Attachment 10 - AF Form 66 Template - 16 Feb 22.xls

Air Force Form Feb 16, 2022 XLS spreadsheet 166 KB Posted

Attached to
Airmen's Lounge Renovation - Bldg700 - Luke AFB
Solicitation number
FA488722R0002
Issued by

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
Solicitation Amendment FA488722R00020003 SF 30.pdf PDF
Attachment 6 - Section L Instructions to Offerors - 25 Mar 22.pdf PDF
Solicitation Amendment FA488722R00020002 SF 30.pdf PDF
Attachment 1 - SOW - 17 Mar 22.pdf PDF
Solicitation Amendment - FA488722R00020001.pdf PDF
01 - All RFIs MARCH 17 2022 - 22R0002.xlsx XLSX spreadsheet
Attachment 9 - AF Form 3064 Template - 16 Feb 22.xlsx XLSX spreadsheet
Attachment 6 - Section L Instructions to Offerors - 16 Feb 22.pdf PDF
Attachment 3 - Kitchen New Layout - 12 Nov 21.pdf PDF
Attachment 14 - Teaming Partner Consent Letter Template - 16 Feb 22.pdf PDF
Attachment 1 - SOW - 12 Nov 21.pdf PDF
Attachment 11 - Present Past Performance Information - 16 Feb 22.pdf PDF
Attachment 15 - 014500 Contractor Quality Control - 16 Feb 22.pdf PDF
Attachment 13 - Present Past Performance Questionnaire - 16 Feb 22.pdf PDF
Attachment 7 - Section M Evaluation Criteria - 16 Feb 22.pdf PDF
Solicitation - FA488722R0002.pdf PDF
Attachment 16 - 010700 Safety Requirements - 16 Feb 22.pdf PDF
Attachment 5 - NAF Clauses - 22 Jan 21.pdf PDF
Attachment 12 - Present Past Performance Questionnaire Cover -17 Feb 22.pdf PDF
Attachment 4 - WD AZ20220031 - 25 Feb 22.pdf PDF
Attachment 8 - RFI Template - 16 Feb 22.xlsx XLSX spreadsheet
Attachment 2 - Site Map - 14 May 16.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Spec Sort

PROJECT NUMBERPROJECT TITLESOLICITATION / CONTRACT NO.
DATE:SCHEDULE OF MATERIAL SUBMITTALSPROJECT TITLEFA488722R0002 - Attachment 10
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NO.ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATIONOF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACUTER'SRECOMMENDATIONSMANUFACUTER'SWARRANTYCATALOG DATAOPERATINGINSTRUCTIONSOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RE- SUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
Safety Program5 Days
1[01070, 1.02, A]after
Safety RequirementsNTP
Preliminary Network5 Days
2[01310, 1.02, A, 1]after
Construction Progress ScheduleNTP
Network Analysis5 days
3[01310, 1.02, A, 2]after
Construction Progress ScheduleNTP
Construction Progress5 Days
4[01310, 1.02, A, 3]after
Construction Pregress ScheduleNTP
Network Analysis Software5 Days
5[01310, 1.02, A, 4]after
Construction Progress ScheduleNTP
Quality Control Plan5 Days
6[01450, 1.03, A, 1]after
Contractor Quality ControlNTP
QC Manager Qualifications5 Days
7[01450, 1.03, A, 2]after
Contractor Quality ControlNTP
Final Inspection requestDate of
8[01700, 1.03, A]Substancial
Contract CloseoutCompletion
Utlity Outages
9[01800, 1.04, A]See Specs
Special Conditions
Asbestos Certifications5 Days
10[02080, 1.05 A]after
Asbestos AbatementNTP
Asbestos Licenses5 days
11[02080, 1.05, B]after
Asbestos AbatementNTP
Testing Laboratory
12[02080, 1.05, C]See Specs
Asbestos Abatement
Industrial Hygienest
