17b - Specifications B578.pdf

PDF 6 MB Posted

Attached to
Repair MX Dock B578 and IMC Pavements Area F
Solicitation number
FA441825R0002
Issued by

About this file

This is a specifications document for a construction project to repair Building 578, a maintenance dock facility at Joint Base Charleston Air Base in North Charleston, South Carolina. The document includes detailed technical specifications across multiple divisions including general requirements, existing conditions, concrete, metals, thermal/moisture protection, openings, finishes, specialties, and mechanical/electrical systems.

The specifications outline requirements for repairing and rehabilitating concrete structures, installing new doors and hardware, applying paints and coatings, upgrading HVAC systems, and performing electrical work. Key components include special inspections requirements, asbestos/lead testing results showing no asbestos was detected but lead-based paint was found on exterior parking bollards, and concrete rehabilitation specifications detailing surface preparation, equipment, materials and quality control requirements. The design was completed in June 2023 by ADC Engineering, with James G. Jones as the Designer of Record. The project number is DKFX 1052062 and includes coordination with the 628 CES/CENMP office.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TWCF - Repair Maintenance Dock, B.578 at

Joint Base Charleston – Air Base North Charleston, South Carolina

Charleston County

Specifications

Final Design Submittal June 8, 2023

Designer of Record: James G. Jones, P.E.

Project Manager: Grant Eversmann, P.E.

gregj@adcengineering.com grante@adcengineering.com JBC Project No. DKFX 1052062 ADC Project No. 22009

TWCF - Repair Maintenance Dock, B.578 Final Submittal JBC No. DKFX 1052062 June 8, 2023

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 JBC 12/21 SUMMARY OF WORK

01 14 00 JBC 12/21 WORK RESTRICTIONS

01 30 00 JBC 12/21 ADMINISTRATIVE REQUIREMENTS

01 32 00 JBC 12/21 PROJECT SCHEDULE

01 33 00 JBC 12/21 SUBMITTAL PROCEDURES

01 35 26 JBC 12/21 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 JBC 12/21 QUALITY CONTROL

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 JBC 12/19 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 54 00.00 31 JB CHS 07/14 GREEN PROCUREMENT (JB CHS)

01 57 19.00 31 JBC 06/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 20.00 31 JBC 05/22 ENVIRONMENTAL

01 74 19.00 31 JBC 12/19 CONSTRUCTION AND DEMOLITION WASTE

MANAGEMENT

01 78 00 JBC 12/21 CLOSEOUT REQUIREMENTS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 02 00.00 03/20 LEAD AND ASBESTOS REPORT

DI VI SI ON 03 - CONCRETE

03 01 00 02/18 REHABILITATION OF CONCRETE

DI VI SI ON 05 - METALS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS

08 60 45 08/20 TRANSLUCENT PANELS

08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE

DI VI SI ON 09 - FI NI SHES

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 67 23.16 02/21 FUEL RESISTIVE RESINOUS FLOORING,

5-COAT SYSTEM

09 90 00 02/21 PAINTS AND COATINGS

09 97 13.00 40 11/19 STEEL COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 21 13 08/20 TOILET COMPARTMENTS

10 28 13 08/20 TOILET ACCESSORIES

PROJECT TABLE OF CONTENTS Page 1

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Line

Ben Bressler (628 CES/CENMP) Text Box Refer to "Specifications - Combined Division 01"

10 51 13 05/11 METAL LOCKERS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 73 05/20, CHG 1: 08/20 SEISMIC CONTROL FOR MECHANICAL

EQUIPMENT

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 01 30.41 05/22 HVAC SYSTEM CLEANING

23 05 15 05/22 COMMON PIPING FOR HVAC

23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 21 23 08/17 HYDRONIC PUMPS

23 23 00 08/21 REFRIGERANT PIPING

23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 5: 11/19 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 75 15 02/20 CUSTOM-PACKAGED, AIRCRAFT

PRE-CONDITIONED AIR UNITS

23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

DI VI SI ON 26 - ELECTRI CAL

26 05 00.00 40 11/20 COMMON WORK RESULTS FOR ELECTRICAL

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 08 00 11/21 APPARATUS INSPECTION AND TESTING

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 35 43 08/21 400-HERTZ (HZ) SOLID STATE FREQUENCY

CONVERTER

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

PROJECT TABLE OF CONTENTS Page 2

SECTION 01 45 35

SPECIAL INSPECTIONS

11/20

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2021) International Building Code

1.2 GENERAL REQUIREMENTS

Perform Special Inspections in accordance with the Statement of Special Inspections, Schedule of Special Inspections and Chapter 17 of ICC IBC .

The Statement of Special Inspections and Schedule of Special Inspections are included as an attachment to this specification. Special Inspections are to be performed by an independent third party and are intended to ensure that the work of the Prime Contractor is in accordance with the Contract Documents and applicable building codes. Special inspections do not take the place of the three phases of control inspections performed by the Contractor's QC Manager or any testing and inspections required by other sections of the specifications.

1.3 DEFINITIONS

1.3.1 Continuous Special Inspections

Continuous Special Inspections is the constant monitoring of specific tasks by a special inspector. These inspections must be carried out continuously over the duration of the particular tasks.

1.3.2 Perform

Perform these Special Inspections tasks for each welded joint or member.

1.3.3 Observe

Observe these Special Inspections items on a periodic daily basis.

Operations need not be delayed pending these inspections.

1.3.4 Special Inspector (SI)

A qualified person retained by the Contractor and approved by the Contracting Officer as having the competence necessary to inspect a particular type of construction requiring Special Inspections. The SI must be an independent third party hired directly by the Prime Contractor.

SECTION 01 45 35 Page 1

1.3.5 Associate Special Inspector (ASI)

A qualified person who assists the SI in performing Special Inspections but must perform inspection under the direct supervision of the SI and cannot perform inspections without the SI on site.

