This is Amendment 0016 to Solicitation FA486125R0003, effective February 3, 2026, issued by the 99th Contracting Squadron at Nellis Air Force Base, Nevada. The amendment updates Section L (Instructions, Conditions, & Notices to Offerors) with highlighted changes and attaches additional Requests for Information responses dated March 9, 2026. The proposal deadline remains March 19, 2026, at 2:30 PM PST, with the contracting point of contact being Corrine Lemon at 702-279-6196.

This is a 100% HUBZone set-aside competition under NAICS 236220 for the Nellis/Creech Simplified Acquisition of Base Engineering Requirements (SABER) program. The Government intends to award one contract to the 2 Highest Technically Rated Offeror (2HTRO) based on integrated assessment of proposals. Evaluation criteria include Factor 1: Technical Experience (self-rated), Factor 2: Technical Proposal and Qualifications (government-rated, including a Seed Project for RKMF 240010—Repair Honor Guard Facility B10250, Quality Control Plan, and Bonding Capability demonstrating capacity for up to $4,000,000 per task order and $40,000,000 aggregate), and Factor 3: Pricing. Offerors must submit one hard copy and one electronic copy via DoD SAFE, provide HUBZone certification evidence, complete SF 1442, demonstrate past performance through a Self-Scoring Matrix across six contract types (SABER Annual, SABER Per Task Order, Multiple Award IDIQs, Design Build, and General Construction), and provide pricing coefficients in an Excel format. The Government reserves the right to award to the second-highest technically rated offeror if their score is within 10% of the highest-rated offeror and their price is lower.

View the file

Other files

File Type Posted
Solicitation Amendment - FA486125R00030015.pdf PDF
Solicitation Amendment - FA486125R00030014.pdf PDF
Solicitation Amendment - FA486125R00030012.pdf PDF
1 - SABER SOW 7 Jan 2026.pdf PDF
Solicitation Amendment - FA486125R00030010.pdf PDF
1- SABER SOW 7 Jan 2025 .pdf PDF
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf PDF
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030006.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png PNG image
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf PDF
Solicitation Amendment - FA486125R00030004.pdf PDF
Solicitation Amendment - FA486125R00030003.pdf PDF
Solicitation Amendment - FA486125R00030002.pdf PDF
Attachment 54 Gordian SABER CTC.pdf PDF
Attachment 52 Nellis AFB Base Pass Request.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030001 SF 30.pdf PDF
Atch 40 NV20250024 19Sep25 Hvy Clark.pdf PDF
2 - Price Schedule 23 September 25.pdf PDF
3 - Self Score Worksheet SABER_23 Sept 2025.xlsx XLSX spreadsheet
5_Nellis-Creech AFB Installation Facilities Standards (IFS) appendix - Fire Protection Requirements.pdf PDF
9_Nellis-Creech Mech-Plumb Req 2020-07-07.pdf PDF
17 - Installation Plan 12 - Hazardous Waste Management Plan 27 Sep 23.pdf PDF
26 - Connection Charge Agreement - 22 Feb 23.pdf PDF
32 - AF 3064 Progress Schedule Template - 01 Apr 1996.xlsx XLSX spreadsheet
33 - AF Form 3065 Progress Report Template - 01 Apr 1996.pdf PDF
37 - BUILDER Inventory Sheet.xlsx XLSX spreadsheet
40 - General Decision Number NV20240058 Highway Clark County.pdf PDF
48 - Example SABER Design Intent Drawing Sets_28 Nov.pdf PDF
51_RFI Log_ SABER Seed RKMF 2400010 Reno Honor Guard 99 FSS B10250.xlsx XLSX spreadsheet
1 - SABER SOW 25 Sep 25.pdf PDF
4 - PPQ _PAST_PERFORMANCE_QUESTIONNAIRE FA486125R0003.pdf PDF
7 - Nellis-Creech Electrical Req 2023-10-17.pdf PDF
10_Nellis-Creech Utility Meter Req 2019-09-13.pdf PDF
11_Nellis-Creech Plant List.pdf PDF
13 - Work Clearance Triggers.pdf PDF
16_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP - 06 Nov 2019.pdf PDF
19_UF3.PC Concrete Pad for Three Phase Requirement - Aug 2016.pdf PDF
20_UT1-UT5 Modified Trenching Drawing - Aug 2016.pdf PDF
24_UG3.3 Three Phase Six Bushing Pad-mounted Transformer - Aug 2016.pdf PDF
31 - AF Form 3052 Cost Estimate Template.xlsx XLSX spreadsheet
35 - AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
36 - AF 3000 Material Approval Submittal - 01 Sep 2003.pdf PDF
38_NTTR Automated Information System _AIS_ Equipment Form.pdf PDF
41 - General Decision Number_NV20240038 Building Clark County.pdf PDF
44- SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_14Feb2025.pdf PDF
45 - Attachment Contract Information Sheet.pdf PDF
46 - Example SABER Design Intent Drawing Set Level 1_20 Nov.pdf PDF
49 - As-Builts.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