13[02080, 1.05, D]See Specs
Asbestos Abatement
Asbestos Inventory
14[02080, 1.05, E]See Specs
Asbestos Abatement
Asbestos Removal Plan5 days
15[02080, 1.05, F]after
Asbestos AbatementNTP
Decontamination Enclosures5 days
16[02080, 1.05, G]after
Asbestos AbatementNTP
Asbestos Safety Plan5 days
17[02080, 1.05, H]after
Asbestos AbatementNTP
Asbstos Waste Disposal5 days
18[02080, 1.05, I]after
Asbestos AbatementNTP
Permits5 days
19[02080, 1.05, J]after
Asbestos AbatementNTP
Notifications5 days
20[02080, 1.05, K]after
Asbestos AbatementNTP
Field Sample Test Results5 days
21[02080, 1.05, L]after
Asbestos AbatementNTP
Work Completion Report5 days
22[02080, 1.05, M]after
Asbestos AbatementNTP
Records of Inspection5 days
23[02080, 1.05, N]after
Asbestos AbatementNTP
24
Removal Plan
25[02090, 1.02, A, 1]
Lead Paint Abatement
Stamped Drawings
26[02090, 1.02, A, 2]
Lead Paint Abatement
Approved air permit
27[2090, 1.02, A, 3]
Lead Paint Abatement
Ambient Air Program
28[2090, 1.02, B]
Lead Paint Abatement
Exposure Monitoring
29[02090, 1.02, C,1]
Lead Paint Abatement
Compliance Program
30[02090, 1.02, C, 2]
Lead Paint Abatement
Respiratory Protection Program
31[02090, 1.02, 2, 3
Lead Paint Abatement
Protective Work Clothing
32[02090, 1.02, C, 4]
Lead Paint Abatement
Housekeeping
33[02090, 1.02, C, 5]
Lead Paint Abatement
Hygiene Facilities and Practices
34[02090, 1.02, C, 6]
Lead Paint Abatement
Medical Surveillance Program
35[02090, 1.02, C, 7]
Lead Paint Abatement
Employee Training
36[02090, 1.02, C, 8]
Lead Paint Abatement
Hazard Communication
37[02090, 1.02, C, 9]
Lead Paint Abatement
Employee Access to Records
38[02090, 1.02, C, 10
Lead Paint Abatement
Signs
39[02090, 1.02, C, 11]
Lead Paint Abatement
Handling and Site Storage
40[02090, 1.02, D, 1]
Lead Paint Abatement
Sampling and Testing of Debris
41[02090, 1.02, D, 2]
Lead Paint Abatement
Transportation
42[02090, 1.02, D, 3]
Lead Paint Abatement
Disposal
43[02090, 1.02, D, 4]
Lead Paint Abatement
Clearance Testing
44[02090, 1.02, E]
Lead Paint Abatement
Reportable Releases
45[02090, 1.02, F]
Lead Paint Abatement
Security Documentation
46[02090, 1.02, G]
Lead Paint Abatement
Materials List
47[02090, 1.02, H]
Lead Paint Abatement
Work Schedule
48[02090, 1.02, I]
Lead Paint Abatement
Previous Work Experience
49[02090, 1.02, J]
Lead Paint Abatement
Radioactive Materials Permit
50[02090, 1.02, K]
Lead Paint Abatement
Copy of all required permits
51[02090, 1.02, L]
Lead Paint Abatement
52
Affidavid of Vegitation Control5 days
53[02252, 1.02, A]after
Vegitation ControlNTP
Chemical Product Data5 Days
54[02281, 1.02, B]after
Termite ControlNTP
Certification of Test5 Days
55[02675, 1.02, A]after
Disinfection of Water SystemNTP
Bacteriological Report5 days
56[02675, 1.02, B]after
Disinfection of Water Systemsampling
Disinfection Report5 days
57[02675, 1.02, C]after
Disinfection of Water SystemNTP
Chain of Custody Records5 days
58[02675, 1.02, D]after
Disinfection of Water SystemNTP
Data, catalog cut5 days
59[02698, 1.03, A]after
Prefabricated U/G Dist SystemNTP
Shop Drawings5 days
60[02698, 1.03, B]after
Prefabricated U/G Dist SystemNTP
