROM ALL REMOVE WOOD PANEL WAINSCOT AND VINYL WALL COVERING FROM ALL WALLS IN THIS ROOM. PREP., PRIME AND TEXTURE WALLS AND PROVIDE 2 COATS OF PAINT. 8. MOVE DUPLEX RECEPTACLE TO EXIST. WALL APPROX. 3' TO THE SOUTH MOVE DUPLEX RECEPTACLE TO EXIST. WALL APPROX. 3' TO THE SOUTH OF WALL BEING DEMOLISHED. 9. CAREFULLY REMOVE, SALVAGE AND REINSTALL TOILET PARTITION UPON CAREFULLY REMOVE, SALVAGE AND REINSTALL TOILET PARTITION UPON COMPLETION OF THE FINISH WORK. 10. PROVIDE DOOR CLOSER SUCH AS LCN 4040XP. DEMO. EXISTING CLOSER. PROVIDE DOOR CLOSER SUCH AS LCN 4040XP. DEMO. EXISTING CLOSER. ADJUST EXISTING WOOD DOOR AND HARDWARE SO DOOR CLOSES PROPERLY. STAIN AND FINISH DOOR TO MATCH EXIST. FINISH. 11. DEMOLISH SHEET VINYL FLOOR. PREP. FLOOR AND PROVIDE LVP FLOORING. DEMOLISH SHEET VINYL FLOOR. PREP. FLOOR AND PROVIDE LVP FLOORING. 12. DEMOLISH PINK WALL TILE WAINSCOT AND GYP. BD. TO 4' HIGH OFF OF DEMOLISH PINK WALL TILE WAINSCOT AND GYP. BD. TO 4' HIGH OFF OF ALL WALLS. PROVIDE CEMENT TILE BACKER BOARD AND PROVIDE PORCELAIN STONE WALL TILES, STAINLESS STEEL SCHLUTER COVE BASE TRIM AND STAINLESS STEEL BULLNOSE SCHLUTER TRIM ALONG TOP OF 4' HIGH TILE WAINSCOT, TYP. 13. CAREFULLY REMOVE AND SALVAGE EXISTING LAVATORY. DEMOLISH EXISTING CAREFULLY REMOVE AND SALVAGE EXISTING LAVATORY. DEMOLISH EXISTING VANITY CABINET. PROVIDE NEW PLASTIC LAMINATE CABINET AND REMOVEABLE ACCESS PANEL, SIMILAR TO EXISTING CABINET IN SIZE AND CONSTRUCTION. PROVIDE SOLID SURFACE COUNTERTOP AND 4" HIGH BACKSPLASH, "SEAGROVE" COASTAL COLLECTION BY CAMBRIA OR APPROVED EQUAL. REINSTALL SALVAGED SINK. PROVIDE CAULKING AROUND PERIMETER OF COUNTERTOP AND ALONG 4" HIGH BACKSPLASH. 14. REMOVE BROKEN CLEAR PLASTIC KICKPLATE AND PROVIDE NEW. MATCH REMOVE BROKEN CLEAR PLASTIC KICKPLATE AND PROVIDE NEW. MATCH TYPE AND SIZE OF EXISTING BROKEN KICKPLATE. 15. REMOVE CRACKED AND LOOSE PLASTER FROM ALL WALLS. PATCH ALL REMOVE CRACKED AND LOOSE PLASTER FROM ALL WALLS. PATCH ALL PLASTER WALLS IN ENTIRE STAIRWAY FROM CEILING TO BOTTOM FLOOR. PRIME, TEXTURE, AND PAINT ALL WALLS, CEILING AND UNDER ALL LANDINGS AND SIDES OF LANDINGS. 16. EXISTING PAINTED MURAL TO REMAIN. PAINT ENTIRE WALL AROUND IT. EXISTING PAINTED MURAL TO REMAIN. PAINT ENTIRE WALL AROUND IT. 17. DEMOLISH EXISTING RUBBER TREADS, RISERS AND LANDING STRIP DEMOLISH EXISTING RUBBER TREADS, RISERS AND LANDING STRIP CARPETS. PREP. FLOORS AND PROVIDE NEW RUBBER TREADS, RISERS, STRINGERS AND LANDINGS. 18. DEMOLISH EXISTING H.M. DOOR AND DOOR FRAME. SALVAGE EXISTING DEMOLISH EXISTING H.M. DOOR AND DOOR FRAME. SALVAGE EXISTING LOCKSET AND EXIT DEVICE FOR REINSTALLATION IN NEW DOOR. PROVIDE 5 PANEL, H.M. INSULATED DOOR, WITH THE SECOND PANEL FROM THE TOP BEING " TEMPERED, INSULATED GLASS. MATCH PROFILE OF NEW DOOR 12" TEMPERED, INSULATED GLASS. MATCH PROFILE OF NEW DOOR WITH EXISTING 5 PANEL BATHROOM DOOR. PROVIDE 1-1/2 PR. BALL BEARING STEEL HINGES, PEMKO S88 PERIMETER WEATHERSTRIPPING, THERMALLY BROKEN ALUMINUM THRESHOLD, SUCH AS PEMKO 253_FG SERIES. CONTRACTOR TO MATCH EXISTING THRESHOLD SIZE. PROVIDE A DOOR BOTTOM SWEEP SUCH AS PEMKO 307 SERIES. HARDWARE FINISHES TO MATCH EXISTING SALVAGED EXIT DEVICE. PROVIDE A DOOR CLOSER CONFORMING TO ANSI/BHMA A156.4 GRADE 1, ISO 9000 CERTIFIED CLOSER SUCH AS LCN 4040XP OR APPROVED EQUAL. PATCH EXISTING BRICK TO MATCH EXISTING ADJACENT. STEP BRICK PATCH TO BLEND IN WITH EXISTING ADJACENT BRICK, TYP. 19. REMOVE GYP. BD. THAT IS COVERING UP EXISTING WINDOW. PATCH GYP. REMOVE GYP. BD. THAT IS COVERING UP EXISTING WINDOW. PATCH GYP. BD. AROUND THE PERIMETER OF WINDOW JAMBS. TEXTURE, PRIME AND PAINT ALL GYP. BD. CLEAN GLASS ON WINDOW. 20. DEMOLISH EXISTING SUSPENDED ACOUSTICAL CEILING SYSTEM AND 2 X 4 DEMOLISH EXISTING SUSPENDED ACOUSTICAL CEILING SYSTEM AND 2 X 4 LIGHTS. PROVIDE 2' X 2' SUSPENDED ACOUSTICAL TEGULAR CEILING PANELS AND GRID. PROVIDE 2' X 4' LED CEILING LIGHTS SUCH AS LITHONIA STACK TROFFER ALO6 SWW7 OR APPROVED EQUAL. 21. DEMOLISH EXISTING WOOD DOOR, WOOD DOOR FRAME AND HARDWARE. DEMOLISH EXISTING WOOD DOOR, WOOD DOOR FRAME AND HARDWARE. PROVIDE NEW SOLID RED OAK, 5 PLY, FLUSH DOOR AND OAK DOOR FRAME. INTENT IS TO MATCH EXISTING SIZE. STAIN AND FINISH WOOD DOOR AND FRAME. PROVIDE 1-1/2 PAIR BALL BEARING STEEL HINGES, LEVER LOCKSET ENTRY FUNCTION, ANSI / BHMA A156.2 SERIES 4000, GRADE 1 U.L. LISTED FOR 3 HOUR FIRE DOORS. 22. CONNECT ALL CEILING LIGHTS TO THE EXISTING LIGHT SWITCH AT THIS CONNECT ALL CEILING LIGHTS TO THE EXISTING LIGHT SWITCH AT THIS LOCATION. 23. DEMOLISH EXISTING WOOD DOOR, FRAME AND HARDWARE. PATCH WALL DEMOLISH EXISTING WOOD DOOR, FRAME AND HARDWARE. PATCH WALL OPENING TO MATCH EXISTING ADJACENT CONSTRUCTION. PRIME, TEXTURE, PRIME AND PROVIDE 2 COATS OF PAINT ON ENTIRE WALL. 24. EXISTING LIGHT SWITCH TO REMAIN AT THIS LOCATION. CHANGE TO A EXISTING LIGHT SWITCH TO REMAIN AT THIS LOCATION. CHANGE TO A SINGLE GANG BOX. HALLWAY LIGHT SWITCH TO REMAIN. 25. CAREFULLY REMOVE, SALVAGE AND REINSTALL TOILET AND URINAL UPON CAREFULLY REMOVE, SALVAGE AND REINSTALL TOILET AND URINAL UPON COMPLETION OF FINISH WORK AS REQUIRED. PROVIDE CAULKING AROUND THE PERIMETER OF THE TOILET BASE AND AROUND PERIMETER OF URINAL. 26. PROVIDE 2' X 4' LED CEILING LIGHTS IN THIS ROOM. PROVIDE 2' X 4' LED CEILING LIGHTS IN THIS ROOM.

