01 - All RFIs MARCH 17 2022 - 22R0002.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Airmen's Lounge Renovation - Bldg700 - Luke AFB
Solicitation number
FA488722R0002
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA488722R00020003 SF 30.pdf PDF
Attachment 6 - Section L Instructions to Offerors - 25 Mar 22.pdf PDF
Solicitation Amendment FA488722R00020002 SF 30.pdf PDF
Attachment 1 - SOW - 17 Mar 22.pdf PDF
Solicitation Amendment - FA488722R00020001.pdf PDF
Attachment 9 - AF Form 3064 Template - 16 Feb 22.xlsx XLSX spreadsheet
Attachment 10 - AF Form 66 Template - 16 Feb 22.xls XLS spreadsheet
Attachment 6 - Section L Instructions to Offerors - 16 Feb 22.pdf PDF
Attachment 3 - Kitchen New Layout - 12 Nov 21.pdf PDF
Attachment 14 - Teaming Partner Consent Letter Template - 16 Feb 22.pdf PDF
Attachment 1 - SOW - 12 Nov 21.pdf PDF
Attachment 11 - Present Past Performance Information - 16 Feb 22.pdf PDF
Attachment 15 - 014500 Contractor Quality Control - 16 Feb 22.pdf PDF
Attachment 13 - Present Past Performance Questionnaire - 16 Feb 22.pdf PDF
Attachment 7 - Section M Evaluation Criteria - 16 Feb 22.pdf PDF
Solicitation - FA488722R0002.pdf PDF
Attachment 16 - 010700 Safety Requirements - 16 Feb 22.pdf PDF
Attachment 5 - NAF Clauses - 22 Jan 21.pdf PDF
Attachment 12 - Present Past Performance Questionnaire Cover -17 Feb 22.pdf PDF
Attachment 4 - WD AZ20220031 - 25 Feb 22.pdf PDF
Attachment 8 - RFI Template - 16 Feb 22.xlsx XLSX spreadsheet
Attachment 2 - Site Map - 14 May 16.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Log

REQUEST FOR INFORMATION LOG
CONTRACT/SOLICITATION #:PROJECT # / TITLE:FA488722R0002 Attachment 8
FA488722R0002REV 01 Airmen's Lounge Renovation Project
TO BE COMPLETED BY CONTRACTORTO BE COMPLETED BY GOVERNMENT
RFI #DATEDOCUMENTSHEET / PAGE / PARADISCIPLINEQUESTION / ISSUERESPONSE DATERESPONSEPOC
OFFICE SYMNAME
00111-Mar-22Statement of WorkARCHPlease provide drawings, specifications and finish details for the Statement of Work item 5.d., quartz countertop with tile front.This information is not avalable.
00211-Mar-22Statement of WorkARCHPlease confirm that the contractor is only required to complete the physical installation of the POS system.contrator required to supply all electrical and communication connections and install the POS system.
00311-Mar-22Statement of WorkARCHPlease provide a make and model as basis of design for the condiment cart listed on item 5.e.SOW provides the reference information to purchase equipment equal to the description.
00411-Mar-22Statement of WorkARCHItem 5.g does not give sufficient detail to price this scope. Please include drawings or a basis of design for the bench seating as well as banquet tables. Please provide a quantity of benches and tables.Contrator required to measure area(s) where benches as well as banquet talbles will best fit to provide as much seating as possible. Space will govern quantity of benches. Drawings or basis of design is not avalable.
00511-Mar-22Statement of WorkARCHPlease provide a make and model as basis of design for the 65 Item 5.g does not give sufficient detail to price this scope. Please include drawings or a basis of design for the bench seating as well as banquet tables. Please provide a quantity of benches and tables. tv's listed on item 5.h.Contrator required to measure area(s) where benches as well as banquet talbles will best fit to provide as much seating as possible. Space will govern quantity of benches. Drawings or basis of design is not avalable. See REV 01 SOW for TV quantity.
00611-Mar-22Statement of WorkARCHPlease provide specifications and details for the speaker system listed on item 5.i. How many speakers are required? Are the speakers to be commercial 70v type? What type of source material will be utilized to play content over the sound system? How is the amplifier to be mounted and where within room 108 is it to be located? What is required for "Controls" to operate the system?To provide and instale speakers contrator required to measure square footage and provide skilled labor proffessional for correct placement and quantities. Submit all materials on an AF3000 is required for acceptance.
00711-Mar-22Statement of WorkARCHPlease provide specifications and a manufacturer make and model for all of the kitchen eqp listed in the statement of work item 8.aSee REV 01 SOW for the reference information avalible.
00811-Mar-22Statement of WorkARCHPlease provide specifications for the epoxy flooringFor flooring follow REV 01 SOW. No specifications avalible
00911-Mar-22Statement of WorkARCHPlease provide a plan that shows the location of the I.T room for communications connections.See as-built documents for all plan information avalible.
01011-Mar-22Statement of WorkARCHPlease provide additional details for item 5.k small clean dish counter. There is insufficient information to price this item.Contrator required to measure area(s) available to provide clean dish counter space. Limited space governs counter size. Drawings or basis of design not avalable. See SOW for all equipment.
