This document is an Asbestos and Lead Based Paint Inspection Report for Nellis Air Force Base, focusing on Building 10250. Macrotec Consulting, LLC performed an inspection on 5/31/2023 to identify potential asbestos-containing materials and lead-based paint in the south corner restrooms prior to planned renovation activities. The scope of work involves renovating restrooms in the south corner of the building.
The comprehensive report includes detailed laboratory analysis from Triangle Environmental Service Center, which tested 19 different samples across various materials including drywall, concrete walls and floors, ceramic tile grout, window putty, and other building components. Critically, no asbestos or lead was detected in any of the tested samples. The inspection utilized both Polarized Light Microscopy (PLM) and X-Ray Fluorescence (XRF) testing methods, with samples taken from both the men's and women's restrooms. The report emphasizes that if any suspect materials are found during renovation activities outside the identified areas, work should immediately stop until further testing can be completed.
View the file
Other files
Show 40 more
Latest 50 of 126 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nellis Air Force Base Asbestos and Lead Based Paint Inspection Report
Work Order Scope of Work:
Renovate restrooms in south corner of the building.
Building Number: 10250
Inspection Date: 5/31/2023
Nellis Work Order: RKMF240010
Macrotec Job Number: 23746
The information contained in this report pertains only to the specific area defined in the above scope of work. This summarized report is for reference purposes, only. A detailed generic report is on file with Nellis Air Force Base Civil Engineering. Only proper personnel should interpret this report to determine whether the information herein can be utilized for current and future renovation activities within the building.
Macrotec Consulting, LLC. performed an inspection for Asbestos Containing Building Materials and Lead Based Paint. The intent of this inspection was to identify materials containing asbestos and lead, within the subject site, that may be impacted during planned renovation activities.
Introduction:
Report Limitations:
Office@MacrotecConsulting.com Phone: (702) 949-6225 Fax: (702) 629-5677
Appendix A - Asbestos Assessment
Macrotec Job #23746 - Bldg. 10250 ; RKMF240010
The following table lists each of the materials suspected to contain asbestos at the subject site. For each material the sample number, location and laboratory result are listed. If the material was found to contain asbestos, the friablity and NESHAP classification is identified.
1 Smooth Walls & Ceilings (Drywall/Mud) - No Asbestos Detected
None DetectedSouth Corner - Women's Room - Fire closetAB1
None DetectedSouth Corner - Women's Room - N cornerAB2
None DetectedSouth Corner - Men's Room Outer - Adj. inner doorAB3
2 Coating on Concrete Wall - No Asbestos Detected
None DetectedSouth Corner - Men's Room Inner - SE wallAB4
None DetectedSouth Corner - Men's Room Inner - NW wallAB5
None DetectedSouth Corner - Men's Room Inner - SW wallAB6
3 Coating on Concrete Floor - No Asbestos Detected
None DetectedSouth Corner - Men's Room Inner - CenterAB7
None DetectedSouth Corner - Women's Room - Fire closetAB8
4 Concrete Sub Floor - No Asbestos Detected
None DetectedSouth Corner - Women's Room - Fire closetAB9
5 Ceramic Tile Grout - No Asbestos Detected
None DetectedSouth Corner - Men's Room Inner - CenterAB10
6 Window Putty - No Asbestos Detected
None DetectedSouth Corner - Men's Room Inner - SE sideAB11
Asbestos Survey
Bldg. 10250
Macrotec Job #23746
Appendix A
7 FRP Mastic - No Asbestos Detected
None DetectedSouth Corner - Men's Room Outer - S cornerAB12
8 Gray Base Cove - No Asbestos Detected
None DetectedSouth Corner - Men's Room Outer - S cornerAB13
9 Yellow Base Cove Mastic - No Asbestos Detected
None DetectedSouth Corner - Men's Room Outer - S cornerAB14
10 CMU Wall - No Asbestos Detected
None DetectedSouth Corner - Women's Room - SW wallAB15
11 CMU Mortar - No Asbestos Detected
None DetectedSouth Corner - Women's Room - SW wallAB16
Asbestos Survey
Bldg. 10250
Appendix B - Lead Assessment
Macrotec conducted analysis of the painted surfaces and/or bulk materials that may be impacted during the defined scope of work, using an XRF analyzer. No lead was detected during the inspection of the suspect materials. Appendix E lists the painted surfaces that were analyzed during this inspection along with its location and analysis result. Note: If suspect materials are found during renovation activities outside what was identified in this report, stop work immediately until further testing can be completed.
