About this file

This document is a Federal Solicitation Amendment for a Simplified Acquisition of Base Engineering Requirements (SABER) contract for Nellis/Creech Air Force Base. The solicitation is a 100% HUBZone set-aside competition under NAICS 236220 for a 5-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an estimated overall ceiling of $185M. The government intends to award one contract to the Highest Technically Rated Offeror (HTRO), using a three-step evaluation process assessing Technical Experience, Technical Proposal and Qualifications, and Pricing.

Key requirements include submitting a seed project proposal for renovating the Honor Guard 99 FSS B10250 facility, a Level 1 Design (Magnitude 2), a Quality Control Plan, and demonstrating Bonding Capability. Offerors must provide a comprehensive technical approach, CPARS ratings, contract information sheets, and a price schedule using eGordian software. The evaluation will validate the top two self-rated proposals, with the potential to award to the offeror with the highest validated technical score or the second-highest if their price is lower and their technical score is within 10% of the highest-rated offeror. Proposals are due by an unspecified date, with RFIs accepted until 3 November 2025.

View the file

Other files

File Type Posted
Solicitation Amendment FA486125R00030017 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030017.pdf PDF
Solicitation Amendment - FA486125R00030013.pdf PDF
Attach 79 RFI Log SABER Seed 29 Jan 2026_.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030011 SF 30 .pdf PDF
2 - Price Schedule _13 Jan 2026.xlsx XLSX spreadsheet
3 - Self Scoring Matrix 7_Jan 26.xlsx XLSX spreadsheet
44 -Statement of Objectives (SOO) for RKMF 240010 20 Nov 25.pdf PDF
Solicitation Amendment - FA486125R00030009.pdf PDF
Solicitation Amendment FA486125R00030009_SF 30.pdf PDF
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf PDF
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf PDF
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf PDF
(Attachment 68) SABER Seed SOO Honor Guard Building 10250 Attachment 15 - B10250 room numbers.pdf PDF
(Attachment 70) SABER Seed SOO Honor Guard Building 10250 Attachment 17 - Double Check Valve Assembly.pdf PDF
Solicitation Amendment - FA486125R00030005.pdf PDF
Solicitation Amendment FA486125R00030004 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Atch 41 NV20250038 19Sep25 Bldg Clark.pdf PDF
Atch 43 NV20250001 1Aug25 NTTR.pdf PDF
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
Solicitation - FA486125R0003.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
29 - Nuclear Gauge Form 2.docx DOCX document
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
2 - Price Schedule 23 September 25.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Purpose of this modification is to: Block 14 (Description of Amendment/Modification):

1) Update Section L of Solicitation

2) Update Section M of Solicitation

3) Attach RFI Response Log (Attachment 76) for General Solicitation Responses dated 13 Jan 2026

4) Attach RFI Response Log (Attachment 77) for SABER Seed Responses 13 Jan 2026

5) Revise (Attachment 1) from SABER SOW dated 25 Sep 25 to SABER SOW dated 7 Jan 25

6) Revise (Attachment 44) from Statement of Objectives (SOO) for RKMF 240010 14 Feb 25 to Statement of Objectives (SOO) for RKMF 240010 dated 20 Nov 25

7) Revise (Attachment 3) from Self Scoring Worksheet 23 Sept 25 undated to Self-Scoring Matrix dated 7 Jan 26

8) Revise (Attachment 2) from Pricing Schedule 23 Sept 25 to Pricing Schedule dated 13 Jan 2026

9) Attach (Attachment 73) Nellis AFB Task Order Pricing Letter _ Gordian System License fees Breakdown 5% and 1.95%

10) Attach (Attachment 74) SABER Seed Attachment 18 - Knox Box Location

11) Attach (Attachment 75) SABER Seed Attachment 19 - B10250 Comm Room

12) NOTE: Amendment 008 does not exist due to system error.

POC: Corrine Lemon; corrine.lemon@us.af.mil; 702-652-6196

Section I - Contract Clauses

Additional Regulation or Supplemental Clauses Incorporated by Full Text

The following Clause(s) were added:

FAR Clauses Incorporated by Full Text 52.225-9 Buy American-Construction Materials. (Oct 2022)

BUY AMERICAN-CONSTRUCTION MATERIALS (OCT 2022)

(a) . As used in this clause-Definitions

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at

FAR 25.105.

Domestic construction material means-

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if-

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029.

Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

FA486125R00030010

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

Domestic preference.(b) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In (1) accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

____________[Contracting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) .For domestic construction material that is not a critical item or does not contain critical components

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A) of this clause.(1)

(3) The procedures in paragraph (b)(3)(i)(A) of this clause will no longer apply as of January 1, 2030.(2) .(B) For domestic construction material that is a critical item or contains critical components The cost of a particular domestic construction material that is a (1) critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B) of this clause.(1)

(3) The procedures in paragraph (b)(3)(i)(B) of this clause will no longer apply as of January 1, 2030.(2)

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

Request for determination of inapplicability of the Buy American statute.(c) (1) Any Contractor request to use foreign construction material in accordance with (i) paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) . To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information Data and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description

Unit of Mea sure

Quant ity

Pri ce (d ollars)

Item1:

Foreign construction material ____ ____ ____

Domestic construction material ____ ____ ____

Item2:

Foreign construction material ____ ____ ____

Domestic construction material ____ ____ ____

[* ].Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)

[ ]List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

[ ]Include other applicable supporting information.

(End of clause)

The following Clause modifications were made:

52.252-2 Clauses Incorporated by Reference. Feb 1998 hereby reads as follows:

Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

(End of clause)

The following Clause(s) were deleted:

FAR Clauses Incorporated by Full Text 52.225-11 Buy American-Construction Materials under Trade Agreements. (Nov 2023)

BUY AMERICAN-CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2023)

(a) . As used in this clause-Definitions

Caribbean Basin country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C.40102(4), such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at

FAR 25.105.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, North Macedonia, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);

(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

Domestic construction material means-

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if-

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029.

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Free Trade Agreement country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

Least developed country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

United States means the 50 States, the District of Columbia, and outlying areas.

WTO GPA country construction material means a construction material that-

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

Construction materials.(b) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In (1) accordance with 41 U.S.C.1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction material, excluding COTS fasteners. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

____________[Contracting Officer to list applicable excepted materials or indicate "none"]

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

.(A) For domestic construction material that is not a critical item or does not contain critical components The cost of a particular domestic construction material (1) subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(A) of this clause.(1)

(3) The procedures in paragraph (b)(4)(i)(A) of this clause will no longer apply as of January 1, 2030.(2) .(B) For domestic construction material that is a critical item or contains critical components The cost of a particular domestic construction material that is a (1) critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(4)(i)(B) of this clause.(1)

(3) The procedures in paragraph (b)(4)(i)(B) of this clause will no longer apply as of January 1, 2030.(2)

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

Request for determination of inapplicability of the Buy American statute.(c) (1) Any Contractor request to use foreign construction material in accordance with (i) paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) . To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information Data and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description

Unit of Measure Quantity Price (Dollars)*

Item1

Foreign construction material ____ ____ ____

Domestic construction material ____ ____ ____

Item1

Foreign construction material ____ ____ ____

Domestic construction material ____ ____ ____

[* )].Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued

[ ]List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

[ ]Include other applicable supporting information.

(End of clause)

Section J - List of Attachments

The following Attachment(s) were added:

Attach 74 - SABER Seed SOO Attachment 18 - Knox Box Location Attach 75 - SABER SOO Seed Attachment 19 B10250 comm room Gordian System License Fees 5 percent and 1.95 percent RFI Response Log General Solicitation 13 Jan 26 RFI Response Log SABER Seed Related _ 13 Jan 2026

The following Attachment modifications were made:

2 - Price Schedule 23 Sept 2025

Information From To OtherAttachment 2 - Price Schedule Price Schedule 13 Jan 2026 AttachmentName 2 - Price Schedule 23 Sept 2025 Price Schedule 13 Jan 2026 AttachmentDate 23 Sep 2025 13 Jan 2026 AttachmentReferenceIdenti fier

2 - Price Schedule Price Schedule 13 Jan 2026

AttachmentURL 70163402 71956054

3 - Self Scoring Matrix 23 Sept 2025 Information From To OtherAttachment 3 - Self Scoring Matrix 23 Sept 2025 Self Scoring Matrix 7 Jan 26 AttachmentName 3 - Self Scoring Matrix 23 Sept 2025 Self Scoring Matrix 7 Jan 26 AttachmentReferenceIdenti fier