03 Feb 2026

4. REQUISITION/PURCHASE

REQUISITION NUMBER

5. PROJECT NUMBER (if applicable) Not Available

6. ISSUED BY CODE FA4861

FA4861 99 CONS LGC

5865 SWAAB BLVD, ADMINISTRATIVE ONLY NO REQUISITIONS

NELLIS AFB, NV 89191-7063

UNITED STATES

Corrine Lemon, Email: gilbert.cano.2@us.af.mil Telephone: 702 652-2531 Gilbert Cano, Email: gilbert.cano.2@us.af.mil Telephone: 702 652-2531

7. ADMINISTERED BY (if other than Item 6) CODE

SCD: PAS:

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

CODE: FACILITY CODE:

9A. AMENDMENT OF SOLICITATION NUMBER

FA486125R0003

9B. DATED (SEE ITEM 11)

26 Sep 2025

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; 1 or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required) See Section G - Contract Administration Data

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE

A.THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN

ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Schedule

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Gilbert R Cano

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

10 Mar 2026

(Signature of person authorized to sign) (Signature of Contracting Officer) Computer generated. Previous edition unusable STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA-FAR (48 CFR) 53.243

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Purpose of this Amendment is to: Block 14 (Description of Amendment/Modification):

1) Update Section L, Changes are highlighted in yellow

2) Attach additional Requests for Information (RFIs) deemed essential to support the preparation and submission of the solicitation proposal.

a) Attach (Attachment 80) RFI Additional Responses for General Solicitation 9 March 2026

3) Proposal deadline remains 19 March 2026, 2:30 PM PST.

POC: Corrine Lemon' 702-279-6196, corrine.lemon@us.af.mil

Section J - List of Attachments

The following Attachment(s) were added:

80_ RFI Response Log_General Solicitation 9 March 2026

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Header Miscellaneous Text (Modified):

L-1. GENERAL INSTRUCTION

These instructions outline the requirements for the format and content of proposals.

L-1.2. The Government intends to Award one contract for the Nellis/Creech SABER (Simplified Acquisition of Base Engineering Requirements) program. Award will be made to the best overall Offeror, based upon the results of an integrated assessment of the proposals, that offers the Government the 2 Highest Technically Rated Offeror

(2HTRO).

L-1.3. This is a 100% HUBZone set-aside competition under NAICS 236220 and PSC/FSC Z2JZ. Offerors must provide evidence of HUBZone registration through SBA (Small Business Administration) HUBZone acceptance letter, or active registration of HUBZone status on System for Award Management (SAM.gov) at https:// sam.gov.

L-1.4. Offerors may not submit more than one offer as the prime or joint venture in response to this Solicitation. Offerors submitting a prime proposal cannot submit a separate proposal as a subcontractor. Only proposals submitted in accordance with these instructions will be accepted. The Government will retain one copy of each offeror's proposal (FAR Subpart 4.8).

L-1.5. The Government reserves the right to cancel this Solicitation at any point before contract Award. In the event this Solicitation is canceled, the Government has no obligation to reimburse Offerors for any costs incurred.

L-1.6. Late proposals will not be accepted for evaluation unless the conditions of FAR 15.208(b) apply. Early submissions are encouraged.

L-1.7. Post-Award notices and debriefings will be conducted IAW FAR 15.505 and 15.506, as applicable.

L-2. PROPOSAL FORMAT AND SUBMISSION

Proposals in response to this Solicitation shall be valid for 180 calendar days (FAR 52.215-1(d)).

Submissions shall include 1 electronic copy. All electronic proposals shall be submitted using DoD SAFE (Department of Defense Secure Access File 1 hard copy and Exchanges; https://www.safe.apps.mil). No CDs will be accepted.

Hard Copy- For Binding and Labeling, each section of the proposal should shall be separately bound to permit the volume to lie flat when open. Staples shall not be used.

A cover sheet should shall be bound in each book, clearly marked as to volume number, title, copy number, Solicitation identification, and the Offerors' name.

Please submit a hard copy directly to the 99th Contracting Squadron. The address for 99 CONS is as follows: 5865 Swaab Blvd, Bldg. 588 Nellis AFB, NV 89191.

The same identifying data should be placed on the spine of each binder if applicable. Be sure to apply all appropriate markings including those prescribed in accordance with FAR 52.215-1(e), Restriction on disclosure and use of data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal information and

Source selection information.

