(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png
PNG image 259 KB Posted
- Attached to
- SABER IDIQ
- Solicitation number
- FA486125R0003
About this file
This is a field observation document from KAL Architects for a building maintenance assessment, dated 08/15/2024, focusing on a backflow assembly in Building No. 10250. The document details a 3-inch pipe backflow system with noted condition issues, including leakage, insulation problems, and potential corrosion. The five key comments/notes recommend comprehensive repair and replacement actions: removing and replacing pipe insulation, installing a weatherproof enclosure, addressing air gap drain issues, terminating to floor drain, and installing a new BFP/PVB valve assembly. The accompanying photo confirms visible pipe infrastructure with orange and black piping, visually substantiating the documented maintenance requirements.
View the file
Other files
Show 40 more
Latest 50 of 126 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .