Airmen's Lounge Renovation - Bldg700 - Luke AFB

Cancelled Solicitation Posted

Solicitation number
FA488722R0002
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Luke AFB, Arizona 85309, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

The purpose of this project is to maximize space while creating an inviting environment for the Airmans Lounge
old subway area. This renovation will create a more open eating environment improving quality of life for all
airman. The work site is located in the north east portion of building 700. This is one of the main eating places
on base. Renovation includes Rooms 105, 106, 108, and 109 includes cooking equipment, furniture, and updated
LED lighting. The flooring in room 105 will be removed and replaced with polished concreate. Rooms 106,108,
and 109 includes removing old tile floor for a new tile floor.

PLEASE NOTE: All RFI responses have seen posted. Please see the attachment "01 -  All RFIs  MARCH 17 2022 - 22R0002". If you would like the large files referenced in the RFIs such as the "as-builts" which cannot be posted here, please reach out to the government Points of Contact for this project. The RFI attachments are listed below:

03 - AS BUILTS 700 Record Drawings Res

04 - Electrical Asbuilts 700 Record Drawings (Resubmittal)

05 - pg A 107 A B700 Dimension plan Record Drawings (Resubmittal)

06 - Instillation Facility Standards - Luke_AFB_IFS_102418_Final

07 - LUKE MASTER SPECS

Amendment 0001- Updated SOW dated 17 March 2022

Amendment 0002 - Updated attachment 6 Section L Instructions to Offerors. Only minor clarifications to paragraph L.2.1.1 and Table L.2.1.1 have been updated. The SOW dated 17 Mar 2022 is current and is unchanged from amendment 0001. Ensure to acknowledge all amendments on the SF1442 in block 19 for proposal submission. 

Amendment 0003 - The purpose of this amendment is to cancel the solicitation in its entirety.

Update #4 ·

The purpose of this project is to maximize space while creating an inviting environment for the Airmans Lounge
old subway area. This renovation will create a more open eating environment improving quality of life for all
airman. The work site is located in the north east portion of building 700. This is one of the main eating places
on base. Renovation includes Rooms 105, 106, 108, and 109 includes cooking equipment, furniture, and updated
LED lighting. The flooring in room 105 will be removed and replaced with polished concreate. Rooms 106,108,
and 109 includes removing old tile floor for a new tile floor.

PLEASE NOTE: All RFI responces have seen posted. Please see the attachment "01 -  All RFIs  MARCH 17 2022 - 22R0002". If you would like the large files referenced in the RFIs such as the "as-builts" which cannot be posted here, please reach out to the government Points of Contact for this project. The RFI attachments are listed below:

03 - AS BUILTS 700 Record Drawings Res

04 - Electrical Asbuilts 700 Record Drawings (Resubmittal)

05 - pg A 107 A B700 Dimension plan Record Drawings (Resubmittal)

06 - Instillation Facility Standards - Luke_AFB_IFS_102418_Final

07 - LUKE MASTER SPECS

Amendment 0001- Updated SOW dated 17 March 2022

Amendment 0002 - Updated attachment 6 Section L Instructions to Offerors. Only minor clarifications to paragraph L.2.1.1 and Table L.2.1.1 have been updated. The SOW dated 17 Mar 2022 is current and is unchanged from amendment 0001. Ensure to acknowledge all amendments on the SF1442 in block 19 for proposal submission. 

Update #3 ·

The purpose of this project is to maximize space while creating an inviting environment for the Airmans Lounge
old subway area. This renovation will create a more open eating environment improving quality of life for all
airman. The work site is located in the north east portion of building 700. This is one of the main eating places
on base. Renovation includes Rooms 105, 106, 108, and 109 includes cooking equipment, furniture, and updated
LED lighting. The flooring in room 105 will be removed and replaced with polished concreate. Rooms 106,108,
and 109 includes removing old tile floor for a new tile floor.