Manufacturer's Certificate5 days
61[02698, 1.03, C]after
Prefabricated U/G Dist SystemNTP
O & M Manuals5 days
62[02698, 1.03, D]after
Prefabricated U/G Dist SystemNTP
Component Product Data5 days
63[02811, 1.02, B]after
Landscape IrrigationNTP
Irrigation System Shop Drawings5 Days
64[02811, 1.02, C]after
Landscape IrrigationNTP
As-Built Record DrawingsDate of
65[02811, 1.02, D]Substantial
Landscape IrrigationCompletion
O&M ManualsDate of
66[02811, 1.02, E]Substantial
Landscape IrrigationCompletion
Landscape Planting Shop Drawings5 Days
67[02900, 1.02, A]after
LandscapingNTP
Certificates5 Days
68[02900, 1.02, B]after
LandscapingNTP
Concrete Form Shop Drawings5 Days
69[03100, 1.02, B]after
Concrete FormworkNTP
Product data5 Days
70[03100, 1.02, C]after
Concrete FormworkNTP
Concrete Shop Drawings5 Days
71[03200, 1.02, B]after
Concrete ReinforcementNTP
Mill Test Report5 Days
72[03200, 1.02, C]after
Concrete ReinforcementNTP
Product data on Accessory Items]5 Days
73[03300, 1.02, B]after
Cast-in-Place ConcreteNTP
Samples, Exp/Cont Joints5 Days
74[03300, 1.02, C]after
Cast-in-Place ConcreteNTP
Record DocumentsDate of
75[03300, 1.02, D]Substantial
Cast-in-Place ConcreteCompletion
Mix Designs, Mortar and Grout5 Days
76[04100, 1.02, B]after
Mortar and Masonry GroutNTP
Samples, Mortar Channels5 Days
77[04100, 1.02, C]after
Mortar and Masonry GroutNTP
Test Reports, as required5 days
78[04100, 1.02, D]after
Mortar and Masonry GroutTest
Samples5 Days
79[04220, 1.02, B]after
Concrete Unit masonryNTP
Certification, Certified Block Pgm5 Days
80[04220, 1.02, C]after
Concrete Unit masonryNTP
Shop Drawings, Shop and Erection5 Days
81[05110, 1.03, B]after
Structural SteelNTP
Methods of Erection5 Days
82[05110, 1.03, C]after
Structural SteelNTP
Ceritifications5 Days
83[05110, 1.03, D]after
Structural SteelNTP
Shop and Erection Drawings5 Days
84[05310, 1.03, B]after
Steel Roof DeckNTP
Shop and Erection Drawings5 Days
85[05313, 1.02, B]after
Steel Floor DeckNTP
Product Data5 Days
86[05400, 1.02, B]after
Cold-Formed Metal FramingNTP
Shop Drawings5 Days
87[05400, 1.02, C]after
Cold-Formed Metal FramingNTP
Shop Drawings5 Days
88[05500, 1.02, B]after
Metal FabricationsNTP
Shop Drawings5 Days
89[05510, 1.02, B]after
Metal StairsNTP
Shop Drawings5 Days
90[05520, 1.02, B]after
Handrails and RailingsNTP
Shop Drawings5 Days
91[06100, 1.03, A]after
Rough CarpentryNTP
Samples, rigid sheathing5 Days
92[06100, 1.03, B]after
Rough CarpentryNTP
Product Data5 Days
93[06100, 1.03, C]after
Rough CarpentryNTP
Product Data5 Days
94[07180, 1.02, B]after
Water RepellentsNTP
Samples, Coating5 Days
95[07180, 1.02, C]after
Water RepellentsNTP
Product Data5 Days
96[07200, 1.02, B]after
InsulationNTP
Product Data5 Days
97[07270, 1.02, B]after
FirestoppingNTP
Test Reports, as required5 Days
98[07270, 1.02, C]after
FirestoppingNTP
Shop Drawings, Detail Drawings5 Days
99[07415, 1.04, A]after
Metal Roofing and Siding, Fact ColorNTP
Samples5 Days
100[07415, 1.04, B]after
Metal Roofing and Siding, Fact ColorNTP
Certificates of Compliance5 Days
101[07415, 1.04, C]after
Metal Roofing and Siding, Fact ColorNTP