Electronic Copy- The content and page size of electronic copies must be identical to the hard copies. When discrepancies exist between the written offers and those . Use separate files to permit rapid location of all portions, including subfactor required provided in electronic format, the electronic copy will take precedence in all cases plans, exhibits, appendices and attachments, if any. If files are compressed, the necessary decompression program must be included.

FA486125R00030016

The Government Point of Contact (GPOC) will send an e-mail to the Offeror acknowledging the request for a proposal drop-off code in DoD SAFE. The GPOC e-mail acknowledging the request will not be sent to the Offeror after close of business hours, weekends, or on nationally observed holidays. If you do not receive an acknowledgement e-mail from either of the GPOCs after 72 hours, you must send another e-mail. E-mails will not be returned after close of business hours, weekends, or on nationally observed holidays.

The request for DoD SAFE drop-off is only valid for 14 days. If the 14 days has expired and the RFP is still open, the Offeror may send another e-mail request for drop-off code to the GPOC e-mail addresses listed on the Solicitation. Be advised that classified information is not allowed on DoD SAFE. Any files containing CUI/ PII/PHI must be encrypted prior to uploading or by checking the "Encrypt every file" box. The Offeror is allowed to drop-off one or more files (up to 8GB total). The Offeror may select the box "Send me an e-mail when each recipient picks up the files" for documentation purposes. The GPOC will receive an automated e-mail containing the information the Offeror has entered and instructions for downloading the file(s). The GPOC will have 7 days to retrieve the files submitted in the drop-off. DoD SAFE does not guarantee delivery of documents within a specified time under 4 hours.

L-3. Exceptions to Solicitation Requirements

Offerors are required to meet all Solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for Award.

There will be no alternate Proposals, and the Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this Solicitation.

L-4. Proposal Content

OFFEROR Proposals will be organized according to the below order.

L-4.1 General Requirements and Qualifications L-4.1.1 File Name L-4.1.2 Cover Letter L-4.1.3 Solicitation Contract Form SF 1442 L-4.1.4 Contract Provisions/Clauses L-4.1.5 Joint Venture and Mentor Protege (as applicable) Agreement L-4.1.6 HUBZone Certification L-4.2 Technical Experience (Factor 1) - Self Rated L.4.2.1 Self-Scoring Matrix L-4.2.2 Contract Information Sheet

L-4.2.3 CPARS

L-4.2.4 PPQ (if applicable) L-4.3 Technical Proposal and Qualifications (Factor 2) - Government Rated L-4.3.1 Seed Project (Factor 2 - Subfactor 1) L-4.3.2 Quality Control Plan (Factor 2 - Subfactor 2A) L-4.3.3 Bonding Capability (Factor 2 - Subfactor 2B) L-4.4 Pricing (Factor 3) - Government Rated L-4.4.1 Coefficients and Price Schedule

L-4.1

L-4.1. General Requirements and Technical Qualifications Proposals will follow the format required and will provide technical qualifications instructions in Section L-3.1. Failure to provide requirements may result in immediate disqualification.

L-4.1.1. File Name: Offeror Name 24R0018 Proposal V.1 If revisions are requested, revised proposals will be labeled V.2 for second revision, V.3 for third revisions and etc.

L-4.1.2. Cover Letter The format for this section needs to include:

(a) Name

(b) Address

(c) CAGE Code

(d) Unique Entity Identifier

(e) System for Award Management (SAM.gov) registration expiration date

(f) Proposal validity statement

(g) Virus free electronic submission statement

(h) POC authorized to obligate the company (name, email, and phone)

L-4.1.3. Solicitation Contract Form SF 1442 Completion of blocks 14 - 16, and 19 (if applicable) and signature and date for blocks 20 of the SF 1442. Signature by the Offeror on the SF 1442 constitutes a legally-binding offer which the Government may accept. The "original" copy should be submitted without any punched holes.

L-4.1.4. Contract Provisions/Clauses Offeror shall complete any fill-in clauses as applicable, to include completed representations, certifications, acknowledgments, and statements. Annual representations and certifications shall be completed electronically via the System for Award Management (SAM) Website accessed through www.sam.gov.

L-4.1.5. Joint Venture and Mentor-Protege Agreement (as applicable) Joint Venture: Offerors who are an existing Joint Venture as defined in FAR 9.601(1) or FAR 9.601(2) may submit a proposal under this Solicitation subject to the following conditions: (1) The Offeror (e.g., Joint Venture or Prime Small Business contractor) and each Contractor identified in an Joint Venture Contract Team Arrangement (CTA) must be registered in SAM at https://www.sam.gov with a corresponding Unique Entity ID and CAGE Code; and (2) Offeror must submit complete representations and certifications in accordance with FAR Provision 52.212-3 at the time of proposal submission. Contractors must submit proper certificates proving Joint Venture status if SAM registration has not been updated. If the Offeror is a Joint Venture, it must meet the definition of a Joint Venture for size determination purposes (FAR 2.101 or 13 CFR 121.103). All minimum requirements and scored evaluation criteria must have been performed by the Offeror or member of the joint venture.