Lead Paint Inspection Bldg. 10250
Appendix B
Asbestos & Lead Based Paint Inspection
NAFB—Bldg. 10250
Macrotec Project # 23746
Appendix C
Sample Location Diagram
N
AB3
AB2
AB1
AB8
AB7
AB6
AB5
AB4
AB10
AB9
AB16
AB15
AB14
AB13
AB12
AB11
Men’s Room
Women’s Room
Macrotec Consulting
TRIANGLE ENVIRONMENTAL SERVICE CENTER, INC.
13509 East Boundary Road, Suite B, Midlothian, VA 23112
804-739-1751 • fax: 804-739-1753
BULK ASBESTOS SAMPLE ANALYSIS SUMMARY
9724 Mild Weather Ct.
Las Vegas, NV 89148
23746
Bldg 10250
230601W
6/1/2023
6/1/2023
6/1/2023
B. TrimmerJOB SITE:
TESC LOGIN #:
DATE OF RECEIPT:
DATE OF ANALYSIS:
DATE OF REPORT:
ANALYST:
TESC
SAMPLE #
CLIENT SAMPLE ID
& GROSS DESCRIPTION
ESTIMATED
% ASBESTOS
NON ASBESTOS
% FIBERS
NON FIBROUS
% MATERIALS
CLIENT:
CLIENT JOB/ #:
1A AB1 Drywall / White Powder, Brown Fibers NAD 80%20% Cellulose
1B AB1 Mud / White Powder NAD 100%
2A AB 2 Drywall / White Powder, Brown and White
Fibers
NAD 75%20% Cellulose
5% Fiberglass
2B AB2 Mud / White Powder NAD 100%
3A AB3 Drywall / White Powder, Brown and White
Fibers
NAD 75%20% Cellulose
5% Fiberglass
3B AB3 Mud / White Powder NAD 100%
4 AB4 / White Powder NAD 100%
5 AB5 / White Powder NAD 100%
Friday, June 2, 2023 Page 1 of 3
Samples are analyzed in accordance with “EPA -- 40 CFR Appendix E to Subpart E of Part 763, Interim Method for the Determination of Asbestos in Bulk
Insulation Samples”, EPA 600/R-93/116: Method for the Determination of Asbestos in Bulk Building Materials. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Sodium Chloride is analyzed for quality control blank. TESC recommends by point count or
Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report must not be reproduced except in full with approval of Triangle Environmental Service Center, Inc. This test report relates only to the item(s) tested. This repo r t may no t be u sed by the c l i en t to c la im p roduc t endo rsemen t by NV LAP o r any o ther agency o f the U.S . Government .
NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound] [
Reviewed By Authorized Signatory:
Feng Jiang, MS Senior Geologist, Laboratory Director
Yuedong Fang, Senior Geologist
13509 East Boundary Road, Suite B, Midlothian, VA 23112
23746
Bldg 10250
230601W
6/1/2023
6/1/2023
6/1/2023
B. TrimmerJOB SITE:
TESC LOGIN #:
DATE OF RECEIPT:
DATE OF ANALYSIS:
DATE OF REPORT:
ANALYST:
TESC
SAMPLE #
CLIENT SAMPLE ID
& GROSS DESCRIPTION
ESTIMATED
% ASBESTOS
NON ASBESTOS
% FIBERS
NON FIBROUS
% MATERIALS
CLIENT:
CLIENT JOB/ #:
6 AB6 / White Powder NAD 100%
7 AB7 / Gray Adhesive NAD 100%
8 AB8 / Gray Adhesive NAD 100%
9 AB9 / Gray Adhesive NAD 100%
10 AB10 / Gray Granular NAD 100%
11 AB11 / Tan Powder NAD 100%
12 AB12 / Beige Adhesive NAD 100%
13 AB13 / Gray Rubber NAD 100%
14 AB14 / Yellow Adhesive NAD 100%
Friday, June 2, 2023 Page 2 of 3
Samples are analyzed in accordance with “EPA -- 40 CFR Appendix E to Subpart E of Part 763, Interim Method for the Determination of Asbestos in Bulk
Insulation Samples”, EPA 600/R-93/116: Method for the Determination of Asbestos in Bulk Building Materials. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Sodium Chloride is analyzed for quality control blank. TESC recommends by point count or
Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report must not be reproduced except in full with approval of Triangle Environmental Service Center, Inc. This test report relates only to the item(s) tested. This repo r t may no t be u sed by the c l i en t to c la im p roduc t endo rsemen t by NV LAP o r any o ther agency o f the U.S . Government .
NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound] [
Reviewed By Authorized Signatory:
13509 East Boundary Road, Suite B, Midlothian, VA 23112
23746
Bldg 10250
230601W
6/1/2023
6/1/2023
6/1/2023
B. TrimmerJOB SITE:
TESC LOGIN #:
DATE OF RECEIPT:
DATE OF ANALYSIS:
DATE OF REPORT:
ANALYST:
TESC
SAMPLE #
CLIENT SAMPLE ID
& GROSS DESCRIPTION
ESTIMATED
% ASBESTOS
NON ASBESTOS
% FIBERS
NON FIBROUS
% MATERIALS
CLIENT:
CLIENT JOB/ #:
15 AB15 / Gray Granular NAD 100%
16 AB16 / Gray Granular NAD 100%
Total Samples/Layers Analyzed: 19
Friday, June 2, 2023 Page 3 of 3
Samples are analyzed in accordance with “EPA -- 40 CFR Appendix E to Subpart E of Part 763, Interim Method for the Determination of Asbestos in Bulk
Insulation Samples”, EPA 600/R-93/116: Method for the Determination of Asbestos in Bulk Building Materials. None Detected: not detected at/or below the detected limit of method (Reporting limit: 1% Asbestos). Sodium Chloride is analyzed for quality control blank. TESC recommends by point count or
Transmission Electron Microscopy (TEM), for materials regulated by the EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by Polarized Light Microscopy (PLM). Both services are available for an additional fee. This report must not be reproduced except in full with approval of Triangle Environmental Service Center, Inc. This test report relates only to the item(s) tested. This repo r t may no t be u sed by the c l i en t to c la im p roduc t endo rsemen t by NV LAP o r any o ther agency o f the U.S . Government .
NVLAP Lab Code: 200794-0 LEGEND NAD=No Asbestos Detected, Lino.=Linoleum, JC=Joint Compound] [
Reviewed By Authorized Signatory:
Bulk Sampling Chain of Custody Form project Name Bldg. 7O2SO ; RK/ilF21LOO\O
Project L<rcation Etdg' 7O25O client Name NaFE
Technician Jason R /ltc,frllister