3 - Self Scoring Matrix 23 Sept 2025 Self Scoring Matrix 7 Jan 26

AttachmentURL 70154246 71955784

SABER SOW

Information From To AttachmentName SABER SOW SABER SOW 7 Jan 2025 (002) AttachmentDate 25 Sep 2025 07 Jan 2026 AttachmentReferenceIdenti fier

1- SABER SOW 25 Sep 25 SABER SOW 7 Jan 26

AttachmentURL 70309991 71989496

Statement of Objectives (SOO) for RKMF 240010 Information From To AttachmentName Statement of Objectives (SOO) for RKMF 240010 Statement of Objectives (SOO) for RKMF 240010 20 Nov 25 AttachmentDate 15 Aug 2024 20 Nov 2025 AttachmentReferenceIdenti fier

Statement of Objectives (SOO) for RKMF 240010 Statement of Objectives (SOO) for RKMF 240010 20 Nov 25

AttachmentURL 64151237 71955513

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Header Miscellaneous Text (Modified):

L-1. GENERAL INSTRUCTION

These instructions outline the requirements for the format and content of proposals.

The Government intends to Award one contract for the Nellis/Creech SABER (Simplified Acquisition of Base Engineering Requirements) program. Award will L-1.2.

be made to the best overall Offeror, based upon the results of an integrated assessment of the proposals, that offers the Government the Highest Technically Rated Offeror (HTRO).

This is a 100% HUBZone set-aside competition under NAICS 236220 and PSC/FSC Z2JZ. Offerors must provide evidence of HUBZone registration through L-1.3.

SBA (Small Business Administration) HUBZone acceptance letter, or active registration of HUBZone status on System for Award Management (SAM.gov) at https:// sam.gov.

Offerors may not submit more than one offer as the prime or joint venture in response to this Solicitation. Offerors submitting a prime proposal cannot submit L-1.4.

a separate proposal as a subcontractor. Only proposals submitted in accordance with these instructions will be accepted. The Government will retain one copy of each offeror's proposal (FAR Subpart 4.8).

The Government reserves the right to cancel this Solicitation at any point before contract Award. In the event this Solicitation is canceled, the Government L-1.5.

has no obligation to reimburse Offerors for any costs incurred.

Late proposals will not be accepted for evaluation unless the conditions of FAR 15.208(b) apply. Early submissions are encouraged. L-1.6.

Post-Award notices and debriefings will be conducted IAW FAR 15.505 and 15.506, as applicable. L-1.7.

PROPOSAL FORMAT AND SUBMISSION L-2.

Proposals in response to this Solicitation shall be valid for 180 calendar days (FAR 52.215-1(d)).

Submissions should include 1 hard copy and 1 electronic copy. All proposals shall be submitted using DoD SAFE (Department of Defense Secure Access File Exchanges; https://www.safe.apps.mil). No CDs will be accepted.

Hard Copy- For Binding and Labeling, each section of the proposal should be separately bound to permit the volume to lie flat when open. Staples shall not be used. A cover sheet should be bound in each book, clearly marked as to volume number, title, copy number, Solicitation identification, and the Offerors' name.

Please submit a hard copy directly to the 99th Contracting Squadron. The address for 99 CONS is as follows: 5865 Swaab Blvd, Bldg. 588 Nellis AFB, NV 89191.

The same identifying data should be placed on the spine of each binder if applicable. Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on disclosure and use of data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal information and Source selection information.

Electronic Copy- The content and page size of electronic copies must be identical to the hard copies. When discrepancies exist between the written offers and those provided in electronic format, the written offer will take precedence in all cases. Use separate files to permit rapid location of all portions, including subfactor required plans, exhibits, appendices and attachments, if any. If files are compressed, the necessary decompression program must be included.

The Government Point of Contact (GPOC) will send an e-mail to the Offeror acknowledging the request for a proposal drop-off code in DoD SAFE. The GPOC e-mail acknowledging the request will not be sent to the Offeror after close of business hours, weekends, or on nationally observed holidays. If you do not receive an acknowledgement e-mail from either of the GPOCs after 72 hours, you must send another e-mail. E-mails will not be returned after close of business hours, weekends, or on nationally observed holidays.