Mentor-Protege: Offerors may submit a proposal under this Solicitation as an approved Mentor-Protege Joint Ventures in accordance with 13 CFR 125.9. Contractors must submit proper certificates proving Mentor-Protege Joint Venture status if SAM registration has not been updated. The amount of Mentor-protege Provided the Mentor is not a Small Business under the applicable size standard, that Mentor may submit a maximum of two (2) Relevant Experience Projects. The remaining Relevant Experience Projects submitted must be submitted by the Protege.

L-4.1.6. HUBZone Certification Offerors must submit evidence of HUBZone registration through SBA (Small Business Administration) HUBZone acceptance letter, or active registration of HUBZone status on System for Award Management (SAM.gov) at https://sam.gov. Any proposal missing evidence of HUBZone certification will be considered incomplete and not reviewed further.

L-4.2. Technical Experience (Factor 1) Offerors must provide information on contracts that demonstrate their capability to perform on the SABER contract using a Self-Scoring Matrix (Attachment 3). The Self- Scoring Matrix is used to rate Work Samples. In the context of this Solicitation, a Work Sample is a record that can be validated for past performance (such as a specific contract, task order, or annual evaluation period) that has been rated with a CPARS report or, where one is not available, a Past Performance Questionnaire (PPQ). The types of Work Samples that can be submitted for points differ across the evaluation criteria, and Offerors must refer to the specific requirements of each tab (SABER Annual, SABER Per TO, etc.) as specified in Section L-4.2.1 to properly complete the Self-Scoring Matrix. The self-rated scoring matrix is an Excel document that Offerors self-score against the pre-defined objective scoring criteria and deliver supporting documentation to objectively prove self-score validity. Self-rated scores shall be validated using work samples provided by the Offeror. The work samples shall include all the evidence required to validate the proposed self-score. Each Work Sample must have a completed Contract Information Sheet (see L4.2.2 for details), along with a Statement of Work and Price Schedule. Work samples must be relevant contracts performed for Government agencies and commercial customers within the last six (6) years.

L-4.2.1. Self -Scoring Matrix The matrix consists of a table of contents that displays the matrix broken down into six tabs (sections/criteria) for self-rating past performance. Any attempt to change formulaic values outside of editable fields may warrant an Offeror's proposal invalid and may not be considered.

Notes for Tab Completion and Maximum Points for Each Section

Tab 1 SABER Annual - 2000 points Fill out Tab 1 to self-score SABER Contracts Past Performance (CPARS) Rated annually.

Tab 2 SABER Per TO - 752 points Fill out Tab 2 to self-score SABER Contracts Past Performance (CPARS) Rated per task Order Tab 3 Multiple Award IDIQ -360 points Fill out Tab 3 to self-score Multiple Award IDIQs Construction Contracts Rated Annually Tab 4 Multiple IDIQ - 100 points Fill out Tab 4 to self-score Multiple Award IDIQs Construction Contracts Rated per Task Order Tab 5 Design Build - 48 points Fill out Tab to self-Score Design Build Construction Contracts Tab 6 General Construction - 30 points Fill Out Tab 5 to self-score General Construction Contracts Offerors shall fill out the proper number of Work samples in each Tab. Work Samples can only be used on one Tab.

To properly fill out the Work Sample information, Offerors must complete the blue-highlighted columns by entering the contract number and the name of the contract.

Additionally, depending on the section, the Annual Period or the Task Order number cell highlighted in Blue will need to be completed if applicable. Columns F and Columns I are to be left Blank. Column J shall be completed. In Column J, File Names for Reference shall reference any Contract Information Sheets, CPARS or PPQs that correspond to the Work Sample.

In the orange-highlighted columns, Offerors shall select the CPARs ratings for Quality, Schedule, and Management using the dropdown menus provided. It is important to note that only ratings of Satisfactory or higher will earn points, while Marginal or Unsatisfactory ratings will not contribute to the score. These guidelines ensure accurate and consistent evaluation of contractor performance.

Similar work for Government agencies outside the Department of the Air Force can be considered in the SABER Tabs (Tab 1 and Tab 2). However, the experience must include the essential elements of a SABER Contract. The definitions of a SABER contract, for the purpose of this solicitation, can be found in Section M-2.3.1.

The same is applicable for Multiple Award Construction Contract/ Design-Build Contracts. Similar work for Government agencies outside the Department of the Air Force can be considered in the MACC Tabs (Tab 3 and Tab 4). However, the experience must include the essential elements of a MACC Contract. The definition of MACC Contract, for the purpose of this solicitation, can be found in Section M-2.3.2.