1.3.6 Third Party

A Special inspector must not be an employee of the Contractor or of any Sub-Contractor performing the work to be inspected.

1.3.7 Special Inspector of Record (SIOR)

A licensed engineer in responsible charge of supervision of all special inspectors for the project and approved by the Contracting Officer. The SIOR must be an independent third party entity hired directly by the Prime Contractor.

1.3.8 Contracting Officer

The Government official having overall authority for administrative contracting actions. Certain contracting actions may be delegated to the Contracting Officer's Representative (COR).

1.3.9 Contractor's Quality Control (QC) Manager

An individual retained by the Prime Contractor and qualified in accordance with the Section having the overall responsibility for the Contractor's QC organization.

1.3.10 Structural Engineer of Record (SER)

A registered design professional retained by the Prime Contractor responsible for the overall design and review of submittal documents prepared by others. The SER is registered or licensed to practice their respective design profession as defined by the statutory requirements of the professional registration laws in the state in which the design professional works. The SER is also referred to as the Engineer of Record (EOR) in design code documents.

1.3.11 Statement of Special Inspections (SSI)

A document developed by the SER identifying the material, systems, components and work required to have Special Inspections. This statement is included at the end of this specification.

1.3.12 Schedule of Special Inspections (SSI)

A schedule which lists each of the required Special Inspections, the extent to which each Special Inspection is to be performed, and the required frequency for each in accordance with ICC IBC Chapter 17. This schedule is included at the end of this specification.

1.3.13 Designated Seismic Systems (DSS)

Those nonstructural components that require design in accordance with ASCE 7-16 Chapter 13 and for which the component importance factor, Ip, is greater than 1.0. This designation applies to systems that are required

SECTION 01 45 35 Page 2 to be operational following the Design Earthquake for RC I - IV structures and following the MCER for RC V structures. All systems in RC V facilities designated as MC-1 in accordance with UFC 3-301-02 are considered part of the Designated Seismic Systems..

1.3.14 Definable Feature of Work (DFOW)

An inspection group that is separate and distinct from other inspection groups, having inspection requirements or inspectors that are unique.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

SIOR Letter of Acceptance; G

Special Inspections Project Manual; G

Special Inspections Agency's with method and evidence of regular equipment calibration where applicable

SD-06 Test Reports

Special Inspections Daily Reports

Special Inspections Biweekly Reports

SD-07 Certificates Special Inspector of Record Qualifications; G

Special Inspector Qualifications; G for NDT technicians SD-11 Closeout Submittals

Interim Report of Special Inspections for Each DFOW; G

Comprehensive Final Report of Special Inspections; G

1.5 SPECIAL INSPECTOR QUALIFICATIONS

Submit qualifications for each special inspector and the special inspector of record.

1.5.1 Steel Construction and High Strength Bolting

1.5.1.1 Special Inspector

a. ICC Structural Steel and Bolting Special Inspector certificate with one year of related experience, or

b. Registered Professional Engineer with three years of related experience

SECTION 01 45 35 Page 3

1.5.1.2 Associate Special Inspector

Engineer-In-Training with one year of related experience.

1.5.2 Cold Formed Steel Framing

1.5.2.1 Special Inspector

a. ICC Structural Steel and Bolting Special Inspector certificate with one year of related experience, or

b. ICC Commercial Building Inspector with one year of experience, or

c. ICC Residential Building Inspector with one year of experience, or

d. Registered Professional Engineer with three years related experience

1.5.2.2 Associate Special Inspector

Engineer-In-Training with one year of related experience.

1.5.3 Concrete Construction

1.5.3.1 Special Inspector

a. ICC Reinforced Concrete Special Inspector Certificate with one year of related experience, or

b. ACI Concrete Construction Special Inspector, or

c. Registered Professional Engineer with three years of related experience

1.5.3.2 Associate Special Inspector

a. ACI Concrete Construction Special Inspector in Training, or

b. Engineer-In-Training with one year of related experience

1.5.4 Masonry Construction

1.5.4.1 Special Inspector

a. ICC Structural Masonry Special Inspector Certificate with one year of related experience, or

b. Registered Professional Engineer with three years of related experience

1.5.4.2 Associate Special Inspector

Engineer-In-Training with one year of related experience.

1.5.5 Verification of Site Soil Condition, Fill Placement and Load-Bearing Requirements

1.5.5.1 Special Inspector

a. ICC Soils Special Inspector Certificate with one year of related experience, or

SECTION 01 45 35 Page 4

b. NICET Soils Technician Level II Certificate in Construction Material Testing, or

c. Geologist-In-Training with three years of related experience, or

d. Registered Professional Engineer with three years of related experience

1.5.5.2 Associate Special Inspector

a. NICET Soils Technician Level I Certificate in Construction Material Testing with one year of related experience, or

b. Engineer-In-Training with one year of related experience

1.5.6 Special Inspector of Record (SIOR)

Registered Professional Engineer with five years of related experience.

PART 2 PRODUCTS

2.1 FABRICATOR SPECIAL INSPECTIONS

Special Inspections of fabricator's work performed in the fabricator's shop is required to be inspected in accordance with the Statement of Special Inspections and the Schedule of Special Inspections unless the fabricator is certified by the approved agency to perform such work without Special Inspections.

PART 3 EXECUTION

3.1 RESPONSIBILITIES

3.1.1 Special Inspector of Record

a. Supervise all Special Inspectors required by the Contract Documents and the IBC.

b. Submit a SIOR Letter of Acceptance to the Contracting Officer attesting to acceptance of the duties of SIOR, signed and sealed by the SIOR.

c. Verify the qualifications of all of the Special Inspectors.

d. Verify the qualifications of fabricators.

e. Prepare a Special Inspections Project Manual, which must cover the following:

(1) Roles and responsibilities of the following individuals during Special Inspections: SIOR, SI, ASI, General Contractor's QC Manager and SER.