Warranty5 Days
102[07600, 1.02, A]after
Flashing and Sheet MetalNTP
Product Data5 Days
103[07900, 1.02, B]after
Joint SealersNTP
Shop Drawings5 Days
104[08110, 1.03, B]after
Steel Doors and FramesNTP
Shop Drawings5 Days
105[08361, 1.02, B]after
Insulated Sectional Overhead DoorsNTP
Product Data5 Days
106[08520, 1.03, B]after
Aluminum WindowsNTP
Shop Drawings5 Days
107[08520, 1.03, C]after
Aluminum WindowsNTP
Samples5 Days
108[08520, 1.03, D]after
Aluminum WindowsNTP
Shop Drawings and Schedule5 Days
109[08712, 1.02, A]after
Door HardwareNTP
Samples5 Days
110[08712, 1.02, B]after
Door HardwareNTP
Manufacturer's Certificate5 Days
111[08712, 1.02, C]after
Door HardwareNTP
O&M ManualsDate of
112[08712, 1.02, D]Substantial
Door HardwareCompletion
Keying ScheduleDate of
113[08712, 1.02, E]Substantial
Door HardwareCompletion
Samples5 Days
114[08800, 1.03, B]after
GlazingNTP
Product Data5 Days
115[09100, 1.02, A]after
Metal Support SystemsNTP
Samples, Wall Texture5 Days
116[09250, 1.02, B]after
Gypsum BoardNTP
Product Data5 Days
117[09310, 1.02, A]after
Ceramic TileNTP
Samples, ceramic tile5 Days
118[09310, 1.02, B]after
Ceramic TileNTP
Shop Drawings, Layout5 Days
119[09510, 1.02, B]after
Acoustical CeilingsNTP
Samples, finish color5 Days
120[09510, 1.02, C]after
Acoustical CeilingsNTP
Product Data5 Days
121[09650, 1.02, B]after
Resilent FlooringNTP
Samples, Colors & Patterns5 Days
122[09650, 1.02, C]after
Resilent FlooringNTP
Moisture Testing Results5 Days
123[09650, 1.02, D]after
Resilent FlooringNTP
O&M ManualsDate of
124[09650, 1.02, E]Substantial
Resilent FlooringCompletion
Product Data5 Days
125[09900, 1.02, B]after
PaintingNTP
Samples, colors5 Days
126[09900, 1.02, C]after
PaintingNTP
Product Data5 Days
127[10520, 1.02, B]after
Fire Protection SpecialtiesNTP
Shop Drawings, Brochures5 Days
128[10810, 1.02, A]after
Toilet AccessoriesNTP
Product Data5 Days
129[15070, 1.02, A]after
Condensate & Equip Drain SystemsNTP
Product Data5 Days
130[15080, 1.02, A]after
Chilled & Condenser Water PipingNTP
Product Data5 Days
131[15150, 1.02, A]after
Meters and GaugesNTP
Shop Drawings, Isolators5 Days
132[15240, 1.02, A]after
Mech Sound, Vibration & SeismicNTP
Product Data5 Days
133[15240, 1.02, B]after
Mech Sound, Vibration & SeismicNTP
Certification, Installation5 Days
134[15240, 1.02, C]after
Mech Sound, Vibration & SeismicNTP
Product Data5 Days
135[15250, 1.02, A]after
Mechanical InsulationNTP
Preliminary Shop Drawings5 Days
136[15330, 1.02, A]after
Wet-Pipe Sprinkler SystemsNTP
Shop Drawings, Hydraulic CalcsDate of
137[15330, 1.02, B]Substantial
Wet-Pipe Sprinkler SystemsCompletion
Product Data5 Days
138[15330, 1.02, C]after
Wet-Pipe Sprinkler SystemsNTP
Manufacturer's Certificate5 Days
139[15330, 1.02, E]after
Wet-Pipe Sprinkler SystemsNTP
Product Data5 Days
140[15410, 1.02, A]after
Plumbing PipingNTP
Product Data5 Days
141[15430, 1.02, A]after
Plumbing SpecialtiesNTP
Product Data5 Days
142[15440, 1.02, A]after
Plumbing Fixtures & TrimNTP
Shop Drawings5 Days
143[15451, 1.02, A]after
Water HeatersNTP
Product Data5 Days
144[15451, 1.02, B]after
Water HeatersNTP