01111-Mar-22Statement of WorkARCHPlease provide a finish schedule for item 5.m. modern tile flooring.No schedule avilible
01211-Mar-22Statement of WorkARCHPlease provide drawings and specifications and finish details for item 5.t. 10' built in back counterContrator required to measure area for locating 10' built in back counter. Drawings or basis of design not avalable.
01311-Mar-22Statement of WorkARCHPlease provide specifications and a basis of design for item 9 plumbing fixtures.No specifications or basis of design availible.
01411-Mar-22Statement of WorkARCHWill the contractor be required to provide an exhaust hood system for the kitchen equipment?REV 01 SOW equipment govern this need.
01511-Mar-22Statement of WorkARCHWill a chemical fire suppression system be required?REV 01 SOW equipment govern this need.
01611-Mar-22Statement of WorkARCHWhat is the control mechanism & location for item 5.i. audio and video? Control source and volume only?Contractor to follow manufacture specifications. Provide submital(s) for all materials on an AF3000 for acceptance.
01711-Mar-22Statement of WorkARCHThere is a TV to be mounted on the east wall of 105. It appears that the available space on the east wall is occupied by a window (A7) and a future coffee. Please advise where the TV is to be located.Submit a map showing Tv placement on an AF3000 for government approval.
01811-Mar-22Statement of WorkARCHThere are 3 TVs required. Will all three TVs display the same content? If no, please provided details about desired functionality.Government to determine. Walls have connections for two TV's best locate 3rd TV and include all connections
01911-Mar-22Statement of WorkARCHAre the TVs going to be in operation 24x7?Government to determine
02011-Mar-22Statement of WorkARCHRegarding the two 3’x4’ vertical digital menu boards. This seems very specific, does the owner have a manufacture/model they have in mind? Is this a custom direct view LED creation?For reference only - provide modern high quality vertical digital menu boards.
02111-Mar-22Statement of WorkARCHWhat is the source of the content for the vertical digital menu boards? OFE digital signage player? Is the owner responsible for the content?Owner responsible for content.
0228-Feb-22Attachment 3 Kitchen New Layout1Kitchen EquipmentNew Kitchen equipment as called out on Attachment 3 does not have enough information for accurate pricing. There is a wide variability in pricing based on quality and brand name. We need the government to establish a minimum quality standard so everybody bids apples to apples. We request equipment the government's specification to follow 11400 standard format and give a suggested manufacturer and model with a provision for similar quality equipment allowed.See REV 01 SOW for information
0228-Mar-22Plans - Attachemnt 2Need plans that are to scale for measuring and bidding purposesSee as-built documents for all plan information avalible.
0228-Mar-22SOW - Attachment 1Item 5 - BNeed specifications and information on model/manufacturer/colors/etc.See REV 01 SOW and as- built documents.
0228-Mar-22SOW - Attachment 1Item 5 - DNeed specifications and information on model/manufacturer/colors/dim./electrical requirments/etcSee Luke specifications attached
0228-Mar-22SOW - Attachment 1Item 5 - GNeed specifications and information on model/manufacturer/colors/Dim/etc.See attached docs for information avalible
0228-Mar-22SOW - Attachment 1Item 5 - HNeed manufacturer and model numbersSee attached docs for information avalible
0228-Mar-22SOW - Attachment 1Item 5 - INeed layout with quanities/manufacturer/model of all speakers and equipment requiredSee attached docs for information avalible
0228-Mar-22SOW - Attachment 1Item 5 - JNeed manufacturer and model numbersSee attached docs for information avalible
0228-Mar-22SOW - Attachment 1Item 5 - KNeed more information on counter top materials and manufacturer required, dimensions, etc.REV 01 SOW contains information avalible
0228-Mar-22SOW - Attachment 1Item 5 - MNeed manufacturer type, size, and colorsSee attached docs for information avalible
0228-Mar-22SOW - Attachment 1Item 5 - PNeed manufacturer type, size, and colorsSee attached docs for information avalible
0228-Mar-22SOW - Attachment 1Item 5 - QNeed manufacturer type, size, and colorsSee attached docs for information avalible
0228-Mar-22SOW - Attachment 1Item 5 - TNeed more info on equipment and countertop materials, colors, etc. Plans provided are un-clearSee attached docs for information avalible
0228-Mar-22SOW - Attachment 1Item 5 - UWhat furniture is government expecting? Is the GC required to provide? Need more info?Yes follow the REV 01 SOW
0228-Mar-22SOW - Attachment 1Item 8 - ANeed model numbers, manufacturer, speciifcations for all equipment to be provided by contractor, need spec sheets on any equipment provided by governemntREV 01 SOW contains information avalible
0228-Mar-22SOW - Attachment 1Item 9 - ANeed model numbers, manufacturer, speciifcations for all equipment to be provided by contractor, need spec sheets on any equipment provided by governemntREV 01 SOW contains information avalible
0220
0228-Mar-22SOW/PlansIn order for this to be a competive bid process, government needs to establish a uniform list of plans, specifications, materials, equipment, etc. for all contractors to bid fair and competitive. Please advise if this information will be added to the project documents so all contractors are bidding apples to apples?Please follow REV 01 SOW.