This is an AF Form 66 Schedule of Material Submittals containing 180 line items of required submittals for contract FA441821C0028, "Repair IMC Pavements - Area F" at Joint Base Charleston. The form details required documentation across multiple categories including preconstruction submittals, shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions/reports, operations/maintenance data, and closeout submittals.

Key submittal requirements include construction plans, safety documentation, quality control plans, environmental protection plans, concrete mix designs, asphalt placement plans, diamond grinding plans, and various testing/inspection reports. Each line item specifies the reference specification, number of copies required (generally 5), and includes columns for tracking submission dates, reviews, approvals and contractor resubmittals. Major work elements appear to involve concrete/asphalt paving, joint sealing, surface preparation, painting/marking, and associated quality control requirements for airfield pavement repairs.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SCHEDULE OF MATERIAL SUBMITTALS PAGE 1 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RNO. OF COPIES REQUIRED
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIEDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
101 11 00, Para 1.6.2,
"Outage Requests"; G5
201 11 00, Para 1.6.2, "Road
Closure Requests"; G5
301 11 00, Para 1.6, "Work
Clearance"; G5
401 11 00, Para ,
"Contractor's Proposed Laydown Area Plan"; G5
501 14 00, Para 1.2.1.1, "List
of Contact Personnel"; G5
601 30 00, Para 1.2, "View Location Map"; G5
701 30 00, Para 1.3,
"Progress and Completion Pictures"; G5
801 30 00, Para 1.5.2,
"Resume for the proposed Superintendent"; G5
901 32 16.00 20, Para 1.2,
"Qualifications"; G5
1001 32 16.00 20, Para 1.3,
"Project Schedule"; G5
1101 32 16.00 20, Para 1.4.1,
"Initial Contract Progress Report (AF IMT 3065)"; G5
1201 32 16.00 20, Para 1.4.2,
"Initial Contract Progress Schedule (AF IMT 3064)"; G5
1301 32 16.00 20, Para 1.3.3,
"Project Schedule Updates"; G5
1401 32 16.00 20, Para 1.4.1,
"Monthly Contract Progress Reports (AF IMT 3065)"; G5
1501 32 16.00 20, Para 1.4.2,
"Monthly Contract Progress Schedules (AF IMT 3064)"; G5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 2 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
1601 33 00, Para 1.6,
"Submittal Register"; G5
1701 35 13, Para 3.1.4, "Heavy Equipment and Vehicle List"5
1801 35 13, Para 3.1.3.2,
"Existing Conditions Survey"5
1901 35 13, Para 3.1.2, "FAA
Form 7460-1"5
2001 35 13, Para 3.1.2, "FAA
Form 7460-2"5
2101 35 13, Para 3.1.3.1,
"Construction Operations Plan"5
2201 35 23, Para 1.3, "Safety
Plan Compliance Document (SPCD)"; G5
2301 35 26, Para 1.6, "Accident Prevention Plan (APP)"; G5
2401 35 26, Para 1.7, "Activity
Hazard Analysis (AHA)"; G5
2501 35 26, Para 1.11,
"Notifications and Reports"5
2601 35 26, Para 1.11.2,
"Accident Reports"; G5
2701 35 26, Para 1.8.1,
"Confined Space Entry Permit"5
2801 35 26, Para 1.8.1, "Hot
Work Permit"5
2901 35 26, Para 1.13,
"License Certificates"5
3001 45 00, Para 1.6, "QC
Plan"; G5
3101 50 00, Para 1.3,
"Construction Site Plan"; G5
3201 50 00, Para 3.4.1, "Traffic
Control Plan"; G5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 3 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
3301 50 00, Para 1.4,
"Backflow Preventers"5
3401 50 00, Para 2.2.4,
"Backflow Preventer Tests"5
3501 50 00, Para 1.4.1,
"Backflow Tester"5
3601 50 00, Para 1.4,
"Backflow Preventers"5
3701 54 00.00 31, Para 1.5.2.1,
"Affirmative Procurement Reporting Form"; G5
3801 57 19.00 31, Para 1.7.1,
"Preconstruction Survey"; G5
3901 57 19.00 31, Para 1.8.3,
"Regulatory Notifications"; G5
4001 57 19.00 31, Para 1.5,
"Environmental Protection Plan"; G5
4101 57 19.00 31, Para 1.6,
"Dirt and Dust Control Plan"; G5
4201 57 19.00 31, Para 3.9.2,
"Disposal Requirements"5
4301 57 19.00 31, Para 1.8.4,
"Erosion and Sediment Control Inspection Reports"5
4401 57 19.00 31, Para 3.4,
"Erosion and Sediment Control Inspection Reports"5
4501 57 19.00 31, Para 3.4,
"Storm Water Inspection Reports for General Permit"5
4601 57 19.00 31, Para 1.8.5,
"Solid Waste Disposal Report"; G5
4701 57 19.00 31, Para 1.8.2,

"Contractor 40 CFR employee training records";

G5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 4 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
4801 57 19.00 31, Para ,
"Storm Water Pollution Prevention Plan compliance notebook"; G5
4901 57 19.00 31, Para 1.8,
"Waste Determination Documentation"5
5001 57 19.00 31, Para 3.7.2,
"Waste Determination Documentation"5
5101 57 19.00 31, Para 1.8.1,
"Disposal Documentation for Hazardous and Regulated Waste"5
5201 57 19.00 31, Para 1.8.2,
"Contractor 40 CFR Employee Training Records"5
5301 57 19.00 31, Para 1.7.2,
"Solid Waste Disposal Permit"5
5401 57 19.00 31, Para 1.8.5,
"Solid Waste Disposal Report"5
5501 57 19.00 31, Para 3.7.2,
"Hazardous Waste/Debris Management"5
5601 57 19.00 31, Para 1.8.3,
"Regulatory Notifications"5
5701 57 20.00 31, Para ,
"Material Safety Data Sheets (MSDS)"5
5801 57 20.00 31, Para 1.8,
"Green Procurement"5
5901 57 20.00 31, Para 1.8,
"Green Procurement"5
6001 57 20.00 31, Para 1.3,
"Recycling Report"5
6101 57 20.00 31, Para 1.3,
"Recycling Report"5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 5 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
6201 74 19.00 31, Para 1.3.3,
"Construction Waste Management Plan"; G5
6301 78 00, Para 1.5.1,
"Warranty Management Plan"5
6401 78 00, Para 1.5.4,
"Warranty Tags"5
6501 78 00, Para 1.4, "Spare
Parts Data"5
6601 78 00, Para 3.8,
"Preventative Maintenance"5
6701 78 00, Para 3.8,
"Condition Monitoring"5
6801 78 00, Para 3.8,
"Inspection"5
6901 78 00, Para 1.5.1,
"Instructions"5
7001 78 00, Para 3.6,
"Operation and Maintenance Manuals"; G5
7101 78 00, Para 3.1, "As-Built
Drawings"; G5
7201 78 00, Para 3.3, "Record
Drawings"; G5
7301 78 00, Para 3.5, "As-Built Record of Equipment and
Materials"5
7401 78 00, Para 3.4, "Final Approved Shop Drawings"5
7501 78 00, Para 3.9, "Interim
DD FORM 1354"; G5
7601 78 00, Para 3.9,
"Checklist for DD FORM 1354"; G5
7702 41 00, Para 1.2.2,
"Demolition Plan"; G5
7802 41 00, Para 1.1, "Existing
Conditions"5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 6 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
7903 30 53, Para 1.4,
"Installation Drawings"; G5
8003 30 53, Para 2.2.3.1, "Air-
Entraining Admixture"5
8103 30 53, Para 2.2.3.2,
"Water-Reducing or Retarding Admixture"5
8203 30 53, Para 2.2.5, "Curing
Materials"5
8303 30 53, Para 3.2,
"Conveying and Placing Concrete"5
8403 30 53, Para 2.3, "Mix
Design Data"; G5
8503 30 53, Para 2.3, "Ready-
Mix Concrete"5
8603 30 53, Para 2.4.1, "Curing Compound"5
8703 30 53, Para 2.2.2,
"Aggregates"5
8803 30 53, Para 2.1.3,
"Concrete Mixture Proportions"; G5
8903 30 53, Para 3.8.3,
"Compressive Strength Testing"; G5
9003 30 53, Para 3.8.3,
"Slump"; G5
9103 30 53, Para 3.8.3, "Air
Content"5
9203 30 53, Para 2.2.4,
"Water"5
9303 30 53, Para 2.2.1,
"Cementitious Materials"5
9403 30 53, Para , "Pozzolan"5
9503 30 53, Para 2.2.2,
"Aggregates"5
9603 30 53, Para 2.3, "Delivery
Tickets"5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 7 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
9703 30 53, Para 2.4.1, "Curing
Compound"5
9831 00 00, Para 1.3.1,
"Dewatering Work Plan"; G5
9931 00 00, Para 3.6,
"Utilization of Excavated Materials"; G5
10031 00 00, Para 3.13,
"Testing"5
10131 00 00, Para 3.13,
"Testing"5
10232 01 11.51, Para ,
"Schedule of work"; G5
10332 01 11.51, Para 3.1, "Paint
Removal Process Plan"; G5
10432 01 11.51, Para 3.4,

"Waste Collection

10532 01 11.51, Para 1.3,
"Mechanical paint removal equipment"5
10632 01 11.51, Para 1.4, "Test
Section Results"5
10732 01 19.61, Para 2.1,
"Sealants"5
10832 01 19.61, Para 2.1,
"Sealants"5
10932 01 19.61, Para 3.4.2,
"Manufacturer's Recommendations"5
11032 01 19.61, Para 2.3.1,
"Blocking Media/Backup Materials"5
11132 01 19.61, Para 3.3.4.1,
"Backer Rod"5
11232 01 19.61, Para 2.3.2,
"Bond Breaking Tapes"5
11332 01 19.61, Para 2.1,
"Sealants"5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 8 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
11432 01 19.61, Para 3.1,
"Equipment List"5
11532 01 19.61, Para 2.1,
"Sealants"5
11632 01 29.61, Para 2.1.6,
"Rigid Proprietary Repair Products"; G5
11732 01 29.61, Para 2.1.1.1,
"Pigmented Liquid Membrane-Forming Compound"; G5
11832 01 29.61, Para 2.1.1.1,
"Pigmented Liquid Membrane-Forming Compound"; G5
11932 01 29.61, Para 2.1.6.6,
"Aggregate Service Record"5
12032 01 29.61, Para 3.5.1,
"Absorbent Curing Material"; G2
12132 01 29.61, Para 2.1.4,
"Joint Filler"; G2
12232 01 29.61, Para 2.1.3,
"Joint Sealant"; G2
12332 01 29.61, Para , "Test
Results"5
12432 01 29.61, Para 2.1.6.1,
"Compressive Strength"5
12532 01 29.61, Para 2.1.6.2,
"Bond Strength"5
12632 01 29.61, Para 3.5.1,
"Absorbent curing material"5
12732 01 29.61, Para 2.1.1.1,
"Pigmented Liquid Membrane-Forming Compound"5
12832 01 29.61, Para 2.1.1.1,