The request for DoD SAFE drop-off is only valid for 14 days. If the 14 days has expired and the RFP is still open, the Offeror may send another e-mail request for drop-off code to the GPOC e-mail addresses listed on the Solicitation. Be advised that classified information is not allowed on DoD SAFE. Any files containing CUI/ PII/PHI must be encrypted prior to uploading or by checking the "Encrypt every file" box. The Offeror is allowed to drop-off one or more files (up to 8GB total). The Offeror may select the box "Send me an e-mail when each recipient picks up the files" for documentation purposes. The GPOC will receive an automated e-mail containing the information the Offeror has entered and instructions for downloading the file(s). The GPOC will have 7 days to retrieve the files submitted in the drop-off. DoD SAFE does not guarantee delivery of documents within a specified time under 4 hours.

Exceptions to Solicitation Requirements L-3.

Offerors are required to meet all Solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for Award.

There will be no alternate Proposals, and the Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this Solicitation.

L-4. Proposal Content

OFFEROR Proposals will be organized according to Table 1.

Table 1.

Section Proposal Section Title

L-4.1 General Requirements and Qualifications - Not Rated

L-4.1.1 File Name

L-4.1.2 Cover Letter

L-4.1.3 Solicitation Contract Form SF 1442

L-4.1.4 Contract Provisions/Clauses

L-4.1.5 Joint Venture and Mentor Protege (as applicable) Agreement

L-4.1.6 HUBZone Certification

L-4.2 Technical Experience (Factor 1) - Self Rated

L.4.2.1 Self-Scoring Matrix

L-4.2.2 Contract Information Sheet

L-4.2.3 CPARS

L-4.2.4 PPQ (if applicable)

L-4.3 Technical Proposal and Qualifications (Factor 2) - Government Rated

L-4.3.1 Seed Project ( - Subfactor 1)Factor 2

L-4.3.2 Quality Control Plan ( - Subfactor 2A)Factor 2

L-4.3.3 Bonding Capability - Subfactor 2B)(Factor 2

L-4.4 Pricing (Factor 3) - Government Rated

L-4.4.1 Coefficients and Price Schedule

L-4.1

L-4.1. General Requirements and Technical Qualifications Proposals will follow the format required and will provide technical qualifications instructions in Section L-3.1. Failure to provide requirements may result in immediate disqualification.

File Name: Offeror Name 24R0018 Proposal V.1 L-4.1.1.

If revisions are requested, revised proposals will be labeled V.2 for second revision, V.3 for third revisions and etc.

Cover Letter L-4.1.2.

The format for this section needs to include:

(a) Name

(b) Address

(c) CAGE Code

(d) Unique Entity Identifier

(e) System for Award Management (SAM.gov) registration expiration date

(f) Proposal validity statement

(g) Virus free electronic submission statement

(h) POC authorized to obligate the company (name, email, and phone)

. Solicitation Contract Form SF 1442 L-4.1.3 Completion of blocks 14 - 16, and 19 (if applicable) and signature and date for blocks 20 of the SF 1442. Signature by the Offeror on the SF 1442 constitutes a legally-binding offer which the Government may accept. The "original" copy should be submitted without any punched holes.

Contract Provisions/Clauses L-4.1.4.

Offeror shall complete any fill-in clauses as applicable, to include completed representations, certifications, acknowledgments, and statements. Annual representations and certifications shall be completed electronically via the System for Award Management (SAM) Website accessed through www.sam.gov.

Joint Venture and Mentor-Protege Agreement (as applicable) L-4.1.5.

Joint Venture: Offerors who are an existing Joint Venture as defined in FAR 9.601(1) or FAR 9.601(2) may submit a proposal under this Solicitation subject to the following conditions: (1) The Offeror (e.g., Joint Venture or Prime Small Business contractor) and each Contractor identified in an Joint Venture Contract Team Arrangement (CTA) must be registered in SAM at https://www.sam.gov with a corresponding Unique Entity ID and CAGE Code; and (2) Offeror must submit complete representations and certifications in accordance with FAR Provision 52.212-3 at the time of proposal submission. Contractors must submit proper certificates proving Joint Venture status if SAM registration has not been updated. If the Offeror is a Joint Venture, it must meet the definition of a Joint Venture for size determination purposes (FAR 2.101 or 13 CFR 121.103). All minimum requirements and scored evaluation criteria must have been performed by the Offeror or existing Joint Venture CTA.

Mentor-Protege: Offerors may submit a proposal under this Solicitation as an approved Mentor-Protege Joint Ventures in accordance with 13 CFR 125.9.