Recognizing that IDIQ SABER and MACC type contracts can either be assessed a CPAR on an annual basis for the base contract OR be assessed for a CPARs at the Task Order level, two distinct tabs, Tabs 1 & 2 for SABER and Tabs 3 & 4 for MACC/DB Contracts were created on the scoring sheet. Contractors are not permitted to request PPQs for work samples where CPARS evaluations already exist. If a contract is already rated annually in CPARS, a PPQ cannot be completed per task order.

Likewise, if a contract is already rated per task order in CPARS, a PPQ cannot be completed for an annual evaluation rating.

PPQs will only be counted in the scoring when no CPARS evaluations have been completed for the specific work sample. Attempts to receive multiple scores for the same project will be rejected and the score adjusted accordingly.

Offerors shall not enter any information into the deduction column. The deductions column is for Government use only and will be used to deduct points that the Government cannot validate or deduct adverse CPARS that the Government deems necessary.

L-4.2.2. Contract Information Sheet The Offerors shall submit Contract Information Sheets (contracts/orders) which demonstrate their past technical experience for the Work Samples listed within the Self- Scoring Matrix. Contract Information Sheets demonstrating technical experience for multiple required elements in the Self - Scoring Matrix are only required to be submitted once.

Each Contract Information Sheet shall contain a small narrative explaining what aspects of the contract/order is deemed relevant to the proposed effort, which evaluation criteria in the HTRO Self-scoring matrix is supported. This narrative shall include reference number from the matrix, contract number and date of the annual period or task order number.

Offerors shall include corresponding Statement of Work and Price Schedule immediately after each Contract Information Sheet in Proposal Package.

Coefficients and any other information an Offeror considers confidential within a Price Schedule may be redacted at the Offeror's discretion.

L-4.2.3. CPARS

Offerors are required to include CPARS reports to be validated by the Government. CPARS shall include reference number from the matrix, contract number and date of the annual period or task order number.

L-4.2.3.3. Past Performance Questionnaire

Offerors have the option to submit a Past Performance Questionnaire (PPQ) for contracts that have not been rated in CPARS. These questionnaires shall only be completed if there is no CPARS report for the project. The PPQ must be accompanied by a brief narrative explaining the contract, base contract, or task order it pertains to.

Offerors are responsible for ensuring that Attachment 4, Past Performance Questionnaires, is completed by Contracting Officer for the respective project.

Offerors also rate themselves based on their PPQ results and enter the applicable rating on the Self-Scoring Matrix.

L-4.3. Technical Proposal and Qualifications (Factor 2) The offeror shall provide technical proposal and qualifications information which includes a technically acceptable Seed Project proposal, Quality Control Plan, and Bonding Capability.

L-4.3.1. Seed Project (Technical Proposal and Qualifications Subfactor 1)

The Offeror shall provide a technical approach to the accomplishment of the design-build Renovate Honor Guard 99 FSS B10250/ RKMF 240010 in accordance with Attachment 45 Statement of Objectives. Responses to this factor must discuss the Offeror's technical understanding of the design/build work requirements and their commitment to accomplish all the work in accordance with the Solicitation requirements and integrated construction schedule. Technical approach shall demonstrate how the site, architectural, structural, electrical, communications, mechanical, HVAC and plumbing issues will be addressed. Discuss phasing and any interim completion dates needed. The proposed approach shall provide all of the following essential components.

a. A complete Level 1 Design (Magnitude 2) which ensures the successful of the Project RKMF 240010 in accordance with Attachment 50 Statement of Objectives for RKMF 240010. To be considered technically acceptable, Level 1 Design (Magnitude 2) must meet the requirements of Attachment 01 SABER Specs SOW, Level 1 Design.

b. A detailed, narrative description of procedures, processes, and methods for tracking the progress of the project in accordance with Specifications.

c. A complete cost estimate prepared using eGordian software in accordance with Attachment 01, SABER Specifications SOW.

d. Contractors must contact Thais Crespo at t.crespo@gordian.com to request access to eGordian during the solicitation period in order to develop proposals that support their coefficients.

L-4.3.2. Quality Control Plan (Technical Proposal and Qualifications Subfactor 2A)

1. The Offeror shall provide a narrative and visual representation of how they plan to accomplish Quality Control for the SABER program and subsequent task order projects. At a minimum, the Quality Control Plan shall:

a. Specifically address quality control (to include schedule management) in regard to design review, submittal review, construction management, and closeout

b. Address how quality problems will be logically, effectively, and expediently documented and resolved.

c. Detail measures that will be accomplished to identify poor performing subcontractors, including appropriate corrective action, management tools, methods, and documentation.

d. Identify key quality control personnel (with no overlapping duties and responsibilities) and the extent of their authority.

e. Identify how often projects will be inspected (i.e. frequency of at least once per day per job)

f. Detail methods the Offeror will utilize to update the Government on project status and how interface with Government inspectors will be accomplished (status updates shall be a minimum of weekly).