"Pigmented Liquid Membrane-Forming

Compound"5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 9 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
12932 01 29.61, Para 2.1.4,
"Joint Filler"5
13032 01 29.61, Para 2.1.3,
"Joint Sealant"5
13132 11 23, Para 1.4, "Plant
13232 11 23, Para 2.3.1, "Initial
Tests"; G5
13332 11 23, Para 3.12.1, "In-
Place Tests"; G5
13432 12 13, Para 3.7,
"Sampling and Testing"5
13532 12 15.13, Para 2.1,
"Placement Plan"; G5
13632 12 15.13, Para 2.1.6,
"Diamond Grinding Plan"; G5
13732 12 15.13, Para 2.4, "Mix
Design"; G5
13832 12 15.13, Para 3.1,
"Contractor Quality Control"; G5
13932 12 15.13, Para 2.2,
"Aggregates"2
14032 12 15.13, Para 2.3,
"Asphalt Binder"2
14132 12 15.13, Para 2.2,
"Aggregates"; G5
14232 12 15.13, Para 3.1.3.10,
"QC Monitoring"5
14332 12 15.13, Para 2.3,
"Asphalt Binder"; G5
14432 12 15.13, Para 3.1.2,
"Testing Laboratory"5
14532 12 15.13, Para 1.5,
"Airfield Asphalt Pavement QC Manager"5
14632 12 15.13, Para 1.5,
"Airfield Asphalt Pavement Inspector"5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 10 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
14732 12 15.13, Para 1.5,
"Airfield Asphalt Pavement Technician"5
14832 13 14.13, Para 2.1.7,
"Diamond Grinding Plan"; G5
14932 13 14.13, Para 2.9.1,
"Dowels"; G5
15032 13 14.13, Para 2.9.2,
"Dowel Bar Assemblies"; G5
15132 13 14.13, Para 2.11,
"Equipment"5
15232 13 14.13, Para 3.1.2,
"Proposed Techniques"; G5
15332 13 14.13, Para 2.13.2,
"Preliminary Proposed Proportioning"; G5
15432 13 14.13, Para 2.13.2,
"Proportioning Studies"; G5
15532 13 14.13, Para 1.4.1,
"Batch Plant Manufacturer's Inspection Report"; G5
15632 13 14.13, Para 1.4.1,
"Slipform Paver Manufacturer's Inspection Report"; G5
15732 13 14.13, Para 2.1.4.1,
"Sampling and Testing"; G5
15832 13 14.13, Para 2.1.7,
"Diamond Grinding of PCC Surfaces"; G5
15932 13 14.13, Para 2.11.2.3,
"Mixer Performance (Uniformity) Testing"; G5
16032 13 14.13, Para 3.9.1,
"Repair Recommendations Plan"; G5
16132 13 14.13, Para 1.4.1,
"Contractor Quality Control Staff"; G5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 11 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
16232 13 14.13, Para 1.4.3,
"Laboratory Accreditation and Validation"5
16332 13 14.13, Para 1.4.3.3,
"Commercial Laboratory"; G5
16432 13 14.13, Para 2.11,
"NRMCA Certificate of Conformance"5
16532 17 23, Para 2.1.1.2,
"Surface Preparation Equipment List"; G5
16632 17 23, Para 2.1.2,
"Application Equipment List"; G5
16732 17 23, Para 3.2, "Exterior
Surface Preparation"5
16832 17 23, Para 1.3.1, "Safety
Data Sheets"; G5
16932 17 23, Para 2.2.2.1,
"Reflective media for airfields"; G5
17032 17 23, Para 2.2.1,
"Waterborne Paint"; G5
17132 17 23, Para 2.2.2.1,
"Reflective Media for Airfields"; G5
17232 17 23, Para 2.2.1,
"Waterborne Paint"; G5
17332 17 23, Para 1.3.2,
"Qualifications"; G5
17432 17 23, Para 2.2.2.1,
"Reflective Media for Airfields"5
17532 17 23, Para 2.2.1,
"Waterborne Paint"5
17632 17 23, Para 1.3.1,
"Volatile Organic Compound"; G5
17732 17 23, Para 2.2.1,
"Waterborne Paint"; G5
SCHEDULE OF MATERIAL SUBMITTALS PAGE 12 OF 12PROJECT NUMBER DKFX 1069806PROJECT TITLE
Repair IMC Pavements - Area FSOLICITATION/CONTRACT NO. FA441821C0028
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
L I N E
N U M B E RITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
(Ref spec & para no.)NO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL
ENGINEERINGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SD-01 PRECONSTRUCTION SUBMITTALSSD-02 SHOP DRAWINGSSD-03 PRODUCT DATASD-04 SAMPLESSD-05 DESIGN DATASD-06 TEST REPORTSSD-07 CERTIFICATESSD-08 MANUFACTURER'S INSTRUCTIONSSD-09 MANUFACTURER'S FIELD REPORTSSD-10 OPERATION & MAINTENANCE DATASD-11 CLOSEOUT SUBMITTALSOTHERS AS SPECIFIED
APPROVEDDISAPPROVED
17832 92 23, Para 2.4,
"Fertilizer"5
17932 92 23, Para 2.2.2,
"Topsoil composition tests"5
18032 92 23, Para 2.1, "sods"5

File details come from the government source that posted it. Updated .