Product Data5 Days
145[15481, 1.02, A]after
Fuel Gas SystemsNTP
Product Data5 Days
146[15500, 1.02, A]after
Circulating PumpsNTP
Installation Instructions5 Days
147[15500, 1.02, B]after
Circulating PumpsNTP
Product Data5 Days
148[15670, 1.02, A]after
Cooling TowersNTP
Installation Instructions5 Days
149[15670, 1.02, B]after
Cooling TowersNTP
Product Data5 Days
150[15682, 1.04, A]after
Direct Fired, Gas Absop ChillersNTP
Installation Instructions5 Days
151[15682, 1.04, B]after
Direct Fired, Gas Absop ChillersNTP
Data5 Days
152[15682, 1.04, C]after
Direct Fired, Gas Absop ChillersNTP
Product Data5 Days
153[15685, 1.03, A]after
Rotary Screw ChillerNTP
Installation Instructions5 Days
154[15685, 1.03, B]after
Rotary Screw ChillerNTP
Data5 Days
155[15685, 1.03, C]after
Rotary Screw ChillerNTP
Product Data5 Days
156[15712, 1.02, A]after
Plate & Frame Heat ExchangersNTP
Installation Instructions5 Days
157[15712, 1.02, B]after
Plate & Frame Heat ExchangersNTP
Shop Drawings5 Days
158[15815, 1.02, A]after
Evaporative CoolersNTP
Product Data5 Days
159[15815, 1.02, B]after
Evaporative CoolersNTP
Shop Drawings5 Days
160[15816, 1.02, A]after
Gas Unit HeatersNTP
Product Data5 Days
161[15816, 1.02, B]after
Gas Unit HeatersNTP
Product Data5 Days
162[15855, 1.02, A]after
Heat Pump - Split SystemNTP
Shop Drawings5 Days
163[15855, 1.02, B]after
Heat Pump - Split SystemNTP
Certificates, Manufacturer5 Days
164[15855, 1.02, C]after
Heat Pump - Split SystemNTP
Shop Drawings, dimensions5 Days
165[15870, 1.02, A]after
Power VentilatorsNTP
Product Data5 Days
166[15870, 1.02, B]after
Power VentilatorsNTP
Product Data5 Days
167[15890, 1.02, A]after
DuctworkNTP
Shop Drawings, layout5 Days
168[15890, 1.02, B]after
DuctworkNTP
Product Data, Drawings5 Days
169[15900, 1.03, A]after
Energy Manag Cont SystemNTP
Data- Control Points5 Days
170[15900, 1.03, B]after
Energy Manag Cont SystemNTP
Shop Drawings5 Days
171[15910, 1.02, A]after
Ductwork, AccessoriesNTP
Product Data5 Days
172[15910, 1.02, B]after
Ductwork AccessoriesNTP
Certification, UL Listing5 Days
173[15910, 1.02, C]after
Ductwork, AccessoriesNTP
Product Data5 Days
174[15940, 1.02, A]after
Air Outlets and InletsNTP
Shop Drawings5 Days
175[15940, 1.02, B]after
Air Outlets and InletsNTP
Color Chart5 Days
176[15940, 1.02, C]after
Air Outlets and InletsNTP
Data, Technician, Certification5 Days
177[15990, 1.02, A]after
Test, Adjust, & Balance of SystemsNTP
ReportsDate of
178[15990, 1.02, B]Substantial
Test, Adjust, & Balance of SystemsCompletion
Record Drawings, CloseoutDate of
179[16010, 1.06, A]Substantial
Basic Electrical RequirementsCompletion
O&M Manuals, CloseoutDate of
180[16010, 1.06, B]Substantial
Basic Electrical RequirementsCompletion
Product Data5 Days
181[16110, 1.02, A]after
RacewaysNTP
Product Data5 Days
182[16117, 1.02, A]after
HandholesNTP
Shop Drawings, Hanholes5 Days
183[16117, 1.02, B]after
HandholesNTP
Shop Drawings, layout5 Days
184[16120, 1.02, A]after
Wires & Cables (600V or Less)NTP
Product Data5 Days
185[16120, 1.02, B]after
Wires & Cables (600V or Less)NTP
Product Data5 Days
186[16121, 1.02, A]after