(2) Organizational chart or communication plan, indicating lines of communication.

(3) Contractor's internal plan for scheduling inspections. Address

SECTION 01 45 35 Page 5 items such as timeliness of inspection requests, who to contact for inspection requests, and availability of alternate inspectors.

(4) Indicate the Government reporting requirements.

(5) Propose forms or templates to be used by SI and SIOR to document inspections.

(6) Indicate procedures for tracking nonconforming work and verification that corrective work is complete.

(7) Indicate how the SIOR and SI will participate in weekly QC meetings.

(8) Indicate how Special Inspections of shop fabricated items will be handled when the fabricator's shop is not certified in accordance with paragraph FABRICATOR SPECIAL INSPECTIONS.

(9) Include a section in the manual that covers each specific item requiring Special Inspections that is indicated on the Schedule of Special Inspections. Provide names and qualifications of each special inspector who will be performing the Special Inspections for each specific item. Provide detail on how the Special Inspections are to be carried out for each item so that the expectations are clear for the General Contractor and the Subcontractor performing the work.

Make a copy of the Special Inspections Project Manual available on the job site during construction. Submit a copy of the Special Inspections Project Manual for approval.

f. Attend coordination and mutual understanding meeting where the information in the Special Inspections Project Manual will be reviewed to verify that all parties have a clear understanding of the Special Inspections provisions and the individual duties and responsibilities of each party.

g. Maintain a 3-ring binder for the Special Inspector's daily and biweekly reports and the Special Inspections Project Manual. This file must be located in a conspicuous place in the project trailer/office to allow review by the Contracting Officer and the SER.

h. Submit a copy of the Special Inspector's daily reports to the QC Manager.

i. Discrepancies that are observed during Special Inspections must be reported to the QC Manager for correction. If discrepancies are not corrected before the special inspector leaves the site the observed discrepancies must be documented in the daily report.

j. Submit a biweekly Special Inspections report until all work requiring Special Inspections is complete. A report is required for each biweekly period in which Special Inspections activity occurs, and must include the following:

(1) A brief summary of the work performed during the reporting time frame.

(2) Changes and discrepancies with the drawings, specifications and

SECTION 01 45 35 Page 6 mechanical or electrical component certification, that were observed during the reporting period.

(3) Discrepancies which were resolved or corrected.

(4) A list of nonconforming items requiring resolution.

(5) All applicable test results including nondestructive testing reports.

n. At the completion of each Definable Feature of Work (DFOW) requiring Special Inspections, submit an interim report that documents the Special Inspections completed for that DFOW including corrections of all discrepancies noted in the daily reports. Interim reports of Special Inspections must be signed and dated by the SIOR.

o. At the completion of the project submit a comprehensive final report of Special Inspections that documents the Special Inspections completed for the project including corrections of all discrepancies noted in the daily reports. The comprehensive final report of Special Inspections must be signed, dated and bear the seal of the SIOR.

3.1.2 Quality Control Manager

a. Supervise all Special Inspectors required by the Contract Documents and the IBC.

b. Verify the qualifications of all of the Special Inspectors.

c. Verify the qualifications of fabricators.

d. Maintain a 3-ring binder for the Special Inspector's daily and biweekly reports. This file must be located in a conspicuous place in the project trailer/office to allow review by the Contracting Officer and the SER.

e. Maintain a rework items list that includes discrepancies noted on the Special Inspectors daily report.

3.1.3 Special Inspectors

a. Inspect all elements of the project for which the special inspector is qualified to inspect and are identified in the Schedule of Special Inspections.

b. Attend preparatory phase meetings related to the Definable Feature of Work (DFOW) for which the special inspector is qualified to inspect.

c. Submit a copy of the daily reports to the QC Manager.

d. Report discrepancies that are observed during Special Inspections to the QC Manager for correction. If discrepancies are not corrected before the special inspector leaves the site the observed discrepancies must be documented in the daily report.

e. Submit a biweekly Special Inspection Report until all inspections are complete. A report is required for each biweekly period in which Special Inspections activity occurs, and must include the following:

SECTION 01 45 35 Page 7

(1) A brief summary of the work performed during the reporting time frame.

(2) Changes and discrepancies with the drawings, specifications and mechanical or electrical component certification, that were observed during the reporting period.

(3) Discrepancies which were resolved or corrected.

(4) A list of nonconforming items requiring resolution.

(5) All applicable test result including nondestructive testing reports.

f. At the completion of the project submit a comprehensive final report of Special Inspections that documents the Special Inspections completed for the project and corrections of all discrepancies noted in the daily reports. The comprehensive final report of Special Inspections must be signed, dated and indicate the certification of the special inspector qualifying them to conduct the inspection.

g. Submit daily reports to the SIOR.

3.2 DEFECTIVE WORK

Check work as it progresses, but failure to detect any defective work or materials must in no way prevent later rejection if defective work or materials are discovered, nor obligate the Contracting Officer to accept such work.