Contractors must submit proper certificates proving Mentor-Protege Joint Venture status if SAM registration has not been updated. The amount of Mentor-protege Provided the Mentor is not a Small Business under the applicable size standard, that Mentor may submit a maximum of two (2) Relevant Experience Projects. The remaining Relevant Experience Projects submitted must be submitted by the Protege.

. HUBZone Certification L-4.1.6 Offerors must submit evidence of HUBZone registration through SBA (Small Business Administration) HUBZone acceptance letter, or active registration of HUBZone status on System for Award Management (SAM.gov) at https://sam.gov. Any proposal missing evidence of HUBZone certification will be considered incomplete and not reviewed further.

Technical Experience (Factor 1) L-4.2.

Offerors must provide information on contracts that demonstrate their capability to perform on the SABER contract. All past performance will be evaluated using a Self-Scoring Matrix (Attachment 3). The information on the Self-Scoring Matrix must be supported by corresponding CPARS ratings for Quality and relevant Work Samples. The self-rated scoring matrix is an Excel document that Offerors self-score against the pre-defined objective scoring criteria and deliver supporting documentation to objectively prove self-score validity. Self-rated scores shall be verifiable using work samples provided by the Offeror. The work samples shall include all the evidence required to validate the proposed self-score.

Self -Scoring Matrix L-4.2.1.

The matrix consists of a table of contents that displays the matrix broken down into six tabs (sections/criteria) for self-rating past performance. Any attempt to change formulaic values outside of editable fields may warrant an Offeror's proposal invalid and may not be considered.

Tab Description Notes for Section Completion Maximum Points for Each Section

Tab 1 SABER Annual

Fill out Tab 1 to self-score SABER Contracts Past Performance (CPARS) Rated annually.

Tab 2 SABER Per TO Fill out Tab 2 to self-score SABER Contracts Past Performance (CPARS) Rated per task Order

Tab 3 Multiple Award IDIQ

Fill out Tab 3 to self-score Multiple Award IDIQs Construction Contracts Rated Annually

Tab 4 Multiple IDIQ Fill out Tab 4 to self-score Multiple Award IDIQs Construction Contracts Rated per Task Order

Tab 5 Design Build Fill out Tab to self-Score Design Build Construction Contracts

Tab 6 General Construction

Fill Out Tab 5 to self-score General Construction Contracts 30

Offerors shall fill out the proper number of Work samples in each Tab. Work Samples can only be used on one Tab.

To properly fill out the Work Sample information, Offerors must complete the blue-highlighted columns by entering the contract number and the name of the contract. Additionally, depending on the section, the Annual Period or the Task Order number cell highlighted in Blue will need to be completed if applicable.

Columns F and Columns I are to be left Blank. Column J should be completed. In Column J, File Names for Reference should reference any Contract Information Sheets, CPARS or PPQs that correspond to the Work Sample.

In the orange-highlighted columns, Offerors should select the CPARs ratings for Quality, Schedule, and Management using the dropdown menus provided. It is important to note that only ratings of Satisfactory or higher will earn points, while Marginal or Unsatisfactory ratings will not contribute to the score. These guidelines ensure accurate and consistent evaluation of contractor performance.

Similar work for Government agencies outside the Department of the Air Force can be considered in the SABER Tabs (Tab 1 and Tab 2). However, the experience must include the essential elements of a SABER Contract. The definitions of a SABER contract, for the purpose of this solicitation, can be found in Section M-2.3.1.

The same is applicable for Multiple Award Construction Contract/ Design-Build Contracts. Similar work for Government agencies outside the Department of the Air Force can be considered in the MACC Tabs (Tab 3 and Tab 4). However, the experience must include the essential elements of a MACC Contract. The definition of MACC Contract, for the purpose of this solicitation, can be found in Section M-2.3.2.

Offerors shall not enter any information into the deduction column. The deductions column is for Government use only and will be used to deduct points that the Government cannot verify or deduct adverse CPARS that the Government deems necessary.

. Contract Information Sheet L-4.2.2 The Offerors shall submit Contract Information Sheets (contracts/orders) which demonstrate their past technical experience in the required elements listed within the HTRO Scoring Matrix. Contract Information Sheets demonstrating technical experience for multiple required elements in the HTRO Scoring Matrix are only required to be submitted once.

Each Contract Information Sheet should contain a small narrative explaining what aspects of the contract/order is deemed relevant to the proposed effort, which evaluation criteria in the HTRO Self-scoring matrix is supported.