PLEASE NOTE: All RFI responces have seen posted. Please see the attachment "01 -  All RFIs  MARCH 17 2022 - 22R0002". If you would like the large files referenced in the RFIs such as the "as-builts" which cannot be posted here, please reach out to the government Points of Contact for this project. The RFI attachments are listed below:

03 - AS BUILTS 700 Record Drawings Res

04 - Electrical Asbuilts 700 Record Drawings (Resubmittal)

05 - pg A 107 A B700 Dimension plan Record Drawings (Resubmittal)

06 - Instillation Facility Standards - Luke_AFB_IFS_102418_Final

07 - LUKE MASTER SPECS

Update #2 ·

The purpose of this project is to maximize space while creating an inviting environment for the Airmans Lounge
old subway area. This renovation will create a more open eating environment improving quality of life for all
airman. The work site is located in the north east portion of building 700. This is one of the main eating places
on base. Renovation includes Rooms 105, 106, 108, and 109 includes cooking equipment, furniture, and updated
LED lighting. The flooring in room 105 will be removed and replaced with polished concreate. Rooms 106,108,
and 109 includes removing old tile floor for a new tile floor.

PLEASE NOTE: All RFI responces have seen posted. Please see the attachment "01 -  All RFIs  MARCH 17 2022 - 22R0002". If you would like the large files referenced in the RFIs such as the "as-builts" which cannot be posted here, please reach out to the government Points of Contact for this project.

Update #1 ·

The purpose of this project is to maximize space while creating an inviting environment for the Airmans Lounge
old subway area. This renovation will create a more open eating environment improving quality of life for all
airman. The work site is located in the north east portion of building 700. This is one of the main eating places
on base. Renovation includes Rooms 105, 106, 108, and 109 includes cooking equipment, furniture, and updated
LED lighting. The flooring in room 105 will be removed and replaced with polished concreate. Rooms 106,108,
and 109 includes removing old tile floor for a new tile floor.

Files

File Type Posted
Solicitation Amendment FA488722R00020003 SF 30.pdf PDF
Attachment 6 - Section L Instructions to Offerors - 25 Mar 22.pdf PDF
Solicitation Amendment FA488722R00020002 SF 30.pdf PDF
Attachment 1 - SOW - 17 Mar 22.pdf PDF
Solicitation Amendment - FA488722R00020001.pdf PDF
01 - All RFIs MARCH 17 2022 - 22R0002.xlsx XLSX spreadsheet
Solicitation - FA488722R0002.pdf PDF
Attachment 1 - SOW - 12 Nov 21.pdf PDF
Attachment 7 - Section M Evaluation Criteria - 16 Feb 22.pdf PDF
Attachment 10 - AF Form 66 Template - 16 Feb 22.xls XLS spreadsheet
Attachment 11 - Present Past Performance Information - 16 Feb 22.pdf PDF
Attachment 12 - Present Past Performance Questionnaire Cover -17 Feb 22.pdf PDF
Attachment 14 - Teaming Partner Consent Letter Template - 16 Feb 22.pdf PDF
Attachment 13 - Present Past Performance Questionnaire - 16 Feb 22.pdf PDF
Attachment 15 - 014500 Contractor Quality Control - 16 Feb 22.pdf PDF
Attachment 2 - Site Map - 14 May 16.pdf PDF
Attachment 4 - WD AZ20220031 - 25 Feb 22.pdf PDF
Attachment 8 - RFI Template - 16 Feb 22.xlsx XLSX spreadsheet
Attachment 9 - AF Form 3064 Template - 16 Feb 22.xlsx XLSX spreadsheet
Attachment 3 - Kitchen New Layout - 12 Nov 21.pdf PDF
Attachment 5 - NAF Clauses - 22 Jan 21.pdf PDF
Attachment 6 - Section L Instructions to Offerors - 16 Feb 22.pdf PDF
Attachment 16 - 010700 Safety Requirements - 16 Feb 22.pdf PDF
Show all 23

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Airmen's Lounge Renovation - Bldg700 - Luke AFB Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors