AF Form 66.xlsx
Air Force Form XLSX spreadsheet 30 KB Posted
- Attached to
- Repair MX Dock B578 and IMC Pavements Area F
- Solicitation number
- FA441825R0002
About this file
This is an AF Form 66 Schedule of Material Submittals containing 180 line items of required submittals for contract FA441821C0028, "Repair IMC Pavements - Area F" at Joint Base Charleston. The form details required documentation across multiple categories including preconstruction submittals, shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions/reports, operations/maintenance data, and closeout submittals.
Key submittal requirements include construction plans, safety documentation, quality control plans, environmental protection plans, concrete mix designs, asphalt placement plans, diamond grinding plans, and various testing/inspection reports. Each line item specifies the reference specification, number of copies required (generally 5), and includes columns for tracking submission dates, reviews, approvals and contractor resubmittals. Major work elements appear to involve concrete/asphalt paving, joint sealing, surface preparation, painting/marking, and associated quality control requirements for airfield pavement repairs.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 1 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | NO. OF COPIES REQUIRED | |||||||||||||||||
| ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | ||||||||||||||||||
| (Ref spec & para no.) | SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | |||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 1 | 01 11 00, Para 1.6.2, | |||||||||||||||||
| "Outage Requests"; G | 5 | |||||||||||||||||
| 2 | 01 11 00, Para 1.6.2, "Road | |||||||||||||||||
| Closure Requests"; G | 5 | |||||||||||||||||
| 3 | 01 11 00, Para 1.6, "Work | |||||||||||||||||
| Clearance"; G | 5 | |||||||||||||||||
| 4 | 01 11 00, Para , | |||||||||||||||||
| "Contractor's Proposed Laydown Area Plan"; G | 5 | |||||||||||||||||
| 5 | 01 14 00, Para 1.2.1.1, "List | |||||||||||||||||
| of Contact Personnel"; G | 5 | |||||||||||||||||
| 6 | 01 30 00, Para 1.2, "View Location Map"; G | 5 | ||||||||||||||||
| 7 | 01 30 00, Para 1.3, | |||||||||||||||||
| "Progress and Completion Pictures"; G | 5 | |||||||||||||||||
| 8 | 01 30 00, Para 1.5.2, | |||||||||||||||||
| "Resume for the proposed Superintendent"; G | 5 | |||||||||||||||||
| 9 | 01 32 16.00 20, Para 1.2, | |||||||||||||||||
| "Qualifications"; G | 5 | |||||||||||||||||
| 10 | 01 32 16.00 20, Para 1.3, | |||||||||||||||||
| "Project Schedule"; G | 5 | |||||||||||||||||
| 11 | 01 32 16.00 20, Para 1.4.1, | |||||||||||||||||
| "Initial Contract Progress Report (AF IMT 3065)"; G | 5 | |||||||||||||||||
| 12 | 01 32 16.00 20, Para 1.4.2, | |||||||||||||||||
| "Initial Contract Progress Schedule (AF IMT 3064)"; G | 5 | |||||||||||||||||
| 13 | 01 32 16.00 20, Para 1.3.3, | |||||||||||||||||
| "Project Schedule Updates"; G | 5 | |||||||||||||||||
| 14 | 01 32 16.00 20, Para 1.4.1, | |||||||||||||||||
| "Monthly Contract Progress Reports (AF IMT 3065)"; G | 5 | |||||||||||||||||
