Attachment 16 - 010700 Safety Requirements - 16 Feb 22.pdf

PDF 155 KB Posted

Attached to
Airmen's Lounge Renovation - Bldg700 - Luke AFB
Solicitation number
FA488722R0002
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA488722R00020003 SF 30.pdf PDF
Attachment 6 - Section L Instructions to Offerors - 25 Mar 22.pdf PDF
Solicitation Amendment FA488722R00020002 SF 30.pdf PDF
Attachment 1 - SOW - 17 Mar 22.pdf PDF
Solicitation Amendment - FA488722R00020001.pdf PDF
01 - All RFIs MARCH 17 2022 - 22R0002.xlsx XLSX spreadsheet
Attachment 9 - AF Form 3064 Template - 16 Feb 22.xlsx XLSX spreadsheet
Attachment 10 - AF Form 66 Template - 16 Feb 22.xls XLS spreadsheet
Attachment 6 - Section L Instructions to Offerors - 16 Feb 22.pdf PDF
Attachment 3 - Kitchen New Layout - 12 Nov 21.pdf PDF
Attachment 14 - Teaming Partner Consent Letter Template - 16 Feb 22.pdf PDF
Attachment 1 - SOW - 12 Nov 21.pdf PDF
Attachment 11 - Present Past Performance Information - 16 Feb 22.pdf PDF
Attachment 15 - 014500 Contractor Quality Control - 16 Feb 22.pdf PDF
Attachment 13 - Present Past Performance Questionnaire - 16 Feb 22.pdf PDF
Attachment 7 - Section M Evaluation Criteria - 16 Feb 22.pdf PDF
Solicitation - FA488722R0002.pdf PDF
Attachment 5 - NAF Clauses - 22 Jan 21.pdf PDF
Attachment 12 - Present Past Performance Questionnaire Cover -17 Feb 22.pdf PDF
Attachment 4 - WD AZ20220031 - 25 Feb 22.pdf PDF
Attachment 8 - RFI Template - 16 Feb 22.xlsx XLSX spreadsheet
Attachment 2 - Site Map - 14 May 16.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA488722R0002 – Attachment 16

010700-1

SECTION 010700

SAFETY REQUIREMENTS

PART 1 GENERAL

1.01 GENERAL:

A. This Section specifies the health and safety requirements to be enforced during the performance of the work specified herein.

B. Refer to Section 010800 for Fire Prevention.

1.02 SUBMITTALS

A. Safety Program: The Contractor shall submit a Safety Program in accordance with paragraph 1.07.

1.03 RESPONSIBILITY:

A. The Base Ground Safety Officer or his representative will attend preconstruction conferences to brief contractors on pertinent safety regulations and to provide guidance for safe operations during contract performance. Local safety guidance will be furnished to the Contractor for briefing his personnel.

B. It is the responsibility of any person who discovers a safety violation to report it immediately.

C. The Contractor shall perform whatever work is necessary for safety and shall be solely and completely responsible for conditions of the job site, including care and safety of all property and safety of all persons whether or not employed by the Contractor during the Contract Period.

1. This requirement shall apply continuously and not be limited to normal working hours and shall apply to all activities both directly and indirectly associated with all work covered by the Contract.

2. These requirements do not supersede, but are in addition to any federal, OSHA, state, or local regulations.

3. If a conflict occurs between these requirements and current regulations, the more stringent shall apply.

D. The Contractor shall, at all times, provide proper facilities for safe access to the Work by authorized Government officials.

E. It shall be the responsibility of the Contractor to be familiar with the required health and safety regulations in the performance of this work.

F. It is the Contractor’s responsibiilty to ensure that:

1. Safety equipment is available for Contractor personnel and is properly maintained.

010700-2

2. Use of personal protective equipment and clothing by personnel entering the site is enforced.

3. Communication with all Contractor Personnel, the Contracting Officer, and other personnel regarding safety matters is maintained.

4. Corrective actions are implemented immediately in the event of emergency or unsafe conditions.

1.04 APPLICABLE PUBLICATIONS:

A. Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities, U.S. Department of Health and Human Services, October 1985

B. Environmental Protection Agency (EPA), Standard Operating Safety

Guidelines, Office of Emergency and Remedial Response, Hazardous Response Support Division, November 1985.

C. American National Standards Institute (ANSI), American National Standard

Practices for Respiratory Protection, 1980.

D. U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM

385-1-1.

E. The Arizona Occupational Safety and Health Act of 1972, Arizona Revised

Statutes, Title 23, Chapter 2, and Article 10.

F. 29 CFR 1910 and 29 CFR 1926.

G. All Luke Air Force Base and State of Arizona Traffic Laws and

Regulations.

1.05 EMERGENCY AND FIRST AID REQUIREMENTS

A. The Contractor shall prearrange for emergency medical care services at a nearby medical facility and establish emergency routes.

B. The Contractor shall establish communication links with health and emergency services to inform them of any emergency situations that may arise.

c. In the event of any emergency associated with or resulting from Work at this site, the Contractor shall without delay:

1. Cease Work activity on the site

2. Take diligent action to remove or otherwise minimize the cause of the emergency

3. Render full assistance to Local authorities to remedy any impact on local residents or property.

4. Alert the Contracting Officer and Government.

5. Institute whatever measures are necessary to prevent any repetition of the conditions or actions leading to or resulting in the emergency.

010700-3

1.06 PERSONAL PROTECTION EQUIPMENT

A. The Contractor shall provide all on-site Contractor and Subcontractor personnel with appropriate personal safety equipment.

1.07 SAFETY PROGRAM

A. The Contractor shall provide, no later than five days after receiving

Notice of Award, four (4) copies of their written safety program to the Contracting Officer for review. No construction shall commence until the Contractor’s Safety Program has been reviewed by the 56th FW Safety Office.

B. The Safety Program shall include detailed description of the

Contractor’s Safety Organization, responsibilities, method of program implementation and description of methods for corrective measures.

C. The Contractor shall not deviate from their written Safety Program.

D. All Subcontractors shall follow the Contractor’s Safety Program.

PART 2 PRODUCTS: NOT USED

PART 3 EXECUTION: NOT USED

END OF SECTION

SAFETY REQUIREMENTS
PART 1 GENERAL
1.01 GENERAL:
1.02 SUBMITTALS
1.03 RESPONSIBILITY:
1.04 APPLICABLE PUBLICATIONS:
1.05 EMERGENCY AND FIRST AID REQUIREMENTS
1.06 PERSONAL PROTECTION EQUIPMENT
1.07 SAFETY PROGRAM
PART 2 PRODUCTS: NOT USED
PART 3 EXECUTION: NOT USED
END OF SECTION

File details come from the government source that posted it. Updated .