Laboratory JESC Stop at 1st positive?: y / N Composite Wallsubstrate?: y/ N
'B l3 6ray Base Cove -
Turn Around Time 3 Dau< Method of ,Analysis
Matrix ,9ulk
PLM
lnner - 5E wall lnner - Center
Project Number
Collection Date
WO Number
237t6 5/37/202s cDate:
u /o'o,Received By:
Received By:
Z:5060tv Macrotec
Sample Description (Material Type : Color /Description
Smoobh Lilalls & Ceilings (Drywalt//ilud) _
Room - Fire closet Smooth Ltlalls & Ceilings (Drywail/tt4ud) -
Smooth tlatls & C,eilings (Drywall/l/irud) Outer - Adj. inner doorCoating on Concrebe Nall - South Corner - /f!en,s
Coating on Concrete liall - South Corner - /l/len,s Coating on Concrete k)all th Corner.- lllen,s Coating on Concrete Floor -lnner - Center Coating on Concrete Floor -
Room - Fire closet Concrete Sub Floor -
South Corner - h/omen,, Room - Fire closet
South Corner - //len,s Uindow Putby
South Corner - //len,s lnner - 5E side
South Corner - ,//len,s Outer - 5 corner
Outer - 5 corner Yellow Base Cove lllasbic - South Corncr - ,/l/len,s Outer - 5 corner
Soubh Corner - lliomen,s
Date:
lSample *t H# lCount
I qB/
/ qE2
7 las s
2 lns +
2 las s
2 htu 3 qB7
3 48A
4 qB9
5 AE IO Cerqmic Tile 6rout
6 qE 77
7 48 t2 FRP tllastic -a
9 qB 74
70 qB /5 C/IIU Nall - South Corner - lltJomen,s Room - SLt) wailt7 l,sE /6 C/IIU //lortar -
XRF Data Table
Date Time Component Substrate Color Room Side Result Conc. 3 SD N.Secs
5/31/2023 13:48:49 Wall Drywall White Women's Room A Negative 0 0.4 2
5/31/2023 13:49:22 Wall Drywall White Women's Room B Negative -0.6 0.4 2
5/31/2023 13:49:56 Wall Drywall White Women's Room C Negative 0 0.4 2
5/31/2023 13:50:28 Wall Drywall White Women's Room D Negative 0 0.4 2
5/31/2023 13:50:59 Ceiling Drywall White Women's Room Negative 0 0.4 2
5/31/2023 13:51:41 Floor Concrete Gray Women's Room Negative 0.1 0.4 2
5/31/2023 13:52:29 Door Metal Gray Women's Room B Negative 0.1 0.4 2
5/31/2023 13:53:00 Doorframe Metal Gray Women's Room B Negative 0.1 0.4 2
5/31/2023 13:54:02 Wall Brick White Women's Room B Negative -0.1 0.4 2
5/31/2023 13:55:07 Sink Porcelain White Women's Room A Negative -0.1 0.4 2
5/31/2023 13:55:44 Toilet Porcelain White Women's Room A Negative 0 0.4 2
5/31/2023 13:56:53 Locker Metal Gray Women's Room A Negative 0.1 0.4 2
5/31/2023 13:57:29 Locker Metal Blue Women's Room C Negative 0.1 0.4 2
5/31/2023 13:58:54 Wall Drywall White Men's Room A Negative 0.2 0.4 2
5/31/2023 13:59:40 Wall Drywall White Men's Room B Negative 0.1 0.4 2
5/31/2023 14:00:16 Wall Concrete White Men's Room C Negative 0.1 0.4 2
5/31/2023 14:00:54 Wall Brick White Men's Room D Negative 0.1 0.4 2
5/31/2023 14:01:46 Ceiling Drywall White Men's Room Negative -0.1 0.4 2
5/31/2023 14:02:31 Floor Concrete Gray Men's Room Negative 0 0.4 2
5/31/2023 14:03:14 Door Metal Gray Men's Room D Negative 0 0.4 2
5/31/2023 14:03:46 Doorframe Metal Gray Men's Room D Negative 0 0.4 2
5/31/2023 14:05:01 elec box Metal White Men's Room C Negative -0.2 0.4 2
5/31/2023 14:06:02 Doorframe Metal White Men's Room B Negative 0.4 0.4 2
5/31/2023 14:06:30 Doorframe Metal White Men's Room B Negative 0.4 0.4 2
5/31/2023 14:27:13 Floor Ceramic Tile Blue Men's Room Negative 0 0.4 2
5/31/2023 14:27:37 Floor Ceramic Tile Blue Men's Room Negative 0 0.4 2
5/31/2023 14:28:02 Floor Ceramic Tile Blue Men's Room Negative 0.1 0.4 2
5/31/2023 14:29:31 Calibration Positive 1 0.2 5
5/31/2023 14:30:20 Calibration Positive 1 0.2 5