| 15 | 01 32 16.00 20, Para 1.4.2, | |||||||||||||||||
| "Monthly Contract Progress Schedules (AF IMT 3064)"; G | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 2 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 16 | 01 33 00, Para 1.6, | |||||||||||||||||
| "Submittal Register"; G | 5 | |||||||||||||||||
| 17 | 01 35 13, Para 3.1.4, "Heavy Equipment and Vehicle List" | 5 | ||||||||||||||||
| 18 | 01 35 13, Para 3.1.3.2, | |||||||||||||||||
| "Existing Conditions Survey" | 5 | |||||||||||||||||
| 19 | 01 35 13, Para 3.1.2, "FAA | |||||||||||||||||
| Form 7460-1" | 5 | |||||||||||||||||
| 20 | 01 35 13, Para 3.1.2, "FAA | |||||||||||||||||
| Form 7460-2" | 5 | |||||||||||||||||
| 21 | 01 35 13, Para 3.1.3.1, | |||||||||||||||||
| "Construction Operations Plan" | 5 | |||||||||||||||||
| 22 | 01 35 23, Para 1.3, "Safety | |||||||||||||||||
| Plan Compliance Document (SPCD)"; G | 5 | |||||||||||||||||
| 23 | 01 35 26, Para 1.6, "Accident Prevention Plan (APP)"; G | 5 | ||||||||||||||||
| 24 | 01 35 26, Para 1.7, "Activity | |||||||||||||||||
| Hazard Analysis (AHA)"; G | 5 | |||||||||||||||||
| 25 | 01 35 26, Para 1.11, | |||||||||||||||||
| "Notifications and Reports" | 5 | |||||||||||||||||
| 26 | 01 35 26, Para 1.11.2, | |||||||||||||||||
| "Accident Reports"; G | 5 | |||||||||||||||||
| 27 | 01 35 26, Para 1.8.1, | |||||||||||||||||
| "Confined Space Entry Permit" | 5 | |||||||||||||||||
| 28 | 01 35 26, Para 1.8.1, "Hot | |||||||||||||||||
| Work Permit" | 5 | |||||||||||||||||
| 29 | 01 35 26, Para 1.13, | |||||||||||||||||
| "License Certificates" | 5 | |||||||||||||||||
| 30 | 01 45 00, Para 1.6, "QC | |||||||||||||||||
| Plan"; G | 5 | |||||||||||||||||
| 31 | 01 50 00, Para 1.3, | |||||||||||||||||
| "Construction Site Plan"; G | 5 | |||||||||||||||||
| 32 | 01 50 00, Para 3.4.1, "Traffic | |||||||||||||||||
| Control Plan"; G | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 3 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 33 | 01 50 00, Para 1.4, | |||||||||||||||||
| "Backflow Preventers" | 5 | |||||||||||||||||
| 34 | 01 50 00, Para 2.2.4, | |||||||||||||||||
| "Backflow Preventer Tests" | 5 | |||||||||||||||||
| 35 | 01 50 00, Para 1.4.1, | |||||||||||||||||
| "Backflow Tester" | 5 | |||||||||||||||||
| 36 | 01 50 00, Para 1.4, | |||||||||||||||||
| "Backflow Preventers" | 5 | |||||||||||||||||
| 37 | 01 54 00.00 31, Para 1.5.2.1, | |||||||||||||||||
| "Affirmative Procurement Reporting Form"; G | 5 | |||||||||||||||||
| 38 | 01 57 19.00 31, Para 1.7.1, | |||||||||||||||||
| "Preconstruction Survey"; G | 5 | |||||||||||||||||
| 39 | 01 57 19.00 31, Para 1.8.3, | |||||||||||||||||
| "Regulatory Notifications"; G | 5 | |||||||||||||||||
| 40 | 01 57 19.00 31, Para 1.5, | |||||||||||||||||
| "Environmental Protection Plan"; G | 5 | |||||||||||||||||
| 41 | 01 57 19.00 31, Para 1.6, | |||||||||||||||||
| "Dirt and Dust Control Plan"; G | 5 | |||||||||||||||||
| 42 | 01 57 19.00 31, Para 3.9.2, | |||||||||||||||||
| "Disposal Requirements" | 5 | |||||||||||||||||
| 43 | 01 57 19.00 31, Para 1.8.4, | |||||||||||||||||
| "Erosion and Sediment Control Inspection Reports" | 5 | |||||||||||||||||
| 44 | 01 57 19.00 31, Para 3.4, | |||||||||||||||||
| "Erosion and Sediment Control Inspection Reports" | 5 | |||||||||||||||||
| 45 | 01 57 19.00 31, Para 3.4, | |||||||||||||||||
| "Storm Water Inspection Reports for General Permit" | 5 | |||||||||||||||||
| 46 | 01 57 19.00 31, Para 1.8.5, | |||||||||||||||||
| "Solid Waste Disposal Report"; G | 5 | |||||||||||||||||
| 47 | 01 57 19.00 31, Para 1.8.2, |
"Contractor 40 CFR employee training records";
| G | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 4 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 48 | 01 57 19.00 31, Para , | |||||||||||||||||
| "Storm Water Pollution Prevention Plan compliance notebook"; G | 5 | |||||||||||||||||
| 49 | 01 57 19.00 31, Para 1.8, | |||||||||||||||||
| "Waste Determination Documentation" | 5 | |||||||||||||||||
| 50 | 01 57 19.00 31, Para 3.7.2, | |||||||||||||||||
| "Waste Determination Documentation" | 5 | |||||||||||||||||
| 51 | 01 57 19.00 31, Para 1.8.1, | |||||||||||||||||
| "Disposal Documentation for Hazardous and Regulated Waste" | 5 | |||||||||||||||||
| 52 | 01 57 19.00 31, Para 1.8.2, | |||||||||||||||||
| "Contractor 40 CFR Employee Training Records" | 5 | |||||||||||||||||
| 53 | 01 57 19.00 31, Para 1.7.2, | |||||||||||||||||
| "Solid Waste Disposal Permit" | 5 | |||||||||||||||||
| 54 | 01 57 19.00 31, Para 1.8.5, | |||||||||||||||||
| "Solid Waste Disposal Report" | 5 | |||||||||||||||||
| 55 | 01 57 19.00 31, Para 3.7.2, | |||||||||||||||||
| "Hazardous Waste/Debris Management" | 5 | |||||||||||||||||
| 56 | 01 57 19.00 31, Para 1.8.3, | |||||||||||||||||
| "Regulatory Notifications" | 5 | |||||||||||||||||
| 57 | 01 57 20.00 31, Para , | |||||||||||||||||
| "Material Safety Data Sheets (MSDS)" | 5 | |||||||||||||||||
| 58 | 01 57 20.00 31, Para 1.8, | |||||||||||||||||
| "Green Procurement" | 5 | |||||||||||||||||
| 59 | 01 57 20.00 31, Para 1.8, | |||||||||||||||||
| "Green Procurement" | 5 | |||||||||||||||||
| 60 | 01 57 20.00 31, Para 1.3, | |||||||||||||||||
| "Recycling Report" | 5 | |||||||||||||||||
| 61 | 01 57 20.00 31, Para 1.3, | |||||||||||||||||
| "Recycling Report" | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 5 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 62 | 01 74 19.00 31, Para 1.3.3, | |||||||||||||||||
| "Construction Waste Management Plan"; G | 5 | |||||||||||||||||
| 63 | 01 78 00, Para 1.5.1, | |||||||||||||||||
| "Warranty Management Plan" | 5 | |||||||||||||||||
| 64 | 01 78 00, Para 1.5.4, | |||||||||||||||||
| "Warranty Tags" | 5 | |||||||||||||||||
| 65 | 01 78 00, Para 1.4, "Spare | |||||||||||||||||
| Parts Data" | 5 | |||||||||||||||||
| 66 | 01 78 00, Para 3.8, | |||||||||||||||||
| "Preventative Maintenance" | 5 | |||||||||||||||||
| 67 | 01 78 00, Para 3.8, | |||||||||||||||||
| "Condition Monitoring" | 5 | |||||||||||||||||
| 68 | 01 78 00, Para 3.8, | |||||||||||||||||
| "Inspection" | 5 | |||||||||||||||||
| 69 | 01 78 00, Para 1.5.1, | |||||||||||||||||
| "Instructions" | 5 | |||||||||||||||||
| 70 | 01 78 00, Para 3.6, | |||||||||||||||||