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text A. ALL EXISTING FURNITURE WILL BE MOVED BY THE GOVERNMENT ALL EXISTING FURNITURE WILL BE MOVED BY THE GOVERNMENT TO GIVE CONTRACTOR ACCESS TO THE SPACES TO PERFORM THE WORK UNLESS NOTED OTHERWISE. B. THE CONTRACTOR SHALL PATCH ALL HOLES IN WALLS. PREP. THE CONTRACTOR SHALL PATCH ALL HOLES IN WALLS. PREP. ALL WALLS IN HATCHED AREAS TO RECEIVE 2 COATS OF PAINT. C. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, QUANTITIES CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, QUANTITIES AND EXISTING CONSTRUCTION PRIOR TO BIDDING. D. CONTRACTOR SHALL COORDINATE DOOR HARDWARE CONTRACTOR SHALL COORDINATE DOOR HARDWARE REQUIREMENTS WITH THE GOVERNMENT. E. THE WORK ON THIS PROJECT WILL NEED TO BE PHASED IN 2 THE WORK ON THIS PROJECT WILL NEED TO BE PHASED IN 2 PARTS SO THAT FURNITURE AND EQUIPMENT MAY BE MOVED AROUND BY THE GOVERNMENT. CONTRACTOR TO COORDINATE PHASING WITH THE GOVERNMENT. F. CONTRACTOR SHALL INCLUDE IN HIS BID, 15 ADDITIONAL GYP. CONTRACTOR SHALL INCLUDE IN HIS BID, 15 ADDITIONAL GYP. BD. PATCHES WHERE ELECTRICAL BOXES ARE NO LONGER BEING USED AND ARE CURRENTLY COVERED UP BY A COVER PLATE. COVER PLATE SHALL BE REMOVED, AND GYP. BD. PATCHED. COORDINATE EXACT LOCATIONS OF THESE PATCHES WITH THE GOVERNMENT.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

NEW 2' X 4' LED CEILING LIGHT FIXTURE

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .