RFI Log
| REQUEST FOR INFORMATION LOG | |||||||||
| CONTRACT/SOLICITATION #: | PROJECT # / TITLE: | FA488722R0002 Attachment 8 | |||||||
| FA488722R0002 | REV 01 Airmen's Lounge Renovation Project | ||||||||
| TO BE COMPLETED BY CONTRACTOR | TO BE COMPLETED BY GOVERNMENT | ||||||||
| RFI # | DATE | DOCUMENT | SHEET / PAGE / PARA | DISCIPLINE | QUESTION / ISSUE | RESPONSE DATE | RESPONSE | POC | |
| OFFICE SYM | NAME | ||||||||
| 001 | 11-Mar-22 | Statement of Work | ARCH | Please provide drawings, specifications and finish details for the Statement of Work item 5.d., quartz countertop with tile front. | This information is not avalable. | ||||
| 002 | 11-Mar-22 | Statement of Work | ARCH | Please confirm that the contractor is only required to complete the physical installation of the POS system. | contrator required to supply all electrical and communication connections and install the POS system. | ||||
| 003 | 11-Mar-22 | Statement of Work | ARCH | Please provide a make and model as basis of design for the condiment cart listed on item 5.e. | SOW provides the reference information to purchase equipment equal to the description. | ||||
| 004 | 11-Mar-22 | Statement of Work | ARCH | Item 5.g does not give sufficient detail to price this scope. Please include drawings or a basis of design for the bench seating as well as banquet tables. Please provide a quantity of benches and tables. | Contrator required to measure area(s) where benches as well as banquet talbles will best fit to provide as much seating as possible. Space will govern quantity of benches. Drawings or basis of design is not avalable. | ||||
| 005 | 11-Mar-22 | Statement of Work | ARCH | Please provide a make and model as basis of design for the 65 Item 5.g does not give sufficient detail to price this scope. Please include drawings or a basis of design for the bench seating as well as banquet tables. Please provide a quantity of benches and tables. tv's listed on item 5.h. | Contrator required to measure area(s) where benches as well as banquet talbles will best fit to provide as much seating as possible. Space will govern quantity of benches. Drawings or basis of design is not avalable. See REV 01 SOW for TV quantity. | ||||
| 006 | 11-Mar-22 | Statement of Work | ARCH | Please provide specifications and details for the speaker system listed on item 5.i. How many speakers are required? Are the speakers to be commercial 70v type? What type of source material will be utilized to play content over the sound system? How is the amplifier to be mounted and where within room 108 is it to be located? What is required for "Controls" to operate the system? | To provide and instale speakers contrator required to measure square footage and provide skilled labor proffessional for correct placement and quantities. Submit all materials on an AF3000 is required for acceptance. | ||||
| 007 | 11-Mar-22 | Statement of Work | ARCH | Please provide specifications and a manufacturer make and model for all of the kitchen eqp listed in the statement of work item 8.a | See REV 01 SOW for the reference information avalible. | ||||
| 008 | 11-Mar-22 | Statement of Work | ARCH | Please provide specifications for the epoxy flooring | For flooring follow REV 01 SOW. No specifications avalible | ||||
| 009 | 11-Mar-22 | Statement of Work | ARCH | Please provide a plan that shows the location of the I.T room for communications connections. | See as-built documents for all plan information avalible. | ||||
| 010 | 11-Mar-22 | Statement of Work | ARCH | Please provide additional details for item 5.k small clean dish counter. There is insufficient information to price this item. | Contrator required to measure area(s) available to provide clean dish counter space. Limited space governs counter size. Drawings or basis of design not avalable. See SOW for all equipment. | ||||
| 011 | 11-Mar-22 | Statement of Work | ARCH | Please provide a finish schedule for item 5.m. modern tile flooring. | No schedule avilible | ||||
| 012 | 11-Mar-22 | Statement of Work | ARCH | Please provide drawings and specifications and finish details for item 5.t. 10' built in back counter | Contrator required to measure area for locating 10' built in back counter. Drawings or basis of design not avalable. | ||||
| 013 | 11-Mar-22 | Statement of Work | ARCH | Please provide specifications and a basis of design for item 9 plumbing fixtures. | No specifications or basis of design availible. | ||||
| 014 | 11-Mar-22 | Statement of Work | ARCH | Will the contractor be required to provide an exhaust hood system for the kitchen equipment? | REV 01 SOW equipment govern this need. | ||||
| 015 | 11-Mar-22 | Statement of Work | ARCH | Will a chemical fire suppression system be required? | REV 01 SOW equipment govern this need. | ||||
| 016 | 11-Mar-22 | Statement of Work | ARCH | What is the control mechanism & location for item 5.i. audio and video? Control source and volume only? | Contractor to follow manufacture specifications. Provide submital(s) for all materials on an AF3000 for acceptance. | ||||
| 017 | 11-Mar-22 | Statement of Work | ARCH | There is a TV to be mounted on the east wall of 105. It appears that the available space on the east wall is occupied by a window (A7) and a future coffee. Please advise where the TV is to be located. | Submit a map showing Tv placement on an AF3000 for government approval. | ||||
| 018 | 11-Mar-22 | Statement of Work | ARCH | There are 3 TVs required. Will all three TVs display the same content? If no, please provided details about desired functionality. | Government to determine. Walls have connections for two TV's best locate 3rd TV and include all connections | ||||
| 019 | 11-Mar-22 | Statement of Work | ARCH | Are the TVs going to be in operation 24x7? | Government to determine | ||||
| 020 | 11-Mar-22 | Statement of Work | ARCH | Regarding the two 3’x4’ vertical digital menu boards. This seems very specific, does the owner have a manufacture/model they have in mind? Is this a custom direct view LED creation? | For reference only - provide modern high quality vertical digital menu boards. | ||||
| 021 | 11-Mar-22 | Statement of Work | ARCH | What is the source of the content for the vertical digital menu boards? OFE digital signage player? Is the owner responsible for the content? | Owner responsible for content. | ||||
| 022 | 8-Feb-22 | Attachment 3 Kitchen New Layout | 1 | Kitchen Equipment | New Kitchen equipment as called out on Attachment 3 does not have enough information for accurate pricing. There is a wide variability in pricing based on quality and brand name. We need the government to establish a minimum quality standard so everybody bids apples to apples. We request equipment the government's specification to follow 11400 standard format and give a suggested manufacturer and model with a provision for similar quality equipment allowed. | See REV 01 SOW for information | |||
| 022 | 8-Mar-22 | Plans - Attachemnt 2 | Need plans that are to scale for measuring and bidding purposes | See as-built documents for all plan information avalible. | |||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - B | Need specifications and information on model/manufacturer/colors/etc. | See REV 01 SOW and as- built documents. | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - D | Need specifications and information on model/manufacturer/colors/dim./electrical requirments/etc | See Luke specifications attached | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - G | Need specifications and information on model/manufacturer/colors/Dim/etc. | See attached docs for information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - H | Need manufacturer and model numbers | See attached docs for information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - I | Need layout with quanities/manufacturer/model of all speakers and equipment required | See attached docs for information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - J | Need manufacturer and model numbers | See attached docs for information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - K | Need more information on counter top materials and manufacturer required, dimensions, etc. | REV 01 SOW contains information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - M | Need manufacturer type, size, and colors | See attached docs for information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - P | Need manufacturer type, size, and colors | See attached docs for information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - Q | Need manufacturer type, size, and colors | See attached docs for information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - T | Need more info on equipment and countertop materials, colors, etc. Plans provided are un-clear | See attached docs for information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 5 - U | What furniture is government expecting? Is the GC required to provide? Need more info? | Yes follow the REV 01 SOW | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 8 - A | Need model numbers, manufacturer, speciifcations for all equipment to be provided by contractor, need spec sheets on any equipment provided by governemnt | REV 01 SOW contains information avalible | ||||
| 022 | 8-Mar-22 | SOW - Attachment 1 | Item 9 - A | Need model numbers, manufacturer, speciifcations for all equipment to be provided by contractor, need spec sheets on any equipment provided by governemnt | REV 01 SOW contains information avalible | ||||
| 022 | 0 | ||||||||
| 022 | 8-Mar-22 | SOW/Plans | In order for this to be a competive bid process, government needs to establish a uniform list of plans, specifications, materials, equipment, etc. for all contractors to bid fair and competitive. Please advise if this information will be added to the project documents so all contractors are bidding apples to apples? | Please follow REV 01 SOW. |