| "Operation and Maintenance Manuals"; G | 5 | |||||||||||||||||
| 71 | 01 78 00, Para 3.1, "As-Built | |||||||||||||||||
| Drawings"; G | 5 | |||||||||||||||||
| 72 | 01 78 00, Para 3.3, "Record | |||||||||||||||||
| Drawings"; G | 5 | |||||||||||||||||
| 73 | 01 78 00, Para 3.5, "As-Built Record of Equipment and | |||||||||||||||||
| Materials" | 5 | |||||||||||||||||
| 74 | 01 78 00, Para 3.4, "Final Approved Shop Drawings" | 5 | ||||||||||||||||
| 75 | 01 78 00, Para 3.9, "Interim | |||||||||||||||||
| DD FORM 1354"; G | 5 | |||||||||||||||||
| 76 | 01 78 00, Para 3.9, | |||||||||||||||||
| "Checklist for DD FORM 1354"; G | 5 | |||||||||||||||||
| 77 | 02 41 00, Para 1.2.2, | |||||||||||||||||
| "Demolition Plan"; G | 5 | |||||||||||||||||
| 78 | 02 41 00, Para 1.1, "Existing | |||||||||||||||||
| Conditions" | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 6 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 79 | 03 30 53, Para 1.4, | |||||||||||||||||
| "Installation Drawings"; G | 5 | |||||||||||||||||
| 80 | 03 30 53, Para 2.2.3.1, "Air- | |||||||||||||||||
| Entraining Admixture" | 5 | |||||||||||||||||
| 81 | 03 30 53, Para 2.2.3.2, | |||||||||||||||||
| "Water-Reducing or Retarding Admixture" | 5 | |||||||||||||||||
| 82 | 03 30 53, Para 2.2.5, "Curing | |||||||||||||||||
| Materials" | 5 | |||||||||||||||||
| 83 | 03 30 53, Para 3.2, | |||||||||||||||||
| "Conveying and Placing Concrete" | 5 | |||||||||||||||||
| 84 | 03 30 53, Para 2.3, "Mix | |||||||||||||||||
| Design Data"; G | 5 | |||||||||||||||||
| 85 | 03 30 53, Para 2.3, "Ready- | |||||||||||||||||
| Mix Concrete" | 5 | |||||||||||||||||
| 86 | 03 30 53, Para 2.4.1, "Curing Compound" | 5 | ||||||||||||||||
| 87 | 03 30 53, Para 2.2.2, | |||||||||||||||||
| "Aggregates" | 5 | |||||||||||||||||
| 88 | 03 30 53, Para 2.1.3, | |||||||||||||||||
| "Concrete Mixture Proportions"; G | 5 | |||||||||||||||||
| 89 | 03 30 53, Para 3.8.3, | |||||||||||||||||
| "Compressive Strength Testing"; G | 5 | |||||||||||||||||
| 90 | 03 30 53, Para 3.8.3, | |||||||||||||||||
| "Slump"; G | 5 | |||||||||||||||||
| 91 | 03 30 53, Para 3.8.3, "Air | |||||||||||||||||
| Content" | 5 | |||||||||||||||||
| 92 | 03 30 53, Para 2.2.4, | |||||||||||||||||
| "Water" | 5 | |||||||||||||||||
| 93 | 03 30 53, Para 2.2.1, | |||||||||||||||||
| "Cementitious Materials" | 5 | |||||||||||||||||
| 94 | 03 30 53, Para , "Pozzolan" | 5 | ||||||||||||||||
| 95 | 03 30 53, Para 2.2.2, | |||||||||||||||||
| "Aggregates" | 5 | |||||||||||||||||
| 96 | 03 30 53, Para 2.3, "Delivery | |||||||||||||||||
| Tickets" | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 7 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 97 | 03 30 53, Para 2.4.1, "Curing | |||||||||||||||||
| Compound" | 5 | |||||||||||||||||
| 98 | 31 00 00, Para 1.3.1, | |||||||||||||||||
| "Dewatering Work Plan"; G | 5 | |||||||||||||||||
| 99 | 31 00 00, Para 3.6, | |||||||||||||||||
| "Utilization of Excavated Materials"; G | 5 | |||||||||||||||||
| 100 | 31 00 00, Para 3.13, | |||||||||||||||||
| "Testing" | 5 | |||||||||||||||||
| 101 | 31 00 00, Para 3.13, | |||||||||||||||||
| "Testing" | 5 | |||||||||||||||||
| 102 | 32 01 11.51, Para , | |||||||||||||||||
| "Schedule of work"; G | 5 | |||||||||||||||||
| 103 | 32 01 11.51, Para 3.1, "Paint | |||||||||||||||||
| Removal Process Plan"; G | 5 | |||||||||||||||||
| 104 | 32 01 11.51, Para 3.4, |
"Waste Collection
| 105 | 32 01 11.51, Para 1.3, | |||||||||||||||||
| "Mechanical paint removal equipment" | 5 | |||||||||||||||||
| 106 | 32 01 11.51, Para 1.4, "Test | |||||||||||||||||
| Section Results" | 5 | |||||||||||||||||
| 107 | 32 01 19.61, Para 2.1, | |||||||||||||||||
| "Sealants" | 5 | |||||||||||||||||
| 108 | 32 01 19.61, Para 2.1, | |||||||||||||||||
| "Sealants" | 5 | |||||||||||||||||
| 109 | 32 01 19.61, Para 3.4.2, | |||||||||||||||||
| "Manufacturer's Recommendations" | 5 | |||||||||||||||||
| 110 | 32 01 19.61, Para 2.3.1, | |||||||||||||||||
| "Blocking Media/Backup Materials" | 5 | |||||||||||||||||
| 111 | 32 01 19.61, Para 3.3.4.1, | |||||||||||||||||
| "Backer Rod" | 5 | |||||||||||||||||
| 112 | 32 01 19.61, Para 2.3.2, | |||||||||||||||||
| "Bond Breaking Tapes" | 5 | |||||||||||||||||
| 113 | 32 01 19.61, Para 2.1, | |||||||||||||||||
| "Sealants" | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 8 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 114 | 32 01 19.61, Para 3.1, | |||||||||||||||||
| "Equipment List" | 5 | |||||||||||||||||
| 115 | 32 01 19.61, Para 2.1, | |||||||||||||||||
| "Sealants" | 5 | |||||||||||||||||
| 116 | 32 01 29.61, Para 2.1.6, | |||||||||||||||||
| "Rigid Proprietary Repair Products"; G | 5 | |||||||||||||||||
| 117 | 32 01 29.61, Para 2.1.1.1, | |||||||||||||||||
| "Pigmented Liquid Membrane-Forming Compound"; G | 5 | |||||||||||||||||
| 118 | 32 01 29.61, Para 2.1.1.1, | |||||||||||||||||
| "Pigmented Liquid Membrane-Forming Compound"; G | 5 | |||||||||||||||||
| 119 | 32 01 29.61, Para 2.1.6.6, | |||||||||||||||||
| "Aggregate Service Record" | 5 | |||||||||||||||||
| 120 | 32 01 29.61, Para 3.5.1, | |||||||||||||||||
| "Absorbent Curing Material"; G | 2 | |||||||||||||||||
| 121 | 32 01 29.61, Para 2.1.4, | |||||||||||||||||
| "Joint Filler"; G | 2 | |||||||||||||||||
| 122 | 32 01 29.61, Para 2.1.3, | |||||||||||||||||
| "Joint Sealant"; G | 2 | |||||||||||||||||
| 123 | 32 01 29.61, Para , "Test | |||||||||||||||||
| Results" | 5 | |||||||||||||||||
| 124 | 32 01 29.61, Para 2.1.6.1, | |||||||||||||||||
| "Compressive Strength" | 5 | |||||||||||||||||
| 125 | 32 01 29.61, Para 2.1.6.2, | |||||||||||||||||
| "Bond Strength" | 5 | |||||||||||||||||
| 126 | 32 01 29.61, Para 3.5.1, | |||||||||||||||||
| "Absorbent curing material" | 5 | |||||||||||||||||
| 127 | 32 01 29.61, Para 2.1.1.1, | |||||||||||||||||
| "Pigmented Liquid Membrane-Forming Compound" | 5 | |||||||||||||||||
| 128 | 32 01 29.61, Para 2.1.1.1, |
"Pigmented Liquid Membrane-Forming
| Compound" | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 9 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 129 | 32 01 29.61, Para 2.1.4, | |||||||||||||||||
| "Joint Filler" | 5 | |||||||||||||||||
| 130 | 32 01 29.61, Para 2.1.3, | |||||||||||||||||
| "Joint Sealant" | 5 | |||||||||||||||||
| 131 | 32 11 23, Para 1.4, "Plant | |||||||||||||||||
| 132 | 32 11 23, Para 2.3.1, "Initial | |||||||||||||||||
| Tests"; G | 5 | |||||||||||||||||
| 133 | 32 11 23, Para 3.12.1, "In- | |||||||||||||||||
| Place Tests"; G | 5 | |||||||||||||||||
| 134 | 32 12 13, Para 3.7, | |||||||||||||||||
| "Sampling and Testing" | 5 | |||||||||||||||||
| 135 | 32 12 15.13, Para 2.1, | |||||||||||||||||
| "Placement Plan"; G | 5 | |||||||||||||||||
| 136 | 32 12 15.13, Para 2.1.6, | |||||||||||||||||
| "Diamond Grinding Plan"; G | 5 | |||||||||||||||||
| 137 | 32 12 15.13, Para 2.4, "Mix | |||||||||||||||||
| Design"; G | 5 | |||||||||||||||||
| 138 | 32 12 15.13, Para 3.1, | |||||||||||||||||
| "Contractor Quality Control"; G | 5 | |||||||||||||||||
| 139 | 32 12 15.13, Para 2.2, | |||||||||||||||||
| "Aggregates" | 2 | |||||||||||||||||
| 140 | 32 12 15.13, Para 2.3, | |||||||||||||||||
| "Asphalt Binder" | 2 | |||||||||||||||||
| 141 | 32 12 15.13, Para 2.2, | |||||||||||||||||
| "Aggregates"; G | 5 | |||||||||||||||||
| 142 | 32 12 15.13, Para 3.1.3.10, | |||||||||||||||||
| "QC Monitoring" | 5 | |||||||||||||||||
| 143 | 32 12 15.13, Para 2.3, | |||||||||||||||||
| "Asphalt Binder"; G | 5 | |||||||||||||||||
| 144 | 32 12 15.13, Para 3.1.2, | |||||||||||||||||
| "Testing Laboratory" | 5 | |||||||||||||||||
| 145 | 32 12 15.13, Para 1.5, | |||||||||||||||||
| "Airfield Asphalt Pavement QC Manager" | 5 | |||||||||||||||||
| 146 | 32 12 15.13, Para 1.5, | |||||||||||||||||
| "Airfield Asphalt Pavement Inspector" | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 10 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 147 | 32 12 15.13, Para 1.5, | |||||||||||||||||
| "Airfield Asphalt Pavement Technician" | 5 | |||||||||||||||||
| 148 | 32 13 14.13, Para 2.1.7, | |||||||||||||||||
| "Diamond Grinding Plan"; G | 5 | |||||||||||||||||
| 149 | 32 13 14.13, Para 2.9.1, | |||||||||||||||||
| "Dowels"; G | 5 | |||||||||||||||||
| 150 | 32 13 14.13, Para 2.9.2, | |||||||||||||||||
| "Dowel Bar Assemblies"; G | 5 | |||||||||||||||||
| 151 | 32 13 14.13, Para 2.11, | |||||||||||||||||
| "Equipment" | 5 | |||||||||||||||||
| 152 | 32 13 14.13, Para 3.1.2, | |||||||||||||||||
| "Proposed Techniques"; G | 5 | |||||||||||||||||
| 153 | 32 13 14.13, Para 2.13.2, | |||||||||||||||||
| "Preliminary Proposed Proportioning"; G | 5 | |||||||||||||||||
| 154 | 32 13 14.13, Para 2.13.2, | |||||||||||||||||
| "Proportioning Studies"; G | 5 | |||||||||||||||||
| 155 | 32 13 14.13, Para 1.4.1, | |||||||||||||||||
| "Batch Plant Manufacturer's Inspection Report"; G | 5 | |||||||||||||||||
| 156 | 32 13 14.13, Para 1.4.1, | |||||||||||||||||
| "Slipform Paver Manufacturer's Inspection Report"; G | 5 | |||||||||||||||||
| 157 | 32 13 14.13, Para 2.1.4.1, | |||||||||||||||||
| "Sampling and Testing"; G | 5 | |||||||||||||||||
| 158 | 32 13 14.13, Para 2.1.7, | |||||||||||||||||
| "Diamond Grinding of PCC Surfaces"; G | 5 | |||||||||||||||||
| 159 | 32 13 14.13, Para 2.11.2.3, | |||||||||||||||||
| "Mixer Performance (Uniformity) Testing"; G | 5 | |||||||||||||||||
| 160 | 32 13 14.13, Para 3.9.1, | |||||||||||||||||
| "Repair Recommendations Plan"; G | 5 | |||||||||||||||||
| 161 | 32 13 14.13, Para 1.4.1, | |||||||||||||||||
| "Contractor Quality Control Staff"; G | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 11 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 162 | 32 13 14.13, Para 1.4.3, | |||||||||||||||||
| "Laboratory Accreditation and Validation" | 5 | |||||||||||||||||
| 163 | 32 13 14.13, Para 1.4.3.3, | |||||||||||||||||
| "Commercial Laboratory"; G | 5 | |||||||||||||||||
| 164 | 32 13 14.13, Para 2.11, | |||||||||||||||||
| "NRMCA Certificate of Conformance" | 5 | |||||||||||||||||
| 165 | 32 17 23, Para 2.1.1.2, | |||||||||||||||||
| "Surface Preparation Equipment List"; G | 5 | |||||||||||||||||
| 166 | 32 17 23, Para 2.1.2, | |||||||||||||||||
| "Application Equipment List"; G | 5 | |||||||||||||||||
| 167 | 32 17 23, Para 3.2, "Exterior | |||||||||||||||||
| Surface Preparation" | 5 | |||||||||||||||||
| 168 | 32 17 23, Para 1.3.1, "Safety | |||||||||||||||||
| Data Sheets"; G | 5 | |||||||||||||||||
| 169 | 32 17 23, Para 2.2.2.1, | |||||||||||||||||
| "Reflective media for airfields"; G | 5 | |||||||||||||||||
| 170 | 32 17 23, Para 2.2.1, | |||||||||||||||||
| "Waterborne Paint"; G | 5 | |||||||||||||||||
| 171 | 32 17 23, Para 2.2.2.1, | |||||||||||||||||
| "Reflective Media for Airfields"; G | 5 | |||||||||||||||||
| 172 | 32 17 23, Para 2.2.1, | |||||||||||||||||
| "Waterborne Paint"; G | 5 | |||||||||||||||||
| 173 | 32 17 23, Para 1.3.2, | |||||||||||||||||
| "Qualifications"; G | 5 | |||||||||||||||||
| 174 | 32 17 23, Para 2.2.2.1, | |||||||||||||||||
| "Reflective Media for Airfields" | 5 | |||||||||||||||||
| 175 | 32 17 23, Para 2.2.1, | |||||||||||||||||
| "Waterborne Paint" | 5 | |||||||||||||||||
| 176 | 32 17 23, Para 1.3.1, | |||||||||||||||||
| "Volatile Organic Compound"; G | 5 | |||||||||||||||||
| 177 | 32 17 23, Para 2.2.1, | |||||||||||||||||
| "Waterborne Paint"; G | 5 | |||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS PAGE 12 OF 12 | PROJECT NUMBER DKFX 1069806 | PROJECT TITLE | ||||||||||||||||
| Repair IMC Pavements - Area F | SOLICITATION/CONTRACT NO. FA441821C0028 | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| L I N E | ||||||||||||||||||
| N U M B E R | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | |||||||||||||||||
| (Ref spec & para no.) | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL | ||||||||||||||
| ENGINEERING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||
| SD-01 PRECONSTRUCTION SUBMITTALS | SD-02 SHOP DRAWINGS | SD-03 PRODUCT DATA | SD-04 SAMPLES | SD-05 DESIGN DATA | SD-06 TEST REPORTS | SD-07 CERTIFICATES | SD-08 MANUFACTURER'S INSTRUCTIONS | SD-09 MANUFACTURER'S FIELD REPORTS | SD-10 OPERATION & MAINTENANCE DATA | SD-11 CLOSEOUT SUBMITTALS | OTHERS AS SPECIFIED | |||||||
| APPROVED | DISAPPROVED | |||||||||||||||||
| 178 | 32 92 23, Para 2.4, | |||||||||||||||||
| "Fertilizer" | 5 | |||||||||||||||||
| 179 | 32 92 23, Para 2.2.2, | |||||||||||||||||
| "Topsoil composition tests" | 5 | |||||||||||||||||
| 180 | 32 92 23, Para 2.1, "sods" | 5 |