L-4.3.3. Bonding Capability (Technical Proposal and Qualifications Subfactor 2B) The Offeror will provide documents demonstrating their company can meet the minimum requirement for an acceptable Bonding Capability. Provide information, from an acceptable surety in accordance with FAR 28.202 Acceptability of Corporate Sureties, reflecting sufficient bonding capability to meet the maximum task order amount ($4,000,000) as well as a potential aggregate amount of $40,000,000.

L-4.4. Pricing (Factor 3) Offerors must provide a price for all line items. Offerors must complete Attachment 02 - Price schedule. The Price Schedule is required to be submitted in excel format.

Offerors shall complete the orange highlighted cells (Column D). No editing of the format or the document is permitted. Tampering with the formatting or calculations of the Price Schedule may result in disqualification from consideration.

Offerors should be aware the pricing factor is specifically for the base contract only.

L-4.4.1. Coefficients and Price Schedule

a. The coefficient shall cover all items including all general conditions, profit, overhead, bonds, taxes, insurance, administrative/technical support and labor burden for the prime Contractor's office staff and workforce. Bond costs shall be included in the coefficient and payment, and performance bonds will be required in accordance with (IAW) FAR Part 28 Bonds and Insurance.

L-5 Request for Information (RFIs) RFIs must be submitted in writing and are due no later than 3 November 2025. Any Questions /RFIs must be submitted in writing using Attachments 50 and 51 as necessary.

Offerors must use Attachment 50 RFI Log_ General Solicitation and Attachment 51 RFI Log_ SABER Seed as applicable.

- Attachment 50 is designated for all RFIs related to the Solicitation process, the self-scoring matrix, the SABER Statement of Work and any related attachments. except those pertaining to the SABER Seed project This would include anything about the solicitation process, the self-scoring matrix, the SABER Statement of Work or any of the corresponding attachments. Attachment 51 is designated for all RFIs related to the SABER Seed Project RKMF 2400010. This would include the SABER Seed Statement of Work and corresponding attachments.

Section M - Evaluation Factors for Award

Header Miscellaneous Text (Modified):

M-1 GENERAL INFORMATION

Basis of Contract Award M-1.0.

This is a best value source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15.3 and DoD Source Selection Procedures, as supplemented. In this procurement, the Government will determine best value based on an objective assessment and validation of the 2 Highest Technically Rated Offerors (2HTRO). Using 2HTRO, the highest 2 validated scores will be analyzed for price fairness and reasonableness in accordance with FAR 15.304.

If the offeror with the highest Government validated technical score also has the lowest price, the award is made to that offeror. However, if the second highest technically rated offeror has a lower price and their government validated technical score is within 10% of the highest rated offeror, then the award is made to the second highest offeror instead.

. EVALUATION METHODOLOGY AND FACTORS M-2.0

The basis of award will be a technically acceptable, 2 Highest Technically Rated Offeror (2HTRO). The Government will select the best overall Offeror based on results of an integrated assessment of the proposals and ratings of past experience.

- Factor 1. Technical Experience

- Factor 2. Technical Proposal and Qualifications

- Factor 3. Pricing

The Government will use 2HTRO to evaluate the two top highest self-rated offerors. Offers will be validated by the Government for self-rated scores through the Technical Experience (Factor 1) and will be evaluated by the Government for a Technically acceptable Technical Proposal and Qualifications (Factor 2). Then Price fairness and reasonableness (Factor 3) will be evaluated by evaluating Contractor's coefficients and Total Evaluated Price.

Once the Government has identified at least two awardable offers after evaluating and validating Factor 1 and 2, the evaluation proceeds as follows. If the offeror with the highest Government validated technical score also has the lowest price, the award is made to that offeror. However, if the second highest technically rated offeror has a lower price and their government validated technical score is within 10% of the highest rated offeror, then the award is made to the second highest offeror instead.

Factor 1: Technical Experience M-2.1.

The Government will validate all technical experience for all six tabs as well as accompanying Contract Information Sheets/Attachment 45, Statement of Works, Price Schedules and CPARS (or Past Performance Questionnaire/Attachment 3) corresponding to the self-scoring matrix. The validation will be completed by the government using the provided CPARS reports as well as an integrated assessment of any CPARS reports not included.

Recognizing that IDIQ SABER and MACC type contracts can either be assessed a CPAR on an annual basis for the base contract OR be assessed for a CPARs at the Task Order level, two distinct tabs, Tabs 1 & 2 for SABER and Tabs 3 & 4 for MACC/DB Contracts were created on the scoring sheet. Contractors are not permitted to request PPQs for work samples where CPARS evaluations already exist. If a contract is already rated annually in CPARS, a PPQ cannot be completed per task order.