-- End of Section --

SECTION 01 45 35 Page 8

Statement of Special Inspections Project: JBC Air Base Repair Dock Building 578 Permit Number:

Project Location:

Owner/Address: City Zip 2

Registered Design Professional In Responsible Charge: Jeffrey M. Dillon

Address: 1226 Yeamans Hall Rd

City: Hanahan State: SC Zip: 29410 Phone: 843-566-0161

E-mail: markd@adcengineering.com

This statement of Special Inspections attached is submitted as a condition for permit issuance in accordance with Section 1704 of the 2018 International Building Code. It includes a Schedule of Special Inspection Services applicable to the above referenced project as well as the identity of the individuals, agencies, or firms (completed by others) intended to be retained for conducting these inspections. The Special Inspection Coordinator (Registered Design Professional In Charge of Administering Special Inspections) shall keep records of all inspections and shall furnish interim inspection reports to the Engineer of Record (Registered Design Professional in Responsible Charge of Construction Documents) at a frequency agreed upon by the permit applicant and Building Official prior to the start of work. Discrepancies shall be brought to the immediate attention of the Contractor and the Engineer of Record for correction. If the discrepancies are not corrected, the Special Inspection Coordinator shall bring the discrepancies to the attention of the Building Official and the Engineer of Record prior to the completion of that phase of work. The Special Inspection Coordinator shall submit a Final Report of Special Inspections to the building official at the conclusion of the project and before a certificate of occupancy will be issued.

Statement of Special Inspections encompass the following disciplines:

Structural Mechanical/Electrical/Plumbing Architectural Other:

Prepared by:

Jeffrey M. Dillon Type or Print Name

Signature

December 6, 2022 Date

Preparer’s Seal and Signature Required

To be filled out by the jurisdiction and returned to applicant Building Official’s Acceptance of Special Inspections

Frequency of Interim reports: Monthly Bi-Monthly Upon Completion Per Attached Schedule

Signature Date TMS Permit Number

Schedule of Inspection and Testing Agencies

This Statement of Special Inspections includes the following building systems:

Soils and Foundations Wood Construction Cast-in-Place Concrete Architectural Components Precast Concrete Mechanical & Plumbing Systems Masonry Storage Racks Structural Steel Spray Fire Resistant Material Cold-Formed Steel Framing Special Cases

Special Inspection Agencies Firm Address, Telephone, e-mail

1. Special Inspection Coordinator (Registered Professional in Responsible Charge of Administering Special Inspections)

2. Inspector

3. Inspector

4. Testing Agency

5. Testing Agency

6. Other

Qualifications of Inspectors and Testing Technicians The qualifications of all personnel performing Special Inspection and testing activities are subject to the approval of the Building Official and shall be in accordance with the building code or any particular requirements of the specifications or material specific referenced standards. The credentials of all Inspectors and testing technicians shall be provided if requested.

Special Inspection Definitions Continuous Special Inspection - Special inspection by the special inspector who is present when and where the work to be inspected is being performed.

Periodic Special Inspection - Special inspection by the special inspector who is intermittently present where the work to be inspected has been or is being performed. Unless noted otherwise 100% of the work designated for inspection shall be inspected.

MATERIAL / ACTIVITY SCOPE OF SERVICE

1705.12 Special Inspections for Seismic Resistance

Mechanical Equipment Verify mechanical equipment is attached and braced in accordance with manufacturers requirements and the specifications.

Plumbing Verify piping is braced in accordance with the specifications.

SECTION 02 02 00.00

LEAD AND ASBESTOS REPORT

03/20

PART 1 GENERAL

1.1 SUMMARY OF WORK

This section covers all work associated with lead and asbestos investigations.

Lead and asbestos investigations were conducted at the site, the results of which are to be found in the report issued by S&ME, Inc., dated May 13, 2022. A copy of the Lead and Asbestos Report is attached.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 02 02 00.00 Page 1

Asbestos and Lead-Based Paint Assessment Report

Joint Base Charleston (Air Base) – Building 578

S&ME Project No. 22130035

Assessment Performed by:

5-13-2022

William R. Seaborn (SCDHEC Accreditation #BI-01317) Date

Report Prepared by:

5-13-2022

James L. McMillan (SCDHEC Accreditation #BI-01643) Date

PREPARED FOR:

ADC Engineering

1226 Yeamans Hall Road

Hanahan, SC 29410

PREPARED BY:

S&ME, Inc.

620 Wando Park Boulevard

Mount Pleasant, SC 29464

May 13, 2022

Joint Base Charleston (Air Base) - Building 578

North Charleston, South Carolina

S&ME Project No. 22130035

May 13, 2022 ii

Table of Contents

Executive Summary

1.0 Background

2.0 Site and Project Description

2.1 Purpose

2.2 Site Description

3.0 Assessment Procedures

3.1 Asbestos Containing Materials

3.2 Lead-Based Paint

4.0 Findings and Results

4.1 Asbestos

4.2 Lead-Based Paint

5.0 Conclusions and Recommendations

5.1 Asbestos Recommendations

5.2 Lead-Based Paint Recommendations

6.0 Assumptions and Limitations

Appendices

Appendix I – Summary of Asbestos Results

Appendix II – Diagram of Bulk Sample Locations

Appendix III – Copy of Inspectors’ SCDHEC Licenses

Appendix IV- Laboratory Analysis Sheets and Chain of Custody Records

Appendix V - Summary of XRF Readings

May 13, 2022 1

Executive Summary

An asbestos and lead-based paint assessment was conducted on April 21, 2022, of Building 578 located at Joint

Base Charleston (Air Base) in North Charleston, South Carolina. The assessment included interior and exterior areas of the referenced structure. The purpose of the assessment was to identify the presence of asbestos containing materials (ACMs) and lead-based paint to support renovation and repair activities. The assessment also complies with federal, state, and local asbestos requirements regarding identification of ACMs that may be disturbed due to renovation or demolition.

Building 578 consists of a large aircraft maintenance dock and adjacent restrooms and mechanical areas, totaling

27,100 square feet in size. Finishes within the aircraft maintenance dock consist of painted concrete floors, metal paneled walls and open ceilings, and finishes in mechanical areas consist of unfinished concrete floors, metal, and concrete masonry unit (CMU) walls, and open ceilings. The adjacent common and restroom areas are finished with vinyl and ceramic floor coverings, CMU and drywall walls, and suspended ceilings with acoustical tiles. The exterior of the structure is constructed of metal, brick-veneer, and CMU. The structure was occupied at the time of assessment.

Asbestos Assessment

The suspect ACMs sampled and analyzed as part of the asbestos assessment of Building 578 consist of drywall and associated joint compound, mastics associated with heating, ventilating, and air conditioning (HVAC) ducts, vinyl floor tile and associated mastic, mastic associated with rubber cove base, fire-stop caulk, fire door insulation, rope gasket material, mastics associated with mechanical piping, and expansion joint material. Of the representative materials sampled and analyzed as part of the assessment, no ACMs were identified.

The Environmental Protection Agency (EPA), South Carolina Department of Health and Environmental Control

(SCDHEC), and the Occupational Safety and Health Administration (OSHA) defines a material an ACM if an asbestos content greater than one percent (>1%) is detected in a representative sample.

If additional suspect ACMs not addressed in this report are discovered during the planned renovation and repair activities, bulk samples must be collected by a SCDHEC licensed inspector and analyzed for asbestos content prior to disturbance or disposal of the suspect material(s).

Lead-Based Paint Assessment

A lead-based paint assessment was performed concurrently with the asbestos assessment, of representative painted components associated with the referenced structure. The components were analyzed using direct measurement X-Ray Fluorescence (XRF) technology using a Heuresis Pb200i (serial #1852). For the purpose of this assessment, painted surfaces with lead concentrations meeting the SCDHEC disposal limit (0.7 mg/cm2) are considered lead-based paint.

May 13, 2022 2

Of the representative suspect painted components finishes tested, the following exhibited lead concentrations meeting the SCDHEC disposal limit of 0.7 mg/cm2.

• Exterior parking bollards (brown paint on metal) – non-deteriorated condition.

The identified painted components were in non-deteriorated (intact) condition at the time of assessment. Low levels of lead were also detected which may be applicable to the standards of the OSHA 29 CFR 1926.62 (Lead in

Construction), dependent upon the tasks impacting those surfaces.

Prior to renovation activities, the identified building components exhibiting lead-based paint may have the surfaces stabilized and prepared to the extent suitable for the new replacement coatings/finishes, or those lead-based paint coatings may be subject to complete removal by means of a specifically manufactured and marketed product suitable for the chemical removal of lead-based paint. Component removal of the items containing lead-based paint requires disposal in a Class II or Class III landfill.

Accumulations of paint waste (sludge, chips, dust, or flakes) and lead contaminated products must be tested by the Toxicity Characteristic Leachate Procedure (TCLP) to determine if the waste is classified as hazardous, which requires disposal in a Subtitle C (hazardous waste) landfill. Lead waste, at a minimum, must be disposed in a Class

II or III landfill.

Destructive actions to paint containing detectable levels of lead (e.g. component removal, demolition, sanding, grinding, burning, paint preparation, etc.) will require the contractor comply with the standards of the OSHA regulation 29 CFR 1926.62 (Lead in Construction), including but not limited to training, initial exposure monitoring, the use of personal protective equipment, and medical surveillance.

This summary is for convenience of the reader and should not be completely relied upon without reviewing the full contents of this report, including appended materials.

May 13, 2022 3

1.0 Background

S&ME, Inc. (S&ME) was contracted by ADC Engineering to perform an asbestos and lead-based paint assessment of Building 578 located at Joint Base Charleston (Air Base) in North Charleston, South Carolina. The assessment included interior and exterior areas of the referenced structure. The assessment was subsequently performed on

April 20, 2022, by Bill Seaborn and John McEathron, both with S&ME. The assessment was conducted to identify the presence of asbestos containing materials (ACMs) and lead-based paint to support planned renovation and repair activities. The assessment also complies with federal, state, and local asbestos requirements regarding identification of asbestos containing building materials that may be disturbed due to renovation or demolition.

The asbestos assessment was conducted to assess, sample, and identify ACMs in accordance with regulatory requirements. The identification of ACMs will aid in the prevention of occupational exposures and/or environmental releases of airborne asbestos. Identification of ACMs also complies with Title 40 Code of the

Federal Regulations, part 61, and State regulation 61-86.1 enforced by the South Carolina Department of Health and Environmental Control (SCDHEC), along with Title 29 Code of Federal Regulations, part 1926 enforced by the

Occupational Safety and Health Administration (OSHA). The following sections describe the assessment procedures used, results of the suspect ACMs sampled and analyzed, and conclusions and recommendations related to ACMs.

The purpose of the lead-based paint assessment was to assess and identify lead-based paint coatings and lead containing materials associated with the subject structure. The identification of these materials will aid in the compliance of occupational exposure (OSHA) and/or environmental releases of airborne lead dust in accordance with OSHA 29 CFR 1926.62 (Lead in Construction) and provide information to determine proper disposal of lead-based paint coated components and debris in accordance with the SCDHEC and the Environmental Protection

Agency (EPA).

2.0 Site and Project Description

2.1 Purpose

The purpose of the assessment was to identify the presence of ACMs and lead-based paint prior to planned renovation and repair activities. The assessment included the interior and exterior of Building 578. An assessment strategy appropriate for this purpose was presented in our proposal and is described in this report. The report should be interpreted only with regard to the specific location and materials referenced.

2.2 Site Description

Building 578 consists of a large aircraft maintenance dock and adjacent restrooms and mechanical areas, totaling

27,100 square feet in size. Finishes within the aircraft maintenance dock consist of painted concrete floors, metal paneled walls and open ceilings, and finishes in mechanical areas consist of unfinished concrete floors, metal, and

May 13, 2022 4 concrete masonry unit (CMU) walls, and open ceilings. The adjacent common and restroom areas are finished with vinyl and ceramic floor coverings, CMU and drywall walls, and suspended ceilings with acoustical tiles. The exterior of the structure is constructed of metal, brick-veneer, and CMU. The structure was occupied at the time of assessment.

3.0 Assessment Procedures

3.1 Asbestos Containing Materials

The assessment was performed by observing and sampling suspect ACMs associated with the referenced structure. Diagrams exhibiting bulk sample locations and confirmed ACMs are provided in Appendix II of this report. The possibility exists that suspect materials were undetected in inaccessible areas. If additional suspect

ACMs not identified in this report are discovered during destructive activities, bulk samples must be collected by a

SCDHEC licensed inspector and analyzed for asbestos content prior to disturbance or disposal of the suspect materials.

The suspect ACMs were quantified and subject to a physical condition assessment. A sampling strategy was then developed to provide representative samples in accordance with the SCDHEC and EPA. Suspect ACMs observed were classified based on their condition (good, damaged, or significantly damaged) and potential for disturbance.

Bulk samples of suspect ACMs were collected by a SCDHEC licensed inspector. The bulk samples were then extracted from suspect ACMs and recorded on a chain of custody record and submitted to our in-house Polarized

Light Microscopy (PLM) laboratory. The samples were subsequently analyzed by PLM, and confirmation analysis was performed by Transmission Electron Microscopy (TEM) by EMSL Analytical, for non-friable organically bound materials reported negative by PLM. The laboratories are located in Charlotte, North Carolina and are accredited by the National Voluntary Laboratory Accreditation Program (NVLAP), which is administered by the National

Institute of Standards and Technology.

Polarized Light Microscopy (PLM)

The suspect materials were analyzed by trained microscopists using PLM techniques coupled with dispersion staining in accordance with EPA Test Method Title 40 Code of Federal Regulations, Chapter I (1-1-87 edition), Part

763, Subpart F-APPENDIX A. This method identifies asbestos mineral fibers based on six optical characteristics:

morphology, birefringence, refractive index, extinction angle, sign of elongation and dispersion staining colors.

The laboratory analysis reports the specific type of asbestos identified (there are six asbestos minerals) and the percentage of asbestos present.

Transmission Electron Microscopy (TEM)

One representative sample from each suspect non-friable organically bound homogeneous material, which exhibited negative results via PLM analysis, was analyzed by trained microscopists via TEM, in accordance with

ASTM E2356 per SCDHEC requirements.

May 13, 2022 5

3.2 Lead-Based Paint

Lead-based paint testing was performed on representative painted components associated with the referenced structure. The components were analyzed with a Heuresis Pb200i (serial #1852). The suspect painted finishes were selected based on the color of the topcoat and the underlying paint layers and/or the substrate on which it was applied. The possibility exists that lead-based paint finishes are present in those inaccessible areas. The

SCDHEC defines a lead-based paint as any paint containing lead at concentrations equaling 0.7 mg/cm2 or greater by XRF testing. For the purpose of the assessment, paint containing 0.7 mg/cm2 or greater was considered lead-based paint due to the planned renovation activities.

The OSHA does not recognize a threshold level of lead for definition purposes, only the airborne concentration of lead a worker is exposed. The current OSHA regulations recognize an airborne action level of 30 micrograms per cubic meter (µg/m3) during an eight-hour day and a permissible exposure limit of 50 µg/m3.

4.0 Findings and Results

4.1 Asbestos

The suspect ACMs sampled and analyzed as part of the asbestos assessment of Building 2190 include drywall and associated joint compound, mastics associated with heating, ventilating, and air conditioning (HVAC) ducts, vinyl floor tile and associated mastic, mastic associated with rubber cove base, fire-stop caulk, fire door insulation, rope gasket material, mastics associated with mechanical piping, and expansion joint material. Of the representative materials sampled and analyzed as part of the assessment, no ACMs were identified

The EPA, SCDHEC and OSHA defines a material an ACM if an asbestos content greater than one percent (>1%) is detected in a representative sample.

A summary of asbestos results is provided in Appendix I, and exhibits the sample number, location, type of material tested, approximate quantity of the material sampled, condition of the material, and corresponding result for each sample. A diagram of bulk sample locations is provided in Appendix II, and a copy of the inspectors’

SCDHEC licenses are provided in Appendix III. The laboratory analyses and chain-of-custody records are provided in Appendix IV.

4.2 Lead-Based Paint

The assessment and testing performed on April 21, 2022, of the suspect painted components associated with the subject structure identified the presence lead-based paint in non-deteriorated (intact) condition. The following components exhibited lead concentrations meeting the SCDHEC limit of 0.7 mg/cm2 and are considered lead-based paint:

• Exterior parking bollards (brown paint on metal) – non-deteriorated condition.

May 13, 2022 6

Low levels of lead were also present in each area which may be applicable to the standards of 29 CFR 1926.62

(Lead in Construction) depending upon the tasks impacting those painted surfaces.

The summary of XRF readings is provided in Appendix V and should be reviewed in full.

5.0 Conclusions and Recommendations

The asbestos and lead-based paint assessment performed on April 21, 2022, of Building 578 located at Joint Base

Charleston (Air Base) in North Charleston, South Carolina, did not identify the presence of ACMs. Lead-based paint, applicable to the SCDHEC disposal standards, was identified. Low levels of lead were also identified which may be applicable to the standards of the OSHA regulations found in 29 CFR 1926.62 (Lead in Construction). This report should be provided to the contractor(s) to assist with compliance with applicable State and Federal regulations

5.1 Asbestos Recommendations

If suspect materials not addressed in this report will be disturbed by the planned renovation activities, bulk samples must be collected by a SCDHEC licensed inspector, prior to continuation of the work or disturbance to the material. This report should be provided to the contractor(s) to assist with compliance with applicable State and Federal regulations.