High Voltage Wires & CablesNTP
Product Data5 Days
187[16130, 1.02, A]after
BoxesNTP
Shop Drawings, layout5 Days
188[16130, 1.02, B]after
BoxesNTP
Product Data5 Days
189[16140, 1.02, A]after
Wiring DevicesNTP
Samples5 Days
190[16140, 1.02, B]after
Wiring DevicesNTP
Product Data5 Days
191[16400, 1.02, A]after
Service and DistributionNTP
Shop Drawings5 Days
192[16400, 1.02, B]after
Service and DistributionNTP
Shop Drawings5 Days
193[16425, 1.02, A]after
SwitchboardsNTP
Product Data5 Days
194[16425, 1.02, B]after
SwitchboardsNTP
Product Data5 Days
195[16430, 1.02, A]after
MeteringNTP
Data - Wiring Diagrams5 Days
196[16430, 1.02, B]after
MeteringNTP
O&M Manuals5 Days
197[16430, 1.02, C]after
MeteringNTP
Shop Drawings, Disconnects5 Days
198[16440, 1.02, A]after
Disconnect SwitchesNTP
Data5 Days
199[16440, 1.02, B]after
Disconnect SwitchesNTP
Test Report, Ground5 Days
200[16450, 1.02, A]after
GroundingTest
Shop Drawings, Transformers5 Days
201[16460, 1.02, A]after
Transformers (Oil Filled)NTP
Product data5 Days
202[16460, 1.02, B]after
Transformers (Oil Filled)NTP
Certificates5 Days
203[16460, 1.02, C]after
Transformers (Oil Filled)NTP
Shop Drawings5 Days
204[16461, 1.02, A]after
Transformers (Dry-Type)NTP
Product Data5 Days
205[16461, 1.02, B]after
Transformers (Dry-Type)NTP
Certificates5 Days
206[16461, 1.02, C]after
Transformers (Dry-Type)NTP
Product Data5 Days
207[16470, 1.02, A]after
PanelboardsNTP
Data5 Days
208[16470, 1.02, B]after
PanelboardsNTP
Shop Drawings (Fuses)5 Days
209[16475, 1.02, A]after
Overcurrent Protective DevicesNTP
Shop Drawings (Circuit Breakers)5 Days
210[16475, 1.02, B]after
Overcurrent Protective DevicesNTP
Shop Drawings5 Days
211[16482, 1.02, A]after
Motor StartersNTP
Product Data5 Days
212[16482, 1.02, B]after
Motor StartersNTP
O&M ManualsDate of
213[16482, 1.02, C]Substantial
Motor StartersCompletion
Shop Drawings5 Days
214[16483, 1.02, A]after
Variable Frequency DrivesNTP
Product Data5 Days
215[16483, 1.02, B]after
Variable Frequency DrivesNTP
O&M Manuals5 Days
216[16483, 1.02, C]after
Variable Frequency DrivesNTP
Data - Wiring Diagrams5 Days
217[16490, 1.02, A]after
Transient Voltage Surge SuppressNTP
Manufacturer's Data5 Days
218[16500, 1.02, A]after
LightingNTP
Shop Drawings - Fixtures5 Days
219[16500, 1.02, B]after
LightingNTP
Shop Drawings5 Days
220[16721, 1.02, A]after
Fire Alarm & Detection systemNTP
Product Data5 Days
221[16721, 1.02, B]after
Fire Alarm & Detection systemNTP
Certification5 Days
222[16721, 1.02, C]after
Fire Alarm & Detection systemNTP
Record Drawings, CloseoutDate of
223[16721, 1.02, D]Substantial
Fire Alarm & Detection systemCompletion
Product Data5 Days
224[16741, 1.02, A]after
Telephone SystemNTP
Record Drawings, CloseoutDate of
225[16741, 1.02, B]Substantial
Telephone SystemCompletion
Test Reports, as required5 Days
226[16950, 1.02, A]after
TestingTest
Test Report, (Graphs)5 Days
227[16965, 1.02, A]after
High Potential TestingTest
228
229
230
231
232
233
234
235
236
237
238
239
240

&L&"Arial"&BAF Form 66, Computer Generated

File details come from the government source that posted it. Updated .