Likewise, if a contract is already rated per task order in CPARS, a PPQ cannot be completed for an annual evaluation rating.

PPQs will only be counted in the scoring when no CPARS evaluations have been completed for the specific work sample. Attempts to receive multiple scores for the same project will be rejected and the score adjusted accordingly.

For the purpose of this Solicitation, a SABER (Simplified Acquisition of Base Engineer) Contract contains the following elements:

-Element (1) The SABER needs to be a fixed price indefinite-delivery/indefinite-quantity (IDIQ) contract.

-Element (2) Design task orders and subsequent construction task orders based off those designs need to be in the scope of the IDIQ.

-Element (3) There is a unit price guide that is implemented, such as R.S Means or eGordian, that uses coefficients. (The pricing for designs are pre-priced).

-Element (4) The design and construction task orders must be carried out within the duration of the IDIQ.

For the purpose of this Solicitation, a MACC (Multiple Award Construction Contract)/Design-Build contains the following elements:

-Element 1) IDIQ whose requirements are competed among a pool of multiple awardees based on work defined in individual task orders.

-Element 2) Work should consist of multiple disciplines in general construction categories. This may include the following: architectural, structural, civil, mechanical, electrical, fire protection or communications.

-Element 3) Contract involves DB which stands for Design-Build. Design-Build means combining design and construction in a single contract with one contractor.

If an Offeror makes unsupported or misleading claims in their past technical experience, the Government may find that their self-rated score is inflated. The Government reserves the right to lower the Offeror's score. Additionally, the Government reserves to right to identify additional work samples to be utilized in its evaluation of Past Performance.

The Government intends to run Integrity Reports through Contractor Performance Assessment Reporting System (CPARS) for all Offerors and finding are subject to deductions. The CPARS Integrity Report is a report run through CPARS.gov. Potential deductions will be found running UEI and Cage codes through the database. The Government reserves the right to deduct 15 points for derogatory issues found in the Integrity Reports. Points will be deducted for records that display "Yes" under the following categories: Administrative Agreements, Defective Pricing, DoD determination of Contractor Fault, Information on Trafficking in Persons, Material Failure to Comply with Closeout requirements, Non-Responsibility Determination, Recipient Not-Qualified Determination, Subcontractor Payments Issues, Termination for Cause, or Termination for Material Failure to Comply.

In conducting the Technical Experience validation evaluation, the Government reserves the right to use both the information provided in the Offeror's Past Performance proposal volume and information obtained from other sources such as the Contractor Performance Assessment Reporting System (CPARS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources.

Factor 2: Technical Proposal and Qualifications M-2.2.

Technical Proposal and Qualifications includes the Seed Project proposal (Subfactor 1), Quality Control Plan (Subfactor 2A), and Bonding Capability (Subfactor 2B). The technical evaluation team will evaluate all proposals on a as either Acceptable or Unacceptable. The minimum requirements for acceptability are:

Subfactor 1) Seed Project Proposal

An acceptable Seed Project (Subfactor 1) must meet all requirements in Section L 4.3.1 and Attachment 01/Statement of Work, (Section 1.4.11.2 Level 1 Design and Section 1.4.11.2.1 Drawings) for RKMF 240010- Repair Honor Guard Facility B10250. The Seed project Cost Proposal will be completed by using eGordian or software specified in the SABER Specifications.

Subfactor 2A) Quality Control Plan

An Acceptable Quality Control Plan (Subfactor 2A) must meet the requirements in Section L 4.3.2 and Attachment 01/Statement of Work (Section 1.25 Quality Control).

Subfactor 2B) Bonding Capability Information

Bonding Capability Information (Subfactor 2B) must meet the requirements in Section L 4.3.3. in order to be Acceptable.

Factor 3-Price M-2.3 The Government will evaluate Factor 3 by assessing the Contract using Attachment 2 - Price Schedule. A price analysis will be conducted IAW FAR15.404-1 to ensure a reasonable price has been proposed. The Government will analyze offers to determine if they are unbalanced with respect to prices for separately priced line items.

All five years will be considered in determining the Offeror's aggregate price.

Evaluation Methodology M-3.0.

The Government will utilize a 2 Highest Technically Rated Offeror (2HTRO) methodology. M-3.1.

The 2HTRO methodology requires the Offeror to submit a self-rated score based on the objective criteria described in Section L. The Government will utilize 2HTRO with fair and reasonable price. The use of 2HTRO enables the Government to evaluate the (2) highest rated Offerors. Following negotiations, if either of the two highest rated offerors are determined to be unacceptable, the proposal will be removed from further consideration. The next highest rated offeror will be evaluated in the place of the removed offeror(s).