5.2 Lead-Based Paint Recommendations

Prior to renovation activities, the identified building components exhibiting lead-based paint may have the surfaces stabilized and prepared to the extent suitable for the new replacement coatings/finishes, or those lead-based paint coatings may be subject to complete removal by means of a specifically manufactured and marketed product suitable for the chemical removal of lead-based paint. Component removal of the items containing lead-based paint requires disposal in a Class II or Class III landfill.

Accumulations of paint waste (sludge, chips, dust, or flakes) and lead contaminated products must be tested by the Toxicity Characteristic Leachate Procedure (TCLP) to determine if the waste is classified as hazardous, which requires disposal in a Subtitle C (hazardous waste) landfill. Lead waste, at a minimum, must be disposed in a Class

II or III landfill.

Destructive actions to paint containing detectable levels of lead (e.g. component removal, demolition, sanding, grinding, burning, paint preparation, etc.) will require the contractor comply with the standards of the OSHA regulation 29 CFR 1926.62 (Lead in Construction), including but not limited to training, initial exposure monitoring, the use of personal protective equipment, and medical surveillance.

Paint coatings may be present that contain low levels of lead that cannot be detected by X-ray fluorescence and may be applicable to OSHA regulations 29 CFR 1926.62. The quantities reported by XRF may be useful in

May 13, 2022 7 determining the relative risk associated with various demolition tasks, for example disturbances to paints with low lead levels may be less likely to result in airborne lead exposures in excess of the OSHA Action Level.

6.0 Assumptions and Limitations

This report is provided for the sole use of ADC Engineering. Use of this report by any other parties will be at such party’s sole risk, and S&ME disclaims liability for any such use or reliance by third parties. The results presented in this report are indicative of conditions only during the time of the sampling period and of the specific areas referenced. Under no circumstances is this report to be used as a bidding document, or as a project design or specification.

S&ME performed the services in accordance with generally accepted practices of reputable environmental consultants undertaking similar studies at the same time and in the same geographical area. S&ME has endeavored to meet this standard of care. No other warranty, expressed or implied, is intended or made with respect to this report or S&ME’s services. Users of this report should consider the scope and limitations related to these services when developing opinions as to risks associated with the site.

The findings of the asbestos assessment were based largely on visual observations within the amount of time available. The findings do not warrant that all asbestos-containing materials have been identified; suspect asbestos-containing materials may be present in areas not readily-accessible to observation. In addition, the actual locations and quantities of materials may vary from those herein. Apparent homogeneous sampling areas may vary in actual asbestos or lead content due to previous renovations, maintenance or related operations. The possibility exists that suspect materials were undetected in inaccessible or concealed areas such as under carpeting or multiple flooring layers, and inside pipe chases or wall voids. If additional suspect materials are discovered during the planned destructive activities, bulk samples must be sampled and analyzed by qualified entities.

The findings of the lead-based paint assessment were based largely on visual observations within the amount of time available, and the associated project areas. The findings do not warrant that all painted surfaces containing lead have been identified; different underlying painted surfaces which contain lead could exist under similar top layers. Also, apparent similarly painted surfaces may vary in actual lead content.

Appendices

Appendix I – Summary of Asbestos Results

Summary of Asbestos Results

Building 578

Joint Base Charleston - Air Base

North Charleston, South Carolina

S&ME Project No. 22130035

Date of Sampling: April 21, 2022

HA Material Description Material

Location

2Approx.

Quantity

Cat.

(F/I/II)

Type

Condition/

Potential for

Disturbance

Sample

Number

Sample

Location

1Type and

Percent

Asbestos

578-DW-01 Mechanical Room ND

578-DW-02 Mechanical Room ND

578-DW-03 Office ND

578-JC-01 Mechanical Room ND

578-JC-02 Office ND

578-JC-03 Office ND

578-JC-04 Mechanical Room ND

578-JC-05 Mechanical Room ND

578-DM1-01 Mechanical Room ND

578-DM1-02 Mechanical Room ND

³578-DM1-03 Hangar ND

578-DM2-01 Mechanical Room ND

578-DM2-02 Mechanical Room ND

³578-DM2-03 Mechanical Room ND

578-DM3-01 Mechanical Room ND

578-DM3-02 Mechanical Room ND

³578-DM3-03 Mechanical Room ND

578-FT-01 Office

ND

ND

578-FT-02 Office

ND

ND

³578-FT-03 Office

ND

ND

Misc. NA

Misc. NA

DM2

Mastic (grey) associated with

HVAC ducts Mechanical Room 3 SF NF Cat I Misc. NA

DM3

Mastic (white) associated with HVAC ducts Mechanical Room 120 SF NF Cat I

FT

Vinyl Floor Tile (12" beige)

Mastic (tan)

Hallway and Break

Room 240 SF NF Cat I

Drywall

Various Walls and

Ceilings of the Exterior

Building

3,850 SF F

Misc.

Sur

Table I: Summary of Asbestos Results

DW

DM1

Mastic (beige) associated with HVAC ducts

Hanger and Mechanical

Room 30 SF NF Cat I Misc. NA

JC Joint Compound

NA

Joint Base Charleston - Air Base

North Charleston, South Carolina

S&ME Project No. 22130035

Date of Sampling: April 21, 2022

HA Material Description Material

Location

2Approx.

Quantity

Cat.

(F/I/II)

Type

Condition/

Potential for

Disturbance

Sample

Number

Sample

Location

1Type and

Percent

Asbestos

Table I: Summary of Asbestos Results

578-CB-01 Office ND

578-CB-02 Office ND

³578-CB-03 Corridor ND

578-FS-01 Hangar ND

578-FS-02 Hangar ND

578-FS-03 Hangar ND

578-FD-01 Hangar ND

578-FD-02 Hangar ND

578-FD-03 Hangar ND

578-RG-01 Mechanical Room ND

578-RG-02 Mechanical Room ND

578-RG-03 Mechanical Room ND

578-PM1-01 Mechanical Room ND

578-PM1-02 Mechanical Room ND

578-PM1-03 Mechanical Room ND

578-PM2-01 Mechanical Room ND

578-PM2-02 Mechanical Room ND

578-PM2-03 Mechanical Room ND

NF Cat I Misc NA

PM2

Mastic (beige) associated with Mechanical Piping Mechanical Room 230 LF NF Cat I Misc. NA

Misc. NACB Mastic (white/tan) associated with Rubber Cove Base

Hallway and Break

Room 100 LF NF Cat I

Fire Door Insulation

Hanger, Tool Room, Break Room and

Hallway

105 SF F

Misc. NA

FS Fire Stop Mastic Tool Room/Hanger 8 SF

Misc. NA

RG Rope Gasket Mechanical Room on

Boiler 7LF F Misc. NA

FD

PM1

Mastic (silver) associated with

Mechanical Piping Mechanical Room 230 LF NF Cat I

Joint Base Charleston - Air Base

North Charleston, South Carolina

S&ME Project No. 22130035

Date of Sampling: April 21, 2022

HA Material Description Material

Location

2Approx.

Quantity

Cat.

(F/I/II)

Type

Condition/

Potential for

Disturbance

Sample

Number

Sample

Location

1Type and

Percent

Asbestos

Table I: Summary of Asbestos Results

578-EJ-01 Hangar ND

578-EJ-02 Hangar ND

³578-EJ-03 Hangar ND

LF = linear feet Sur = Surfacing Misc. = Miscellaneous EA = each

F= friable TSI = Thermal System Insulation PD = potential for disturbance Bold = >1% asbestos

NF = non-friable G = good PSD = potential for significant disturbance

Cat I = Category I D = damaged ND = No Asbestos Detected

Cat II = Category II SD = significantly damaged NA = Not Applicable

EPA, SCDHEC and OSHA defines a material as asbestos containing if an asbestos content greater than one percent (>1%) is detected in a representative sample

Quantities are estimated, and should not be used for bidding purposes, as field conditions should be verified

Samples analyzed by TEM to confirm negative results reported by PLM analysis

Misc. NAEJ Concrete Floor Expansion

Joints Hangar 2,600 LF NF Cat I

Appendix II – Diagram of Bulk Sample Locations

578-FT-01

578-CB-01

578-FT-03

578-JC-03

578-DW-03

579-CB-02

578-FD-03

578-RG-01

578-RG-02

578-RG-03 578-DW-01

578-JC-01578-PM1-01

578-PM1-02

578-PM1-03

578-PM2-01

578-PM2-02

578-PM2-03

578-DM3-01

578-DM3-02

578-DM3-03

578-DM1-02

578-DM1-03

578-CB-03

578-FT-02

578-JC-02

578-JC-04

578-DW-02

578-JC-05 578-DM1-01

578-EJ-03

578-EJ-02578-EJ-01

578-FS-01

578-FS-02

578-FS-03

578-DM2-01

578-DM2-02

578-DM2-03

MECH

LEGEND

BULK SAMPLE LOCATIONS578 XX-XX

578-FD-01

578-FD-02

NOTE: NO ASBESTOS WAS DETECTED IN THE BULK

SAMPLES COLLECTED AND ANALYZED FROM

BUILDING 578.

LEAD-BASED PAINT (≥0.7 mg/cm²)

· EXTERIOR PARKING BOLLARDS (BROWN PAINT ON

METAL) - NON-DETERIORATED CONDITION

FIGURE NO.

T:

\E

N V\

Pr oj ec ts

\2

2\

_A

D C

En gi ne er in g_

AD

C

En gi ne er in g_

JB

S

B5

, B

, B

, B

_A sb _N or th

C ha rle st on S

C\

EN

V\

CA

D

\B

8\

.d w g

PROJECT NUMBER

DATE:

SCALE:

0 30 60

(IN FEET)GRAPHIC SCALE (IN FEET)GRAPHIC SCALE

A

SB

ES

TO

S A

N D

L

EA

D -B

A

SE

D P

A

IN

T A

SS

ES

SM

EN

T

BU

IL

D

IN

G

JO

IN

T

BA

SE

C H

AR

LE

ST

O

N (A

IR

B

AS

E)

CH

AR

LE

ST

O N

, S O

UT

H

C

AR

O

LI

N A

NTS

5-13-2022

22130035

TRUMP=TREASON

Appendix III – Copy of Inspectors’ SCDHEC Licenses

South Carolina Department of Health and Environmental Control

Asbestos License

Bill Seaborn

Air Sampler AS-00416 Building Inspector BI-01317

S&ME, Inc. / 620 Wando Park Blvd. / Mt. Pleasant SC 29464 / p 843.884.0005 / f 843.881.6149 / www.smeinc.com http://www.smeinc.com/

South Carolina

Department of Health and Environmental Control

Asbestos License

John McEathron

Air Sampler AS-00235 Building Inspector BI-00794

S&ME, INC. / 620 Wando Park Blvd. / Mt. Pleasant, SC 29464 / p 843.884.0005 / f 843.881.6149 / www.smeinc.com http://www.smeinc.com/

Appendix IV- Laboratory Analysis Sheets and Chain of

Custody Records

Bulk Asbestos Analysis By Polarized Light Microscopy

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

Joint Base Charleston - Bldg. 578 22130035 (578)Project:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Bill Seaborn Terry Richburg

Attn:Customer: S&ME 620 Wando Park Blvd Mt. Pleasant, SC 29464

Analysis ID: 71990606_PLM

Date Reported: 4/29/2022

Date Received: 4/22/2022

Lab Order ID: 71990606

None…

This is the start of the file's text. The full file is on GovTribe.