The evaluation will be conducted in three steps. Step 1 validates Factor 1, Technical Experience; Step 2 evaluates Factor 2, Technical Proposal and Qualifications; and Step 3 evaluates Factor 3, Price.

The Government plans to award without any discussions. However, if needed, the Government reserves the right to have discussions with the top 2 highest rated offerors.

The decision to open discussions will be based on the Contracting Officer's decision at any step of the Evaluation process.

- Step 1- Validate Factor 1, Technical Experience M-3.2.1.

The Government will validate the top two ranked proposals to evaluate for Factor 1: Technical Experience. To qualify as the top two ranked proposals, Offeror's must have one of the two highest number of points on their self-scoring matrix. The Government will complete the validation process by checking each self-rated score on the Self Scoring Matrix. Validation will require that the scores align with the corresponding work samples. Supporting documents include Contract Information Sheets, Statements of Work, Price Schedules, and the CPARS provided by the Offeror in the proposal package.

If the Government is unable to find the supporting information within the referenced page, paragraph, table, etc., the Government may or may not reach out further for the substantiating information. The Government will unilaterally downward adjust the Offeror's self-rated score, potentially down to zero points. The Government may unilaterally downward adjust the Offeror's self-rated score if unsupported information is referenced. The Government will only adjust the Offeror's self-rated score downward, not upward. Such adjustments are within the sole discretion of the Government and are based upon the substantiation of the self-rated score provided by the Offeror.

The Government intends to run Integrity Reports through Contractor Performance Assessment Reporting System (CPARS) for all Offerors and finding are subject to deductions. The CPARS Integrity Report is a report run through CPARS.gov. Potential deductions will be found running UEI and Cage codes through the database. The Government reserves the right to deduct 15 points for any derogatory issues found in the Integrity Reports. Points will be deducted for records that display "Yes" under the following categories: Administrative Agreements, Defective Pricing, DoD determination of Contractor Fault, Information on Trafficking in Persons, Material Failure to Comply with Closeout requirements, Non-Responsibility Determination, Recipient Not-Qualified Determination, Subcontractor Payments Issues, Termination for Cause, or Termination for Material Failure to Comply.

Since the scores can be deducted it is possible that one or both top two original Offeror proposals can be displaced by the next highest technically rated offeror's proposal.

If this happens, next highest self-scored proposal or proposals are evaluated.

Once two of the highest scores are validated by the Government, Factor 2 will be evaluated for those two Offerors.

- Step 2 - Evaluate Factor 2, Technical Proposal and Qualifications M-3.2.2.

In Step 2, the Government will evaluate Factor 2: Technical Proposal and Qualifications. This includes evaluating the top two proposals based on their Seed Project Proposal, Quality Control Plan, and Bonding Capability.

If both contractors meet the requirements and are considered technically acceptable in Step 2, the Government will move forward to Factor 3: Pricing and proceed to Step

3. However, if one or both proposals fail to meet the standards in any of the three subfactors: Seed Project Proposal, Quality Control Plan, or Bonding Capability, the process will revert to Step 1. At this point, any proposal deemed unacceptable may prompt the Contracting Officer to initiate discussions if necessary. However, the Contractor reserves the right to eliminate contractors from considerations when deemed appropriate.

- Step 3- Evaluate Factor 3, Price M-3.2.3.

The Government will review the top two validated Offerors that are technically acceptable and determine prices proposed are fair and reasonable using price analysis methods in accordance with FAR 15.404.

If either of the Offerors' prices are determined not fair and reasonable, the Government will return to Step 1 and evaluate the next highest validated Offeror.

If the offeror with the highest government validated technically rated proposal also offers the lowest price, the award will be made to that offeror. If, however, the second highest technically rated offeror has a lower price and their government validated technical score is within 10% of the highest rated offeror's score, the award will instead be made to the second highest offeror.

The Government intends to award to one (1) Offeror who is validated as the highest technically rated, with a fair and reasonable evaluated price.

Number of Contracts to be Awarded M-3.3.

The Government intends to award to one (1) contract for the Nellis/Creech Simplified Acquisition of Base Engineer Requirements (SABER) as a HUBZone set-aside.

Rejection of Unrealistic Offers M -3.4.

The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or low in price when compared to Government estimate, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program. Offerors are required to meet all Solicitation requirements, such as terms and conditions, representations and certifications, and Statement of Work, in addition to those identified as factors. Failure to comply with the terms and conditions of the Solicitation may result in the Offeror being ineligible for Award.

The Government will not entertain any exceptions. In the case a discrepancy exists between Section L- Instructions to Offerors and Section M -Evaluation Factors for Award, the evaluation criteria in Section M - Evaluation Factors for Award will take precedence.

SUMMARY OF CHANGES
List of Attachments
Instructions, Conditions, & Notices to Offerors or Quoters
Evaluation Factors for Award

File details come from the government source that posted it. Updated .